5. Ball charge management Grinding with ball mill systems

Upload: mail2quraishi3084

Post on 16-Oct-2014

84 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Ball Charge Management

5. Ball charge management

Grinding with ball mill systems

Page 2: Ball Charge Management

2

07-06/JOKHGRS ACC & GACL Mill Workshop

Ball charge management

Ball charge

Page 3: Ball Charge Management

3

07-06/JOKHGRS ACC & GACL Mill Workshop

Ball charge management

Mill absorbed power reduces Grinding efficiency reduces

As the balls wear

So does production So does production

Top up for wear compensation Ball charge classification

Page 4: Ball Charge Management

4

07-06/JOKHGRS ACC & GACL Mill Workshop

While a Ø 90 [mm] becomes an Ø 80 [mm] an Ø 80 [mm] becomes a Ø 70 [mm] and so on …

< Ø 30 – 40 [mm] wear slower than bigger balls

Ø70 [mm]

Ø80 [mm]

Ø90 [mm]

Top up for ball wear compensation (1/5)

Page 5: Ball Charge Management

5

07-06/JOKHGRS ACC & GACL Mill Workshop

Replace the missing balls

Ø70 [mm]

Ø80 [mm]

Ø90 [mm]

Top up for ball wear compensation (2/5)

Page 6: Ball Charge Management

6

07-06/JOKHGRS ACC & GACL Mill Workshop

First chamber:

1. Compartment

Ø Ball [mm] Weight [ t ] Percent [%] Wear comp. [%]

90 20.0 25.0 100.0

80 28.0 35.0

70 20.0 25.0

60 12.0 15.0

Total 80.0 100

Average ball weight [ g ] 1667

Spec. media surface [m2 / t] 10.2

Top up for ball wear compensation (3/5)

Biggest ball size

Page 7: Ball Charge Management

7

07-06/JOKHGRS ACC & GACL Mill Workshop

2.Compartment

Ø Ball [mm] Weight [ t ] Percent [%] Wear comp. [%]

50 17.0 10.0 15.0

40 17.0 10.0

30 27.2 16.0 35.0

25 27.2 16.0

20 35.7 21.0 50.0

17 45.9 27.0

15

Total 170.0 100

Average ball weight [ g ] 41

Spec. media surface [m2 / t] 32.8

Second chamber:

Top up for ball wear compensation (4/5)

3 balls sizes required

Page 8: Ball Charge Management

8

07-06/JOKHGRS ACC & GACL Mill Workshop

Top up for ball wear compensation (5/5)

Frequency Regular production intervals Regular time intervals (e.g.: targeting a constant absorbed

power for the mill motor)

Page 9: Ball Charge Management

13

07-06/JOKHGRS ACC & GACL Mill Workshop

Ball charge classification (2/4)

Page 10: Ball Charge Management

14

07-06/JOKHGRS ACC & GACL Mill Workshop

Good

Bad

Ball charge classification (3/4)

Visual criteria for ball form classification (deformed/broken)

Page 11: Ball Charge Management

15

07-06/JOKHGRS ACC & GACL Mill Workshop

First chamber Once every year

Second chamber Once every two – three years:

- OPC

- OPC + < 5 [%] MIC Once every one – two years:

- Composite cements (>> 5 [% MIC)

- Slag

- Puzolana

Standard frequency for ball charge classification

Ball charge classification (4/4)

Page 12: Ball Charge Management

16

07-06/JOKHGRS ACC & GACL Mill Workshop

Ball charge operating cost

Purchasing

Electrical energy

Classification

0.05

1.30 – 4.40

0.03 – 0.05

50 [g/t] gross wear

40 [kWh/t]

Standard frequency

USD/tcement

1.38 - 4.50

Classification costs are 1-4 [%] of energy costs. Therefore sensible to classify the charge at standard intervals.