GHDClient : CHCCTitle : Boambee Newport Floodplain Risk Management PlanJob No : 22-16407
www.ghd.com.au [email protected]
Tel. +61 2 6650 5600 Fax. +61 2 6650 5601230 Harbour Drive, Coffs Harbour
Boambee Newport Floodplain Risk Management Plan
Mitigation Options
NOTE: The preliminary cost estimates presented in this section have been developed solely for the purpose of comparing and evaluating competing options. They are sufficiently accurate to serve this purpose. They cannot be used for budget-setting purposes as common elements between options may have been omitted and/or the works not fully scoped. A functional design is recommended if a budget
estimate is required.
SCHEDULE OF ESTIMATED QUANTITIESPAY ITEM DESCRIPTION OF WORK QTY UNIT RATE AMOUNT NOTES
1 Preliminaries1.1 Establishment 1 item 11,000.00$ $ 11,000 Allowance only1.2 Erosion and sediment control 1 item 11,000.00$ $ 11,000 Allowance only1.3 Traffic control 1 item 11,000.00$ $ 11,000 Allowance only
SUBTOTAL $ 33,000 2 Channel Upstream of North Boambee Road (~100m)2.1 Clear site of vegetation - light vegetation, over 500m2 800 m2 $ 0.48 $ 382 -2.2 Excavate over site to reduce levels in clay 265 m3 $ 30.18 $ 7,997 -2.3 Fill with topsoil 800 m3 $ 75.41 $ 60,330 -
2.4Geotextile Fabric - non woven polypropylene/ polyethylene 1.9mm thick (180g/sqm) 800 m2 $ 3.58 $ 2,867 -
2.5 Landscaping - hydro mulch sprayed grass seed 0.08 ha $ 3,469.14 $ 274 -SUBTOTAL $ 71,850
3 North Boambee Road Culverts and pavement (~25m)3.1 Demolition - break up and remove bitumen paving 250 m2 $ 3.75 $ 937 Disposal extra3.2 Demolition - cut away reinforced concrete walls 15 m3 $ 562.11 $ 8,432 Disposal extra3.3 Excavate over site to reduce levels in clay 400 m3 $ 30.18 $ 12,071 -
3.4Box Culvert - Supply, deliver, lay and join 2.4m (span) x 1.8m (height) box culvert 18 each $ 1,160.16 $ 20,883 includes access hole
3.5Headwall - Cast in-situ reinforced concrete to suit pipe/culvert; includes excavation 15 m3 $ 522.54 $ 7,838 -
3.6 Handrail - CHS 75mm attached to wall 24 m $ 217.82 $ 5,228 -
3.7
Pavement - Asphalt; 40mm AC10 wearing course, 175mm basecourse (1 layer AC10 over 2 layers AC20), 195mm sub-base lean mix, 7mm primer seal, 300mm select material CBR>15% 240 m2 $ 197.24 $ 47,338 -
3.8Kerb and gutter - Cast in-situ with reinforcement, formwork and surface finishes 24 m $ 164.42 $ 3,946 -
3.9lifting of existing road formation for approx. 40m of road each side of culvert and reconstruction of road formation (inc. K&G, line Marking) 1 each $ 75,000.00 $ 75,000 allowance only
3.10 reconnect existing services 1 each $ 10,000.00 $ 10,000 allowance onlySUBTOTAL $ 191,672
4 Channel Downstream of North Boambee Road (~170m)4.1 Excavate over site to reduce levels in clay 1,000 m3 $ 30.18 $ 30,177 -
4.2Geotextile Fabric - non woven polypropylene/ polyethylene 1.9mm thick (180g/sqm) 1,600 m2 $ 3.58 $ 5,733 -
4.3 Landscaping - hydro mulch sprayed grass seed 0.16 ha $ 3,469.14 $ 555 -SUBTOTAL $ 36,466
5 New culverts and channel paralell to highway (~300)
5.1Box Culvert - Supply, deliver, lay and join 1.8m (span) x 0.9m (height) box culvert 9 each $ 1,160.16 $ 10,441 includes access hole
5.2Headwall - Cast in-situ reinforced concrete to suit pipe/culvert; includes excavation 12 m3 $ 522.54 $ 6,270 -
5.3 Handrail - CHS 75mm attached to wall 12 m $ 217.82 $ 2,614 -5.4 Excavate over site to reduce levels in clay 1,850 m3 $ 30.18 $ 55,828 -
5.5Geotextile Fabric - non woven polypropylene/ polyethylene 1.9mm thick (180g/sqm) 2,600 m2 $ 3.58 $ 9,317 -
5.6 Landscaping - hydro mulch sprayed grass seed 0.26 ha $ 3,469.14 $ 902 -5.7 re-instate road access from highway 1 each $ 10,000.00 $ 10,000 allowance only
SUBTOTAL $ 95,373
SUBTOTAL ITEMS 1-3 $ 428,360 4 Supervision, Project Management & Contractor On-Costs
4.1 Supervision, Project Management & Contractor On-Costs (20%) 20 % - $ 85,672 -SUBTOTAL $ 85,672
5 Contingencies5.1 Contingencies - General (30%) 30 % - $ 128,508 -
SUBTOTAL $ 128,508 TOTAL (Ex-GST) $ 642,540
Option PC27Widening of North Boambee Road drain, remove and replace culverts under North Boambee Road, reconstruct low point in North Boambee Road,
regrade swale drain around corner of North Boambee Road and Pacific Highway, construct colverts under Good Guys access ramp, construct swale drain channel from access ramp to Newports Creek
8N:\AU\Coffs Harbour\Projects\22\16407\Technical\Flood Damages\Concept Costings\Updated Construction Cost Estimate - MASTER2.xlsm
Page 1 of 1
11/05/2015 2:29 PM
Attachment 10
CH 0.000 m
CH 20.000 m
CH 40.000 m
CH 60.000 m
CH 80.000 m
CH 100.000 m
CH 120.000 m
CH 140.000 m
CH 160.000 m
CH 180.000 m
CH 200.000 m
CH 220.000 m
CH 240.000 m
CH 260.000 m
CH 280.000 m
CH 300.000 m
CH 320.000 m
CH 340.000 m
CH 360.000 m
CH 380.000 m
CH 400.000 m
CH 42 0.00 0 m
CH 440 .000 m
CH 46 0. 000 m
CH 480.000 m
CH 500. 000 m
CH 520.000 m
CH 540.000 m
CH 56 0. 000 m
CH 580.000 m
CH 594.990 m
Job NumberRevision
FigureDate
230 Harbour Drive Coffs Harbour NSW 2450 Australia T 61 2 6650 5600 F 61 2 6650 5601 E [email protected] W www.ghd.comN:\AU\Coffs Harbour\Projects\22\16407\CADD\Drawings\22-16407-FIG NBR.dwgCad File No:11 May 2015 - 2:32 PMPlot Date: Sam DouglasPlotted by:
P27.1
COFFS HARBOUR CITY COUNCILBOAMBEE NEWPORTS CREEKFLOODPLAIN RISK MANAGEMENT STUDY AND PLANMITIGATION OPTIONNORTH BOAMBEE ROAD WORKS PLAN
22-16407AMAY 2015
REGRADE CHANNEL FROM LAKES ESTATETO CULVERT HEADWALL
PROVIDE SCOUR PROTECTIONAT NEWPORTS CREEK OUTFALL
EXCAVATE CHANNEL FROM OFF-RAMPTO NEWPPORTS CREEK
REGRADE CHANNEL BETWEEN NORTH BOAMBEE ROADAND DISCHARGE UNDER PACIFIC HIGHWAY
REMOVE EXISTING PIPE CROSSING UNDERNORTH BOAMBEE ROAD AND REPLACEWITH 2 X 2.4m X 1.8m RCBC @ INVERT 3.7 mAHD.
LIFT ROAD PAVEMENT AT SAG TO 5.7mAHD AND TIE INTO EXISTING
PROVIDE 3 X 1.8m X 0.9mRCBC UNDER ACCESS ATRL = 5.00 mAHD
1 in 2 1% 1% 1 in 2
PROPOSED CHANNEL ALIGNMENTSCALE 1:2000
6m
TYPICAL CHANNEL SECTION
MATCH INTO EXISTING LEVELS AT HEADWALLUNDER PACIFIC HIGHWAY
Attachment 10
Job NumberRevision
FigureDate
230 Harbour Drive Coffs Harbour NSW 2450 Australia T 61 2 6650 5600 F 61 2 6650 5601 E [email protected] W www.ghd.comN:\AU\Coffs Harbour\Projects\22\16407\CADD\Drawings\22-16407-FIG NBR.dwgCad File No:11 May 2015 - 2:25 PMPlot Date: Sam DouglasPlotted by:
P27.2
COFFS HARBOUR CITY COUNCILBOAMBEE NEWPORTS CREEKFLOODPLAIN RISK MANAGEMENT STUDY AND PLANMITIGATION OPTIONNORTH BOAMBEE ROAD LONGSECTION
22-16407AMAY 2015
IP CH
106.2
5 RL 3
.69
IP CH
304.1
RL 3.3
IP CH
306.5
RL 5
VERTICAL ALIGNMENTL=81.97m L=29.28m L=168.57m L=2.4m L=288.5m
G=-1.09% G=-0.2% G=-0.2% G=70.95% G=-0.26%
R=5.00m R=-5.00m R=12.50m R=-30.00m R=-20.00mR=10.00m R=-350.00mR=-10.00m
HORIZONTAL ALIGNMENT L=207.81mL=107.76mL=20.60m
L=46.66m L=28.28m L=32.47m L=34.29m L=18.52m
0.00
5.41
20.00
4.75
40.00
4.409
-0.29
4.70
60.00
4.192
-0.07
4.26
80.00
3.975
-0.63
4.61
100.00
3.758
-0.42
4.17
106.25
3.690
-0.00
3.69
107.76
3.687
-0.00
3.69
114.31
3.673
-0.70
4.38
120.00
3.662
-1.84
5.50
135.53
3.630
-0.00
3.63
139.26
3.623
-0.79
4.41
144.40
3.613
-0.40
4.01
160.00
3.582
-0.76
4.34
180.00
3.543
-0.80
4.34
195.35
3.513
-0.85
4.36
200.00
3.504
-0.78
4.29
217.92
3.469
-0.80
4.27
220.00
3.465
-0.82
4.28
240.00
3.425
-0.89
4.31
246.20
3.413
-0.79
4.20
248.63
3.409
-0.83
4.24
260.00
3.386
-0.80
4.19
280.00
3.347
-0.81
4.16
281.10
3.345
-0.81
4.16
294.66
3.318
-0.78
4.09
296.03
3.316
-0.05
3.36
300.00
3.308
-0.01
3.32
303.89
3.300
-0.02
3.32
306.50
5.000
-0.10
5.10
320.00
4.965
-1.31
6.27
340.00
4.913
-0.48
5.39
359.01
4.863
-0.83
5.69
380.00
4.809
-0.87
5.68
400.00
4.757
-0.89
5.64
420.00
4.705
-1.13
5.84
440.00
4.653
-1.14
5.79
460.00
4.601
-0.85
5.45
480.00
4.549
-0.92
5.47
500.00
4.497
-0.98
5.48
520.00
4.445
-0.91
5.35
540.00
4.393
-0.82
5.22
560.00
4.341
-0.92
5.26
566.82
4.323
-0.89
5.21
580.00
4.289
-0.77
5.06
585.35
4.275
-0.67
4.94
590.25
4.262
-0.63
4.89
CHAINAGE
DESIGN SURFACE LEVEL
LEVEL DIFFERENCECUT - / FILL +
EXISTING SURFACE LEVEL
DATUM RL. 0.00
LONGITUDINAL SECTION - CLHORZ 1:2000 VERT 1:200
NORTH BOAMBEE ROADPACIFIC HIGHWAY OFF-RAMPTO GOOD GUYS NEWPORTS
CREEKLAKES ESTATE
Attachment 10
230 Harbour Drive Coffs Harbour NSW 2450 Australia T 61 2 6650 5600 F 61 2 6652 6021 E [email protected] W www.ghd.com
ELSW
ICK P
LACE
MANSBRIDGE DRIVE
NORTH BOAMBEE ROAD
COOK DRIVE
PACIFIC HIGHWAY
O'KEEFE DRIVE
FRASER DRIVE
KEONA CIRCUIT
NEWPORTS CREEK
NEWPORTS CREEK
509,000
509,000
G:\22\16407\GIS\Maps\Deliverables\22_16407_F_P_27_3_005yr_NBR_Diff_Rev_A.mxd© 2015. Whilst every care has been taken to prepare this map, GHD (and LPI) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.
0 25 50 75 10012.5
MetresMap Projection: Transverse Mercator
Horizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 56
Coffs Harbour City CouncilBoambee newports CreekFloodplain Risk Management StudyExisting vs P27
Appendix F.P27.3
Job NumberRevision A
22-16407
31 Jul 2015
20% AEPo Date
Data source: LPI (2012), LPI Lot Boundaries, 2012. Created by:sldouglas
DRAFTPaper Size A3
ClientLogo
LegendChange in Flood Level(mm)
> -500mm-500mm - -400mm
-400mm - -300mm
-300mm - -200mm
-200mm - -100mm-100mm - -50mm-50mm - -25mm
-25mm - +25mm
+25mm - +50mm+50mm - +100mm+100mm - +200mm
+200mm - +300mm
+300mm - +400mm+400mm - +500mm> +500mm
No Longer Flooded
Attachment 10
230 Harbour Drive Coffs Harbour NSW 2450 Australia T 61 2 6650 5600 F 61 2 6652 6021 E [email protected] W www.ghd.com
ELSW
ICK P
LACE
MANSBRIDGE DRIVE
NORTH BOAMBEE ROAD
COOK DRIVE
PACIFIC HIGHWAY
O'KEEFE DRIVE
FRASER DRIVE
KEONA CIRCUIT
NEWPORTS CREEK
NEWPORTS CREEK
509,000
509,000
G:\22\16407\GIS\Maps\Deliverables\22_16407_F_P_27_4_020yr_NBR_Diff_Rev_A.mxd© 2015. Whilst every care has been taken to prepare this map, GHD (and LPI) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.
0 25 50 75 10012.5
MetresMap Projection: Transverse Mercator
Horizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 56
Coffs Harbour City CouncilBoambee newports CreekFloodplain Risk Management StudyExisting vs P27
Appendix F.P27.4
Job NumberRevision A
22-16407
31 Jul 2015
5% AEPo Date
Data source: LPI (2012), LPI Lot Boundaries, 2012. Created by:sldouglas
DRAFTPaper Size A3
ClientLogo
LegendChange in Flood Level(mm)
> -500mm-500mm - -400mm
-400mm - -300mm
-300mm - -200mm
-200mm - -100mm-100mm - -50mm-50mm - -25mm
-25mm - +25mm
+25mm - +50mm+50mm - +100mm+100mm - +200mm
+200mm - +300mm
+300mm - +400mm+400mm - +500mm> +500mm
No Longer Flooded
Attachment 10
230 Harbour Drive Coffs Harbour NSW 2450 Australia T 61 2 6650 5600 F 61 2 6652 6021 E [email protected] W www.ghd.com
ELSW
ICK P
LACE
MANSBRIDGE DRIVE
NORTH BOAMBEE ROAD
COOK DRIVE
PACIFIC HIGHWAY
O'KEEFE DRIVE
FRASER DRIVE
KEONA CIRCUIT
NEWPORTS CREEK
NEWPORTS CREEK
509,000
509,000
G:\22\16407\GIS\Maps\Deliverables\22_16407_F_P_27_5_100yr_NBR_Diff_Rev_A.mxd© 2015. Whilst every care has been taken to prepare this map, GHD (and LPI) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.
