Solar Park:

Utility Scale Solar Power ProjectDevelopment

A S M Alamgir KabirChairman, BPDB

20 September, 2011

Page 2: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 2/34

2

Bangladesh’s Power Sector: At a Glance(FY 2010)

Electricity Growth : 10 % in FY-2010 (Av. 7 % since 1990)

Generation Capacity : 6984 MW(16 August, 2011)

Total Consumers : 12.5 Million

Transmission Lines : 8,600 km Distribution Lines : 2,75,000 km

Per Capita Generation : 251 kWh (incl. Captive)

Access to Electricity : 50 %

Page 3: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 3/34

3

Demand Supply Situation

Generation on Jan 6, 2009: 3268 MW(Capacity- 4931 MW)

Generation: 5000 –5300 MW(Capacity- 6984 MW)

Highest so far: 5244 MW( August 29, 2011)

Gas shortage causes 400 - 600 MWless Power Generation

Peak Demand: 6000 MW(with DSM)

Load shedding up to800 MWduring hot summer days (with DSM)

Shortage and unreliable power supply has constrainedeconomic growth

Page 4: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 4/34

44444

Power Generation Projects up to 2016Calendar Year Wise Projects Completion (From 2010 to 2016)

YEAR

2010

(MW)Commissioned

2011(MW)

2012(MW)

2013(MW)

2014(MW)

2015(MW)

2016(MW)

TOTAL(MW)

Public 2 5 5 1 1 0 7 5 8 2 1 0 4 0 1 2 7 0 4 5 0 1 5 0 0   6 2 0 4  

Private2 7 0 1 0 5 1 3 1 9 1 1 3 4 1 0 5 3 1 9 0 0 1 3 0 0   7 0 8 1

QuickRental 2 5 0 1 2 3 8   1 4 8 8  

Total 775 2450 1901 2174 2323 2350 2800 14,773

Public Sector : 6204 MW (comm: 360 MW, u/c: 1629 MW, Tender: 1425 MW); (42%)

Private Sector : 8569 MW (comm:1463 MW, u/c: 1667 MW, Tender: 2639 MW); (58%)

January, 2011

Page 5: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 5/34

55555

Gen Addition Jan 09 – Dec 09 : 356 MW

Gen Addition Jan 10 – Dec 10 : 775 MW

Gen Addition Jan 11 – Aug 11 : 1048 MW

Total Gen. Addition (Jan 09 – Aug 11): 2179 MW

Power Generation Addition From Jan 09 to Aug. 11

Page 6: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 6/34

6

Successful Contract Signed since Jan 2009

Sl.

No.

Descript

ion

No. of 

Contract

No. of 

Plant

Capacity

(MW)

Commis

. (MW)

01. PrivateSector

25 27 3020 1353

02. PublicSector

17 17 1734 105

Total 42 44 4754 1458

• Out of 4754 MW, 1458 MW (18 Plants) already commissioned.• 26 Projects with capacity 3296 MW under construction.

Page 7: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 7/34

7

Projects Under Tendering Process: Contract within Next 6Months

Sl.

No Description No. of  Projects Capacity(MW)

01. Public Sector 5 1425

02. Private Sector(IPP’s)

23 2639

Total 28 4064

Page 8: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 8/34

8

Renewable Energy Policy envisions 5% of total power,i.e. at least 800 MW from renewable sources by 2015.

Solar energy is the most proven source till date

Private sector is the engine of growth in power sector development of Bangladesh

Solar Park is the concept through which utility scale

solar power project is to be developed through privatesector 

Renewable Energy Development in Bangladesh

Page 9: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 9/34

9

Policy, Incentives and Security

Mechanism for Investment inPrivate Power Projects

Page 10: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 10/34

10

Private Sector Power Generation Policy

Tariff based bidding

Sovereign guarantee from the Government for 

obligations of Government entities through

Implementation Agreement (IA)

Assistance in getting clearances from various agencies

Attractive incentive packages

Page 11: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 11/34

11

Exemption from corporate income tax for a period of 10years.

