asphalt pavement association of west virginia 2018 fall ...asphaltwv.com/portals/19/2018 apa fall...

72
Canaan Valley Conference Center September 29, 2018 CONSTRUCTION UPDATE Asphalt Pavement Association of West Virginia 2018 Fall Conference

Upload: others

Post on 03-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

Canaan Valley Conference Center

September 29, 2018

CONSTRUCTION UPDATE

Asphalt Pavement Association of West Virginia

2018 Fall Conference

Page 2: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS
Page 3: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS
Page 4: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

Fall - 2017

Page 5: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

Spring/Summer - 2018

Page 6: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

Fall - 2018

Page 7: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS
Page 8: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

36,000+ centerline miles

79,000+ lane miles

7,000+ bridges

2% Interstate

5% US Route

10% WV Route

83% County/Local Route

93% of all roadways in WV owned, operated, maintained by WVDOT

6th largest roadway network

mountainous terrain = expensive road construction

least flat state

Page 9: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

36,000+ centerline miles

79,000+ lane miles

7,000+ bridges

2% Interstate

5% US Route

10% WV Route

83% County/Local Route

93% of all roadways in WV owned, operated, maintained by WVDOT

6th largest roadway network

mountainous terrain = expensive road construction

$

Page 10: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

PRESERVATION

Page 11: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS
Page 12: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS
Page 13: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

2019 LETTING SCHEDULE

Baseline

(other dates added as needed)

Page 14: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

BID SUBMISSION

Page 15: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS
Page 16: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

ESTIMATE PAYMENTS

Page 17: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS
Page 18: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

ESTIMATE PAYMENTS

Page 19: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

GENERAL ESTIMATE PAYMENT WORKFLOW – PRIOR TO 10/1/18

Project personnel follow our estimate cutoff schedule which usually occurs every other Friday at Close of Business (COB). By COB of the following Wednesday, the District is required to conduct the following;

1) Generate the estimate for the project

2) Place the estimate into approval phase in Site Manager (SM)

3) Project Supervisor approval of estimate

4) Construction Engineer approval of estimate

5) Office Manager approval of estimate

6) The Office Manager then prints and scans estimate into a program called Application Extender

7) The Office Manager also has to “receipt” amount to be paid in our legacy system called REMIS.

Page 20: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

8) The Estimate then is in Finance Division for scrutiny through at least two separate offices and the office of Business Manager and Budget Division

9) The Estimates when approved from step (8) are interfaced into OASIS (nightly) as a General Accounting Expenditure (GAX) document

10) The GAX document then goes to the West Virginia State Auditor’s Office (WVSAO) for their scrutiny.

11) When WVSAO approves estimate it then goes to WV Treasury to be paid

Page 21: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS Go Live

Step 1) thru Step 5) remain unchanged (District approvals)

Then automated interface to OASIS

Step 8) thru Step 11) similar approval process in OASIS

A few less steps to the process, and hopefully more transparent and efficient

Time will tell…

Page 22: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

Project

Contractor

Page 23: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS
Page 24: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

AWARD STATUS

Page 25: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS
Page 26: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS
Page 27: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

DBE PLAN SUBMISSION

Page 28: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

PREQUALIFICATION LIMITS

Page 29: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

PREQUALIFICATION LIMITS

Page 30: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS
Page 31: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS
Page 32: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS
Page 33: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS
Page 34: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

B D BBILLION DOLLAR BOYD

Page 35: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

CONTRACTOR PREQUALIFICATION REVISIONS

Page 36: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

PREQUAL REVISIONS

Page 37: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

PREQUAL REVISIONS

Page 38: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS
Page 39: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

STAFFING ISSUES

Page 40: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

EXTRA WORK – MARK UP

Page 41: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

TURNPIKE PROJECTS - ADMINISTRATION

?

