  • New ATI range will be available from 63A to 1600A.The range will follow 3 releases:Ratings available from November 2003;63A 100A125A250A400A630ARatings available from April 2004;800A1000ARatings available from July 2004;1250A1600AProduct Introduction

  • FeaturesWall mounting to 400AFloor standing 630A & overElectronic ControlsMotorised Unit with Automatic or Manual OperationMotorised SwitchPower Connections identified on SwitchProduct Introduction

  • Manual operation ensures load can always be connectedMechanically held switch no loss of power due to contactor coil burn out or electronics failureSwitch can be padlocked in off position for maintenanceIn the event of failure the motor module can be replaced without disconnecting the power cables Product IntroductionMotor Module can be removed without affecting the switch

  • Timers and trip settings can be adjusted from front panelDigital voltage and frequency metering standardTimer operation digitally displayedOver/under frequency trip as standardAuto/Manual retransfer as standardCompact unit size New options available Lightning protection Remote communicationsProduct Introduction

  • Transfer System Arrangement

  • Transfer System Arrangement

  • 1 Transfer Switch

    2 Motorised Unit

    3 Electronic ModuleTransfer System Arrangement

  • 4 pole mechanically held motorised switch Bottom cable entryThe panel is CE certified and complies with IEC 60947-6-1ATI Transfer System

  • Automatic or Manual operation Padlockable in off position facility

    ATI Transfer System

  • Electronic control module Digital display voltage, frequency, timer operation 3 phase mains voltage & frequency sensing 1 phase generator voltage & frequency sensing Auto/Manual retransfer controlATI Transfer System

  • All timers, voltage, & frequency settings are set from the digital front panelATI Transfer System

  • System status display on front panelATI Transfer System

  • Top cable entry Factory option Solid neutral link Dealer option IP54 protection Dealer option Auxiliary contacts for ATI status signalling - Dealer option Lightning protection Dealer option Remote communications of changeover panel status via Modbus Dealer option Power metering PHASE IIStandard Options

  • Top Cable Entry Arrangement

  • Top Cable Entry Arrangement

  • Standard Options

  • IP54 Protection Kit

  • Solid Neutral Link

  • Lightning Protection

  • Lightning Protection

  • Standard Options(Top cable entry shown)

  • Standard Options Contact f, g and h are closed when the switch is in position 1, 2 or 0. Contact i is closed when the switch is in Automatic mode. Contact j is closed when the switch is padlocked.

  • Communication Module

    Installation of this module allows RS485 connection.

    For standard configurations the ATI can be connected with a PC or a PLC over a maximum distance of 1500 metres, using JBUS/MODBUS protocol.

  • Voltage OptionsOne switch will cover common voltages.

    A separate switch will be available for 277V

  • Power connections to change in accordance to P-P voltageChanging the Voltage OptionsCommon voltages will work with the standard switch by reconnecting the voltage sensing.The power supply should be connected to points 101/102 and 201/202 to provide 220 - 240V Ac. A separate switch is required for 277V

  • Inputs and Outputs

  • Digital ModuleVerify power applied on the electronic module power inputs terminals 101-102 or 201-202 before powering up the unit.

  • Setting the ATISoftware version is displayed on the unit after reset (powering up action after 3 minutes power off to discharge the unit).Product Programming is possible in Automatic Mode in position 1 when the Mains Source is available, or in Manual mode.It is not accessible when a test or an automatic sequence is activated. Programming mode is accessible by pressing and holding the validation key for 5 seconds and then entering the code 1000 Press for 5 seconds Press once to display 1 Press the Validate keyTo exit the Programming hold the validation pushbutton for 5 seconds.

  • Setting the ATISetup : Network parametersVolt : Voltage detection levelsFr : Frequency detection levelstim : Automatic timer settingsComm: Communication parameters (Optional communication module must be connected). Set-up parameters must always be verified /modified in accordance with the application.

  • Setting the ATIDefinition

    Un: Phase-Phase nominal voltage.

    nt: Network configuration. Type of metering (1P or 3P phases). Number of active wires (2L, 3L or 4L) definition.

    Fn: Nominal frequency.

    trI: Retransfer inhibit feature: press on RTI button required to allow retransfer form gen to main.