Plant and equipment (full value) and spare parts (10% of original plant cost) without payment of customs duties, VATand any other surcharges.

Repatriation of equity along with dividends.

Cont…

Major Incentives for IPPs

Page 12: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 12/34

12

Major Incentives for IPPs……..contd.

Tax exemption and repatriation facilities on royalties,technical know– how and technical assistance fees

Avoidance of double taxation on the basis of bilateral

agreements

The Bangladeshi currency, Taka is freely convertible for 

FDI

Duty Exemption for Solar Panel

Page 13: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 13/34

13

Payment Guarantee

Implementation Agreement (IA) and PPA will ensure fair andreasonable risk allocation, and payment by the Purchaser is

guaranteed by GOB

Payments under the PPA will continue in the event of 

dispatch failure

Payment under the PPA will be ensured by Letter of Credit

Payment to ‘ Escrow Account’ ensures lenders re - payment

Page 14: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 14/34

14

Why invest in Bangladesh Solar Park ?

Projects will implemented on BOO basis

IPPsare operating about 50 % of total generation and makingprofit;

IPPsand BPDB have met their obligations under the PPA without

problems or controversy and no conflict or major problems/issueshave arisen

Independent Regulation to protect Industry and Consumers’

interests

Local engineers, technician and skill workers are available

Page 15: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 15/34

1515

Solar Park

Solar Park Demonstration Projects will be in non-

agricultural lands

Two types of Land will be used:

- Government owned land- Railway owned Land.

Power generated will be directly fed into the Grid oncommercial basis

Primarily 8 potential sites have been identified

Estimated Development Target: 135 MW

Page 16: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 16/34

16

Solar Park at Govt. Land

Sl. No. Project Location Land available Est. Gen.

Capacity1. Rajabarihat, Rajshahi 52 Acres 15-20 MW

2. PGCB Grid Sub-station

Compound, Ishwardi, Pabna

18 Acres 5-6 MW

3. Rajshahi (Char area at theriver Padma)

500 Acres 150-160 MW

4. Adjacent area near  Bangabandhu Bridge 150 Acres 30-40 MW

TOTAL 200-226 MW

Page 17: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 17/34

1717

Solar Park at Railway Land

Sl. No. Location Land available Est. Gen. Capacity

1. Azampur Railway Station,Dhaka

52 Acres 12-15 MW

2. Halishahar RTA, Chittagong 42 Acres 8-10 MW

3. Pahartoli Railway Station,Chittagong

25 Acres 5-7 MW

4. Kumira Railway Station,Chittagong 30 Acres 6-8 MW

TOTAL 31-40 MW

Page 18: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 18/34

18

Implementation

To be implemented on BOO basis

Contract period shall be 15-20 years

IPP Operator will be selected through Competitive

Bidding Power Purchase Agreement (PPA) between BPDB and

IPP Operator

Land Lease Agreement with IPP Operator

Page 19: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 19/34

1919

BPDB

    T   e   c    h   n    i   c   a    l 

    A   s   s    i   s    t .

    S   e    l   e   c    t

   s

Implementation Model: Government Land

 ADB & other DPs

Solar Park IPP[Equity Participation]

    P    R    G

    P    C    G

BPDB

    G   u   a   r   a   n    t   e   e

    F   e   e

    T   a   r    i    f    f

    1    5    Y   r   s

    P    P    A

Page 20: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 20/34

2020

BPDB

    T   e   c    h   n    i   c   a    l 

    A   s   s    i   s    t .

