Ashish Kalra H.No:- 370/4, Ward No. 4, Mehrauli, New Delhi-110030 INDIA Congo: +242-065097805 India: +91-9910540726, 9312115323 E-mail: [email protected], [email protected] CAREER OBJECIVE To pursue a challenging career in the field of material management , in an organization, which gives a significant exposure and an opportunity to learn, grow and prove my ability, where competence is valued and there I can make a meaningful contribution to the growth of the company. MY STRENGHT / SKILL I am having 9 years of experience in the field of “Oil & Gas Construction in Warehouse, Piping”, Data Base Management, Good communication skills, extrovert, honest, integrity, sincerity, couple and my commitment towards work from any basic strength dedication towards my work and capable of understanding any Computer work and Engineering Drawings. PROFESSIONAL\ACADEMIC QUALIFICATION Qualificati on BOARD/UNIVERSITY Division MBA(HR) Annamalai University On Going BA(HR) Annamalai University 1 st Division NDT Level- II ASNT Pass Diploma Diploma Holder of Computer Application From Starlight Institute 1 st Division 12th CBSE.Board, DELHI 1 ST Division 10th CBSE.Board, DELHI 1 ST Division Ashish Kalra \ [email protected] \+242-065097805 \+91-9910540726 \+91-9582955796 \ +91-9312115323 Page 1

Upload: ashish-kalra

Post on 17-Feb-2017

93 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ashish kalra CV_Congo

Ashish KalraH.No:- 370/4, Ward No. 4,Mehrauli, New Delhi-110030INDIACongo: +242-065097805India: +91-9910540726, 9312115323E-mail: [email protected], [email protected]

CAREER OBJECIVE

To pursue a challenging career in the field of material management , in an organization, which gives a significant exposure and an opportunity to learn, grow and prove my ability, where competence is valued and there I can make a meaningful contribution to the growth of the company.

MY STRENGHT / SKILL

I am having 9 years of experience in the field of “Oil & Gas Construction in Warehouse, Piping”, Data Base Management, Good communication skills, extrovert, honest, integrity, sincerity, couple and my commitment towards work from any basic strength dedication towards my work and capable of understanding any Computer work and Engineering Drawings.

PROFESSIONAL\ACADEMIC QUALIFICATION

Qualification BOARD/UNIVERSITY DivisionMBA(HR) Annamalai University On Going

BA(HR) Annamalai University 1st Division

NDT Level-II ASNT Pass

Diploma Diploma Holder of Computer Application From Starlight Institute

1st Division

12th CBSE.Board, DELHI 1ST Division10th CBSE.Board, DELHI 1ST Division

WORK EXPERIENCE –

a) Saipem Eni Congo, Pointe Noire, Republic of Congo, Africa

b) Abu Dhabi Gas Development Company Ltd, Shah Arab Field, Abu Dhabi, UAE

c) Petroleum Devlopment of Oman, Ruwi City, Sultanate of Oman

d) Ras Gas Company Ltd, Ras Laffan Industrial City, State of Qatar

e) Grass International Company, Narayana, India

f) Happy Hour Overseas Company Ltd., Delhi State, India

Ashish Kalra \ [email protected] \+242-065097805 \+91-9910540726 \+91-9582955796 \+91-9312115323

Page 1

Page 2: Ashish kalra CV_Congo

Boscongo (Saipem)Project – Litchendjili Onshore Plant Project WP5Period – 01st Oct 2015 to Till Date

Position – Warehouse SupervisorDepartment – MaterialOwner – Eni CongoMain contractor– SAIPEM SpA

Responsibilities –

Plan, organize, supervise and participate in daily warehouse operation and activities, including the receipt, documentation, storage, safety and distribution of equipment and supplies and maintenance of inventory.Receive, unpack, pack, load, issue, store and deliver materials, textbooks, supplies or equipment; complete packing slips for shipments as assigned.Inventory ControlManagement of third part offsite storage.Monitor automated warehousing system; operate a computer to enter data, correct errors and control key screens as required.Coordinating with logistic department and site management.Observe health and safety regulations; maintain warehouse in a clean, safe and orderly condition.Working closely with the Purchasing department to ensure adequate stock levels.To ensure effective, safe, accurate and timely stock management to include space allocation, stock transfer and dealing with non-confirming product.Any other reasonable duties which may be required by management from time to time.