0 25 50 75 10012.5
MetresMap Projection: Transverse Mercator
Horizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 56
Coffs Harbour City CouncilBoambee newports CreekFloodplain Risk Management StudyExisting vs P27
Appendix F.P27.5
Job NumberRevision A
22-16407
31 Jul 2015
1% AEPo Date
Data source: LPI (2012), LPI Lot Boundaries, 2012. Created by:sldouglas
DRAFTPaper Size A3
ClientLogo
LegendChange in Flood Level(mm)
> -500mm-500mm - -400mm
-400mm - -300mm
-300mm - -200mm
-200mm - -100mm-100mm - -50mm-50mm - -25mm
-25mm - +25mm
+25mm - +50mm+50mm - +100mm+100mm - +200mm
+200mm - +300mm
+300mm - +400mm+400mm - +500mm> +500mm
No Longer Flooded
Attachment 10
This document is in draft form. The contents, including any opinions, conclusions or recommendations contained in, or which may be implied from, this draft document must not be relied upon. GHD reserves the right, at any time, without notice, to modify or retract any part or all of the draft document. To the maximum extent permitted by law, GHD disclaims any responsibility or liability arising from or in connection with this draft document.
GHD | Report for Coffs Harbour City Council - Boambee Newports Creek Floodplain Risk Management Study and Plan,
22/16407
Appendix G Mitigated Flood Mapping (Option PC25)
Attachment 10
230 Harbour Drive Coffs Harbour NSW 2450 Australia T 61 2 6650 5600 F 61 2 6652 6021 E [email protected] W www.ghd.com
4 m4 m
3.4 m
4.2 m
4.2 m
4.2 m
3.4 m
3.2m
4m
3.4m
4 m 3.6 m4.2 m
3.6 m
3.8 mAVON RISE
CARTEN CLOSE
SAND
STRE
ET
COLAC TERRA CE
COLL
ISONP
LACE
ELSW
ICK P
LACE
FLEMING CLOSE
MORRISON CLOSE
EELEY CLOSE
BURRIDGE AVENUE
MATHIE STREET
ENGI
NEER
ING
DRIVE
FER A
NCR
ESCE
NT
STADIUMDRIVE
CORN
ISH ST
REET
FORG
E DRI
VE
ROBERT GARRETT STREET
WING
ARA
DRIVE
PHIL HAWTHORNE DRIVE
COOK DRIVE
NORTH BOAMBEE ROAD
ENGLANDS ROAD
ISLES DRIVE
REID DRIVE
HOGBIN DRIVE
PACIF
ICHIG
HWAY
WALLACE CIRCUIT
MENINDEE CIRCUIT
MAWSON CLOSE
LOUD
ENCL
OSE
RAYMCCARTHY DRIVE
LAKES DRIVE
HURL
EY D
RIVE
O'KEEFE DRIVE
INDUSTRIAL DRIVE
4.6 m
6 m
6.4 m
3.4 m
5.2 m
6.2 m
3.6 m
3.6 m
4 m
8.6 m
3.6 m
6 m
4 m
8.4 m
6 m
6 m
2.8 m
3.2 m
7.8 m
3 m
3.8 m
4.2 m
7 m
4.4 m
3.2 m
6 m
3.4 m
3.2 m4.8 m
3.2 m
6 m
3.8 m
3.6 m
4 m
7.6 m
8 m
3 m
3.6 m
3 m
6 m
3.4 m
7 m
6.2 m
3.2 m
3.2 m
3.6 m
3.4 m
3.2 m
7 m
6.4 m
5.4 m
3.6 m
3.8 m
3 m
6.6 m
4 m
3.2 m
3.6 m
5 m
6 m
8.8 m
4 m
3 m
7 m
5.8 m
4 m
4.6 m
3 m6.2
m
3.4 m
6.8 m
5 m6.2 m
7.2 m
3m5.8 m
3.2 m
6.2 m
3.4 m
4.6 m
5.8 m
4.6 m
7.6 m
5.2 m 3m
5.2 m 3.2
m
4.8 m
3.4 m
7.2 m
4.8 m
5.6 m
6.6 m
6.4 m
6.2 m
5.8m7.8m
6.6 m
5.6m
4.2m
3m
6.4m
4 m
7 m
8.2 m
8.4m
4 m
3.2 m5.8m
4.2m
3.4m
3.8m
3 m
4.4m
6.2 m
3.8 m
5.8m
3.8m
3.6 m
7.2m
6m
5.2 m
6.4 m
7 m
9 m
6 m
8.2m
6.2 m
7 m
5 m
6.8 m
4.8 m
4.8m
8.4 m
3.4 m
6.4 m
5.4 m
7 m
7.2 m
8.6m
6.2 m
5.6 m
3m
4.2 m
3.8 m
5 m
5.6 m
3.4 m
7.8 m
3.2 m
7.2 m
6.6 m
3 m
4.6 m
7.4 m
4 m
7.2 m
8.8 m
4.6 m
5.2 m
6.8 m
4.4 m
6 m
5.4 m
3.8 m
5.2 m
7 m
7.4 m
8 m
6.8 m
7 m
3.6 m
6.8 m 7.8 m 6.8 m
7.4 m
5.8 m8 m
6.4 m
8.4 m
3 m
3 m
7.8 m
6.6 m
4 m
7.4 m8.2 m
3.8 m
6 m
7.6 m
3.4 m
3.2 m
3.6 m
NEWPORTS CREEK
508,000
508,000
509,000
509,000
510,000
510,000
6,646,
000
6,646,
000
6,647,
000
6,647,
000
G:\22\16407\GIS\Maps\Deliverables\22_16407_G_F_1_6_PC25_100yr_Flood_Extent_and_Depth_RevA.mxd© 2015. Whilst every care has been taken to prepare this map, GHD (and LPI) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.
0 75 150 225 30037.5
MetresMap Projection: Transverse Mercator
Horizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 56
Coffs Harbour City CouncilBoambee newports CreekFloodplain Risk Management StudyFlood Extent and Depth
Appendix G.F.1
Job NumberRevision A
22-16407
01 May 2015
PC25 - 1% AEPo Date
Data source: LPI (2012), LPI Lot Boundaries, 2012. Created by:sldouglas
DRAFT
Paper Size A3
ClientLogo
1Flood Depth (m)0.00 - 0.050.05 - 0.150.15 - 0.50
0.50 - 1.001.00 - 1.501.50 - 2.002.00 - 3.00
3.00 - 4.004.00 - 5.00> 5.00mFlood Level (mAHD)
Attachment 10
230 Harbour Drive Coffs Harbour NSW 2450 Australia T 61 2 6650 5600 F 61 2 6652 6021 E [email protected] W www.ghd.com
ISLES DRIVE
HURLEY DRIVE
DAKOTA DRIVE
NORTH BOAMBEE ROAD
FELLOWSHIP DRIVE
WING
ARA
DRIVE
REID DRIVE
COOK DRIVE
PHIL HAWTHORNE DRIVE
STADIUM DRIVE
DOUGKN
IGHT DRIVE
PACIF
ICHIG
HWAY
AVIATION DRIVE
HOGBIN DRIVE
AIRPORT DRIVE
O'KEEFE DRIVE
6.4 m
3.4 m
6.2 m
3.6 m
4 m
3.6 m
6 m
4 m
6 m
2.8 m
3.2 m
3 m
4.2 m
4.4 m
3.2 m
6 m
3.4 m
3.2 m4.8 m
3.2 m
6 m
3.8 m
3.6 m
4 m
5 m
3 m
3 m
6 m
3.4 m
3.2 m
3.2 m
3.6 m
3.4 m
3.2 m
6.4 m
3.6 m
3.8 m
3 m
6.6 m
4 m
3.2 m
3.6 m
5 m
6 m
4 m
3 m
5.8 m
4.6 m
3 m
6.2 m
3.4 m
5 m6.2 m
3m
5.8 m
3.2 m
3.4 m
4.6 m
3 m
5.2 m 3m
5.2 m 3.2
m
4.8 m
3.4 m
4.8 m
2.4 m
5.6 m
6.4 m
5.8m
4.2m
3m
4 m4 m
3.2 m
4.2m
3.4m
3.8m
3 m
6.2 m
4.4m
6.2 m
3.8 m
5.8m
3.8m
3.6 m
6m
5 m
4.8 m
4.8m
3.4 m
5.4 m5.6 m
3m
4.2 m
5 m
5.6 m
3.4 m
3.2 m
3 m
4.6 m
4 m
4.4 m
6 m
3.8 m
5.2 m
3.6 m
5.8 m
3 m
6 m
3 m
3.4 m
3.2 m
NEWPORTS CREEK
509,000
509,000
510,000
510,000
511,000
511,000
6,645,
000
6,645,
000
6,646,
000
6,646,
000
G:\22\16407\GIS\Maps\Deliverables\22_16407_G_F_1_6_PC25_100yr_Flood_Extent_and_Depth_RevA.mxd© 2015. Whilst every care has been taken to prepare this map, GHD (and LPI) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.
