roN OF SURVEYORS MALAYSIA rCHPLIJII"U COST INFORMATION CENTRE
.. ....:...-. . • ~(:,lf-NTAt COST ANALYSIS - Form 1 8-Residential Building , . A-2-863
JOB TITLE : Bungalow CLIENT: Private
LOCATION: Shah Alam, Selangor TENDER DATE: 27th march 2003
INFORMATION TOTAL PROJECT
Project and Contract Information
Project Details and Site Condition: Contract : 2 Storey Bungalow and 1 service block annexed to it with associated works
, PAM Standard Form of Contract 98 (With Quantities)
The site is generally flat and easily accessible from the main road
Market Conditions: COMPETITIVE
Contract Particulars : Comgetitive Tender List
Type of Contract : Cost Fluctuation : Yes 0 RM Int(Jv)/L
No [JJ 4,867,874.30 L
Basis of Tender Open/Selected Government [JJ Bills of Quantities OJ Competition OJ 4,254,712.10 L
Private 0 Bills of Appr. Quant. D Negotiated D • Provisional Sum RM 1,325,000.00
Sched. Of Rates/ Serials
Spec. & Drawings D D Prime Cost Sum RM -
Contract Period Stip. By Client: 52 weeks Preliminaries RM 205,500.00
Contract Period Offered by Builders: N/A Contingencies RM -
Number of Tenders Issued: 3 Contract Sum RM 4,254,712.10
Number of Tenders Received: 2
ANALYSIS OF SINGLE BUILDING
Design/Shape Information
Accommodation and Design Features :
The work containts a double storey bungalow house with an annexed block for services and a plunge pool. The buildings are generally irregular in shape
• Areas: Functional Unit: 400 Design Sha~s m2 (usable area) Percentage of Gross Floor Area
Below Ground Floor - m2
Ground Floor 623 m2 External Wall Area 561 m2 (a) Below Grd. Fir 0.00%
Upper Floor 240 m2 Gross Floor Area 863
GROSS FLOOR AREA 863 m2 (b) Single Storey
= 0.650 Construction 72.19%
Usable Area 400 m2
Circulation Area 191 m2 (c) Two-storey
AncillaIy Area 184 m2 Storey Heights : Construction 27.81%
Internal Division 88 m2
GROSS FLOOR AREA 863 m2 Av. Below Grd Floor - m (d) 3-storey
Construction 0.00% At Ground Floor 4.55 m
Floor Space NOT Enclosed 375 m2 (e) 4-storey
Above Ground Floor 3.00 m Construction 0.00% Roof Area (Structural and Plant Room) 717 m2
Brief Cost Information Contract Sums RM 4,254,712.10 Functional Unit Costs Provisional Sums RM 1,325,000.00 excluding external works : 9,828.92 perM2 Prime Cost Sums RM -Preliminaries RM 205,500.00 being 5.08% of remainder Contingencies RM - being 0.00% Contract Sum Contract Sums less Contingencies RM 4,254,712.10
Bungalow Shah Alam-ECA
f ~' I
INSTITUTION OF SURVEYORS MALAYSIA . \
BtllLplNGCOST INFORMATION CENTRE
I!LEMENTAL COST ANALYSIS - Form 2 8-Residential Building A·2·863
SUMMARY OF ELEMENT COSTS
GROSS FLOOR AREA: 863 M2 TENDER DATE 27th march 2003
Preliminaries Shown Separately
Total Cost Cost per m2 Element Element Unit Element Reinforced Reinforce- Formwork of Element GFA Unit Rate Ratio Concrete ment m2
RM RM Quantity RM perm2 GFA m3 kg
1 Substructure lA Piling 53,293.44 61.75 1,680 m 31.72 1.947 - - -lB Work Below Lowest Floor Finish 147156.58 170.52 623 m2 236.21 0.722 135 15,682 565
Group Element Total ?nn.d.<;nn? 232.27 135 15,682 565
2 Superstructure
2A Frame 77,879.97 90.24 863 m2 90.24 1.000 57 8,818 597
2B Upper Floors 20,002.40 23.18 240 m2 83.34 0.278 37 4,080 240
2C Roof 269,170.61 311.90 791 m2 340.29 0.917 - - -"0 Stairs 96,269.07 111.55 - - - 11 762 60
