CHAPER III
ACTIVITY
A. The placement of work
During the COOP program author placed at the Logistic Land, Sea, and Air
(LSA) at LSA/toll/OFF in Total Logistic Tanjung Batu, with Mr. Eddy Soesanto as
Head Services and as mentor Mr. Asep Burhanudin% u2013 Juwaini Fahmi with a
position as a logistics supervisior at Tanjungbatu.
Figure 3.1Operational Site POSB
Participants of the COOP has a mentor who is selected from one of the officer
and to provide Logistic Tanjung Batu would be no Supervisor who will guide and
provide a referral patterns of work that will be done during the COOP program in
progress.
15
B. Activities Performed
The activity of work done during in Tanjung Batu logistic is:
1. Fresh Water back charge project
Background:
In contractual arrangement, rigs should have the ability to fulfill its own water,
for example, it has water maker by it’s own. However , if there a special situation where
rigs were not able to meet their needs, for example because of the damage of water
maker TEPI should give the supply of clean water for the sake of keeping the smooth
running of the production activity. Of course it is not just for free, TEPI would impose a
charge back mechanism to the contractor third parties such as the payment for service.
Currently there is no basic mechanism to calculate the value of the buyback
charge. The purpose of this project is to make a basic system to calculate similar
problems. In 2003 , TEPI issued a memo detailing the mechanism of the charge back .In
the memo there are 3 type charge back mechanisms:
1. The supply of fuel and clean water where the product of TEPI in the transfer using three parties using contractor ship. The parameters that must be calculated:
o Fixed cost : The cost of preparation , supervision , and the risk of security
and environment to be borne by TEPI.o Variable cost : Actual price of fuel or the X clean water the quantity of
products in the supply.o Administration fee : (10% * (fixed cost + variable cost))
1. Shipment use: the TEPI ships fleet. Be used to transport the product of a third party contractors .Parameter that must be in the count:o Fixed cost : The cost of preparation , supervision , and the risk of security
and environment to be borne by TEPI.o Variable cost : The time of preparation in actual x ( the rental price of a ship
daily + salary the crew)o Administration fee : (10% * (fixed cost + variable cost)
2. “Door-to-door” service: In product TEPI conveyance using a fleet of ships TEPI to fulfill needs konraktor into three parties .Parameters that must be in the count:
16
o Fixed cost : The cost of preparation , supervision , and the risk of security
and environment to be borne by TEPIo Variable cost -1: The time of preparation in actual x ( the rental price of a
ship daily + salary the crew)o Variable cost -2: Actual price of fuel or clean water x the quantity of
products in the supplyo Administration fee : (10% * (Fixed cost + variable cost -1 + variable cost-
2)
Logistics base in Tanjung Batu supplies 3 type fleet off the coast of belonging to TEPI:
Rig :o Raniworo that operated by PT APEXINDO
o Parameswara that operated by Shelf Drilling
o Soehanah that operated by PT APEXINDO
o Constellation-1 that operated by Transocean Ltd.
o Hakuryu-10 that operated by Japan Drilling Company (JDC)
Barge : o Logindo reliance that operated by PT Logindo
o Logindo radiance that operated by PT Logindo
o Fiore that operated by TBC
o Pelangi operated by Tirta mas
Off shore ships: TEPI Full responsibility for the fulfillment of their clean water
needs .Covering the ships AHTS, tug boat, surfer, etc.
The mechanisms and parameters needed:
The supply amount of clean water (in Metrik Ton)
The total of boat load > total of deck, bulk, dan liquid tank of the carrying ship
(in Metrik Ton)
The daily cost of the ships (USD/day)
Cost of the fuel (aktual)
The consumption of fuel (in Liter)
Some of the calculation used for determination:
17
Back charge = fix cost + variable cost -1 + variable cost -2 + administration fee
o Fix cost = US$ 138.80 (preparation cost, supervision, security risk and
Environment that must be borne by TEPI)
o Variable cost -1 = ((duration transport *( the rental price of a ship daily + salary
the crew)* cargo coefficient)
Transport duration: count as different time since the sips depart from
POSB Tanjung Batu until the end of time of transfer of the clean water.
