Page 1: Aucun titre de diapositive - nisg.org.uk

Welcome toWelcome to

Page 2: Aucun titre de diapositive - nisg.org.uk

Who we areWho we are

Page 3: Aucun titre de diapositive - nisg.org.uk

What we doWhat we doWe are responsible for the following activity:

Supply of services to production

Fire detection and site sprinkler coverage

Non process project responsibility

Page 4: Aucun titre de diapositive - nisg.org.uk

Services to ProductionServices to ProductionSteam 22 bar, 16 bar & 8

barCompressed air 8 & 16 bar100 bar Hydraulics20 bar Hydraulics304 Hydraulics404 HydraulicsProcess Hot WaterCooling waterElectrical DistributionChilled waterVacuumSpace heatingSolvent

Page 5: Aucun titre de diapositive - nisg.org.uk

History LessonHistory LessonHistory LessonFollowing the industrial revolution steam usage became common place.Boiler explosions were almost a daily event1854 Manchester Steam Users Association formedAim was to reduce the number of explosions by examinationReduction was dramatic, only 8 out of 11,000 examined boilers explodedThis success led to the Boiler Explosions Act 1882Legislation remained limited to steam boilers, receivers and air receivers. Until ………….

Following the industrial revolution steam usage became Following the industrial revolution steam usage became common place.common place.Boiler explosions were almost a daily eventBoiler explosions were almost a daily event1854 Manchester Steam Users Association formed1854 Manchester Steam Users Association formedAim was to reduce the number of explosions by Aim was to reduce the number of explosions by examinationexaminationReduction was dramatic, only 8 out of 11,000 examined Reduction was dramatic, only 8 out of 11,000 examined boilers explodedboilers explodedThis success led to the Boiler Explosions Act 1882This success led to the Boiler Explosions Act 1882Legislation remained limited to steam boilers, receivers and Legislation remained limited to steam boilers, receivers and air receivers. air receivers. Until Until ……………………..

Page 6: Aucun titre de diapositive - nisg.org.uk

History LessonHistory LessonHistory Lesson

28 Killed and 89 Injured

Page 7: Aucun titre de diapositive - nisg.org.uk

Development Of LegislationDevelopment Of LegislationDevelopment Of Legislation

1977 First consultative document – too wide ranging1984 Second try – Formed the basis of the current regulations1989 Pressure Systems & Transportable Gas Container Regulations are introduced2000 Pressure Systems Safety Regulations revised and updated

1977 First consultative document 1977 First consultative document –– too wide too wide rangingranging1984 Second try 1984 Second try –– Formed the basis of the Formed the basis of the current regulationscurrent regulations1989 Pressure Systems & Transportable Gas 1989 Pressure Systems & Transportable Gas Container Regulations are introducedContainer Regulations are introduced2000 Pressure Systems Safety Regulations 2000 Pressure Systems Safety Regulations revised and updatedrevised and updated

Page 8: Aucun titre de diapositive - nisg.org.uk
Page 9: Aucun titre de diapositive - nisg.org.uk

PSSRPSSRPSSRGoal setting legislationAim is to prevent serious injury from the hazard of stored energy as a result of failure of a pressure system or one of its component partsSystems containing:

- Steam at any pressure- Gas > 0.5 barg ( 7.5psig )

Written Scheme Of Examination- What needs to be examined- How it should be prepared & examined- How often it needs to be examined

Goal setting legislationGoal setting legislationAim is to prevent serious injury from the hazard of stored Aim is to prevent serious injury from the hazard of stored energy as a result of failure of a pressure system or one of energy as a result of failure of a pressure system or one of its component partsits component partsSystems containing:Systems containing:

-- Steam at any pressureSteam at any pressure-- Gas > 0.5 Gas > 0.5 bargbarg ( 7.5psig )( 7.5psig )

Written Scheme Of ExaminationWritten Scheme Of Examination-- What needs to be examinedWhat needs to be examined-- How it should be prepared & examinedHow it should be prepared & examined-- How often it needs to be examinedHow often it needs to be examined

Page 10: Aucun titre de diapositive - nisg.org.uk

Pressure SystemPressure SystemPressure SystemOne or more pressure vessels

- Rigid construction- Protective devices- Pipework

Pipework attached to transportable pressure receptaclePipeline and its protective devices

One or more pressure vesselsOne or more pressure vessels-- Rigid constructionRigid construction-- Protective devicesProtective devices-- PipeworkPipework

PipeworkPipework attached to transportable pressure receptacleattached to transportable pressure receptaclePipeline and its protective devicesPipeline and its protective devices

Page 11: Aucun titre de diapositive - nisg.org.uk

PSSR at Michelin BallymenaPSSR at Michelin BallymenaPSSR at Michelin BallymenaOur insurance company is Allianz and we work closely with the insurance inspectors.Our systems are divided into a number of Written Schemes

* Factory Steam* Bld 5 Steam* Compressed Air 16 bar* Compressed Air 9 bar* Hydraulic System* Chiller Plant

All items on the scheme are given a unique ID number egBAL 001.