,- External Walls 81,225.37 94.12 416 m2 195.25 0.482 - - -2F Windows & External Doors 227,475.02 263.59 145 m2 1,568.79 0.168 - - -2G Internal Walls and Partitions 120,127.42 139.20 349 m2 344.20 0.404 - - -2H Internal Doors 176,873.66 204.95 219 m2 807.64 0.254 - - -Group Element Total 1 nE;~ n?<I <;? 1,238.73 105 13,660 897
3 Finishes
3A Internal Wall Finishes 51,513.68 59.69 992 m2 51.93 1.149
3B Internal Floor Finishes 172,416.37 199.79 506 m2 340.74 0.586
3C- Internal Ceiling Finishes 44,609.04 51.69 607 m2 73.49 0.703
30 External Finishes 280,101.11 324.57 - - -Group Element Total 548,640.20 635.74
4 Fittings and Furnishings 460,000.00 533.02 - -5 Services 5A Sanitary Appliances 65,152.00 75.49 33 No 1,974.30 0.038
5B Plumbing Installation 517,802.00 600.00 -5C Refuse Disposal - - -50 Air-conditioning & Ventilation System 80,000.00 92.70 3,245 TM3 24.65 3.760
5E Electrical Installation 770,000.00 892.24
5F Fire Protection Installation 5,000.00 5.79
Lift and Conveyor Installation - -Communication Installation 10,000.00 11.59
Special Installation - -5K Builder's Profit & Attendance
on Services - -5L Builder's Work in Connection -
with Services -Group Element Total 1,447,954.00 -1,677.81
Sub-total exc. External Works, Preliminaries and Contingencies 3,726,067.74 4,317.58
6 External Works 6A Site Work 60,585.09 70.20
6B. Drainage 21,115.66 24.47
6C External Services 9,012.15 10.44
60 Ancillary Buildings 232,431.46 269.33
6E Recreational Facilities - -Group Element Total 323,144.36 374.44 List of Provisional Sums
Preliminaries 205,500.00 238.12 Fittings and Furnishing RM 460,000.00
Electrical System RM 770,000.00
Telephone RM 10,000.00
Fire Protection RM 5,000.00
I TOT, (less Contingencies) 4,254,712.10 4,930.14 Air Conditioning and ventilations RM 80,000.00
INSTITUTION OF S~RVEYORS MALAYSIA • ,BUILDING COST INFORMATION CENTRE
,
ELEMENTAL COST ANALYSIS - Form 3 8-Residential Building
A-2-863
BRIEF SPECIFICATION
GROSS FLOOR AREA: 863 m2 TENDER DATE: 27th march 2003
ELEMENT SPECIFICATION
1 Substructure
1A Piling Pre-cast concrete pile Grade 45, 150 mm x 150mm
1B Work Below Lowest Floor Finish Reinforced concrete pile cap, ground beam and slab
2 Su~erstructure
2A Frame Reinforced concrete column and beam
2B Upper Floors Reinforced concrete suspended slab
2C Roof Reinforced concrete roof slab and concrete roof tiles on steel truss
2D Stairs Reinforced concrete staircase with mild steel tubular h/railing, half briick balustrade and s/steel h/rail
2E External Walls Half brickwall of clay bricks
2F Windows & External Doors Timber casement and louvres windows
2G Internal Walls and Partitions Half brickwall of clay bricks
2H Internal Doors Plywood flush door, decorative door, composite glass door; all with timber frames
, 3 Finishes
<3A External Wall Finishes Shanghai plaster, timber wall board and timber strip panel
3B Internal Wall Finishes Cement and sand plaster and paint and ceramic tiles to wet area
3C External Floor Finishes Cement render, timber floor system, timber deck and granite tiles
3D Internal Floor Finishes Cement render, homogenoues tiles, granite, marble and timber floor system
3E External Ceiling Finishes Timber'T' and 'G' ceiling, skim coat, plaster and paint
3F Internal Ceiling Finishes Fibrous plaster ceiling and paint
4 Fittings and Furnishings IDworks
5 Services
5A Sanitary Appliances Imported product fittings; Gala; Vitra; Grohe etc.
