![Page 1: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/1.jpg)
ASBESTOS AIR MONITORING AND SITE CLOSURE REPORT
Project Neon, Phase I
Package A
1705 Loch Lomond Way 1709 Loch Lomond Way 1717 Loch Lomond Way
322 Wall Street 303 W. Charleston Boulevard 305 W. Charleston Boulevard 307 W. Charleston Boulevard
1209 Charmast Lane 351 Martin Luther King Boulevard
433 & 417 Martin Luther King Boulevard 295 Martin Luther King Boulevard
Las Vegas, Nevada
Prepared for:
Nevada Department of Transportation Environmental Services Division
1263 South Stewart Street, Room 104A Carson City, NV 89712-5229
Converse Project No: 12-43224-01
![Page 2: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/2.jpg)
Converse Consultants Over 60 Years of Dedication in Geotechnical Engineering and Environmental Sciences
731 Pilot Road, Suite H, Las Vegas, Nevada 89801 Telephone: (702) 263-7600 Facsimile: (702) 269-8353 email: [email protected]
December 18, 2013 12-43224-10
Mr. Rob Piekarz State of Nevada Nevada Department of Transportation Environmental Services Division 1263 South Stewart Street, Room 104A Carson City, NV 89712-5229
Subject: Asbestos Air Monitoring and Site Closure Report Project Neon, Package A 1705 Loch Lomond Way, 1709 Loch Lomond Way,
1717 Loch Lomond Way, 322 Wall Street 303 W. Charleston Boulevard, 305 W. Charleston Boulevard 307 W. Charleston Boulevard, 1209 Charmast Lane
351 Martin Luther King Boulevard 433 & 417 Martin Luther King Boulevard 295 Martin Luther King Boulevard Las Vegas, Nevada
Dear Mr. Piekarz:
Converse Consultants (Converse) is pleased to present this report containing documentation of air monitoring and project oversight completed during demolition activities for Project Neon. Services were performed in accordance with the Nevada Department of Transportation Service Agreement P-217-12-013 dated October 5, 2012.
Visual clearance inspections were conducted after abatement activities. All mandatory ACMs, including all associated debris, were removed per specifications. Visual inspection methods were models from ASTM Designation: E1368-90. Perimeter monitoring was conducted during the demolition of structures where Category II non-friable Asbestos Containing Materials (ACMs) including primary roofing materials, roofing mastic, joint compound and flooring mastic were left in place during demolition. Abatement and demolition activities began in July 2013 and were completed in September 2013.
If you have any questions concerning information contained in this report, please contact us at your convenience.
Respectfully submitted, CONVERSE CONSULTANTS Philip Childers, CEM Asbestos and Lead Manager
![Page 3: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/3.jpg)
Asbestos Air Monitoring and Site Closure Report
Contents
Page
1.0 Introduction and Summary ..................................................................................................................... 1
2.0 Purpose and Scope of Work ............................................................................................................... 2
3.0 Methodology ............................................................................................... 2
3.1 Air Sample Collection ............................................................................................................. 2
3.2 Air Sampling Analysis ............................................................................................................. 2
3.3 TCLP Sampling Analysis ........................................................................................................ 2
4.0 Findings ............................................................................................................................................................... 3
5.0 Closure and Limitations .......................................................................................................................... 3
Appendix A – Visual Clearance Letters
Appendix B – Laboratory Results, Air Monitoring During Demolition and Paint
Waste
Appendix C – Field Reports
Appendix D – Abatement Contractor’s Final Submittal
![Page 4: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/4.jpg)