Page 42: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

STANDARD CONTRACT VS PO CONTRACT

Page 43: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

TRAFFICENGINEERING

R/W

DEPUTY –PROG/PLANNING

STATE HIGHWAY ENGINEER

DEPUTY - OPERATIONSDEPUTY – CONST/DEV

CONTRACT ADMINMCS&T DISTRICTS MAINTENANCE

Page 44: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

STATE HIGHWAY ENGINEER

DEPUTY - OPERATIONSDEPUTY – CONST/DEV

CONTRACT ADMINMCS&T DISTRICTS MAINTENANCE

Page 45: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

STATE HIGHWAY ENGINEER

DEPUTY - OPERATIONSDEPUTY – CONST/DEV

CONTRACT ADMINMCS&TDISTRICT

ENGINEERMAINTENANCE

DISTRICT CONSTRUCTION

DISTRICT MATERIALS

Page 46: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

STATE HIGHWAY ENGINEER

DEPUTY - OPERATIONSDEPUTY – CONST/DEV

CONTRACT ADMINMCS&TDISTRICT

ENGINEERMAINTENANCE

DISTRICT CONSTRUCTION

DISTRICT MATERIALS

Page 47: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

STATE HIGHWAY ENGINEER

DEPUTY - OPERATIONSDEPUTY – CONST/DEV

CONTRACT ADMINMCS&TDISTRICT

ENGINEERMAINTENANCE

DISTRICT CONSTRUCTION

DISTRICT MATERIALS

Standard Contract

Page 48: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

STATE HIGHWAY ENGINEER

DEPUTY - OPERATIONSDEPUTY – CONST/DEV

CONTRACT ADMINMCS&TDISTRICT

ENGINEERMAINTENANCE

DISTRICT CONSTRUCTION

DISTRICT MATERIALS

Standard ContractPO Contract

Page 49: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

STATE HIGHWAY ENGINEER

DEPUTY - OPERATIONSDEPUTY – CONST/DEV

CONTRACT ADMINMCS&TDISTRICT

ENGINEERMAINTENANCE

DISTRICT CONSTRUCTION

DISTRICT MATERIALS

Standard ContractPO Contract

Page 50: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

STATE HIGHWAY ENGINEER

DEPUTY - OPERATIONSDEPUTY – CONST/DEV

CONTRACT ADMINMCS&TDISTRICT

ENGINEERMAINTENANCE

DISTRICT CONSTRUCTION

DISTRICT MATERIALS

Standard ContractPO Contract

CONFLICT RESOLUTION

Page 51: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

C Factor

Page 52: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

QUESTIONS?

Page 53: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

Canaan Valley Conference Center

September 29, 2018

MATERIALS UPDATE

Asphalt Pavement Association of West Virginia

2018 Fall Conference

Independent Assurance (IA)

Page 54: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

WVDOH IA History

1) The IA program pertained exclusively to WVDOH sampling and testing (Acceptance Sample).

2) The IA program incorporated a project approach.

3) Included only projects on the NHS.

4) IA sampling frequency was 10% of Acceptance Samples.

5) IA materials: asphalt, concrete, and aggregate.

Page 55: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

FHWA Process Review

Because contractor samples (Quality Control) are used for acceptance the WVDOH IA program must incorporate Quality Control sampling and testing.

Page 56: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

Proposed IA Changes

1) The IA program will go from a project approach to a system approach.

2) A system approach checks the active material samplers and testers.

3) The frequency is a percent of the total number of material samplers and testers.

4) States typically set a goal of 90% .

5) Tie the technician and inspector certifications into the IA program.

Page 57: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

Asphalt

1) WVDOH performs all acceptance sampling and testing on PWLprojects.

2) Projects on the NHS are predominately PWL projects.

Page 58: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

Concrete

1) Have IA testing dates throughout the year and state.

2) Testing at each District once per year.

3) Slump and air testing.

Page 59: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

Aggregate

1) Perform AASHTOResource (AMRL) aggregate proficiency samples.

2) Gradation/Sieve Analysis.

Page 60: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

Canaan Valley Conference Center

September 29, 2018

PAVEMENTS UPDATE

Asphalt Pavement Association of West Virginia

2018 Fall Conference

Page 61: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

Percent Within Limits

• All NHS Routes

• We have some work to do getting our Designers to make sure that

it’s reasonable. (ie, not 1,100 tons of skip paving)

• Half of the GARVEE projects are using PWL

• Many projects have not been complete to date

• 5 - 2 lane NHS (complete)

• Test Results are promising

Page 62: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

Percent Within Limits – 2-Lane Data

85.8

102

95.9

82.35

99.25

95.4

50

60

70

80

90

100

Sub Lot 1' Sub Lot 2' Sub Lot 3 Sub Lot 4* Sub Lot 5 Sub Lot 6

Average Pay FactorAverage Pay Factor

Average = 93.45%

Page 63: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

Percent Within Limits – 2-Lane Data

85.8

102

95.9

82.35

99.25

95.4

50

60

70

80

90

100

Sub Lot 1' Sub Lot 2' Sub Lot 3 Sub Lot 4* Sub Lot 5 Sub Lot 6

Average Pay Factor Density PWL AC PWL #200 PWL

Average Pay Factor

Page 64: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

Section 720 Specification

• Is the department supposed to be IRI data in all jobs when the

spec applies?

• Yes.

• What happens if the department fails to test the project prior to paving?

Page 65: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

Section 720 Specification

• Does Section 720 apply to Purchase Orders?

• If the PO contract references the 2018 Supplemental Specification

Page 66: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

Friction Research• West Virginia DOH has partnered with the National Center for

Asphalt Technology (NCAT) to test increased percentages of

Dolomitic Limestone in our asphalt mixes. Two sections of the

NCAT track will have mixes from WV with aggregate donated

by our aggregate suppliers. Extensive laboratory testing will

be done with varying percentages as well.

Page 67: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

Update to Soundness Materials Procedure

• MP 703.00.22 was last updated in 1995

• Currently the 2018 update has passed the MP committee and

is awaiting FHWA approval

Page 68: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

Bond Strength Testing

113

153

117

149

104115

0

20

40

60

80

100

120

140

160

2013 2014 2015 2016 2017 2018

Average Bond Strength (psi) • This includes

the zeros in

the average.

• 2018 with out

the zeros

• 160 psi

Page 69: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

Bond Strength Testing

0

10

20

30

40

50

60

70

80

90

100

12 14 7 10 27 14 45 57 61 87 60 7

Nu

mb

er o

f Te

sts

Test per Project

Non-Zeros

Zeros

• 401 Bond Tests

• 122 were Zero

• 30%

• 69 from a

single project

• With out that

project 13%

2018

Page 70: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS

Compaction Testing

• A proposal was made to return to a procedure which

utilizes lot by lot testing with the target density

established from a roller pass procedure. Any thoughts

or updates on this subject and proposal?

• We have reached out to others on this type of procedure.

We’ve not yet compiled the input.

Page 72: Asphalt Pavement Association of West Virginia 2018 Fall ...asphaltwv.com/Portals/19/2018 APA fall paving conference COMBIN… · GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS