Outline
• Scope
• Challenges
• Operational Direct Broadcast Deployment
• User Readiness Risk Reduction
2
Scope (AWIPS Satellite Product Readiness)
• Multiple new satellite products expected next 18 months. Current "snapshot" of scope includes (~130 new products):– Himawari (23 total / 12 critical)– GOES-R Baseline (38 / 20)– SNPP (38 / 25...most critical's for AR)– GCOM ( 7 / 1)– GOES-R added (11 / 2)– GPM (11 / 4)– Sentinel / Radarsat (1 / 1)– SMAP (4 / 0)– Direct Broadcast Unique (?)
– CSPP-LEO ?– CSPP-GEO ?
3
Scope(continued)
• Rapid introduction of these products into operations due to "enabling" technologies about to be deployed.
• Enabling Technologies– Bandwidth Upgrades (Terrestrial & SBN)– Adhoc requests (PDA/AWIPS Data Delivery)– PDA subscription services– Direct Broadcast
• Forecasters will soon have greatly expanded product set available to them in AWIPS
4
AWIPS Satellite Product Readiness Challenges(A2 baseline development)
• A2-D2D and A2-NCP are on different operational deployment paths– D2D should be fully operationally deployed this fiscal
year– NCP operational deployment will extend into FY16
and likely into FY17• NAWIPS-to-A2-NCP transition
• AWIPS Development (plug-in) Freeze expected in 2016 due to contract re-compete
5
AWIPS Satellite Product Readiness Challenges(Data Distribution)
• AWIPS Data Delivery functionality dependent on interface with PDA OGC interface. PDA deployment for GOES-R and SNPP will occur end of this year with very stressing development / testing schedule.
• Utility of PDA subscription services are short term dependent on terrestrial communications upgrades (mostly CONUS WFO impact)
6
GOES-R Baseline Product AWIPS-II Plug-in Status
7
Available in AWIPS-II Build 15.1.1 (8 September deployment)– Aerosol Detection– Aerosol Optical Depth– Clear Sky Mask– Cloud/Moisture Imagery– Cloud Optical Depth– Cloud Particle Size Distribution– Cloud Top Height– Cloud Top Phase– Cloud Top Pressure– Cloud Top Temperature– Derived Motion Winds
– Derived Stability Indices– Downward Shortwave Radiation– Fire/Hot Spot– Land Surface Temperature– Vertical Moisture Profile– Vertical Temperature Profile– Rainfall Rate/QPE– Reflected Shortwave Radiation– Sea Surface Temperature– Snow Cover– TPW– Volcanic Ash
Available in AWIPS-II Build 16.1.1 ( 14 December deployment)– Hurricane Intensity Estimate - Lightning Detection
Currently Deployed
VIIRS Imagery Channels for AK Region (0.64 um, 3.74 um, 11.45um)
Western Hemisphere NUCAPS
Planned
VIIRS Near-Constant Contrast Imagery est. July 2015 distribution, AWIPS 15.1.1 baseline
Blended Products (e.g., Total Precip Water)
Pending
We would like to make many (most) other SNPP/JPSS products available when AWIPS Data Delivery functionality becomes available
S-NPP/JPSS Products Planned for AWIPS SBN Addition
9
Operational Direct Broadcast Deployment(NWS GOES-R/H8 Re-broadcast Antenna-System Implementation Project)
* NWS Sites Receiving GOES-R/Himawari Antennas. Some spare antennas not shown.