Asbestos Air Monitoring Report 1.0 Introduction and Summary In July 2013, Construction Group International (CGI) began the removal of Regulated Asbestos Containing Material (RACM) materials from the following buildings: 1705 Loch Lomond Way, 1717 Loch Lomond Way, 322 Wall Street, 303 West Charleston Blvd and 307 West Charleston Boulevard. A visual clearance inspection was conducted by Converse after abatement activities were completed in each building; the visual clearance letters are included in Appendix A. As allowed by EPA and Clark County Department of Air Quality (DAQ) regulations, selected Category II non-friable ACM materials were left in place during demolition. In July 2013, Baldwin Development, LLC began the demolition of the structures. Perimeter monitoring was conducted during the demolition on the following buildings: 1717 Loch Lomond Way, 322 Wall Street, 303 W. Charleston, 305 W. Charleston, 307 W. Charleston 417 Martin Luther King Boulevard and 433 Martin Luther King Boulevard. There are no national ambient air quality standards for asbestos. Therefore, Converse compared the results to the OSHA permissible exposure limits (PEL) of 0.1 fibers per cubic centimeter (f/cc). The samples collected were well below the PEL. Lead containing paints on the building exteriors were scraped and stabilized before demolition work began. Toxic Characteristic Leaching Procedure (TCLP) analysis was conducted on the paint waste to determine if it contained a lead content which would characterize it as a hazardous waste. TCLP results reported concentrations of 4.3 mg/l. The hazardous wastes threshold for lead is 5.0 mg/l. Therefore, based upon these results, the lead-based paint is not considered a hazardous waste. Work was completed in September 2013 and was performed in accordance with the Nevada Department of Transportation Service Agreement P-217-12-013 dated October 5, 2012. This report summarizes the results of the asbestos oversight, air monitoring and TCLP analysis conducted by Converse during the building demolition activities. Included in the appendices are the visual clearances, laboratory results for air samples collected during air monitoring, daily logs, and the Abatements Contractors Final Submittal.
![Page 5: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/5.jpg)
Neon, Package A, Final Report For Demolition Oversight
Page 2
2.0 Purpose and Scope of Work The purpose of our work was to 1) conduct visual inspections after abatement activities, 2) monitor the perimeter of the construction site for airborne fiber release during the demolition of structures where non-friable ACM building materials were left in place and 3) supervise the stabilization of lead containing paints before demolition activities occurred. Our scope of work included project oversight, visual inspections, air sample collection, laboratory analyses, and report preparation.
3.0 Methodology
3.1 Air Sample Collection The perimeter air monitoring was conducted using high volume pumps. Calibration of the pumps was conducted using a calibrated secondary calibrator (i.e., Rotometer). The sampling media (cassettes) consisted of 25-millimeter (mm) diameter mixed cellulose ester filters (MCEF) with a 0.8-micron pore size. All pumps were calibrated with in-line cassettes on-site. Airflow rates between 2.5 and 10 liters per minute were used during demolition monitoring. Samples were transferred to an analytical laboratory with appropriate chain-of-custody documentation.
3.2 Air Sample Analysis Samples were analyzed by Forensic Analytical Laboratories (FAL) of Las Vegas, Nevada and Converse Consultants (Converse) of Reno, Nevada by Phase Contrast Microscopy (PCM) using National Institute of Occupational Safety and Health (NIOSH) Method Number 7400. FAL and Converse are accredited under the American Industrial Hygiene Association (AIHA) Industrial Hygiene Laboratory Accreditation Program (IHLAP) for PCM airborne asbestos analysis. Laboratory reports are included in Appendix B.
3.3 TCLP Analysis One composite sample of dry paint waste was taken from a 55 gal drum which was temporarily located at 433 Martin Luther King Boulevard. The paint was generated during paint stabilization activities which were conducted by CGI.
![Page 6: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/6.jpg)
Neon, Package A, Final Report For Demolition Oversight
Page 3
The sample was analyzed for waste characterization purposes by the TCLP EPA method 1311/7420. The laboratory report is included in Appendix B.
4.0 Findings Air samples were taken regularly during demolition activities. There are no national ambient air quality standards for asbestos. Therefore, Converse compared the results to the OSHA permissible exposure limits (PEL) of 0.1 fibers per cubic centimeter (f/cc). The samples collected were well below the PEL. TCLP analysis was conducted on the lead waste generated during the stabilization process. Laboratory analysis reported concentrations of 4.3 mg/l. The hazardous wastes threshold for lead is 5.0 mg/l. Therefore, based upon these results, the lead-based paint is not considered a hazardous waste.