5B Plumbing Installation GI pipe, FRP compartment suction tank for CWS and VCP pi pie for sanitary plumbing
5C Refuse Disposal N/A
5D Air-conditioning & Ventilation System Air cooled split unit, ventilation fan, starter panel exhaust duct, kitchen exhaust hood etc
5E Electrical Installation XLPE/PVC cu. Cable main cabling, PVC submain cabling, distribution bord etc, Lightning protection
5F Fire Protection Installation Portable fire extinguisher
5G Lift and Conveyor Installation N/A
5H Communication Installation Telephone & data
5J Special Installation N/A
5K Builder's Profit & Attendance on Services inclusive in the above cost , 5L Builder's Work in Connection with Services inclusive in the above cost
6 External Works
6A Site Work Road and car park, site preparation and retaining wall
6B Drainage Surface water drainage
6C External Services External water supply reticulation and sewerage
6D Ancillary Buildings Covered walkway, guard house, fencing and gates
6E Recreational Facilities N/A
1" . ,
BUILDING COST INFORMATION CENTRE ,COST INDICES SUB-COMMITTEE DATA FORM 1 - TENDER PRICE INDEX
CONTRACT INFORMATION
A1. PROJECT DETAILS
Client
Project
Location Contract Period
Tender Date
Type of Contract
Fluctuations
No. of Tenders
Issued/Received
Site Conditions
Private
Bungalow
Shah Alam, Selangor
52 weeks Preliminaries Sum
27th March, 2003 Adjustments
PAM Standard Form of Contract (With Quantities) P.C Sums
No
3 2
SC/1I1/1 Rev 9/96
Project Ref: Date 27th March, 2003
• market Conditions
Easily accessible & on
sloping ground
COMPETITIVE
Profit & General
Attendance
Provisional Sum
SUB TOTAL
Contingency Sum
CONTRACT SUM 4,254,712.10
No of storey
Gross Floor Area
(GFA)
Functional Unit
specification
Bungalow with annexe block and plunge
pool.
2
863 M2
400 M2
Element
Superstructure
Substructure
Finishes
Fittings
Services
SUB-TOTAL
Ext. Works
Preliminaries Sum
TOTAL
(exc. Contingency Sum) 4,254,712.10 4,930.14 100.00%
The building is constructed of reinforced concrete foundations pile caps and precast reinforced concrete piles. Walls are generally of
clay brickwall. Windows are generally timber frame casement and louvres. Doors are timber flush doors, decorative timber and glass
doors all with timber frames. Wall finishes are generally cement render and paint with tiles at wet areas. Ceiling finishes are generally
fibrous plaster and paint. Services include plumbing, sanitary, electrical and air conditioning installation.
PROJECT Index as calculated
(From Data Form 3)
Base
: 77.97
: JKR Standard Schedules of Rates (SERIAL NO. JKR 20800-0117-2001)
BUILDING COST INFORMATION CENTRE COST INDICES SUB-COMMITTEE
DATA FORM 3 - TENDER PRICE INDEX
SC 1/1/3 REV 3/86
o PROJECT INDEX CALCULATION SHEET
Project Ref Date 27th March, 2003
Measured Work
Provisional Sums Profit & General Attendance on P.C. Sum Adjustments SUB-TOTAL Add Preliminaries Sum Percentage * 2 ( 7.543% )
* 1
* 2
TOTAL
[ 3% xof
Preliminaries Sum Percentages
Base to Bills Factor
305,450.92
4,354,663.02
x 1.3794 x * 1
3%
[ P.C. Sum x Base To Bills Factor as Tendered ]
= 3% = 0.00
x
= Preliminaries Sum Contract Sum deduct
of adjusted P.C. Sum
(Preliminaries Sum, Contingency Sum, Dayworks)
= 205,500.00 x 100 2,724,212.10
= 7.543%
5,585,320.61
x 1.3794 ]
x 100%
.~----------~----------~ BASED ON
INDEX BY
JKR Standard Schedules of Rates (SERIAL NO. JKR 20800-0117-2001)
R.O
PROJECT INDEX:
Total Column (a) x 100 ~~~--~~----Total Column (c )
4,354,663.02 x 100 ~~~~--------5,585,320.61
= 77.97
-
BUILDING COST INFORMATION CENTRE COST INDICES SUB-COMMITTEE
, '
--------------------------------~~--------------------------------------~>.-'~. SC 1/1/2 REV 9/96 Project Ref:
DATA FORM 2 - TENDER PRICE INDEX I CALCULATION SHEET FOR MEASURED WORK Date:
Base to Bills Factor H
387,841.44 281,174.95
1.3794
-----------------
: I II
: I ----LIS:_-l
¥
• NEIGHB() U RING EMPTY LOT NO:l0
-- - -- - - - ++-IIHIt--
-----==~~ _ =~·=~--=~=-=-=_·-o).l._"_.~.!.J.:JJJ,)=!:=:=:_=§:i:~:~_~:~:~:~:~:~:~:~:~=~=~:~:~:~:~=~=~:~:~:~:~=~=~:~:~:::~::=:=::~~;~~l::9f;';;7:~~~-;:~~~~;'=N;~~::-~=:=;;'!~';;-~~:;:::::-:::.~",~",~:.:.;~""~~~ .. ~~
UM801(. nRNA~AN VoRl)
\.
