x Quickly create your project plan directly from your IFC model le by: Dragging and dropping objects between the 3D view and tasks Using structured templates with predened searches to automatically link to the IFC model objects Split 3D elements down into sub-sections to allow seperate schedulling Compare 'planned' and 'actual' schedule plans with full 3D visual impact Manage large projects with the ability to save snapshot positions to enable quick navigation Save images to standard graphical formats to use for reporting or site recording of project status Create and play a time-line of your project linked to milestones and baselines to simulate subsections or whole projects Full property controls for visual impact and ability to hide and view objects Import costs from estimating applications supporting the IFC file format IFC file scan be loaded locally or hosted in the Elecosoft BIMCloud for easy data sharing A plugin/upgrade to your existing licence of Asta Powerproject Manage your 4D planning at an affordable cost Ideal for tendering and progress monitoring in 3D The Industry Foundation Classes (IFC) data model is an open, international and standardised specication for Building Information Modelling (BIM) data that is exchanged and shared among software applications used by the various participants in a building, construction or facilities management projects. IFC can be used to exchange and share BIM data between applications developed by different software vendors without the software having to support numerous native formats. As an open format, IFC does not belong to a single software vendor; it is neutral and independent of a particular vendors plans for software development. BRINGING 4D PLANNING WITHIN AFFORDABLE REACH BY COMBINING 3D MODELS WITH SCHEDULING TOOLS u x x x x x x x x x x x x x x

Upload: others

Post on 12-Mar-2022

41 views

Category:

Documents


0 download

TRANSCRIPT

Asta Powerproject BIMx

ASTA POWERPROJECT BIM IS 4D ENABLED - LINK YOUR PROJECT PLAN AND MODEL TOGETHER IN ONE APPLICATION

Quickly create your project plan directly from your IFC model fi le by:

Dragging and dropping objects between the 3D view and tasks

Using structured templates with predefi ned searches to automatically link to the IFC model objects

Split 3D elements down into sub-sections to allow seperate schedulling

Compare 'planned' and 'actual' schedule plans with full 3D visual impact

Manage large projects with the ability to save snapshot positions to enable quick navigation

Save images to standard graphical formats to use for reporting or site recording of project status

Create and play a time-line of your project linked to milestones and baselines to simulate subsections or whole projects

Full property controls for visual impact and ability to hide and view objectsImport costs from estimating applications supporting the IFC file format

IFC file scan be loaded locally or hosted in the Elecosoft BIMCloud for easy data sharing

A plugin/upgrade to your existing licence of Asta Powerproject

Manage your 4D planning at an affordable cost

Ideal for tendering and progress monitoring in 3D

*About IFC formatThe Industry Foundation Classes (IFC) data model is an open, international and standardised specifi cation for Building Information Modelling (BIM) data that is exchanged and shared among software applications used by the various participants in a building, construction or facilities management projects.

IFC can be used to exchange and share BIM data between applications developed by different software vendors without the software having to support numerous native formats. As an open format, IFC does not belong to a single software vendor; it is neutral and independent of a particular vendor’s plans for software development.

BRINGING 4D PLANNING WITHIN AFFORDABLE REACH BY COMBINING 3D MODELS WITH SCHEDULING TOOLS

u

x

x

x

x

x

x

x

x

x

x

x

x

x

x

Asta Powerproject BIM

www.astapowerproject.com

x

BRINGING 4D PLANNING WITHIN AFFORDABLE REACH BY COMBINING 3D MODELS WITH SCHEDULING TOOLS

SAVE TIME AND INCREASE EFFICIENCY BY USING ONE APPLICATION

Visually review your 4D planning and the 3D impact all within a professional project management system in one application, from one company

With the IFC fi le and schedule all located within the same software you can interact smoothly and effectively, removing the risk of human error and speeding up the linking process

Quick and easy to learn as fully integrated with Asta Powerproject’s existing feature sets

As you update the schedule, you can see the impact transferred across to the other view

EASY NAVIGATION AND FLEXIBLE VIEWS

View your structure externally and internally with easy to use navigation controls

Simulate the build process while walking or positioning yourself within the structure

User defi nable interface to ease control of model objects

Perspective mode settings to give realistic views around and inside the structure

DirectX graphical interface used to increase performance and enhance model look and feel

INTRODUCING THE ELECO BIMCLOUD

The ELECO BIMCloud shares information and supports improved cross-functional collaboration for all those involved in BIM as it stores all data in the industry common IFC format. This capability enables you to open a 3D model which has been created from 3rd party applications within products across the ELECO range including Asta Powerproject and Bidcon. It improves data sharing, manages fi le revisions and removes problems associated with emailing large BIM models between users.

HOW TO ACCESS ASTA POWERPROJECT BIM AND THE ELECO BIMCLOUD

An Asta Powerproject BIM licence is required. If you are an

©2015 Elecosoft UK Ltd

u

u

u

x

x

x

x

x

x

x

x

u

More information

For information on licensing terms and a quote to match your requirements, please call us on +44 (0) 1844 261700 or email [email protected].

x

Asta Powerproject supported licenced user you just need to upgrade your existing licence to activate the BIM add on. New users can purchase a combined Asta Powerproject and Asta Powerproject BIM licence.

At the same time you will be granted a free subscription to the ELECO BIMCloud, allowing storage of up to 5GB per user. Any additional storage requirements can be quoted upon request.