5.0 Closure and Limitations This report is for the use of the Nevada Department of Transportation as it applies to the Project Neon demolition project. Converse is not responsible for any claims or damages associated with interpretation of available information. This report should not be regarded as a guarantee that future exposure to airborne asbestos fibers will not occur.
![Page 7: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/7.jpg)
Neon, Package A, Final Report For Demolition Oversight
Page 4
We thank you for the opportunity to be of service. If you have any questions regarding this correspondence or the enclosed information, please contact us at your convenience. Respectfully submitted, CONVERSE CONSULTANTS Philip S. Childers Asbestos and Lead Program Manager Certified Environmental Manager No. 1952 Nevada Asbestos Abatement Consultant License No. IM 1692 Certified EPA Lead Inspector and Risk Assessor No. NV-R-128380-1
![Page 8: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/8.jpg)
Appendix A
Visual Clearance Letters
![Page 9: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/9.jpg)
![Page 10: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/10.jpg)
![Page 11: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/11.jpg)
![Page 12: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/12.jpg)
![Page 13: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/13.jpg)
![Page 14: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/14.jpg)
![Page 15: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/15.jpg)
![Page 16: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/16.jpg)
![Page 17: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/17.jpg)
![Page 18: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/18.jpg)
![Page 19: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/19.jpg)
![Page 20: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/20.jpg)
![Page 21: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/21.jpg)
![Page 22: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/22.jpg)
![Page 23: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/23.jpg)
![Page 24: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/24.jpg)
![Page 25: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/25.jpg)
![Page 26: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/26.jpg)
![Page 27: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/27.jpg)
![Page 28: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/28.jpg)
![Page 29: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/29.jpg)
Appendix B
Laboratory Results
![Page 30: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/30.jpg)
![Page 31: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/31.jpg)
![Page 32: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/32.jpg)
![Page 33: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/33.jpg)
![Page 34: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/34.jpg)
![Page 35: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/35.jpg)
![Page 36: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/36.jpg)
![Page 37: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/37.jpg)
![Page 38: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/38.jpg)
![Page 39: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/39.jpg)
![Page 40: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/40.jpg)
![Page 41: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/41.jpg)
![Page 42: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/42.jpg)
![Page 43: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/43.jpg)
Appendix C
Field Reports
![Page 44: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/44.jpg)
![Page 45: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/45.jpg)
![Page 46: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/46.jpg)
![Page 47: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/47.jpg)
![Page 48: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/48.jpg)
![Page 49: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/49.jpg)
![Page 50: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/50.jpg)
![Page 51: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/51.jpg)
![Page 52: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/52.jpg)
![Page 53: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/53.jpg)
![Page 54: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/54.jpg)
![Page 55: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/55.jpg)
![Page 56: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/56.jpg)
![Page 57: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/57.jpg)
Abatement Contractor’s Final Submittal
![Page 58: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/58.jpg)
![Page 59: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/59.jpg)
![Page 60: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/60.jpg)
![Page 61: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/61.jpg)
![Page 62: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/62.jpg)
![Page 63: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/63.jpg)
![Page 64: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/64.jpg)
![Page 65: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/65.jpg)
![Page 66: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/66.jpg)
![Page 67: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/67.jpg)
![Page 68: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/68.jpg)
![Page 69: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/69.jpg)
![Page 70: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/70.jpg)
![Page 71: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/71.jpg)
![Page 72: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/72.jpg)
![Page 73: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/73.jpg)
![Page 74: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/74.jpg)
![Page 75: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/75.jpg)
![Page 76: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/76.jpg)
![Page 77: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/77.jpg)
![Page 78: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/78.jpg)
![Page 79: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/79.jpg)
![Page 80: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/80.jpg)
![Page 81: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/81.jpg)
![Page 82: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/82.jpg)
![Page 83: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/83.jpg)
![Page 84: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/84.jpg)
![Page 85: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/85.jpg)
![Page 86: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/86.jpg)
![Page 87: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/87.jpg)
![Page 88: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/88.jpg)
![Page 89: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/89.jpg)
![Page 90: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/90.jpg)
![Page 91: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/91.jpg)
![Page 92: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/92.jpg)
![Page 93: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/93.jpg)
![Page 94: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/94.jpg)
![Page 95: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/95.jpg)
![Page 96: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/96.jpg)
![Page 97: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/97.jpg)
![Page 98: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/98.jpg)
![Page 99: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/99.jpg)
![Page 100: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/100.jpg)
![Page 101: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/101.jpg)
![Page 102: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/102.jpg)
![Page 103: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/103.jpg)
![Page 104: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/104.jpg)
![Page 105: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/105.jpg)
![Page 106: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/106.jpg)
![Page 107: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/107.jpg)
![Page 108: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/108.jpg)
![Page 109: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/109.jpg)
![Page 110: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/110.jpg)
![Page 111: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/111.jpg)
![Page 112: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/112.jpg)
![Page 113: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/113.jpg)
![Page 114: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/114.jpg)
![Page 115: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/115.jpg)
![Page 116: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/116.jpg)
![Page 117: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/117.jpg)
![Page 118: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/118.jpg)
![Page 119: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/119.jpg)
![Page 120: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/120.jpg)
![Page 121: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/121.jpg)
![Page 122: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/122.jpg)
![Page 123: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/123.jpg)
![Page 124: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/124.jpg)
![Page 125: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/125.jpg)
![Page 126: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/126.jpg)
![Page 127: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/127.jpg)
![Page 128: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/128.jpg)
![Page 129: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/129.jpg)
![Page 130: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/130.jpg)
![Page 131: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/131.jpg)
![Page 132: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/132.jpg)
![Page 133: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/133.jpg)
![Page 134: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/134.jpg)
![Page 135: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/135.jpg)
![Page 136: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/136.jpg)
![Page 137: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/137.jpg)
![Page 138: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/138.jpg)
![Page 139: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/139.jpg)
![Page 140: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/140.jpg)
![Page 141: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/141.jpg)
![Page 142: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/142.jpg)
![Page 143: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/143.jpg)
![Page 144: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/144.jpg)
![Page 145: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/145.jpg)
![Page 146: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/146.jpg)
![Page 147: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/147.jpg)
![Page 148: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/148.jpg)
![Page 149: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/149.jpg)
![Page 150: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/150.jpg)
![Page 151: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/151.jpg)
![Page 152: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/152.jpg)
![Page 153: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/153.jpg)
![Page 154: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/154.jpg)
![Page 155: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/155.jpg)
![Page 156: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/156.jpg)
![Page 157: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/157.jpg)
![Page 158: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/158.jpg)
![Page 159: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/159.jpg)
![Page 160: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/160.jpg)
![Page 161: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/161.jpg)
![Page 162: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/162.jpg)
![Page 163: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/163.jpg)
![Page 164: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/164.jpg)
![Page 165: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/165.jpg)
![Page 166: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/166.jpg)
![Page 167: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/167.jpg)
![Page 168: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/168.jpg)
![Page 169: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/169.jpg)
![Page 170: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/170.jpg)
![Page 171: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/171.jpg)
![Page 172: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/172.jpg)
![Page 173: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/173.jpg)
![Page 174: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/174.jpg)
![Page 175: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/175.jpg)
![Page 176: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/176.jpg)
![Page 177: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/177.jpg)
![Page 178: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/178.jpg)
![Page 179: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/179.jpg)
![Page 180: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/180.jpg)
![Page 181: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/181.jpg)
![Page 182: ASBESTOS AIR MONITORING AND SITE CLOSURE REPORTndotprojectneon.com/Archives/reference_information... · paints before demolition activities occurred. Our scope of work included project](https://reader030.vdocuments.net/reader030/viewer/2022040605/5ea9627565d2793c474c7291/html5/thumbnails/182.jpg)