0 75 150 225 30037.5
MetresMap Projection: Transverse Mercator
Horizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 56
Coffs Harbour City CouncilBoambee newports CreekFloodplain Risk Management StudyFlood Extent and Depth
Appendix G.F.2
Job NumberRevision A
22-16407
01 May 2015
PC25 - 1% AEPo Date
Data source: LPI (2012), LPI Lot Boundaries, 2012. Created by:sldouglas
DRAFT
Paper Size A3
ClientLogo
2Flood Depth (m)
0.00 - 0.050.05 - 0.150.15 - 0.50
0.50 - 1.001.00 - 1.501.50 - 2.002.00 - 3.00
3.00 - 4.004.00 - 5.00> 5.00mFlood Level (mAHD)
Attachment 10
230 Harbour Drive Coffs Harbour NSW 2450 Australia T 61 2 6650 5600 F 61 2 6652 6021 E [email protected] W www.ghd.com
2.8 m
2.8 m
2.8 m
2.8 m
2.8 m
2.6 m2.8 m
2.6 m
2.8 m2.8 m
2.8 m
2.8 m
2.6 m
2.8 m
2.8 m
2.8 m
2.8 m
2.8 m
2.8 m
2.8 m
2.8 m
2.8 m
2.8 m
2.8 m
2.8 m
2.8 m
2.8 m
2.8 m
2.8 m
2.8 m
2.8 m
2.8m
2.8 m
2.8 m
2.8 m
2.8 m
2.8m
2.8 m
2.8m
2.8m
2.8m
2.8 m
2.8 m
2.8 m
2.8 m
2.8 m
2.8 m
2.8 m
2.8 m
BALDW I NCL
OSE
PAYN
ECLO
SE
LEE COURT
CRAF
T CLO
SE
BETE
LPALMCLOSE
FORTITUDE PLACE
HAMI
LTON
DRIVE
PACI
FIC H
IGHW
AY
HI-TECH DRIVE
SAWTELL ROAD LAMB
ERTS
ROAD
HOGB
IN DR
IVE
PEPPERMANROAD
DUNLOP DRIVE
WOR LANDDR
IVE
BOAMBEE CREEK
NEWPORTS CREEK
508,000
508,000
509,000
509,000
510,000
510,000
6,644,
000
6,644,
000
6,645,
000
6,645,
000
G:\22\16407\GIS\Maps\Deliverables\22_16407_G_F_1_6_PC25_100yr_Flood_Extent_and_Depth_RevA.mxd© 2015. Whilst every care has been taken to prepare this map, GHD (and LPI) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.
0 75 150 225 30037.5
MetresMap Projection: Transverse Mercator
Horizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 56
Coffs Harbour City CouncilBoambee newports CreekFloodplain Risk Management StudyFlood Extent and Depth
Appendix G.F.3
Job NumberRevision A
22-16407
01 May 2015
PC25 - 1% AEPo Date
Data source: LPI (2012), LPI Lot Boundaries, 2012. Created by:sldouglas
DRAFT
Paper Size A3
ClientLogo3
Flood Depth (m)0.00 - 0.050.05 - 0.150.15 - 0.50
0.50 - 1.001.00 - 1.501.50 - 2.002.00 - 3.00
3.00 - 4.004.00 - 5.00> 5.00mFlood Level (mAHD)
Attachment 10
230 Harbour Drive Coffs Harbour NSW 2450 Australia T 61 2 6650 5600 F 61 2 6652 6021 E [email protected] W www.ghd.com
2.6 m
2.6 m
2.6 m
3.2 m
2.4 m
2.6 m3.2 m
2.6 m
2.6 m
2.6 m
2.6 m
2.6 m
2.6 m
2.4 m
2.6 m
3.2 m
3.2 m
2.4 m
2.6 m
2.6 m
2.6 m
3.2 m
2.6 m
2.8 m2.6 m
2.6 m
RANKIN CLOSE
MAKINSON CLOSE
ROBY
PLAC
E
TEAL PLACE
JEFFRESS PLACE
BETE
LPALM
CLOSE
MINORCA PLACE
WO RLAND DRIVE
IBIS DRIVE
WALC
O DRIVE
WONGA
CLOSE
MARI
AN PL
ACE
EUNGELLA STREET
REX HARDAKER LANE
TWENTY-FIFTH AVENUE
JANE CIRCUIT
BELBOWRIE ROAD
HERON PLACEKINTORIE CRESCENT
BARDSLEY CRESCENT
KINCHE
LA
AVENUE
PEPP
ERMA
NR O
AD
FIRST AVENUELADY BELMORE DRIVE
CORR
IGAN AV
ENUE
JEMALO
NGCRESCENT
CRAF
T CL
OSE
BANGALEE CRESCENT
LALAGULI DRIVE
COORABIN CRESCENT
BARCOO COURT
ARMSTRONG ROAD
LINDEN AVENUE
TOORMINAROAD
NARIAH CRESCENT
AMAR
OOCR
ESCE
NT
MINORIE DRIVE
HOGB
INDR
IVE
SAWTELL ROAD
KINGP ARROT DRIVEPL
OVER
PLACE
BUTTERFLY CLOSE
NOOMBA STREET
CU
RLEW CRESCENT
CORA
MBAR
A CRE
SCEN
T
WERA
MBIE
STRE
ET
WIRR
ABILL
A DRIV
E
WY BALEN
ACR
ESCE
NT
ALLE
ENA
DRIVE
SUNB
IRDCRESCENT
SEA EA
GLE
DRIVE
HI-TE
CHDR
IVE
CAVA
NBA
ROAD
BOAMBEE CREEK
508,000
508,000
509,000
509,000
510,000
510,000
6,642,
000
6,642,
000
6,643,
000
6,643,
000
G:\22\16407\GIS\Maps\Deliverables\22_16407_G_F_1_6_PC25_100yr_Flood_Extent_and_Depth_RevA.mxd© 2015. Whilst every care has been taken to prepare this map, GHD (and LPI) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.