    Crs: Reset number of commutation counter (from Main to Gen). Displays no once reset.Setting range

    From 110 to 480V

    1P2L, 1P3L, 3P4L, 3P3L

    50 or 60 Hz

    Yes or No

    Yes or NoDefault value

    400 V AC

    3P4L

    50 Hz

    Yes

    No

  • Setting the ATIExample :We want to modify network voltage from 400V to 230 V.Display the parameter for AdjustmentAccess the first digit (flashing)Twice to display 2 (flashing)To access the second digit (flashing)3 times to display 3 (flashing)To store the valueTo return to Setup menu press home pushbutton or press down to continue.To return to Setup menuTo reach next parameter

  • Setting the ATITo reach voltage menu from Setup menu pressDefinition

    oU: Main Over voltage detection

    oUh: Main Over voltage hysteresis detection

    uU: Main Under voltage detection

    uUh: Main Under voltage hysteresis detection

    oU: Generator over voltage detection

    oUh: Generator over voltage hysteresis detection

    uU: Generator under voltage detection

    uUh: Generator under voltage hysteresis detectionSetting Range

    102 - 120 %

    101 - 119 %

    80 - 98 %

    81 - 99 %

    102 - 120 %

    101 - 119 %

    80 - 98 %

    81 - 99 %Default Value

    115 %

    110 %

    85 %

    95 %

    115 %

    110 %

    85 %

    95 %To return to;Press home onceonce

  • Setting the ATITo reach Frequency menu from Voltage menu pressTo return to;Press home onceonceDefinition

    oF: Main over frequency detection

    oFh: Main over frequency hysteresis

    uF: Main under frequency

    uFh: Main Under frequency hysteresis

    oF: Gen over frequency

    oFh: Generator over frequency hysteresis

    uF: Generator under frequency

    uFh: Generator under frequencySetting Range

    101 - 120%

    100.5 - 119.5%

    80 - 99%

    80.5 - 99.5%

    101 - 120%

    100.5 - 119.5%

    80.5 - 99.5%

    80 - 99%Default Values

    105%

    103%

    95%

    97%

    105%

    103%

    95%

    97%

  • Setting the ATITo reach Timers menu from Frequency menu pressTo return to;Press home onceonceDefinition

    2Mt: Loss of mains validation timer. Once mains has disappeared, 2Mt is started. If Mains comes back before 2Mt ends, the commutation cycle is not started. (Delay on Gen start.)

    At: Generator voltage and frequency stabilisation timer. Generator needs to be stable during AT to allow transfer from Mains.

    1Mt: Mains Return validation timer.Once main is back 1Mt is started. If Mains disappears before 1Mt ends, the load is not switched back to the Mains.

    rot: Run on time timer. Once the load is switched back from the Generator to the Mains, ROT is started and the Generator will stop once ROT is finished

    dbt: Dead Band timer. This timer is counted down before transferring the load from the Mains source to the Generator or vice versa. It allows the load residual voltage to decrease under a non critical value before transfer (Necessary in case of rotating loads).Setting range

    0 to 60 sec.

    0 to 60 sec.

    0 to 30 min.

    0 to 10 min.

    0 to 20 sec.Default value

    5 sec.

    5 sec.

    2 min.

    4 min.

    5 sec.

  • Setting the ATITo reach Communication menu from Timers menu pressTo return to;Press home onceonceDefinition

    Add: Slave Jbus / Modbus address

    bd:Communication Speed

    Stop: Stop Bit

    PAr: ParitySetting range

    001 to 247

    2400,4800,9600,14400,19200,28800, 38400

    0,1,2

    No, Eve (Even), OddDefault value

    005

    9600

    1

    OddThis menu is only accessible when the communication module has been fitted. Once plugged into the electronic module, a 2 minute power off action is required for option identification by software.

  • ATI MonitoringIf lightning protectionoption is fitted, LIP menu is available.Metering is active as soon as the unit is powered up.Commutation cycles have priority over Visualisation mode and display timers count down as soon as they are active. Any value available in this mode can be kept on the screen once displayed.After commutation cycle, the display comes back to Mains voltage L1N (first variable of the mode).

