bagpenkompeten robinkar ssdm polri jakarta, …
TRANSCRIPT
BAGPENKOMPETEN ROBINKAR SSDM POLRI
Jakarta, Agustus 2019
1. UU NO 9 THN 2018 TTG PNBP.
2. PP NOMOR 60 THN 2016 TTG JENIS DAN TARIF ATASJENIS PNBP PD POLRI.
3. PERKAP NOMOR 5 THN 2016 TTG PENYELENGGARAANASSESSMENT CENTER POLRI.
4. PERKAP NOMOR 3 THN 20167 TTG PERUBAHAN ATASSEBAGIAN PERKAP NOMOR 1 THN 2015 TTGPENGELAAN PNBP.
5. KMK NOMOR: 347/KMK.05/2017 TTG PERSETUJUANPENGGUNAAN SEBAGIAN DANA PNBP PADA POLRI.
SUMBER PENDAPATAN
NEGARA
NON PAJAK
BUMN
BARANG YG DIKUASAI NEGARA
DENDA
RETRIBUSI
HARTA TERLANTAR
PAJAK
HIBAH
JENIS PNBP POLRI
FUNGSI
LANTAS
SDM
PAMOBVIT
LEMDIKLAT
BINMAS
BAINTELKAM
PUSDOKKES
UMUM
BLU
12 JENIS
1 JENIS
12 JENIS
2 JENIS
6 JENIS
3 JENIS
1 JENIS
NO. JENIS PENERIMAAN NEGARA BUKAN PAJAK SATUAN TARIF
1. 2. 3. 4.
1. Penilaian Kompetensi
a. Assessment Center 2 hari, untuk eselon I dan II (minimal 6 orang)
Per assesse Rp. 6.000.000,-
b. Assessment Center 1 hari, untuk eselon I dan II (minimal 6 orang)
Per assesse Rp. 4.500.000,-
c. Assessment Center 1 hari, untuk eselon III (minimal 6 orang)
Per assesse Rp. 4.000.000,-
d. Assessment Center 1 hari, untuk eselon IV (minimal 6 orang)
Per assesse Rp. 3.800.000,-
2. Feedback Pasca Penilaian Kompetensi/ Per assesse Rp. 700.000,-
PEJABAT PEMUNGUT PNBP/KASATKER
BENMA
BENMA PEMBANTU
ANGGOTA/STAF MAKS 2 ORG
PELAKS GIAT (PUNGUT) SETOR KE BUN
PENGGUNAAN SEBAGIAN
(MAKS 80%)
• SATKER PENGHASIL1. OPSNAL
GIAT.2. BELANJA
MODAL3. BANG SDM4. OPSNAL
PNBP5. DLL
• SATKER BUKAN PENGHASIL
SURAT PERMOHONAN DR
INSTANSI/LEMBAGAKAPOLDA/WILAYAH
KAPOLRI/PUSAT
1. NASKAH KERMA INDUK2. NASKAH KERMA TEKNIS
PERSIAPAN1. WAKTU PELAKS2. PESERTA DAN JAB YG
DI ASSESSMENT3. ASSESSOR DAN
ADMINISTRATOR4. SARPRAS5. SUN PROFIL
KOMPETENSI6. SUN TOOLS7. MODEL PELAPORAN8. PEMBIAYAAN
PELAKSANAAN
SUN LAPORAN
PENYAMPAIAN HASIL
FEEDBACK
MONEV
ASISTENSI
JIKA ADA PERMINTAANJIKA ADA PERMINTAAN
20174.411.200.000
3.462.660.00078,5%
20188.500.000.000
8.252.900.00097,1%
20194.000.000.000
2.296.000.00057,4%
TARGET
REALISASI
NO SATKER/POLDA NILAI PNBP REALISASI SISA/KURANGTARGET PAGU TARGET PENGGUNAAN TARGET PAGU
1 2 3 4 5 6 7 8
1 KEPRI 42,500,000 30,600,000 27,400,000 15,636,000 15,100,000 14,964,000
2 RIAU 1,841,500,000 1,325,880,000 654,000,000 710,944,500 - -
3 BANGKA BELITUNG 150,000,000 91,152,000 150,000,000 91,152,000 - -
4 JAWA BARAT 55,200,000 39,744,000 40,500,000 32,400,000 14,700,000 9,692,600
5 SULAWESI TENGAH 46,000,000 36,800,000 - - 46,000,000 36,800,000
6 SULAWESI UTARA 121,600,000 97,280,000 - 97,280,000 121,600,000 -
7 KALIMANTAN BARAT 126,600,000 101,280,000 - - 126,600,000 101,280,000
8 SSDM POLRI 1,793,200,000 1,434,560,000 2,938,100,000 1,604,350,000 (1.144,900,000) (746,130,000)
REALISASI TARGET DAN PENGGUNAAN PNBP PELAYANAN PENYELENGGARAAN ASSESSMENT CENTER POLRI T.A. 2017
SISA PAGU PNBP POLDA RIAU DIGESER KEPADA SATKER/POLDA SBB:1. POLDA KALTENG SEBESAR Rp. 234.500.000,-2. POLDA LAMPUNG SEBESAR Rp. 208.800.000,-3. SSDM POLRI SEBESAR Rp. 169.790.000,-
1. SSDM POLRI MELEBIHI TARGET YG TELAH DITETAPKAN;2. POLDA YG CAPAIAN TARGETNYA 100% ADL POLDA BABEL;3. POLDA YG CAPAIAN TARGETNYA LEBIH DR 50% ADL POLDAJABAR DAN KEPRI;
4. POLDA YG CAPAIAN TARGETNYA KURANG DR 50% ADL POLDARAIU;
5. POLDA YG TDK TERCAPAI TARGETNYA ADL POLDA KALBAR,SULTENG DAN SULUT;
6. POLDA YG TDK MEMILIKI TARGET PNBP NAMUN MELAKS KERMAADL POLDA KALTENG DAN LAMPUNG;
7. SISA PAGU PNBP POLDA RIAU DIGESER KE POLDA KALTENG,LAMPUNG DAN SSDM POLRI;
8. SISA PAGU PNBP POLDA KEPRI, JABAR, KALBAR DAN SULTENGDIGESER KE SATKER SSDM POLRI UTK MEMENUHI KEKURANGANDANA PNBP SSDM POLRI SEBESAR Rp. 159.852.600,-;
9. POLDA YG TDK MENCAPAI TARGET NAMUN MENGGUNAKAN PAGUPNBP ADL POLDA SULUT
EVALUASI PELAKSANAAN PNBP PELAYANAN PENYELENGGARAAN ASSESSMENT CENTER POLRI T.A. 2017
Sekian
Terima Kasih
12