0 75 150 225 30037.5
MetresMap Projection: Transverse Mercator
Horizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 56
Coffs Harbour City CouncilBoambee newports CreekFloodplain Risk Management StudyFlood Extent and Depth
Appendix G.F.4
Job NumberRevision A
22-16407
01 May 2015
PC25 - 1% AEPo Date
Data source: LPI (2012), LPI Lot Boundaries, 2012. Created by:sldouglas
DRAFT
Paper Size A3
ClientLogo
4
Flood Depth (m)0.00 - 0.050.05 - 0.150.15 - 0.50
0.50 - 1.001.00 - 1.501.50 - 2.002.00 - 3.00
3.00 - 4.004.00 - 5.00> 5.00mFlood Level (mAHD)
Attachment 10
230 Harbour Drive Coffs Harbour NSW 2450 Australia T 61 2 6650 5600 F 61 2 6652 6021 E [email protected] W www.ghd.com
3.2 m
2.8 m
2.8 m
2.8 m
3.2 m
2.8 m 2.8 m
2.8 m
3.2 m
2.8 m
3.2 m
2.8 m
2.8 m2.8 m
2.8 m
2.8 m
2.8 m
2.8 m
2.8 m
2.8m
2.8 m
2.8 m
2.8 m
2.8 m
2.8m
2.8m
2.8 m
2.8 m
2.8 m
4.6m
2.8 m
2.8 m
3.4 m
3.2 m
3.2 m 3.2 m
2.8 m
2.8 m
RANKIN CLOSE
BALDW I N CLOS
E
PAY N
E CLO
SE
REX HARDAKER LANE
LEE COURT
HIBBARD CLOSE
TEAL PLACE
BET E
LPALM
CLOSE
LILLY PILLY
TERRACE
FORTITUDE PLACE
JACKLYN CLOSE
KEAR
N CLOSE
RIN GTAIL CLOSE
PALM
TREE
SDRIVE
LADY
BELM
ORED
RIVE
MCRAE CLOSE
KASCH ROAD
BARDSLEY CRESCENT
AVONLEIGH DRIVE
HAMI
LTON
DRIVE
DEANS ROAD
BLIG
H DR
IVE
CABA CLOSE
CRAF
T CL
OSE
PEPP
ERMA
NR O
A D
LAMB
ERTS
ROAD
SOUTH BOAMBEE ROAD
HOGB
INDR
IVE
MIDDLE BOAMBEE ROAD
LINDEN AVENUE
SAWTELL ROAD
PACIFIC HIGHWAY
WAGT
AILCL
OSE
SILVE
REYECL
OSE BUTTERFLY CLOSE
SHAW
S CLOSE
MOSE
LEY
DRIVE
CORRIGANAVENUE
MCALPINE WAY
CU
RLEW CRESCENT
ANNANDALE COURT
OSCAR RAMSAY D RIVE
IBIS DRIVE
BAYLISS AVENUE
SUNBIRDCR
ESCEN
T
SEA EA
GLE
DRIVE
WOR LANDDR
IVE
HI-TE
CHDR
IVE
BOAMBEE CREEK
BOAMBEE CREEK
CORDWELLS CREEK
CORDWELLS CREEK FLOOD CHANNEL
7.2 m
6.4 m
6.2 m
6.2 m6.4
m
4.8 m
7 m
3.8 m
7.4 m
5.8 m
4.8 m
6.2 m
9.2 m
4 m
8 m8.2 m
4.2 m
4.2 m
6.8 m
4.8 m
6 m
6.8 m
6.8 m
3.6 m
6.8 m
5.8 m
7.6 m
6 m
6.2m
6 m
7.6m
10.2m
4 m4 m
7.4 m
7.2 m
10 m
6.8m
7 m
6.8 m
3.8m
4.8m
9.6m
5.2 m
5.2 m
10 m
6.8 m
4 m
6.6 m
6.8 m
7.4 m
4.4 m
6.6 m
5.8 m
5.2 m
7.4 m
5.2 m
4 m
7 m
8.2 m
5 m
4.4 m
9.2 m
7.2 m
6.6 m
8 m
4.2 m
6.2 m
6.2 m
5.4 m
5.6 m
4 m
3.8 m
6.4 m
8.4 m 7.6 m
5.6 m
4.8 m
3.6 m
4.4 m
4.6 m
8.8 m
4.8 m
9.4 m
7.8 m
5.4 m
9 m
9.8 m
5 m
3.6 m
8.6 m
3.8 m
4.2 m
5.8 m
6 m
4.6 m
506,000
506,000
507,000
507,000
508,000
508,000
6,643,
000
6,643,
000
6,644,
000
6,644,
000
G:\22\16407\GIS\Maps\Deliverables\22_16407_G_F_1_6_PC25_100yr_Flood_Extent_and_Depth_RevA.mxd© 2015. Whilst every care has been taken to prepare this map, GHD (and LPI) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.
0 75 150 225 30037.5
MetresMap Projection: Transverse Mercator
Horizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 56
Coffs Harbour City CouncilBoambee newports CreekFloodplain Risk Management StudyFlood Extent and Depth
Appendix G.F.5
Job NumberRevision A
22-16407
01 May 2015
PC25 - 1% AEPo Date
Data source: LPI (2012), LPI Lot Boundaries, 2012. Created by:sldouglas
DRAFT
Paper Size A3
ClientLogo
5
Flood Depth (m)0.00 - 0.050.05 - 0.150.15 - 0.50
0.50 - 1.001.00 - 1.501.50 - 2.002.00 - 3.00
3.00 - 4.004.00 - 5.00> 5.00mFlood Level (mAHD)
Attachment 10
230 Harbour Drive Coffs Harbour NSW 2450 Australia T 61 2 6650 5600 F 61 2 6652 6021 E [email protected] W www.ghd.com
3.2 m
FOREST CLOSE
CURNUCK CLOSE
RAINTREE PLACE
JACKLYN CLOSE
SKYE
CLOS
E
BANF
F CLO
SE
AMANDA CLOSE
YARA
DPL
ACE
MCRAE CLOSE
KASCH ROAD
SAWTELL ROAD
BO RSATO
DRIVE
PLUN
KETT
CRESCENT
BLIG
H DR
IVE
CANA
LE D
RIVE
WEDDS ROAD
PACIF
ICHIG
HWAY
RAINFORDDRIVE
BAYL
ISS AV
ENUE
SYMONS AVEN
UE
PERKINS ROAD
LINDSAYS ROADMCALPINE WAY
AYRSHIRE PARK DRIVE
BOAMBEE CREEK
7.2 m
11 m
14.2 m
20.6
m
13.8 m
7 m
9.2 m
17.4 m
9.4 m
25.4
m
14 m
7.4 m
11.6
m
11 m
11 m
22 m
25.8 m
10.2 m
29 m
25.8 m
4.8 m
4 m
8 m
11.8 m
8.2 m
12.4 m
4.2 m
24.4 m
6.8 m
5.8 m
27.4 m
28.6
m
7.6 m12.2 m
13.8 m
6 m
13.8 m
6 m
12.2 m
27 m
29.4 m
12m
29 m
30.2 m
22.2m
28.2
m
18.6 m
12m
6.8 m
26.6 m
3.8m
4.8m
9.6 m
5.2 m
17.8 m
19.6 m
19.2 m
5.2 m
10 m
21.8 m
10.6 m
21 m 20 m
21.6 m
15.6 m
22.8 m
21.4 m
6.6 m
24.6 m
7.4 m
10.8 m
23.2 m23.8 m
18.2 m
23 m
5.2 m
10.4 m
10 m
15.2 m
5.8 m
15 m
7.4 m
12 m
15.8 m
7 m
8.2 m
11 m
4.4 m
9.2 m
7.2 m
14.8 m
11.4 m
6.6 m
16 m
8 m11.8 m
4.2 m
14.6 m
12 m
16.4 m16.8 m
25.4 m
6.2 m
17 m
25 m
10.2 m
5.6 m
12.8 m
4 m
17.4 m
8.4 m 7.6 m
17.6 m
26 m
14.4 m14.2 m
3.6 m
13.2 m
13.2 m4.6
m
26.2 m
8.8 m
4.8 m
7.8 m
5.4 m
9.6 m
9 m
14 m
9.8 m
5 m
13.8 m
12.6 m
8.6 m
3.8 m
12.2 m12.4 m
13.6 m
505,000
505,000
506,000
506,000
507,000
507,000
6,644,
000
6,644,
000
6,645,
000
6,645,
000
G:\22\16407\GIS\Maps\Deliverables\22_16407_G_F_1_6_PC25_100yr_Flood_Extent_and_Depth_RevA.mxd© 2015. Whilst every care has been taken to prepare this map, GHD (and LPI) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.