The rental of the ships daily (in USD/day)
Minimum daily salary of the ship crew: US$ 68.40 (international)
Cargo Coefficient: Clean water amount / total ship load
o Variable cost -2 = variable fresh water + variable fuel
Fresh Water Variable = fresh water per metric ton * total fresh water (in
MT)
Fuel Variable = consumption fuel (L)* fuel cost (aktual USD/L)
Administration fee = 10 % * (fix cost + variable cost -1+ variable cost -2)
18
Figure 3.2Memo back charge
2. AHTS Fuel Monitoring
AHTS mainly built to handle anchors for oil rigs, tow them to location, anchor
them up and, in a few cases, serve as an Emergency Rescue and Recovery
Vessel (ERRV). They are also used to transport supplies to and from offshore
drilling rigs. Many of these vessels are designed to meet the harsh conditions of
the North Sea, and can undertake supply duties there between land bases and
drilling sites. In order to control the fuel that used by the vessel, TEPI creates
form in excel to control the use of the fuel by monitoring it every day by asking
the vessel crew to send a “vessel daily report” every day.
19
Figure 3.3Fuel calculation
3. CCU Report and Record
CCU Report and Record is activity in tracking every movement of CCU
( Cargo Carrying Unit ). CCU is used to send general cargo which allows it to
packed into it, CCU with the shipment goal from/to Offshore. CCU Composed
of different kinds as an example: Pallet Basket ( PB ), General Basket, Waste
Basket, Long Basket, etc. there are 120 CCU type of Pallet Basket that traced by
this job. Every day this CCU recorded base on the manifest shipment of the ship
that carrying this CCU.
Figure 3.3Pallet Basket Record
3. Create Summary Boat Planning
At the beginning of month, all the movement of a ship in boat planning will be
summed days elapsed the throughout the month .Summary of this it can be determined
20
Color : Yellow Length : 3150cmWidth : 1950cmHeight : 1950cmTare : 1500kgPayload: 5000kgMGW : 6500kg
how long a ship spend time per day in a month. After the boat planning set by drilling
coordinator then team from logistic manage to loading the tool or equipment that has to
sent to riq as per their request.
BOAT PLANNING & RECORD AUGUST - 2014
POSB 5 6 6 2 3 6 6 6 6 6 6 1 1 6 6 3 5 6 6 6 6 6 6 6 6 6 5 5.75 daysSoehanah 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 1 6 6 6 6 6 6 6 6 6 6 6 6 6 6 3 1 6 6 6 6 6 6 6 6 6 5 6 6 6 6 5 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 1 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 21.66667 daysParameswara 3 0.125 daysHakuryu-10 4 208.1042 daysRaniworo 2 2 0.166667 daysConstellation-1 3 0.125 daysOther 0 daysPOSB 6 6 6 5 6 6 6 6 6 6 3 6 6 6 6 6 6 6 6 6 6 6 4 6 6 6 6 6 6 6 6 6 6 6 6 6 6 8.979167 daysSoehanah 3 