creating a setup standard operation_spd

Upload: larry-sherrod

Post on 30-May-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/14/2019 Creating a Setup Standard Operation_SPD

    1/19

    System Process DocumentCreating a Setup Standard Operation

    Department

    Responsibility/Role

    File Name 27760445.docRevision

    Document Generation Date 18/01/2010 09:39:00

    Date Modified 1/18/2010 09:39:00 AM

    Last Changed by

    Status

    Creating a Setup Standard Operation

    Trigger:

    Concept

    You can create a setup standard operation only when specifying the standard operation used

    during a changeover in the Changeover Times page. You cannot use a setup standard operation

    as a routing operation.

    You can create a setup standard operation the same way you create a standard operation but using

    the Setup Standard Operations page.

    In this topic, you will create a setup standard operation and add resources to that operation.

    Required Field(s) Comments

    Output - Result(s) Comments

    Additional Information

    Last changed on: 1/18/2010 09:39:00 AM Page 1

  • 8/14/2019 Creating a Setup Standard Operation_SPD

    2/19

    System Process DocumentCreating a Setup Standard Operation

    Procedure

    Step Action

    1. Begin by navigating to the Setup Standard Operations page.

    Click the vertical scrollbar.

    Page 2 Last changed on: 1/18/2010 09:39:00 AM

  • 8/14/2019 Creating a Setup Standard Operation_SPD

    3/19

    System Process DocumentCreating a Setup Standard Operation

    Step Action

    2. Click the Manufacturing and Distribution Manager link.

    Last changed on: 1/18/2010 09:39:00 AM Page 3

  • 8/14/2019 Creating a Setup Standard Operation_SPD

    4/19

    System Process DocumentCreating a Setup Standard Operation

    Step Action

    3. Click the vertical scrollbar.

    Step Action

    4. Click the Setup Standard Operations link.

    Page 4 Last changed on: 1/18/2010 09:39:00 AM

  • 8/14/2019 Creating a Setup Standard Operation_SPD

    5/19

    System Process DocumentCreating a Setup Standard Operation

    Step Action

    5. Use the Organizations page to select your organization.

    Last changed on: 1/18/2010 09:39:00 AM Page 5

  • 8/14/2019 Creating a Setup Standard Operation_SPD

    6/19

    System Process DocumentCreating a Setup Standard Operation

    Step Action

    6. Click the M1 Seattle Manufacturing list item.

    Step Action

    7. Click the OKbutton.

    orPress [Alt+O].

    Page 6 Last changed on: 1/18/2010 09:39:00 AM

  • 8/14/2019 Creating a Setup Standard Operation_SPD

    7/19

    System Process DocumentCreating a Setup Standard Operation

    Step Action

    8. Use the Setup Standard Operations page to set up standard operation only when

    specifying the standard operation used during a changeover in the Changeover

    Times page.

    Last changed on: 1/18/2010 09:39:00 AM Page 7

  • 8/14/2019 Creating a Setup Standard Operation_SPD

    8/19

    System Process DocumentCreating a Setup Standard Operation

    Step Action

    9. Click in the Code field.

    Step Action

    10. Enter the desired information into the Code field. Enter "AS10".

    Page 8 Last changed on: 1/18/2010 09:39:00 AM

  • 8/14/2019 Creating a Setup Standard Operation_SPD

    9/19

  • 8/14/2019 Creating a Setup Standard Operation_SPD

    10/19

    System Process DocumentCreating a Setup Standard Operation

    Step Action

    12. Enter the desired information into the Department field. Enter "ASSEMBLY".

    Step Action

    13. Click the horizontal scrollbar.

    Page 10 Last changed on: 1/18/2010 09:39:00 AM

  • 8/14/2019 Creating a Setup Standard Operation_SPD

    11/19

    System Process DocumentCreating a Setup Standard Operation

    Step Action

    14. Click in the Yield field.

    Last changed on: 1/18/2010 09:39:00 AM Page 11

  • 8/14/2019 Creating a Setup Standard Operation_SPD

    12/19

    System Process DocumentCreating a Setup Standard Operation

    Step Action

    15. Enter the desired information into the Yield field. Enter "0.415".

    Step Action

    16. Click the Operation Resources button.

    Page 12 Last changed on: 1/18/2010 09:39:00 AM

  • 8/14/2019 Creating a Setup Standard Operation_SPD

    13/19

    System Process DocumentCreating a Setup Standard Operation

    Step Action

    17. Use the Resources page to enter operation resources for the department.

    Last changed on: 1/18/2010 09:39:00 AM Page 13

  • 8/14/2019 Creating a Setup Standard Operation_SPD

    14/19

    System Process DocumentCreating a Setup Standard Operation

    Step Action

    18. Click in the Seq field.

    Step Action

    19. Enter the desired information into the Seq field. Enter "10".

    Page 14 Last changed on: 1/18/2010 09:39:00 AM

  • 8/14/2019 Creating a Setup Standard Operation_SPD

    15/19

    System Process DocumentCreating a Setup Standard Operation

    Step Action

    20. Click in the Resource field.

    Last changed on: 1/18/2010 09:39:00 AM Page 15

  • 8/14/2019 Creating a Setup Standard Operation_SPD

    16/19

    System Process DocumentCreating a Setup Standard Operation

    Step Action

    21. Enter the desired information into the Resource field. Enter "ASM_LBR_1".

    Step Action

    22. Click the Scheduling tab.

    Page 16 Last changed on: 1/18/2010 09:39:00 AM

  • 8/14/2019 Creating a Setup Standard Operation_SPD

    17/19

    System Process DocumentCreating a Setup Standard Operation

    Step Action

    23. Click in the Assigned Units field.

    Last changed on: 1/18/2010 09:39:00 AM Page 17

  • 8/14/2019 Creating a Setup Standard Operation_SPD

    18/19

    System Process DocumentCreating a Setup Standard Operation

    Step Action

    24. Enter the desired information into the Assigned Units field. Enter "50".

    Step Action

    25. Click the Save button.

    Page 18 Last changed on: 1/18/2010 09:39:00 AM

  • 8/14/2019 Creating a Setup Standard Operation_SPD

    19/19

    System Process DocumentCreating a Setup Standard Operation

    Step Action

    26. You have completed the Creating a Setup Standard Operation procedure.

    End of Procedure.

    Last changed on: 1/18/2010 09:39:00 AM Page 19