asr well systems and factory pump injection testing: is
TRANSCRIPT
![Page 1: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/1.jpg)
1
ASR Well Systems andFactory Pump Injection Testing:
Is This Necessary?Nathan Nutter, P.E.
Carollo Engineers, Phoenix, Arizona, USA
Gary M. Gin, R.G.City of Phoenix
City of Phoenix
![Page 2: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/2.jpg)
2
Vadose ZoneVadose Zone
Injection/StorageDuring
Off-PeakMonths
Injection/StorageDuring
Off-PeakMonths
AquiferAquifer
Aquifer Storage and Recovery (ASR) WellSummary: Dual Purpose Well System
Injection/Storage
![Page 3: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/3.jpg)
3
RecoveryDuringPeak
Months
RecoveryDuringPeak
Months Vadose ZoneVadose Zone
AquiferAquifer
Aquifer Storage and Recovery (ASR) WellSummary: Dual Purpose Well System
Recovery
![Page 4: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/4.jpg)
4
What is a Factory Pump Test?
• Measures PumpPerformance
– Flow vs. Friction Loss Pump Curve
– Flow at Design PressureHead (TDH)
– Pump Efficiency– Motor Horsepower– Shows Limits of
Operational Range andBest Operating Point
Efficiency
Pressure Head (TDH)
Horsepower
![Page 5: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/5.jpg)
5
What is a Factory Injection Test?
• Measures PumpAssembly Losses
– Flow vs. FrictionLoss through BowlAssembly Injection Curve
PressureGauge (P1)
PressureGauge (P2)
![Page 6: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/6.jpg)
6
Why Are Factory Injection Tests Critical forASR Wells?
• Accurately calculate injection hydraulics, ie, injectionrate at various pressures during recharge operation.
• Verify correct size of bowl assembly for injectionhydraulics.
• Advances programming by already knowing howvalve automation will work.
• Provides verification that air entrainment will notoccur during reverse-siphon start up upon first startup.
![Page 7: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/7.jpg)
The Reverse Siphon Concept EliminatesAir Entrainment
To Distribution System
![Page 8: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/8.jpg)
The Reverse Siphon Concept EliminatesAir Entrainment
To Distribution System
![Page 9: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/9.jpg)
9
Case Study – City of Phoenix, Arizona, USACave Creek ASR Well
![Page 10: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/10.jpg)
10
Line-shaft Turbine Pump
- 440ft (135 m) Static Water Level
Filter Pack
Well Statistics• 1,500 gpm Production
(8,200 m3/day)• 1,200 gpm Recharge
(6,500 m3/day)• 500 ft (150 m) TDH
Case Study – Cave Creek ASR Well
![Page 11: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/11.jpg)
11
Injection Testing Took Place at American-Turbine in Lubbock, TX
![Page 12: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/12.jpg)
12
Our Team Identified Three Main Goals forthis Trip
1. Verify production hydraulics of the specified bowlassembly.
2. Verify injection hydraulics of the specified bowlassembly.
3. Test and determine viability of energy recovery byremoving backspin ratchet during injection testing…
….which I will cover if there’s enough time!
![Page 13: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/13.jpg)
13
Our Team Identified Three Main Goals forthis Trip
1. Verify production hydraulics of the specified bowlassembly.
2. Verify injection hydraulics of the specified bowlassembly.
3. Test and determine viability of energy recovery byremoving backspin ratchet during injection testing.
![Page 14: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/14.jpg)