6 6 6 6 6 6 6 6 5 6 1 1 5 3 6 6 6 6 6 6 6 6 6 6 6 3 5 6 6 6 6 6 1 6 6 6 2 6 6 6 6 2 5 6 6 6 6 6 6 6 1 5 4 6 11.91667 daysParameswara 1 2 1 6 6 6 0.916667 daysHakuryu-10 1 2 1 0.166667 daysRaniworo 2 6 1 3 1 3 2 6 2 1.083333 daysConstellation-1 2 5 6 6 6 6 6 6 3 1.916667 daysOther 2 2 0.166667 daysPOSB 5 6 5 2 6 3 5 6 6 6 6 3 6 6 6 6 6 1 6 6 6 6 6 6 1 6 6 6 6 6 6.541667 daysSoehanah 0 daysParameswara 2 3 5 0.416667 daysHakuryu-10 3 4 0.291667 daysRaniworo 6 6 6 6 6 6 6 6 6 1 3 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 3 6 5 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 5 5 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 3 6 20.54167 daysConstellation-1 2 0.083333 daysOther 3 4 0.291667 daysPOSB 5 6 6 4 3 6 6 6 6 6 5 5 6 6 4 6 6 6 6 6 4 5 6 6 6 6 6 1 6 6 6 6 6 7.5 daysSoehanah 0 daysParameswara 2 3 6 6 6 6 6 6 6 6 6 6 6 5 6 6 6 6 6 6 6 6 6 6 6 3 4 6 6 6 6 6 6 6 6 2 6 6 6 6 6 6 6 6 6 4 2 6 6 6 6 6 6 6 2 5 6 6 6 6 6 2 6 6 6 6 6 6 6 3 4 16.20833 daysHakuryu-10 1 1 2 0.166667 daysRaniworo 2 1 1 6 6 6 6 6 6 6 6 2.166667 daysConstellation-1 2 6 6 6 0.833333 daysOther 0 daysPOSB 5 6 6 6 5 6 6 6 6 6 6 6 6 6 6 6 6 6 6 5 1 6 6 6 6 6 4 6 6 6 6 5 4 6 6 8.208333 daysSoehanah 1 1 1 0.125 daysParameswara 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 5 4 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 4 5 6 6 6 6 6 6 6 6 6 1 5 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 18.25 daysHakuryu-10 3 2 0.208333 daysRaniworo 1 0.041667 daysConstellation-1 0 daysOther 0 daysPOSB 6 6 6 4 6 6 6 6 3 6 6 6 6 5 3.25 daysSoehanah 1 1 0.083333 daysParameswara 2 0.083333 daysHakuryu-10 4 6 1 4 6 4 3 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 5 5 6 6 6 6 6 6 6 6 6 6 6 9.333333 daysRaniworo 2 2 0.166667 daysConstellation-1 5 6 6 6 6 1 4 6 6 6 6 6 6 6 6 6 6 6 2 4.25 daysOther ` ` ` 2 0.083333 daysPOSB 1 4 3 6 6 6 6 3 2 6 6 6 2 6 6 6 2 6 6 6 6 5 4 6 6 3 5.208333 daysSoehanah 6 5 3 0.583333 daysParameswara 5 6 6 6 6 1.208333 daysHakuryu-10 6 3 6 6 6 4 3 5 6 6 6 6 6 6 3 5 1 1 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 5 6 3 6 6 6 6 6 6 6 6 6 1 1 6 6 6 12.95833 daysRaniworo 2 0.083333 daysConstellation-1 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 4 1 2 1 1 3 1 3 2 1 6.041667 daysOther 0 daysPOSB 6 6 6 6 6 6 4 3 6 6 6 6 6 6 6 2 1 6 6 6 6 6 6 1 4 6 6 6 6 6 6 6 6 1 4 6 5 4 6 6 6 8.958333 daysSoehanah 3 0.125 daysParameswara 0 daysHakuryu-10 2 3 0.208333 daysRaniworo 1 6 6 6 6 6 6 5 4 6 3 3 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 5 6 6 6 6 6 6 6 5 6 6 6 6 6 6 6 6 6 6 1 5 3 6 6 6 6 6 6 6 6 6 6 6 6 6 6 16.45833 daysConstellation-1 3 1 6 6 6 6 6 6 6 6 6 6 6 6 6 6 4 3.833333 daysOther 0 daysPOSB 1 6 6 6 6 6 6 6 6 3 5 5 6 6 6 6 6 3 1 6 6 6 6 6 5 5.458333 daysSoehanah 1 0.041667 daysParameswara 0 daysHakuryu-10 1 6 6 6 6 6 5 6 6 6 6 6 6 6 6 1 1 3.583333 daysRaniworo 2 2 0.166667 daysConstellation-1 6 6 6 3 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 5 4 6 6 6 5 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 1 5 6 6 6 6 6 6 6 18.45833 daysOther 0 days