Boscongo (Saipem)Project – Litchendjili Onshore Plant Project WP5Period – 01st Aug 2014 to Till Date

Position – Quality Officer (PTS Coordinator)Department – QA/QCOwner – Eni CongoMain contractor– SAIPEM SpA

Responsibilities –

All types of Piping reports using (PTS-Piping Tracking System) All types of Piping reports using (STS-Spool Tracking System) Daily Monitoring of Construction Progress & Reporting to Top Management & Site Management. Maintaining the documents in PTS (Piping Tracking System) Package for Piping Details.Handling the Vendor Package Piping DetailsAll types of NDT Piping reports.Daily Monitoring of RT Progress & Reporting to Site Management. Maintaining the all records of RT films.Maintaining Day to Day basics Manpower and Man-hours details.Maintaining QA/QC Documents and Update Reports for RT/MT/PT Etc.Maintaining all records of Welder Performance Qualification and WPS Records.

Ashish Kalra \ [email protected] \+242-065097805 \+91-9910540726 \+91-9582955796 \+91-9312115323

Page 2

Page 3: Ashish kalra CV_Congo

Dodsal Engineering & Construction Pte LtdProject – Shah Gas Development Project EPC 2 & 3Period – 26th Dec 2011 to 31th May 2014Position – Planning Asst. (PTS Coordinator)Dept – Planning / QC (Working As a PTS Coordinator)Owner – Abu Dhabi Gas Development Company LtdMain contractor– SAIPEM SpA

Responsibilities –

All types of Piping reports using (PTS-Piping Tracking System) [Saipem]. All types of Piping reports using (STS-Spool Tracking System) [Saipem]. Daily Monitoring of Construction Progress & Reporting to Top Management & Site Management. Maintaining the documents in PTS (Piping Tracking System) Package for Piping Details.Handling the Vendor Package Piping Details.Complete the Site Engineers Requirements for Piping Details. Daily Progress review Meeting with management for piping. Preparation of various reports as per Site Management requirement -related to Piping.Preparing MIS Report to HO & client. All types of NDT Piping reports.Daily Monitoring of RT Progress & Reporting to Site Management. Maintaining the all records of RT films.Maintaining Day to Day basics Manpower and Man-hours details.Maintaining QA/QC Documents and Update Reports for RT/MT/PT Etc.Maintaining all records of Welder Performance Qualification and WPS Records.

Dodsal Engineering & Construction LLC, (EPC Contractor)Project – Qarn-Alam Steam ProjectPeriod – 29th Dec 2009 to 25th Dec 2011

Position – Asst. Presentation (ICMS)Dept – Planning / EngineeringOwner – Petroleum Development of OmanMain contractor– Dodsal, (EPC Contractor)

Responsibilities –

All types of Piping reports using (ICMS-Integrated Construction Management System) Ms-Access Database. Daily Monitoring of Construction Progress & Reporting to Top Management & Site Management. Maintaining the documents in ICMS (Integrated Construction Management System) Package for Piping Details.Handling the Vendor Package Piping Details.Update the Drawing Spoolgen Complete in ICMS and then Issue to QC then after DCC.Complete the Site Engineers Requirements for Piping Details. Daily Progress review Meeting with management for piping. Preparation of various reports as per Site Management requirement -related to Piping. Preparing MIS Report to HO & client.

Ashish Kalra \ [email protected] \+242-065097805 \+91-9910540726 \+91-9582955796 \+91-9312115323

Page 3

Page 4: Ashish kalra CV_Congo

Preparation of various ITR-A/B/C/D & Punch point Reports (Internal, Client), Using WinPcs Data Base.

Dodsal Engineering & Construction Pte LtdProject – Ras Gas Onshore Expansion Project, Phase 2 (RGX 2) & Alkhaleej Gas Project, Phase 2 (AKG 2)Period – 29th July 2007 to 28th Dec 2009 Position – Asst. Presentation Dept – PlanningClient – Ras Laffan Liquefied Natural Gas Company Limited (3)Main contractor– Chiyoda Technip Joint Venture (CTJV)

Brief description of the project : Ras Gas Onshore Expansion Project, Phase 2 (RGX 2) & Alkhaleej Gas Project, Phase 2 (AKG 2)

Scope of Works:

Civil and Electromechanical works for Utilities, Common facilities, Off-sites, and Off-plots areas for Train 6 and Train 7 facilities.LNG Train 6 & 7 each having capacity of 7.5 MTPA

Responsibilities –

All types of Piping reports using (ICMS-Integrated Construction Management System) Ms-Access Database. Daily Monitoring of Construction Progress & Reporting to HO Management & Site Management. Updating Daily Manpower and Man hours ReportsMaintaining the documents in ICMS (Integrated Construction Management System) Package for Piping Details.Handling the Vendor Package Piping Details.Complete the Site Engineers Requirements for Piping Details.Preparation Daily and Weekly Progress Report for Client & Contractor.Daily Progress review Meeting with management for piping. Preparing Spools Movement Report. Preparing MIS Report to HO & client. Preparation of various reports as per requirement of client and Site Management-related to Piping.Preparation of various punch point Reports (Internal, Contractor, Client), Using WinPcs Data Base.