0 75 150 225 30037.5
MetresMap Projection: Transverse Mercator
Horizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 56
Coffs Harbour City CouncilBoambee newports CreekFloodplain Risk Management StudyFlood Extent and Depth
Appendix G.F.6
Job NumberRevision A
22-16407
01 May 2015
PC25 - 1% AEPo Date
Data source: LPI (2012), LPI Lot Boundaries, 2012. Created by:sldouglas
DRAFT
Paper Size A3
ClientLogo6
Flood Depth (m)0.00 - 0.050.05 - 0.150.15 - 0.50
0.50 - 1.001.00 - 1.501.50 - 2.002.00 - 3.00
3.00 - 4.004.00 - 5.00> 5.00mFlood Level (mAHD)
Attachment 10
230 Harbour Drive Coffs Harbour NSW 2450 Australia T 61 2 6650 5600 F 61 2 6652 6021 E [email protected] W www.ghd.com
AVON RISE
CARTEN CLOSE
SAND
STRE
ET
COLAC TERRA CE
COLL
ISONP
LACE
ELSW
ICK P
LACE
FLEMING CLOSE
MORRISON CLOSE
EELEY CLOSE
BURRIDGE AVENUE
MANSBRIDGE DRIVE
MATHIE STREET
ENGI
NEER
ING
DRIVE
FER A
NCR
ESCE
NT
STADIUMDRIVE
CORN
ISH ST
REET
FORG
E DRI
VE
ROBERT GARRETT STREET
WING
ARA
DRIVE
PHIL HAWTHORNE DRIVE
COOK DRIVE
NORTH BOAMBEE ROAD
ENGLANDS ROAD
ISLES DRIVE
REID DRIVE
HOGBIN DRIVE
PACIF
ICHIG
HWAY
WALLACE CIRCUIT
MENINDEE CIRCUIT
MAWSON CLOSE
LOUD
ENCL
OSE
RAYMCCARTHY DRIVE
KEONA CIRCUIT
LAKES DRIVE
HURL
EY D
RIVE
FRASER DRIVE
O'KEEFE DRIVE
INDUSTRIAL DRIVE
NEWPORTS CREEK
508,000
508,000
509,000
509,000
510,000
510,000
6,646,
000
6,646,
000
6,647,
000
6,647,
000
N:\AU\Coffs Harbour\Projects\22\16407\GIS\Maps\Deliverables\22_16407_G_H_1_6_PC25_100yr_Provisional_Hazard_RevA.mxd© 2015. Whilst every care has been taken to prepare this map, GHD (and LPI) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.
LEGEND0 75 150 225 30037.5
MetresMap Projection: Transverse Mercator
Horizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 56
Coffs Harbour City CouncilBoambee newports CreekFloodplain Risk Management StudyFinal Hydraulic Hazard
Appendix G.H.
Job NumberRevision A
22-16407
05 May 2015
1% AEPo Date
Data source: LPI (2012), LPI Lot Boundaries, 2012. Created by:rberg
DRAFT
Paper Size A3
ClientLogo
1Low hazardIntermediate HazardHigh hazard
NOTE: Flood Hazard has been calculated in accordance with Figure L2 of the Floodplain Development Manual 2005.
1
Attachment 10
230 Harbour Drive Coffs Harbour NSW 2450 Australia T 61 2 6650 5600 F 61 2 6652 6021 E [email protected] W www.ghd.com
ISLES DRIVE
HURLEY DRIVE
MANSBRIDGE DRIVE
DAKOTA DRIVE
NORTH BOAMBEE ROAD
FELLOWSHIP DRIVE
WING
ARA
DRIVE
REID DRIVE
COOK DRIVE
PHIL HAWTHORNE DRIVE
STADIUM DRIVE
DOUGKN
IGHT DRIVE
PACIF
ICHIG
HWAY
AVIATION DRIVE
HOGBIN DRIVE
AIRPORT DRIVE
KEONACIRCUITFRASER DRIVE
O'KEEFE DRIVE
NEWPORTS CREEK
509,000
509,000
510,000
510,000
511,000
511,000
6,645,
000
6,645,
000
6,646,
000
6,646,
000
N:\AU\Coffs Harbour\Projects\22\16407\GIS\Maps\Deliverables\22_16407_G_H_1_6_PC25_100yr_Provisional_Hazard_RevA.mxd© 2015. Whilst every care has been taken to prepare this map, GHD (and LPI) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.
LEGEND0 75 150 225 30037.5
MetresMap Projection: Transverse Mercator
Horizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 56
Coffs Harbour City CouncilBoambee newports CreekFloodplain Risk Management StudyFinal Hydraulic Hazard
Appendix G.H.
Job NumberRevision A
22-16407
05 May 2015
1% AEPo Date
Data source: LPI (2012), LPI Lot Boundaries, 2012. Created by:rberg
DRAFT
Paper Size A3
ClientLogo
2Low hazardIntermediate HazardHigh hazard
NOTE: Flood Hazard has been calculated in accordance with Figure L2 of the Floodplain Development Manual 2005.
2
Attachment 10
230 Harbour Drive Coffs Harbour NSW 2450 Australia T 61 2 6650 5600 F 61 2 6652 6021 E [email protected] W www.ghd.com
BALDW I NCL
OSE
PAYN
ECLO
SE
LEE COURT
CRAF
T CLO
SE
BETE
LPALMCLOSE
FORTITUDE PLACE
HAMI
LTON
DRIVE
PACI
FIC H
IGHW
AY
HI-TECH DRIVE
SAWTELL ROAD LAMB
ERTS
ROAD
HOGB
IN DR
IVE
PEPPERMANROAD
DUNLOP DRIVE
WOR LANDDR
IVE
BOAMBEE CREEK
NEWPORTS CREEK
508,000
508,000
509,000
509,000
510,000
510,000
6,644,
000
6,644,
000
6,645,
000
6,645,
000
N:\AU\Coffs Harbour\Projects\22\16407\GIS\Maps\Deliverables\22_16407_G_H_1_6_PC25_100yr_Provisional_Hazard_RevA.mxd© 2015. Whilst every care has been taken to prepare this map, GHD (and LPI) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.
LEGEND0 75 150 225 30037.5
MetresMap Projection: Transverse Mercator
Horizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 56
Coffs Harbour City CouncilBoambee newports CreekFloodplain Risk Management StudyFinal Hydraulic Hazard
Appendix G.H.
Job NumberRevision A
22-16407
05 May 2015
1% AEPo Date
Data source: LPI (2012), LPI Lot Boundaries, 2012. Created by:rberg
DRAFT
Paper Size A3
ClientLogo3
Low hazardIntermediate HazardHigh hazard
NOTE: Flood Hazard has been calculated in accordance with Figure L2 of the Floodplain Development Manual 2005.
3
Attachment 10
230 Harbour Drive Coffs Harbour NSW 2450 Australia T 61 2 6650 5600 F 61 2 6652 6021 E [email protected] W www.ghd.com
RANKIN CLOSE
MAKINSON CLOSE
ROBY
PLAC
E
TEAL PLACE
JEFFRESS PLACE
BETE
LPALM
CLOSE
MINORCA PLACE
WO RLAND DRIVE
IBIS DRIVE
WALC
O DRIVE
WONGA
CLOSE
MARI
AN PL
ACE
EUNGELLA STREET
REX HARDAKER LANE
TWENTY-FIFTH AVENUE
JANE CIRCUIT
BELBOWRIE ROAD
HERON PLACEKINTORIE CRESCENT
BARDSLEY CRESCENT
KINCHE
LA
AVENUE
PEPP
ERMA
NR O
AD
FIRST AVENUELADY BELMORE DRIVE
CORR
IGAN AV
ENUE
JEMALO
NGCRESCENT
CRAF
T CL
OSE
BANGALEE CRESCENT
LALAGULI DRIVE
COORABIN CRESCENT
BARCOO COURT
ARMSTRONG ROAD
LINDEN AVENUE
TOORMINAROAD
NARIAH CRESCENT
AMAR
OOCR
ESCE
NT
MINORIE DRIVE
HOGB
IN D
RIVE
SAWTELL ROAD
KINGP ARROT DRIVEPL
OVER
PLACE
BUTTERFLY CLOSE
NOOMBA STREET
CU
RLEW CRESCENT
CORA
MBAR
A CRE
SCEN
T
WERA
MBIE
STRE
ET
WIRR
ABILL
A DRIV
E
WY BALEN
ACR
ESCE
NT
ALLE
ENA
DRIVE
SUNB
IRDCRESCENT
SEA EA
GLE
DRIVE
HI-TE
CHDR
IVE
CAVA
NBA
ROAD
BOAMBEE CREEK
508,000
508,000
509,000
509,000
510,000
510,000
6,642,
000
6,642,
000
6,643,
000
6,643,
000
N:\AU\Coffs Harbour\Projects\22\16407\GIS\Maps\Deliverables\22_16407_G_H_1_6_PC25_100yr_Provisional_Hazard_RevA.mxd© 2015. Whilst every care has been taken to prepare this map, GHD (and LPI) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.