SUN
24
MON
25
SUN
31
TUE
26
WED
27
THU
28
FRI
29
SAT
30
THU
21
FRI
22
SAT
2318
TUE
19
WED
20BOAT NAME LOCATION
TUE
12
SAT
2
SUN
3
MON
4
TUE
5
MON
11
SUN
MV.TRANSKO ANDALAS
(AHTS)
MV. LOGINDO DESTINY (AHTS)
MV. LOGINDO STATURE
(AHTS)
MV. ERA INDONESIA
(AHTS)
MV VELOCE (AHTS)
MV.SMS ENDEAVOUR
(AHTS)
SERVEWELL SINCERE
(PSV)
MV.ERA INDONESIA SATU
(AHTS)
10
WED
6
THU
7
FRI
8
SAT
9SUM DAYS
FRI
1
MV. TRANSKO CELEBES
(AHTS)
WED
13
THU
14
FRI
15
SAT
16
SUN
17
MON
195 Jts 9.5/8" V.Top,
Food (Hakury u)Food (Soehanah)
Food (PMS)Food (Const-1) Food (Rani)
CLEANING TANK
To: HKY
MUD #125
T/O
4x 13.3/8" Pup
To:
MO #030MUD #029
Food (Soehanah)
Food (PMS)
KCL BB
3x Empty BasketCMT #126
Food Stuff
Base Oil
To: Rani
Food Stuff
13.5/8" Cameron Equipment
To: PMS
Food StuffTo: SOE
LTOBM
To: HKY
Mud Product
320 jts DP 5" GPDS-
W/Ford WBC tool
Food (Hakury u)Food (Const-1) Food (Rani)
40x 4.5"Tubing VTNE
40x 4.5"Tubing JFEB
11x 4.5" PJ, VTNE
Econorap
2x 36" CP PUMA
Cameron Equipment
6x Hallco Logging
8.1/2" Rock Bit
Transfer 16" Sperry BHA
From HKY to Rani
48x PJ, VFJL
Tesco Handling
MUD #27- rev 1
13.5/8" Casing (PK-J3)
35 Jts 13.3/8" Casing , bevelled (PK-J3)
1x 13.3/8" Float Shoe
Food Stuff
KCL BB
CMT #57
To: CS
Fishing Tool Smith
WTN FormCameron Skid TS #02
27" Sperry Stabilizer
1x 13.3/8" Float Collar4x 13.3/8" Bakerlock
CMT #45MUD #82
KCL BB
Tesco Power pack 16" Bit PDC
To: Rani
33.7" Taper Mill
To: CS
To: HKY
Smith 6.1/4" Jar
To: CS
Cameron Equipment
Sperry Motor & StabMUD #29
To: SOESLB Welltesting Equipment
Food Stuff
Smith 16" Bit Nozzle
Cam 30" Div erter Adapter
To: HKY
2x 9.5/8" X/O
Transfer KCL
To: CS-1
LTOBM
MUD #130
de-anchor jobTo: SSB
To: CS
12.1/4" HDBS Bit
Sperry Equipement
90 Jts 13.3/8" Casing , bevelled (PK-J11)
2 Jts 13.3/8" F.Collar, bevelled (PK-J11)
2 Jts 13.3/8" F.Shoe, bevelled (PK-J11)
50x 13.3/8" Bow Centralizers
To: CS-1
12.1/4" Rock Bit Smith +
CMT #47 MUD #84 Shelfdrilling Mterl
Food stuff
Shelf drilling materials
Food stuff
Cement # 61
Apex indo drilling materials
Food (Soehanah)
Food (PMS)
Food (Const-1) Food (Rani)
Mud # 031
Halliburton E-line
Apex indo drilling materials
Mud # 96
To: CS-1
8" PDM Sperry tool + 3 ea 6.1/2" Smith Drilling jar + transfer OBM
To: Hakury u
To load 9.5/8" motor
To: L.Reliance
Transfer D.w ater
Ex pro W.Test Container
200 M3 Fuel
Mud # 31
To: Hakury u
To transfer 100M3 Base-oil
MI Filtration equipment
CMT #136
Mud #135 & 133
JDI drilling equipment