14
Our Team Identified Three Main Goals forthis Trip
1. Verify production hydraulics of the specified bowlassembly.
2. Verify injection hydraulics of the specified bowlassembly.
3. Test and determine viability of energy recovery byremoving backspin ratchet during injection testing.
![Page 15: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/15.jpg)
15
Static Water Level
The Original Bowl Assembly Proved to beOversized for Injection Operation
Injection Rate>Production Rate
180 ft (55 m) Air Gap
![Page 16: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/16.jpg)
16
Line-shaft Turbine Pump
- 440 ft (135 m) StaticWater Level
The Original Bowl Assembly Proved to beOversized for Injection Operation
- 260 ft (80 m) of Bowl Losses @1,200 gpm (6,500 m3/day)
- 180 ft (55 m) Air Gap @1,200 gpm (6,500 m3/day)
![Page 17: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/17.jpg)
17
A New Bowl Assembly Was Selected toMeet Production Requirements
![Page 18: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/18.jpg)
18
Static Water Level
New Bowl Assembly Provided AdequateBackpressure for Recharge Operation
160 ft (50 m) ofAdd’l Pressure
![Page 19: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/19.jpg)
19
0
100
200
300
400
500
600
700
800
0 200 400 600 800 1000 1200 1400 1600 1800 2000
Fric
tion
Loss
(ft)
Flow (gpm)
15" vs 12" Bowl Assembly (Ratchet Engaged)Injection Test
12-inch- 9 Stage 15-inch- 5 stage
Static Water Level
Comparison of Bowl Assemblies ShowsVariations in Injection Rates vs Pressure
![Page 20: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/20.jpg)
20
Three Main Goals for this Trip
1. Verify production hydraulics of the specified bowlassembly.
2. Verify injection hydraulics of the specified bowlassembly.
3. Test and determine viability of energy recovery byremoving backspin ratchet during injection testing.
![Page 21: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/21.jpg)
21
Three Main Goals for this Trip
1. Verify production hydraulics of the specified bowlassembly.
2. Verify injection hydraulics of the specified bowlassembly.
3. Test and determine viability of energy recovery byremoving backspin ratchet during injection testing.
![Page 22: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/22.jpg)
22
The Backspin Ratchet was Removed toDetermine the Efficacy of Energy Recovery
• Removed Ratchet.• Conducted injection bowl performance testing to determine
if flow through bowls was adequate for operation.
![Page 23: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/23.jpg)
23
Static Water Level
The Unratcheted Bowl Assembly Did NotAllow Adequate Flow
Enough Headloss;Adequate Flow
Never ReachesDesired Flow Rate!
![Page 24: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/24.jpg)
24
Static Water Level
The Original Bowl Assembly Would HaveWorked for Energy Recovery
Not EnoughHeadloss
Enough Headloss
![Page 25: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/25.jpg)
25
Does Energy Recovery Make Sense for theCave Creek ASR Well?
• There was too much headloss through the final bowlassembly, and it was determined that water in theground was more important than energy savings thatcould be had.
• Payback was calculated to be between 15-25 years,based on duty cycle of well.
• Running shaft backwards for long periods of time mayadversely affect or shorten the life of the well pump.
![Page 26: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/26.jpg)
26
Three Main Goals for this Trip
1. Verify production hydraulics of the specified bowlassembly.
2. Verify injection hydraulics of the specified bowlassembly.
3. Test and determine viability of energy recovery byremoving backspin ratchet during injection testing.
![Page 27: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/27.jpg)
27
Injection Test Conclusions• Provides great accuracy of injection hydraulics, which gives a high
level of confidence to the client about how their system will work.
• Cost is reasonable ($5,000 - $7,000).
• The manufacturer is already doing the production test, so it’sreasonable to run it the other way.
• Verifies the elimination of air entrainment prior to first injection startup.
• Verifies the correct size of bowl assembly for injection hydraulics.
• Advances programming by already knowing how valve automationwill work.
• Has proven that reverse-siphon is viable for very deep pump settingsand deep water tables.
![Page 28: ASR Well Systems and Factory Pump Injection Testing: Is](https://reader031.vdocuments.net/reader031/viewer/2022012915/61c48c170354f131ca04b983/html5/thumbnails/28.jpg)
28
Contact Information
Nathan Nutter, P.E.Carollo Engineers, Inc.