Grass International (Button Exports)Period – 5th May 2007 to 25 Th July 2007

Position – Marketing Asst. Dept – Sales

Responsibilities –

Monitoring all incoming and outgoing material and generating the required reports using Ms-Access Database. Monitoring the Stock availability in the company.Monitoring the proper supply of goods to the client.

Ashish Kalra \ [email protected] \+242-065097805 \+91-9910540726 \+91-9582955796 \+91-9312115323

Page 4

Page 5: Ashish kalra CV_Congo

Chat with our clients to discuss the rates of buttons, and solved there problems.Preparing the material Invoice and LPO.

Happy Hour Overseas (Export House)Period – 15th Oct 2006 to 20 Th April 2007

Position – Accounts Co-OrdinateDept – Accounts

Responsibilities –

Maintaining all incoming and outgoing bills of the materialsCompany provides the customers support.I am also support to our accounts department for staff and workers salary Propose.Also maintaining the important documents and filling them.

CAREER SUMMERY:-

Presently I am working in a Multi International Construction Company “Boscongo (Saipem Eni)” at Litchendjili Onshore Plant Project WP5, Pointe Noire, Republic of Congo. Project as a "QC Officer (PTS Coordinator)".

Company mainly constructed cross-country Pipeline in Oil & Gas sector, Petrochemicals, Refinery and other process plant.

PROJECT UNDERTAKEN:-

Good knowledge of PC especially in MS-Office, MS Excel, MS Excess, Power Point presentation AndICMS (Integrated Construction Management System) in MS Excess Data Base for Piping Details, PTS (Piping Tracking System) & WinPcs Data Base for ITR-A/B/C/D and Punch Points detail for various disciplines.

MILESTONE:-

Safety Team Member – 3 Million Man-hours without LTI – Litchendjili Onshore Plant Project WP5-Congo.Safety Team Member – 75 Million Man-hours without LTI – Shah Gas Project (Only Dodsal) in UAE.Safety Team Member – 1 Year Complete without LTI – Qarn Alan Steam Project (Only Dodsal) in Oman.Safety Team Member – 28 Million Man-hours without LTI – Ras Gas Ex-2 Project (Only Dodsal) in Qatar.

SPECIAL AWARDS:-

Fire Safety Awareness & Fire Warden at Ras Gas Project in Qatar. B-Safe at Ras Gas Observer at Ras Gas Project in Qatar. Fire Safety Awareness & Fire Warden at Qarn-Alan Steam Project in Oman.

Abbreviation And Acronyms used in the text

Ashish Kalra \ [email protected] \+242-065097805 \+91-9910540726 \+91-9582955796 \+91-9312115323

Page 5

Page 6: Ashish kalra CV_Congo

ICMS: Integrated Construction Management System – It’s a computer application (MS-Excess) used for data storage of piping, welding, traceability, inspection, testing, material, processing and management of piping fabrication and Erection work records.

PTS: Piping Tracking System - It’s a computer application used for data storage of piping, welding, traceability, inspection, testing, processing and management of piping fabrication and Erection work records.

PCOS: Project Completion System – It’s a computer software for project Completion database. SPOOLGEN: Spool Generation – Another Company owned computer application operated by

Engineering team for spooling plant piping system. RFI: Request For Inspection - Procedure and relevant form for notifying the involved parties of

any scheduled inspection and test in accordance with the applicable ITP (Inspection and Test Plan). LPO: Local Purchase Orders.

PERSONAL DETAILS

Father's Name : Mr. Inderpal KalraDate of Birth : 06 April, 1988Permanent Address : 370/4 Ward No 4, Mehrauli,

New Delhi – 110030.Contact No. : +242-065097805 (Congo-Africa), +91-9312115323,+91-9910540726 (India)Nationality : IndianHobbies : Painting, Dancing & Listening Music.Blood Group : O+

Marital Status : SingleLanguages Known : English, Hindi and Punjabi.

PASSPORT DETAILS

Passport No : F8557594Place of Issue : DELHI (INDIA)Date of Expiry : 27-06-2016

Time required joining : Minimum one month from the day of confirmation. I can get release.

Ashish Kalra \ [email protected] \+242-065097805 \+91-9910540726 \+91-9582955796 \+91-9312115323

Page 6

Page 7: Ashish kalra CV_Congo

PLACE: (Ashish Kalra)

Ashish Kalra \ [email protected] \+242-065097805 \+91-9910540726 \+91-9582955796 \+91-9312115323

Page 7