Our insurance company is Allianz and we work closely with Our insurance company is Allianz and we work closely with the insurance inspectors.the insurance inspectors.Our systems are divided into a number of Written SchemesOur systems are divided into a number of Written Schemes

* Factory Steam* Factory Steam* * BldBld 5 Steam5 Steam* Compressed Air 16 bar* Compressed Air 16 bar* Compressed Air 9 bar* Compressed Air 9 bar* Hydraulic System* Hydraulic System* * ChillerChiller PlantPlant

All items on the scheme are given a unique ID number All items on the scheme are given a unique ID number egegBAL 001.BAL 001.

Page 12: Aucun titre de diapositive - nisg.org.uk

PSSR at Michelin BallymenaPSSR at Michelin BallymenaPSSR at Michelin BallymenaAll items that require inspection are held on a data baseThis database holds info on each item such as serial number, system type and pressure, location in the factory and the last / next inspection date.

All items that require All items that require inspection are held on a data inspection are held on a data basebaseThis database holds info on This database holds info on each item such as serial each item such as serial number, system type and number, system type and pressure, location in the pressure, location in the factory and the last / next factory and the last / next inspection date.inspection date.

Each engineering department is responsible for the items in its own area and has its own written schemes where requiredBefore the due date the Insurance Inspector is contacted and a mutual time agreed for the inspection. The equipment is then taken out of service and made ready.

Each engineering department is responsible Each engineering department is responsible for the items in its own area and has its own for the items in its own area and has its own written schemes where requiredwritten schemes where requiredBefore the due date the Insurance Inspector Before the due date the Insurance Inspector is contacted and a mutual time agreed for is contacted and a mutual time agreed for the inspection. The equipment is then taken the inspection. The equipment is then taken out of service and made ready.out of service and made ready.

Page 13: Aucun titre de diapositive - nisg.org.uk

Two Part InspectionTwo Part InspectionTwo Part InspectionDuring part 1 the inspector physically examines all the component parts of the system including the safety devices.He is looking for corrosion, fatigue, creep etc. and if necessary will use ultrasonic / magnetic NDT tests to determine condition of vessels & pipework.On completion of the part 1 checks a certificate will be issued detailing any repair work necessary or allowing the system to bemade ready for part 2.During part 2 the system is put back to normal working pressure and then the inspector must witness operation of the safety devices eg. PRV’s and cut-outs.When the inspector is satisfied he will issue a new insurance certificate and the item can be put back into service.The database is then updated and new due date automatically created.

During part 1 the inspector physically examines all the componenDuring part 1 the inspector physically examines all the component t parts of the system including the safety devices.parts of the system including the safety devices.He is looking for corrosion, fatigue, creep etc. and if necessarHe is looking for corrosion, fatigue, creep etc. and if necessary y will use ultrasonic / magnetic NDT tests to determine condition will use ultrasonic / magnetic NDT tests to determine condition of of vessels & vessels & pipeworkpipework..On completion of the part 1 checks a certificate will be issued On completion of the part 1 checks a certificate will be issued detailing any repair work necessary or allowing the system to bedetailing any repair work necessary or allowing the system to bemade ready for part 2.made ready for part 2.During part 2 the system is put back to normal working pressure During part 2 the system is put back to normal working pressure and then the inspector must witness operation of the safety and then the inspector must witness operation of the safety devices devices egeg. . PRVPRV’’ss and cutand cut--outs.outs.When the inspector is satisfied he will issue a new insurance When the inspector is satisfied he will issue a new insurance certificate and the item can be put back into service.certificate and the item can be put back into service.The database is then updated and new due date automatically The database is then updated and new due date automatically created.created.

Page 14: Aucun titre de diapositive - nisg.org.uk
Page 15: Aucun titre de diapositive - nisg.org.uk

ThankThank--you for your you for your attentionattention