LEGEND0 75 150 225 30037.5
MetresMap Projection: Transverse Mercator
Horizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 56
Coffs Harbour City CouncilBoambee newports CreekFloodplain Risk Management StudyFinal Hydraulic Hazard
Appendix G.H.
Job NumberRevision A
22-16407
05 May 2015
1% AEPo Date
Data source: LPI (2012), LPI Lot Boundaries, 2012. Created by:rberg
DRAFT
Paper Size A3
ClientLogo
4
Low hazardIntermediate HazardHigh hazard
NOTE: Flood Hazard has been calculated in accordance with Figure L2 of the Floodplain Development Manual 2005.
4
Attachment 10
230 Harbour Drive Coffs Harbour NSW 2450 Australia T 61 2 6650 5600 F 61 2 6652 6021 E [email protected] W www.ghd.com
RANKIN CLOSE
BALDW I N CLOS
E
CHAR
KA
TE CLOSE
PAY N
E CLO
SE
REX HARDAKER LANE
LEE COURT
HIBBARD CLOSE
TEAL PLACE
BET E
LPALM
CLOSE
LILLY PILLY
TERRACE
FORTITUDE PLACE
JACKLYN CLOSE
KEAR
N CLOSE
RIN GTAIL CLOSE
PALM
TREE
SDRIVE
LADY
BELM
ORED
RIVE
MCRAE CLOSE
KASCH ROAD
BARDSLEY CRESCENT
AVONLEIGH DRIVE
HAMI
LTON
DRIVE
DEANS ROAD
BLIG
H DR
IVE
CABA CLOSE
CRAF
T CL
OSE
PEPP
ERMA
NR O
A D
LAMB
ERTS
ROAD
SOUTH BOAMBEE ROAD
BRUCE KING DRIVE
HOGB
INDR
IVE
MIDDLE BOAMBEE ROAD
LINDEN AVENUE
SAWTELL ROAD
PACIFIC HIGHWAY
WAGT
AILCL
OSE
SILVE
REYECL
OSE BUTTERFLY CLOSE
LINDSAYS ROAD
SHAW
S CLOSE
MOSE
LEY
DRIVE
CORRIGANAVENUE
MEAD OW VIEW CLOSE
MCALPINE WAY
CU
RLEW CRESCENT
ANNANDALE COURT
OSCAR RAMSAY D RIVE
IBIS DRIVE
BAYLISS AVENUE
SUNBIRDCR
ESCEN
T
SEA EA
GLE
DRIVE
WOR LANDDR
IVE
HI-TE
CHDR
IVE
BOAMBEE CREEK
BOAMBEE CREEK
CORDWELLS CREEK
CORDWELLS CREEK FLOOD CHANNEL
506,000
506,000
507,000
507,000
508,000
508,000
6,643,
000
6,643,
000
6,644,
000
6,644,
000
N:\AU\Coffs Harbour\Projects\22\16407\GIS\Maps\Deliverables\22_16407_G_H_1_6_PC25_100yr_Provisional_Hazard_RevA.mxd© 2015. Whilst every care has been taken to prepare this map, GHD (and LPI) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.
LEGEND0 75 150 225 30037.5
MetresMap Projection: Transverse Mercator
Horizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 56
Coffs Harbour City CouncilBoambee newports CreekFloodplain Risk Management StudyFinal Hydraulic Hazard
Appendix G.H.
Job NumberRevision A
22-16407
05 May 2015
1% AEPo Date
Data source: LPI (2012), LPI Lot Boundaries, 2012. Created by:rberg
DRAFT
Paper Size A3
ClientLogo
5
Low hazardIntermediate HazardHigh hazard
NOTE: Flood Hazard has been calculated in accordance with Figure L2 of the Floodplain Development Manual 2005.
5
Attachment 10
230 Harbour Drive Coffs Harbour NSW 2450 Australia T 61 2 6650 5600 F 61 2 6652 6021 E [email protected] W www.ghd.com
FOREST CLOSE
CURNUCK CLOSE
RAINTREE PLACE
JACKLYN CLOSE
SKYE
CLOS
E
BANF
F CLO
SE
AMANDA CLOSE
YARA
DPL
ACE
MCRAE CLOSE
KASCH ROAD
SAWTELL ROAD
BO RSATO
DRIVE
PLUN
KETT
CRESCENT
BLIG
H DR
IVE
CANA
LE D
RIVE
WEDDS ROAD
PACIF
ICHIG
HWAY
MIDDLE BOAMBEE ROAD
RAINFORDDRIVE
BAYL
ISS AV
ENUE
SYMONS AVEN
UE
PERKINS ROAD
LINDSAYS ROADMCALPINE WAY
AYRSHIRE PARK DRIVE
BOAMBEE CREEK
505,000
505,000
506,000
506,000
507,000
507,000
6,644,
000
6,644,
000
6,645,
000
6,645,
000
N:\AU\Coffs Harbour\Projects\22\16407\GIS\Maps\Deliverables\22_16407_G_H_1_6_PC25_100yr_Provisional_Hazard_RevA.mxd© 2015. Whilst every care has been taken to prepare this map, GHD (and LPI) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.
LEGEND0 75 150 225 30037.5
MetresMap Projection: Transverse Mercator
Horizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 56
Coffs Harbour City CouncilBoambee newports CreekFloodplain Risk Management StudyFinal Hydraulic Hazard
Appendix G.H.
Job NumberRevision A
22-16407
05 May 2015
1% AEPo Date
Data source: LPI (2012), LPI Lot Boundaries, 2012. Created by:rberg
DRAFT
Paper Size A3
ClientLogo6
Low hazardIntermediate HazardHigh hazard
NOTE: Flood Hazard has been calculated in accordance with Figure L2 of the Floodplain Development Manual 2005.
6
Attachment 10
230 Harbour Drive Coffs Harbour NSW 2450 Australia T 61 2 6650 5600 F 61 2 6652 6021 E [email protected] W www.ghd.com
AVON RISE
CARTEN CLOSEFARROW CLOSE
SAND
STRE
ET
COLAC TERRA CE
COLL
ISONP
LACE
ELSW
ICK P
LACE
FLEMING CLOSE
MORRISON CLOSE
EELEY CLOSE
BURRIDGE AVENUE
MANSBRIDGE DRIVE
MATHIE STREET
ENGI
NEER
ING
DRIVE
FER A
NCR
ESCE
NT
STADIUMDRIVE
CORN
ISH ST
REET
FORG
E DRI
VE
ROBERT GARRETT STREET
WING
ARA
DRIVE
PHIL HAWTHORNE DRIVE
COOK DRIVE
NORTH BOAMBEE ROAD
ENGLANDS ROAD
ISLES DRIVE
REID DRIVE
HOGBIN DRIVE
PACIF
ICHIG
HWAY
WALLACE CIRCUIT
MENINDEE CIRCUIT
MAWSON CLOSE
RAYMCCARTHY DRIVE
KEONA CIRCUIT
LAKES DRIVE
HURL
EY D
RIVE
FRASER DRIVE
O'KEEFE DRIVE
INDUSTRIAL DRIVE
NEWPORTS CREEK
508,000
508,000
509,000
509,000
510,000
510,000
6,646,
000
6,646,
000
6,647,
000
6,647,
000
N:\AU\Coffs Harbour\Projects\22\16407\GIS\Maps\Deliverables\22_16407_G_D_1_6_PC25_100yr_Diff_RevA.mxd© 2015. Whilst every care has been taken to prepare this map, GHD (and LPI) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.
0 75 150 225 30037.5
MetresMap Projection: Transverse Mercator
Horizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 56
Coffs Harbour City CouncilBoambee newports CreekFloodplain Risk Management StudyExisting vs PC25
Appendix G.D.