  • ATI MonitoringU1: Main Voltage L1-N

    U2: Main Voltage L2-N

    U3: Main Voltage L3-N

    U12: Main Voltage L1-L2

    U23: Main Voltage L2-L3

    U31: Main Voltage L3-L1

    F: Main frequency

    U31: Generator Voltage L3-L1

    F: Generator Frequency

    2nt: Loss of Mains validation Timer

    At:: Delay on transfer Timer

    1nt: Mains return validation timer

    rot: Run on timer (Generator cool down period)

    dbt: Dead Band timer

    CO: Main -> Gen commutation Counter

    LIP: Lightning protection operation (0 or 1)

  • Manual / Automatic Switch

  • Manual / Automatic SwitchTo access Manual Mode turn the front keyswitch to manual position.Do not force the keyswitchFrom Position 1 turn clockwise to reach position 0From position 0 turn clockwise to reach position 2From position 2 turn anti clockwise to reach position 0From position 0 turn anti clockwise to reach position 1Padlock is only possible in manual position.Handle must be out of its housing to padlockPadlock is possible in position 0, 1, 2.Manually pull the padlock handle to allow padlock insertion in the hole handle in automatic mode.Once in manual mode it is possible :To access programming and visualisation menusTo padlock the switchTo operate the switch with the handleTo start the Gen using test off load pushbutton.

  • Manual / Automatic SwitchThe automatic mode must be activated as soon as automatic starting of the generator and source switching is required after loss of mains condition.The unit integrates a power capacitor source to provide enough power during black out (loss of mains) to wait for generator starting. (It does not have power to drive the switch to zero position).Once in automatic mode it is possible:To access programming and visualisation menusTo start off load or on load testingTo start a loss of Mains sequenceTo start a Mains return sequenceAs soon as the unit is switched from Manual to Automatic mode, the automatic cycle is started.Mains and Generator voltage & frequency are verified to define the new stable position of the switch.The same table is considered after a complete power off action (Power Cap must be completely discharged = 2 minutes).

  • ATI OperationThis Sequence is started as soon as the switch is in automatic mode and in position 1.Position 1:Mains is availableSwitch is in position 1 (Mains)Generator is on or off

  • ATI Operation

  • ATI OperationThis sequence is started as soon asthe unit is in automatic mode and inposition 2.Position 2:Mains is not availableSwitch is in position 2 (Generator)Generator is offRetransfer Inhibit FunctionOnce the Mains supply has returned, it may be preferable not to immediately return the load from the generator to the mains.If Retransfer inhibit feature has been enabled in the programming mode, the RTI led is on (default value).Once retransfer from the Generator to the Mains is ready, RTI feature blocks the retransfer and the RTI led is blinking.It is necessary to manually press the RTI push button to start retransfer.

  • ATI OperationThis sequence is started as soon as the unit is in automatic mode and in position 2.Position 2:Mains is not availableSwitch is in position 2 (Generator)Generator is off

  • ATI Operation

  • ATI OperationPress and hold the test pushbutton for 5 seconds to allow test modes access.Enter code = 4000Press and hold the test pushbutton for 5 seconds to exit test mode after the test has been completed.

  • ATI OperationThis test is possible in automatic in position 1 when the mains is available or in manual mode.This mode allows generator testing without load transfer from the Mains to the Generator.The generator is started and stopped normallyThis test is possible in automatic or manual modeThis test is not possible when an automatic sequence is running.Press Test pushbutton to make the testoff load Led blink and press validationpushbutton to start.In automatic mode, as soon as you enter in test mode option, t on l is displayed. Press test key once for to reach test on load option.

  • ATI OperationThis test is only possible in automatic mode in position 1 and Mains available.This test simulates a loss of mains condition. Loss of Mains sequence is started and Mains return sequence automatically activated as soon as the genset is available.All timers operate following their set points.The retransfer inhibit feature is always activated during test on load (from keypad).Press Test pushbutton to start the test on load Led flashing then press the validation pushbutton to start the cycle, following Loss of Mains + Mains return sequences.Remote activation via remote test on load inputIt is possible to remotely start the test on load closing contacts 7 and 9 on the electronic module.The cycle is started as soon as the input is closed.The retransfer from. generator to mains is blocked, and only allowed once the input is de-activated.

    ******************