Transocean drilling materials
Cement & mud product
To: Hakury u
To transfer 200M3 KCL Brine
To: Raniworo
3 ea 13.3/8" Buttress P.joints
Cement # 049
Mud# 086
Transocean drilling equipment
12.1/4" Anadril package
3 ea 12.1/4" PDC bit
Mud # 33
Apex indo drilling materials
110 Sets 13.3/8" Bow centralizer + stop collar + 1 set 13.3/8" Bottom /
Shelf drilling materials
JDI drilling materials
Food stuff
CO # 025
97 jts 13.3/8" Buttress, 68#, K55, R3 + P.Joints
1 set 13.3/8" Buttress F.shoe / F.collar joints
70 jts 13.3/8" Buttress, 68#, K55, R3 + P.Joints + shoe-
track joints
1 set 13.3/8" Buttress F.shoe / F.collar joints
1 set 13.3/8" Buttress F.shoe / F.collar joints
13.3/8" Bow centralizer package
Cement & mud product
9.5/8" Tesco csg equipment 3 Jts 9.5/8" V.Top,53.50#, P110, R3 + 9.5/8" P.Joints Cement # 16
Food stuff
Superior sump packer + w ash pipe + screen
Completion container
Smith w ell commander
To: Parameswara
To transfer 23 Jts 13.3/8" Buttress, 68#, K55, R3
To: Raniworo
Food stuff
To: Soehanah
To transfer 100 M3 OBM
Tesco tubing equipment & handling tools
JDI drilling materials
Competion chemical
60 Bag KCL Big Bag
Shelf drilling materials
100 Jts 9.5/8" TMS,53.50#, P110,R3 ( First-trip )
9.5/8" X 12.1/4" slider centralizer + stop collar + 2 sets
9.5/8" Bottom & Top Plug
178 Jts 9.5/8" TMS,53.50#, P110,R3 ( Second-trip )
9.5/8" TMS Reamer shoe /F.collar joints + 4 ea 9.5/8"
P.joints v ariuos length
Food Stuff
Food Stuff
Apex indo drilling materialsMud # 35 Cement # 18
2 ea 12.1/4" PDC HDBS bit + 1 ea 8.1/2" PDC bit
Mud & cement product
Schlumberger Anadrill Jar
To: Hakury u
To transfer 150 M3 OBM
To: Hakury u
Food stuff
To: CS-1
Cameron compact W.head + accessories
Transocean drilling materials
To: Soehanah
MI Filtration equipment
Schlumbeger logging tools
To: Hakury u
To pick-up Hallco logging cable from HKR for
To: SoehanahBack load Hallco logging cable
CO # 026
Food Stuff
Halliburton Gy rodata tool
9.5/8" CIW csg hanger + R.Tool & accessories.
100 Jts 13.3/8" Casing package + aceesories + Pup Jts + Centralizer , if
enough (First-trip )
Mud # 104
MO # 034
To: CS-1
To: Soehanah
To transfer 100 M3 Base-oil
Mud & cement product
9.5/8" Casing hanger R.tool + 3 Jts 9.5/8" V.Top + 3 ea
9.5/8" V.Top P.joints
To: Rani
To transfer 4 baskets Cement product
Food (Hakury u) Food (Soehanah)
Food (PMS)
Food (Const-1) Food (Rani) Food (Hakury u) Food (Soehanah)
Food (PMS)
To: CS-1Air compressor + 375 Jts 5" GPDS + 3
P.Joints v arios length + X-over + Food stuff
Hallco logging tools
Apex indo drilling materials
200 Jts 4.1/2" JFE bear ,13.50#, L80,R3 + 40Jts 4.1/2" VTNE
,specials drift
Upper Completion materials + Ex pro W/line equip + DH tools + X-mas-tree + 3 sets 13.3/8" specials rigid centralizer + stop collar
32 Jts 9.5/8" TMS,53.50#,
Mud # 37
Cement# 39
Shelf drilling materials
Scomi equipment
To: Soehanah
To transferrng 64 M3 OBM to CS-1
To transferring KL brine
122 Jts 9.5/8' V.Top (L80 ) + 77 Jts TMS (P110 ) + Reamer
shoe + F.collar +Bow Slider centralizer + stop collar + slings
Cement # 65
Mud & cement product
Shelf drilling materials
8.1/2" Phase Anadrill tool
60 Jts 5" DP + 10 Jts5" HWDP + apex indo materials.
3 ea 8.1/2" Diamant PDC bit MR616 & HDBS MM65DM
2 ea 9.5/8" TMS ,53.50#, P110 CIW casing hanger
To: CS-1
To: HKY
Tesco Tbg equipment
To: Rani
To pick-up 9.5/8" Sperry motor
360x 3.1/2" Tubing
Ex pro W/line
To transfer OBM for Soehanah
Tesco Pkg
60 Jts 9.5/8" TMS,53.50#, P110, R3 (First -Trip )
2 sets 9.5/8" TMS CIW casing hanger ( P110 )
To: RaniworoFood Stuff
1 ea Sperry empty basket
Smith rhino reamer + JarFood stuff
13.3/8' X 28" Centralizer
12.1/4" phase Sperry tools + 2 ea 8" Smith Jar
9.5/8" Semi rigid centralizer + stop collar
2 ea 8.1/2" +6" HDBS PDC bit
130 Jts 9.5/8" TMS,53.50#, P110, R3 ( Second -Trip )
9.5/8" TMS Reamer shoe + F.collar joints + 5 Jts 9.5/8'
TMS bakerlock coupling
Hallco logging
Food stuff
Shelf drilling materials
Food stuff
Ex pro W.test Equipment
JDI drilling materials
3.1/2" x 8.1/2" Centralizer + stop collar
MUD #043
To: CS-19.5/8" Reamer Shoe & Float Collar
5" DP GPDS-50
MUD #94
To: HKY
Transfer Fuel
CMT #027
To: Rani
CMT #067
76 Jts 9.5/8" TMS,53.50#, P110, R3 ( Third-Trip )
LTOBM
CMT#69
CMT #063
Food Stuff
MUD #108
Tesco Equipment
9.5/8" PJ-Vtop
CMT #21360x 4.1/2" Tubing
Cameron Xmas Tree
Anadril JarsApex indo Materials
MUD #96
MUD #141
To: HKY
3x Empty Basket
C
T
36" CP Puma
36" Cameron Equipment
MUD #090-rev 1
36" Cameron DHSD
30" Riser Cameron
Cameron Mini Tree
125x 13.3/8" Casing beveled
Base Oil
To: HKY 13.3/8" Tesco Handling
Sperry MWD
Indo Flag
MUD #94
CMT #59
Transfer KCL
100x 13.3/8" Bow centralizers
de-anchor job
Mud # 102
Apex indo drilling
materials
1 set 13.3/8" F.shoe / F.collar joint + 3 Jts 9.5/8' shoetrack joints
Cement #63
Cameron compact W.head + R.tool + acc
To: Hakury u
MI Filtration equipment
To: CS-1
Superior G.Pack tool + Food stuff
Halliburton Logging equipment + Ex pro W/Line equipment
Total w ireline riser + riser accessories
To transferring KL brine
To: Soehanah
To sw ap with Veloce
TANK CLEANING
MUD #106
13.3/8' X 28" Centralizer
PDC Bit
CMT #67
Base Oil & KCL BB
To: Rani
CMT #144
Cameron Xmas Tree
Apex indo Material
CMT #142
21.1/4" Drl Riser
To: CS
Transocean Materials
CMT #23
MUD #98
OBM
Food Stuff
To: PMS
Transfer OBM
Smith WellComm
Anadril Tool
Sperry BHA 16"
#143
From HKY to Rani:
8" Motor BHA
Cameron Tubing Hanger
Smith Drl jars
Sperry BHA 12.1/4"
Food Stuff
LTOBM
4x Empty Basket
MUD #145
MUD #145
200M3 Base Oil
To: Rani
MUD #110
MUD #110
To: PMS
MUD #100
OBM
1x Sperry Tool 12.1/4"
9.5/8" Landing Joint
Apex indo Drill Pipe
MUD #102
JDI Materials
Transfer OBM
Shelfdrilling Materials