    S   e    l   e   c    t

   s

Implementation Model: Railway Land

 ADB & other DPs

Solar Park IPP[Equity Participation]

    L   o   w     I   n

    t   e   r   e   s    t    C   r   e    d    i    t

BPDB

    L   o   a   n    R   e   p   a   y   m

   e   n    t

    T   a   r    i    f    f

    1    5    Y   r   s

    P    P    A

RAILWAY

    L   a   n    d    L   e   a   s   e

    F   e   e

    1    5    Y   r   s

    L    L    A

Page 21: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 21/34

21

Summary of Project Financing

Sl.

No.

Types Est.

Capacity(MW)

Est. Invest.

Req.Mil. US$

Est. Loan

Mil. US$

Est. Equity

Mil. US$

1 Solar Park at Govt. Land 115 546 382

(70%)

164

(30%)

2 Solar Park at Railway Land 20 95 66.5

(70%)

28.5

(30%)

Sub-total 135 MW 641 448.5

(70%)

192.5

(30%)

Page 22: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 22/34

22

.

Site Details

Page 23: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 23/34

23

Rajabarihat, Rajshahi

Land available : 52 Acres- .

Land Status:- Land is under Ministry of 

Fisheries and Livestock- Land uncultivated since 1988- Land available in a single plot- High Land and ready to use- Land transfer under process

Page 24: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 24/34

24

PGCB Grid Substation Compound,

Ishwardi, Pabna

Land available :

Spot 1- Near Grid Control Room: 3 acres

Spot 2- North side of Rest House: 3 acres

Spot 3- P lay ground & adjacent area:7 acres

Spot 4- About 5 acres

Total area available: 18 Acres (Approx.)

Page 25: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 25/34

2525

PGCB Grid Substation Compound,

Ishwardi, Pabna Contd.

Page 26: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 26/34

26

PGCB Grid Substation Compound,

Ishwardi, Pabna Contd.

Spot: 1 Spot: 2

Spot: 3 Spot: 4

Page 27: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 27/34

27

Rajshahi

Char area in the river Padma

Prospective Locations:

• Char Mazerdiar: 200 acres (50-60MW)• Char Ashariadah: 300 acres (80-100MW)

- Sub-station and Transmission System is to be

developed- River crossing Pow er evacuation system isnecessary

‘Cha r ’ i s a St r i p o f Sandy Land r i si ng ou t o f a r i ve r bed .

Page 28: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 28/34

28

Chak Asharia

Page 29: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 29/34

29

Char Mazerdiar

Chak Asharia

Page 30: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 30/34

30

Adjacent area near

Bangabandhu Bridge, Sirajgonj

Land available for Solar PV System :

• East Side of Banghabondhu Bridge (Towards North) : about30 acres

- Prospective location for 10 MW• East side of Banghabondhu Bridge (Towards South) : about

10 acres- Prospective location for 3MW

• West Side of Banghabondhu Bridge (Towards North) besidesEcopark : about 50 acres

- Prospective location for 15 MW• Sirajgonj embankment adjacent area (paikpara) : about 20

acres- Prospective location for 7MW

• Area adjacent to NWZPGCL Grid sub-station: 25-30 acres -Prospective location for 10 MW

Total area available: 150 Acres (Approx.)

Page 31: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 31/34

3131

Adjacent area near

Bangabandhu Bridge, Sirajgonj

Page 32: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 32/34

32

East Side

West Side

Paikpara Near NWPGCL

Page 33: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 33/34

33

Expected Intervention from ADB and

other Development Partners

Technical Assistance :- Comprehensive Feasibil ity Study- Project Design- Preparation of Standard Procurement Documents

- Capacity Building

Low Interest Credit Support Partial Risk Guarantee Partial Credit Guarantee

Technical SupportTechnical Support

Financial SupportFinancial Support

Page 34: ASM Alamgir Kabir - Solar Projects in Bangladesh

8/4/2019 ASM Alamgir Kabir - Solar Projects in Bangladesh

http://slidepdf.com/reader/full/asm-alamgir-kabir-solar-projects-in-bangladesh 34/34

34

.

Thank you