    System Process DocumentAssigning a Resource to a Standard Operation

    Procedure

    Step Action

    1. Begin by navigating to the Standard Operations page.

    Click the vertical scrollbar.

    Page 2 Last changed on: 1/18/2010 09:39:00 AM

  • 8/14/2019 Assigning a Resource to a Standard Operation_SPD

    3/24

    System Process DocumentAssigning a Resource to a Standard Operation

    Step Action

    2. Click the Manufacturing and Distribution Manager link.

    Last changed on: 1/18/2010 09:39:00 AM Page 3

  • 8/14/2019 Assigning a Resource to a Standard Operation_SPD

    4/24

    System Process DocumentAssigning a Resource to a Standard Operation

    Step Action

    3. Click the vertical scrollbar.

    Step Action

    4. Click the Standard Operations link.

    Page 4 Last changed on: 1/18/2010 09:39:00 AM

  • 8/14/2019 Assigning a Resource to a Standard Operation_SPD

    5/24

    System Process DocumentAssigning a Resource to a Standard Operation

    Step Action

    5. Use the Organizations page to select the Shop Floor enabled organization.

    Last changed on: 1/18/2010 09:39:00 AM Page 5

  • 8/14/2019 Assigning a Resource to a Standard Operation_SPD

    6/24

    System Process DocumentAssigning a Resource to a Standard Operation

    Step Action

    6. Click the M4 Minneapolis Manufacturing list item.

    Step Action

    7. Click the OKbutton.

    orPress [Alt+O].

    Page 6 Last changed on: 1/18/2010 09:39:00 AM

  • 8/14/2019 Assigning a Resource to a Standard Operation_SPD

    7/24

    System Process DocumentAssigning a Resource to a Standard Operation

    Step Action

    8. Use the Standard Operations page to navigate to the Operation Resources page.

    Last changed on: 1/18/2010 09:39:00 AM Page 7

  • 8/14/2019 Assigning a Resource to a Standard Operation_SPD

    8/24

    System Process DocumentAssigning a Resource to a Standard Operation

    Step Action

    9. Click the New button.

    Step Action

    10. Click in the Code field.

    Page 8 Last changed on: 1/18/2010 09:39:00 AM

  • 8/14/2019 Assigning a Resource to a Standard Operation_SPD

    9/24

    System Process DocumentAssigning a Resource to a Standard Operation

    Step Action

    11. Enter the desired information into the Code field. Enter "RF10".

    Last changed on: 1/18/2010 09:39:00 AM Page 9

  • 8/14/2019 Assigning a Resource to a Standard Operation_SPD

    10/24

    System Process DocumentAssigning a Resource to a Standard Operation

    Step Action

    12. Click in the Department field.

    Step Action

    13. Enter the desired information into the Department field. Enter "FAB".

    Page 10 Last changed on: 1/18/2010 09:39:00 AM

  • 8/14/2019 Assigning a Resource to a Standard Operation_SPD

    11/24

    System Process DocumentAssigning a Resource to a Standard Operation

    Step Action

    14. Click the horizontal scrollbar.

    Last changed on: 1/18/2010 09:39:00 AM Page 11

  • 8/14/2019 Assigning a Resource to a Standard Operation_SPD

    12/24

    System Process DocumentAssigning a Resource to a Standard Operation

    Step Action

    15. Click in the Yield field.

    Step Action

    16. Enter the desired information into the Yield field. Enter ".415".

    Page 12 Last changed on: 1/18/2010 09:39:00 AM

  • 8/14/2019 Assigning a Resource to a Standard Operation_SPD

    13/24

    System Process DocumentAssigning a Resource to a Standard Operation

    Step Action

    17. Click the Operation Resources button.

    orPress [Alt+r].

    Last changed on: 1/18/2010 09:39:00 AM Page 13

  • 8/14/2019 Assigning a Resource to a Standard Operation_SPD

    14/24

    System Process DocumentAssigning a Resource to a Standard Operation

    Step Action

    18. Use the Resources page to assign resources to the standard operation.

    Step Action

    19. Click in the Seq field.

    Page 14 Last changed on: 1/18/2010 09:39:00 AM

  • 8/14/2019 Assigning a Resource to a Standard Operation_SPD

    15/24

    System Process DocumentAssigning a Resource to a Standard Operation

    Step Action

    20. Enter the desired information into the Seq field. Enter "10".

    Last changed on: 1/18/2010 09:39:00 AM Page 15

  • 8/14/2019 Assigning a Resource to a Standard Operation_SPD

    16/24

    System Process DocumentAssigning a Resource to a Standard Operation

    Step Action

    21. Click in the Resource field.

    Step Action

    22. Enter the desired information into the Resource field. Enter "FABLABOR".

    Page 16 Last changed on: 1/18/2010 09:39:00 AM

  • 8/14/2019 Assigning a Resource to a Standard Operation_SPD

    17/24

  • 8/14/2019 Assigning a Resource to a Standard Operation_SPD

    18/24

    System Process DocumentAssigning a Resource to a Standard Operation

    Step Action

    24. Enter the desired information into the Inverse field. Enter "12".

    Page 18 Last changed on: 1/18/2010 09:39:00 AM

  • 8/14/2019 Assigning a Resource to a Standard Operation_SPD

    19/24

  • 8/14/2019 Assigning a Resource to a Standard Operation_SPD

    20/24

    System Process DocumentAssigning a Resource to a Standard Operation

    Step Action

    27. Click in the Assigned Units field.

    Page 20 Last changed on: 1/18/2010 09:39:00 AM

  • 8/14/2019 Assigning a Resource to a Standard Operation_SPD

    21/24

    System Process DocumentAssigning a Resource to a Standard Operation

    Step Action

    28. Enter the desired information into the Assigned Units field. Enter "50".

    Step Action

    29. Click the Costing tab.

    Last changed on: 1/18/2010 09:39:00 AM Page 21

  • 8/14/2019 Assigning a Resource to a Standard Operation_SPD

    22/24

    System Process DocumentAssigning a Resource to a Standard Operation

    Step Action

    30. Click in the Activity field.

    Page 22 Last changed on: 1/18/2010 09:39:00 AM

  • 8/14/2019 Assigning a Resource to a Standard Operation_SPD

    23/24

    System Process DocumentAssigning a Resource to a Standard Operation

    Step Action

    31. Enter the desired information into the Activity field. Enter "MfgEng'g".

    Step Action

    32. Click the Save button.

    Last changed on: 1/18/2010 09:39:00 AM Page 23

  • 8/14/2019 Assigning a Resource to a Standard Operation_SPD

    24/24

    System Process DocumentAssigning a Resource to a Standard Operation

    Step Action

    33. You have completed the Assigning a Resource to a Standard Operation procedure.

    End of Procedure.