FMC 30" Div erter
Food Stuff
9.5/8" Casing TMS = 150 Jts + Access
9.5/8" Tesco +CDS
B/U MiniTree
To: PMS
To: Rani
9.5/8" Centralizers
Cameron Equipment
To: PMS
9.5/8" Casing TMS = 125 Jts
200 M3 OBM
Cameron equipment
MUD #112
KCL BB
TEPI Completion
Base Oil
Smith 8" Jars
To: CS To: SOE
MUD #106/ KCL BB
To: PMS
JDI Materials
To: HKY
MUD #037
B/L
B/L 200 M3 OBM
CMT #071
Food Stuff
To: PMS
Food Stuff
To: SOE
MUD #45
Backload Gy ro+chemicals
To: PMS
MUD #47MUD #104
MUD #108
Sperry Stab
Cement
Shelfdrilling Apex indo material
Bit Breaker 8.1/2"
B/L 200m3
To: CS
Transfer D.Water
To: Barge Pelangi
Sperry Geo
To: CS
MUD
Food
To:
C
To: CS
T
Mu
Top Plug
9.5/8" F. Collar Cmt Sw edge
Figure 3.5Summary Boat Planning untuk Agustus 2014
4. Create CeRMAT and CeRMAT Record
In making CeRMAT report When see the condition and behavior that not
safe, every anomalys we has to report it in order to reduce accident at work.
Every CeRMAT that already record a week before when that report has already
do action we have to check it so we know that report has already closed. When
there was an act in the condition of not safe hence it is necessary to conduct
scrupulous to then immediately carried out the act of the prevention of the
occurrence of an accident . Every report that already reported to be in
accordance with the actual state.
21
Diisi oleh pelapor (Filled by reporter) Foto / Sketsa jika ada (Photo or sketch, if any )
Diisi oleh pelapor (Filled by reporter)
Unsafe w orking at height condition and ladder placement
Pelapor - Diisi jika diperlukan (Filled if required)
Nama (Name): Rudy Bontor T
Bagian (Entity): LSA/TOL/OFFPerusahaan (Co.):TEPI OJT
Perlu informasi tindak lanjut (Require feedback)?[ ] Ya/Yes [ ] Tidak/No
E-Mail :
Close-out Acknowledgement / Pengakuan Penutupan
Description of Action Implemented /
Lokasi (Site): POSB Daerah (Area): Transit Warehouse [ ] For Statistic [ ] Register in Sy nergi No: Deskripsi Tindakan y ang Dilaksanakan
Real Potential . Move the ladder to a better placementTanggal (Date):16 October 2014Jam (Time): 10:00
Tindakan langsung y ang dilakukan (Immediate action taken):
Inform the Warehouse 1 Superv isor about
their unsafe w orking at height condition Date / Tanggal : 16 October 2014
Name of Performing / Nama Pelaksana : MI Sw aco w arehouse team
Date: Signature&Name: Serv ice / Dinas : MI Sw aco Team
RSES recommendations/actions: Signature / Td. Tangan :
(Action Description - Responsible for Action (By ) - Target Date)
STOP Card Issued? [ ] Ya/Yes [ ] Tidak/No l
Peny ebab langsung (Immediate causes): Close-out Acceptance / Penerima Penutupan
carelesness Line supervisor / Penyelia Lini
Date / Tanggal :
lName / Nama :
Signature / Td. Tangan :
l
RSES - CSR
l Date / Tanggal :
Name / Nama :
Signature / Td. Tangan :
Date: Signature&Name:
CeRMATi sekeliling anda untuk meningkatkan keselamatan. Do CeRMAT in your surrounding to improve safety.