1 ~~9~ND FLOOR PLAN )
230WIQEHAlfROUNDEO ~ PRECAST CONC. DRAIN A1202 lAID 10 FAll
~.,..,,,.,....::- ---- -----, l I I I I
l
vv(O-fl4 ... · /
tv11't
WF~"e)
NOTES:
02 .. D8 LOCAnON REVISED. Ale DUCT ADDED
\IA~\\\1<.OQ\-.\" A"IM\;t\tJW.
FOR CONSTRUCTION
KEY PLAN:
HTA KIN TAN ARCHITECT Arthit«tu~ and Oulgn
Blodt. B, Unit F~L08·3. Bayu Angkasa. "JalanMtdangKapas Bangsar, 59100 Kuahllumpur, WP,MALAYSIA
CUENT:
EN. MOHO. SIOIKbin SAAi~oSMX; lt9Jaian DltultSUI'iman,TamaI')TunDr.lsm.il·· .. 60000 Kuala lumpur, WP . j ..... v
, ''''' .. ,;1:: PROJECT :
CADANGAN MENOIRIKAN SEBUAH RUMAH.· f@!ANGLO OUA TINGKAT O~N BLOK SEIMS~lU'
nNGKAT BERSERTA ·PLUNGE POOl; 01 A'rA$ LOT NO. PI 54. NO.12JALAN PERt,fATA 7/1:.: SEKSYEN 7
BANDAR SHAH ALAM. SELANGORDARUL EHSAN 9s .. w
GENERAL ARRANGEMENT GROUND FLOOR PLAN
28/02/2003 A 1101
"
•
1 ~~~r ~~?g~ P':AN' , -- ~ ,..." ....... ~ ~- ,'"
----------I I I I I ! I/;; d I iil
----LIS: --I ¥ -I-
" : I I I
I 1--+---'1.---- - - - -- - -,-
I -- --- - -- - --,-" I ~ I ~ I ~ I E I
.- - - - __ L -JIt--'\<--+lH1 I I I
--'i<----·-----r
I I I I
l
~
1!iOMM CONOlEtE WAll. ZONE
300 Mtd R0881! WAU ZONE
==================
-------------~-------~ / / ')
/ ~ / I'
~tl'l!!.."!!a.-----------~~~--j- ,i: ! ~ 1 2 --------L--_~-~~~
ROOF LINE AlIOI A2101 .' . ". . _/_ _ I ---, r ....
I I I I I ="'F'ifII'----+--+ l00e~~ - -:r~
_.,."",1=-' I I I
I I
I .wu.UWliJl.J!Jyt.W,UJ I
I I I I I
--
I I, ,J __ ----------~--I----I--------I--:.------
I I I _-.~ ---::}--t--l---~ J'
//J. ,. 'JI) , ,
/ /
~ i i
7000
./
.... -................................. - ..... -........ -.... .
