Atlantic Pacific Marine

CuNi 9010 main sea water supply line to scrubber tower

DN300 return line passing above DG1 & DG2

DN300 return line passing through main engine casing. Deck 17 –

Deck 5

DN300 SMO 254 pipe feed lines into scrubber tower

Main sea water feed line connecting to SMO 254 pipe

Mixing Tube

Modified General service cooling lines to assist with return water

dilution from scrubber tower

Return Line