Incident Classification:
Tingkat Keparahan/ Sev erity Lev el
Cedera Manusia / Human Injury
Kerusakan Lingkungan/Env ironment Damage
Kerusakan Finansial/ Financial Loss
Media
CeRMAT
Uraian (Details):
Saran pencegahan&perbaikan (Suggestion for prevention&improvement):
Atasan Pelapor (Line Supervisor) :
Bagian (Entity): Td. Tangan (Signature):
Diisi oleh Superintenden K3LL dan RSES (Filled by HSE Superintendent & RSES)
job risk assesment and superv ising
Figure 3.6Cermat report
22
To ease of supervision and data collection process of careful findings , Then
required a system to sum up the whole CERMAT report, or its called by Cermat
Summary.
Date Description Pictures (if any) Recommended ActionResponsible
EntityTarget Date Action Status Evidence
15-Aug-14untidy cable in Warehouse 1
cable removed by MI Swaco team
MI SWACO 30-Sep-14Closed.remove the obstructing cable
CLOSED
9-Aug-14
Casing pup 13.3/8" K55 ,68# 3m (10 jts ) & 6m (4
jts) without wooden layer & presling From
Total Handil
loading Tubular use wooden layer or presling as
per standart procedureLSA/TOL/OFF 9-Aug-14
closed.the tubular has been removed.
CLOSED
15-Aug-14bad housekeeping at
Warehouse 1Inform the Mi Swaco team
to keep it tidyMI SWACO 15-Sep-14
Closed.clean up the warehouse and provide
trashcanCLOSED
15-Aug-14fire extinguisher pin was
corroded
change the pin and regular inspection for fire
extinguisher by PetroseaPETROSEA 15-Sep-14
Closed.change the safety PIN and advise the Petrosea team
for regular fire fighting equipment inspection
CLOSED
15-Aug-14placing a bowl ontop of
electrical microwave
Inform the MI Swaco about the risk for placing tools
ontop of electrical appliances
MI SWACO 15-Sep-14Closed.remove the bowl and
brief the electrical equipment hazard
CLOSED
15-Aug-14cigarette stub found outside the trash bin
ashtray provided and socializing about smoking
area tidinessPETROSEA continous
ashtray provided.smoking area tidiness continously
CLOSED
15-Aug-14found broken sack in a
ccu basket outside Warehouse 2
Move the basket to waste management
PETROSEA 15-Sep-14Closed.already remove the
basketCLOSED
15-Aug-14Bad housekeeping at
Warehouse 3
Issuing a weekly regular warehouse clean up request to Petrosea
HALIBURTON continous regular clean up CLOSED
15-Aug-14drag of the door on WHS
4 is broken
inform to Petrosea HSE Supervisor for the door drag
conditionPetrosea 16-Oct-14 Closed. The drag has been
repaired.CLOSED
15-Aug-14Clogged drain at
warehouse 4
inform to Petrosea HSE Supervisor for the drainage
conditionPetrosea 16-Oct-14
Closed.The clogged drain has been replaced.
CLOSED
Finding Close Out Recommendation Close Out
Gambar 3.8Cermat Summary
5. Participant in HSE Management Visit and Committee Meeting IV
HSE Management Visit and Committee Meeting IV Is two monthly
agenda (bimonthly) that set by TOTAL in purpose to visit site in order to
increase safety work in site and to told worker to increase self Consciousness to
behave safe. HSE Management Visit Is management total visits To the ship. The
purpose of this site management visit is to To give a , how the importance of
safety in accordance with standard procedure in the work of Total are and
contractor. Meanwhile Committee Meeting IV Have aims to improve safety that
are at Tj. Batu region. In the committe meeting IV Less inclined to observation
23
in the field for the purpose of finding the possibility of action and a situation that
is not safe who are in work environment.
6. Creating Report
Having finished undergo the COOP program , these practices writer is
obliged to make a report handed up to HRD, as a result of job description while
doing the COOP program for 6 months in every division. And the writer also
wants to say many thanks to TEPI and every crew on Tj. Batu site that has
helped the writer to finish this COOP program.