10
Site Name Start Civil Work
Civil Work Complete
Antenna Start Install
Antenna Install Complete
Rack Start Install
Rack Install Complete
Start CheckOut
Complete Checkout
SAT Start SAT Complete
Melbourne, FL 12/22/2014 4/15/20154/20/2015 (GRB)
5/1/2015 (GRB) 3/2/2015 3/25/2015 5/4/2015 5/5/2015 N/A N/A
Miami, FL 3/20/2015 4/24/2015 6/3/2015 7/10/2015 7/31/2015 8/12/2015 8/5/2015 8/20/2015 8/27/2015 8/27/2015
Norman, OK 5/18/2015 7/3/2015 7/6/2015 8/12/2015 7/15/2015 7/27/2015 7/18/2015 8/15/2015 8/26/2015 8/26/2015
Guam 6/1/2015 7/14/2015 10/5/2015 10/16/2015 10/8/2015 10/15/2015 10/12/2015 10/19/201510/30/2015 10/30/2015
Anchorage, AK 6/15/2015 7/17/2015 8/31/2015 9/18/2015 9/9/2015 9/16/2015 9/3/2015 9/21/2015 10/2/2015 10/2/2015
Honolulu, HI - H8RB 7/27/2015 7/29/2015 7/30/2015 8/12/2015 7/30/2015 8/11/2015 8/3/2015 8/16/2015 8/26/2015 8/26/2015
Kansas City, MO 7/31/2015 9/18/2015 9/21/2015 10/30/2015 9/30/2015 10/12/2015 10/5/2015 11/2/201511/13/2015 11/13/2015
Boulder, CO 9/7/2015 10/23/2015 10/26/2015 12/3/2015 11/4/2015 11/16/2015 11/9/2015 12/5/201512/20/2015 12/20/2015
College Park, MD 9/15/2015 10/30/2015 11/2/2015 12/7/2015 11/16/2015 12/1/2015 11/19/2015 12/10/201512/21/2015 12/21/2015
Honolulu, HI - GRB 10/5/2015 10/7/2015 10/8/2015 10/21/2015 7/30/2015 8/11/2015 10/11/2015 10/24/2015 11/4/2015 11/4/2015
Operational Direct Broadcast DeploymentDeployment Schedule
11
AWIPS Support for Direct Broadcast
• Geostationary – expectation is that no unique AWIPS development needed– DB system output will conform to GOES-R and Himawari output
standards– True for Harris and/or UW/CSPP-GEO
• Polar – expectation is that no unique AWIPS development needed– DB processing via UW/CSPP-LEO– DB system output will conform to SNPP/JPSS output standards
12
User Readiness Risk Reduction(Total Operational Weather Readiness-Satellites – TOWR-S)
• Objective – Evaluate the operational viability of GOES-R and JPSS satellite data and systems in support of the NWS forecast and warning missions
• How? work with NWS operations to develop a broad sample of NWS use cases and leverage GOES-R Data Operations Exercise (DOE-4) to validate entire system readiness
13
TOWR-S Milestones
Event Date Purpose Status
AWIPS Test #3 Jan 20 – 23 2015 Stress testing of Severe Thunderstorm Warning and Red Flag Warning A2 Procedures, Himawari simulated imagery Complete
Satellite Science Week Meeting Feb 23-27 2015 Side meeting - NWS Operational & Training Participation
exploitation planning for AWIPS Test 4, Poster presentation Complete
AWIPS Test #4 May 11 – 15 2015 Stress testing of TAF, Dust Storm Warning, and Deterministic Hydrologic Forecast A2 Procedures Occurring NOW
Proving Ground/User Readiness Meeting June 15-19 2015 Detailed planning for DOE-4 exploitation integrated across
agenda Planned
Ground Readiness Exercise (GRE)
July 27 – Aug 2 2015 Dataflow checkout for DOE-4 Canceled
SOO/DOH Conference Sept 14-18 2015 Daily weather briefings using simulated GOES-R data Planned
DOE – 4 Oct 5 – Nov 11 2015
Full end-to-end data flow test from GOES-R Ground Segment to AWIPS-2 terminals at participating stakeholder
locations (WFOs, National Centers, etc)Planned
Post DOE & GOES-R OT&E TOWR
activities2016
Focused enhancements in AWIPS, integration of Direct Broadcast capabilities, CONOPS development, further
enhancements of capabilities into NWS operationsTBD
AWIPS Tests – Coordinated with AWIPS-2 contractor Raytheon to evaluate AWIPS-2 functionality and performance under simulated GOES-R data load
Data Operations Exercises (DOEs) – Validation of NWS capability to effectively integrate GOES-R products into the forecast and warning mission areas.
Summary & Discussion
• Many new satellite capabilities being fielded within the next 18 months – Exciting and Challenging!
• Challenges – AWIPS deployments, Plug in development, functionality with new distribution systems, inter-related projects being delivered at about the same time. NWS Forecaster Training.
• Direct Broadcast – Most Himawari and GOES-R systems being deployed this year. LEO systems – Alaska DB system should be declared operational by end of this year. Other systems Guam, portions of Mitchnet project could become operational in the future
• Risk Reduction – TOWR-S end-to-end validation...then 2016!