    BAJA SAE 2009

    REVIEW

    VISHWAKARMA INSTITUTE

    OF TECHNOLOGY

  • 8/9/2019 Baja Sae 2009 Review

    2/10

    THE PHASES

    THE BEGINNING

    DESIGN

    PURCHASE & MANUFACTURING TESTING

    THE EVENT

    LESSONS LEARNT

    PLANS FOR THE FUTURE

  • 8/9/2019 Baja Sae 2009 Review

    3/10

    THE BEGINNING

    A team of around 20 formed (& the 1st meetingaround sometime in March).

    Learning the basic concepts of the systems in anautomobile.

    Trying to understand the 2007 rule book.

    The good, bad & ugly of the telephonic interview

    on 9th

    April, 2007. Formal inclusion of Prof. H.G.Phakatkar and

    Prof.S.P.Komble as our guide & faculty advisorrespectively.

  • 8/9/2019 Baja Sae 2009 Review

    4/10

    THE DESIGN

    Lots of meetings sans any conclusions.

    A breakthrough on 9-10thAug, 2008 the

    BAJA workshop at VIT Auditorium. Slow (but steady) beginning in September.

    Process gains momentum after Diwali and

    is almost over by December. Design report completed on 31 Dec, 2008.

  • 8/9/2019 Baja Sae 2009 Review

    5/10

    PURCHASE & MANUFACTURING

    Begins in December 1st week.

    Roll cage manufacturing & shock absorber procurementbegin simultaneously on Dec 16.

    Unseen obstacles on both sides sees shock absorberprocurement not going according to specifications, as well asvehicle manufacturing taking much more time than expected.

    Things fall to a new low on Jan 7, 2009 as the entire design isquestioned and major modifications suggested.

    Vehicle remodeled by Jan 13. Inspection takes place. Furtheradditions and manufacturing goes on till Jan 23 or does it??

  • 8/9/2019 Baja Sae 2009 Review

    6/10

    TESTING

    Few fours on the DSK 2 wheeler parking

    area.

    2 hours at the hill range behind DSK onJan 25 (12 am)on the day of departure.

  • 8/9/2019 Baja Sae 2009 Review

    7/10

    THE EVENT

    Jan 28,29: Track width of 68 - as against required widthof 64 - spotted by organizers. Inspection suspended.

    Jan 30: Miss the morning bus. Allowed for static &dynamic events. Better than average performances in

    design evaluation and marketing presentation boost theteams morale.

    Jan 31: A little slower than expected in hill climb &maneuverability. Decent timing in acceleration. Yet endup 28th overall for the grid positions. Rear tires replacedby narrower tires.

    Feb 1: Fit into the required 64 width. Compete in theendurance event an amazing experience and wereamong the 10 teams which lasted the event. Finish 8th

    overall.

  • 8/9/2019 Baja Sae 2009 Review

    8/10

    LESSONS LEARNT

    Team coordination a must to ensure that the focus remainsentirely on the project.

    Without any systematic approach, things will never go asexpected.

    Planning and a regular review with the guides a must.

    Otherwise time flies and the work remains highly unsatisfactory. Every team member must know his role and take his own

    initiative.

    Dont depend entirely on external help. This is a studentsproject.

    Decisions related to money must not be made withouteveryones consent.

    Cherish every moment of the project. You'll miss it later.

  • 8/9/2019 Baja Sae 2009 Review

    9/10

    PLANS FOR THE FUTURE Proposed team

    structure:

    Design and

    procurement

    fellows keep inmore contact.

    Procurement of

    pipes and tires

    should begin at theearliest. They take

    the longest time.

    Parameter Design Procurement

    Roll cage 1 1

    Suspension &

    steering

    2 1

    Unsprung 2 1

    Engine,

    transmission

    and vehicle

    dynamics

    2 1

    Treasurer 2

    Driver Among these/

    different

    Total 13

  • 8/9/2019 Baja Sae 2009 Review

    10/10

    Reviews

    Reviews can take place twice a week (once thedesign process has started). On these 2 days, nosame person will exhibit his design procedures.

    Everyone should be explained the respectivedesigns. No miscommunications should occurthereafter. Any doubts should be clarified in fronton everyone, especially in front of the guides.

    All procurements and money related issuesshould be discussed with everyone beforemaking a decision.