Job NumberRevision A
22-16407
05 May 2015
1% AEPo Date
Data source: LPI (2012), LPI Lot Boundaries, 2012. Created by:rberg
DRAFT
Paper Size A3
ClientLogo
LegendChange In Flood Level (mm)
. -500mm-500mm - -250mm
-250mm - -100mm-100mm - -50mm-50mm - -30mm
-30mm - -15mm-15mm - +15mm+15mm - +30mm
+30mm - +50mm+50mm - +100mm+100mm - + 250mm
+250mm - +500mmNo Longer Flooded
1
Attachment 10
230 Harbour Drive Coffs Harbour NSW 2450 Australia T 61 2 6650 5600 F 61 2 6652 6021 E [email protected] W www.ghd.com
ISLES DRIVE
HURLEY DRIVE
MANSBRIDGE DRIVE
DAKOTA DRIVE
NORTH BOAMBEE ROAD
FELLOWSHIP DRIVE
WING
ARA
DRIVE
REID DRIVE
COOK DRIVE
PHIL HAWTHORNE DRIVE
STADIUM DRIVE
DOUGKN
IGHT DRIVE
PACIF
ICHIG
HWAY
AVIATION DRIVE
HOGBIN DRIVE
AIRPORT DRIVE
KEONACIRCUITFRASER DRIVE
O'KEEFE DRIVE
NEWPORTS CREEK
509,000
509,000
510,000
510,000
511,000
511,000
6,645,
000
6,645,
000
6,646,
000
6,646,
000
N:\AU\Coffs Harbour\Projects\22\16407\GIS\Maps\Deliverables\22_16407_G_D_1_6_PC25_100yr_Diff_RevA.mxd© 2015. Whilst every care has been taken to prepare this map, GHD (and LPI) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.
0 75 150 225 30037.5
MetresMap Projection: Transverse Mercator
Horizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 56
Coffs Harbour City CouncilBoambee newports CreekFloodplain Risk Management StudyExisting vs PC25
Appendix G.D.
Job NumberRevision A
22-16407
05 May 2015
1% AEPo Date
Data source: LPI (2012), LPI Lot Boundaries, 2012. Created by:rberg
DRAFT
Paper Size A3
ClientLogo
LegendChange In Flood Level (mm)
. -500mm-500mm - -250mm
-250mm - -100mm-100mm - -50mm-50mm - -30mm
-30mm - -15mm-15mm - +15mm+15mm - +30mm
+30mm - +50mm+50mm - +100mm+100mm - + 250mm
+250mm - +500mmNo Longer Flooded
2
Attachment 10
GHDClient : Coffs Harbour City CouncilTitle : Boambee and Newports Creek FRMS Job No : 22-16407
www.ghd.com.au [email protected]
Tel. +61 2 6650 5601 Fax. +61 2 6650 5601230 Harbour Drive, Coffs Harbour
Boambee Newport Floodplain Risk Management Plan
Mitigation Options
purpose. They cannot be used for budget-setting purposes as common elements between options may have been omitted and/or the works not fully scoped. A functional design is recommended if a budget estimate is required.
SCHEDULE OF ESTIMATED QUANTITIESPAY ITEM DESCRIPTION OF WORK QTY UNIT RATE AMOUNT NOTES
1 Preliminaries1.1 Establishment 1 item 11000.00 $ 11,000 Allowance only1.2 Erosion and sediment control 1 item 11000.00 $ 11,000 Allowance only1.3 Traffic control 1 item 11000.00 $ 11,000 Allowance only
SUBTOTAL $ 33,000 2 Earthworks & General - Isles Drive2.1 Clear site of vegetation - light vegetation, over 500m2 4,180 m2 0.50 $ 2,090 -2.3 Excavate over site to reduce levels in light soil 1,150 m3 21.00 $ 24,150 -
Landscaping - hydro mulch sprayed grass seed 4,180 m2 0.30 $ 1,254 -Fence - supply and erect galvanised steel welded mesh 1.2m high 700 m 72.00 $ 50,400 Geotextile Mat - one layer of coir fibre between two layers of polymer mesh - 15-20 mm thick 4,180 m2 8.00 $ 33,440 product or similarMinor Works to culvert Crossing 1 item 100000.00 $ 100,000 Signage - warning signage around perimeter 1 unit 11000.00 $ 11,000
SUBTOTAL $ 222,334 3 Earthworks & General - Hospital Floodway3.1 Clear site of vegetation - light vegetation, over 500m2 13,010 m2 0.50 $ 6,505 -3.2 Excavate over site to reduce levels in light soil 9,450 m3 21.00 $ 198,450 -
Landscaping - hydro mulch sprayed grass seed 13,010 m2 0.30 $ 3,903 -Fence - supply and erect galvanised steel welded mesh 1.2m high 500 m 72.00 $ 36,000 Bollards - make good existing, relocate at completion of works 10,000 item 1.00 $ 10,000 Signage - warning signage around perimeter 1 unit 11000.00 $ 11,000
SUBTOTAL $ 265,858 4 Remove Obstructions under Pacific Highway4.1 Removal of gabions under Pacific Highway 1 item 100000.00 $ 100,000 Allowance only
SUBTOTAL $ 100,000
SUBTOTAL ITEMS 1-4 $ 621,192 5 Supervision, Project Management & Contractor On-Costs5.1 Supervision, Project Management & Contractor On-Costs (20%) 20 % - $ 124,238 -
SUBTOTAL $ 124,238 6 Contingencies6.1 Contingencies - General (30%) 30 % - $ 186,358 -
SUBTOTAL $ 186,358
SUBTOTAL ITEMS 1-6 $ 931,788 3 NBV Basin Works
Proposed (OPTN 4) Detention Basin in Upper North Boambee Valley 1 item 2992500.00 $ 2,992,500 63% of NBV Basin
SUBTOTAL $ 2,992,500 works costed by DGB
TOTAL (Ex-GST) $ 3,924,288
PC 25Re-Grade Isles Drive Drainage Channel, clean out, steepen batters to 1 in 2 and grass.
Re-Grade Hospital Flooday, widen, steepen batters to 1 in 4 and grass. Relocation of BollardsRemoval of obstructions under Newports Creek Bridge
NBV Basin Works
1G:\22\16407\Technical\Flood Damages\Flood Mitigation Levees - Detailed Costings\Updated Construction Cost Estimate - MASTER.xls
Page 1 of 1
1/12/2014 4:13 PM
Attachment 10
This document is in draft form. The contents, including any opinions, conclusions or recommendations contained in, or which may be implied from, this draft document must not be relied upon. GHD reserves the right, at any time, without notice, to modify or retract any part or all of the draft document. To the maximum extent permitted by law, GHD disclaims any responsibility or liability arising from or in connection with this draft document.
GHD | Report for Coffs Harbour City Council - Boambee Newports Creek Floodplain Risk Management Study and Plan,
22/16407
Appendix H Floodplain Risk Management Plan
Attachment 10
This document is in draft form. The contents, including any opinions, conclusions or recommendations contained in, or which may be implied from, this draft document must not be relied upon. GHD reserves the right, at any time, without notice, to modify or retract any part or all of the draft document. To the maximum extent permitted by law, GHD disclaims any responsibility or liability arising from or in connection with this draft document.
GHD 230 Harbour Drive Coffs Harbour NSW 2450 T: (02) 6650 5600 F: (02) 6650 5601 E: [email protected] © GHD 2012 This document is and shall remain the property of GHD. The document may only be used for the purpose for which it was commissioned and in accordance with the Terms of Engagement for the commission. Unauthorised use of this document in any form whatsoever is prohibited. N:\AU\Coffs Harbour\Projects\22\16407\WP\15288.docx Document Status
Rev No. Author Reviewer Approved for Issue Name Signature Name Signature Date
DRAFT1 RB SD & KB RB 08/09/14
DRAFT2 RB SD & KB RB 02/12/14
DRAFT3 RB SD & KB RB 06/05/15
DRAFT4 RB SD & KB RB 31/07/15
DRAFT5 RB SD & KB RB 24/09/15
Final DRAFT RB SD & KB RB 22/12/15
Attachment 10
This document is in draft form. The contents, including any opinions, conclusions or recommendations contained in, or which may be implied from, this draft document must not be relied upon. GHD reserves the right, at any time, without notice, to modify or retract any part or all of the draft document. To the maximum extent permitted by law, GHD disclaims any responsibility or liability arising from or in connection with this draft document.