) )
/
NOTES: , 02 + DB LOCATION REVISED. Ale DUCT ADDED
15A11\iZP~ ~""t>1'O
I
FOR CONSTRUCTION REV. DATE REASON fOR ISSUE CHECKED BY
01 05/05/03 FOR TENDER
01 19105/03 fOR CONSTRUCTION
02 30/05/00 FOR CONSTRUCTION --03 07/07/03 FOR CONSTRUCTION
-
KEY PIAN' -
~~ ~ -~ rLJl~l~ b-q
J U J ·,~c
~b r-
L 01 P , ! I ~ I
HTA H1N TAN ARCHITECf Architecture and Dtsign
Block B. Un;tF~lG6·3. BayuArtgkasa, TELEPHONE; 603·22892812 4 Jalan Medal'lg Kapas Ff&. 603-22892813 Bangsar, 59100 Kuala lumpur, WP, MALAYSIA
CLIENT:
EN, MOHO, SIDIK bin SHAIK OSMAN 119 Jalln Oatuk Sulaiman, Taman Tun Dr. Ismail 60000 Kuala lumpur, WP
PROJECT :
CADANGAN MENDIRIKAN SEBUAH RUMAH SANGLO DUA TlNGKAT DAN BLOK SERVIS SATU TlNGKAT BERSERTA "PWNGE POOL" 01 ATAS LOT NO, PT 54, NO.12)ALAN PERMATA 7/1 ,SEKSYEN 7 40000 BANDAR SHAH AIAM, SEIANGOR DARUL EHSAN
DRAWING TITlE :
GENERAL ARRANGEMENT FIRST FLOOR PLAN
JOB NO: ORIOlNATED: SCAlE: SHEET NO:
~ 02/005 HTA 1:100
DATE LOCATION: DRAWN BY:
28/02/2003 A1 102
0
EXISTING
e.
4800
CD
INTERNAl nMBER SCREENING
BALAUnMBER BOARDING
CD 8 J:- 16600
4BOO 7000
1
t- 1
16600
J.--.-~--"",------_...2QQL_----.
i i
/
CD 0) I
.800
r--'--",re'NAl eURV"D CEIUN6 BALAU PLANKS
:~~ri---!.-.-.-- -.-.-.-.-.-.-.-
0) 0) 0) ... -------,L
I 4800 +-- 4800
i
; PAINTED PlASTER WAU
0)
__ ,~LqF~~V.!f~!:§y.!..!~...:!.~_._. __ ._._.~. _, __ -'\.-
01
:;$1 -I
-------11 ;,;1 Sil
-------11 /
illa 1URUKUR D • IlAflAN SDN laD!
!!AWING RECErveo ON, .... ) 4 JULlo03 FoR' ... ~.~.o.~.~~ ..... :::::~~.·.~:::.'::.'
L::.;:: ......................................................... .
NOTES,
,
FOR CONSTRUCTION 'EV. DATE REASON fOR ISSUE CHECKED BY
Ot 19/05/03 FOR CONSTRUCTION --02 30105/03 FOR CONSTRUCTION
.3 07107/03 FOR CONSTRUcrrON
--~-- !-----'----
.-, ------
---_.
KEY PLAN: -
~~ ~ ~
~~ -.~~: . I ~ I
.~~T-1f~\ ~ --~!~~ J i-~ ,=f=-'= ~ - ,.-i="1 ! if" \
.& §f --~'-~~- \ l H ~/~\\
/- iL...J:E - :~, \\ .--=-===-~~ , I
j I
HTA HIN TAN ARCHITECT , An::hitttture and Design
BloekB,Unitf-LG6-3,Bay .. Angka~, TELEPHONE: 603·22892812 4JalanMedangKapa~ fAX: 603-22892813 &angw, 59100 Kuala lump .. r, WP. MALAYSIA
CLIENT,
EN. MOHD. SIDIK bin SHAIK OSMAN 119 Jalan Datuk Sulaiman, Taman Tun Dt. Ismail 60000 Kuala Lump .. r, WP
PROJECT ,
CAOANGAN MENOIRIKAN SEBUAH RUMAH BANGLO OUA TlNGKAT DAN BLOK SERVIS SATU TINGKAT BERSERTA 'PLUNGE POOL' 01 ATAS LOT NO. PT 54. NO.12JALAN PERMATA 7/1 • SEKSYCN 7 40000 BANOAR SHAH ALAM. SELANGOR OARUL EHSAN
DRAWING TIm :
GENERAL ARRANGEMENT SECTION E-E SECTION F-F
J08NO: ORIGINATED: SCALE: SHEET NO:
~ 02/005 HTA 1:100
DAT! LOCATION: DRAWN BY;
28/02/2003 A2103
.'
.-
1 ;",~~~T ELEVATION
4800
~ t----I I
4800
00 , !
Ppc ALUMINUM GUnER ~"-''--:;---,
o I
--.....J.o~---- 1000
4800 7000
,6200 00 I ,
12mm THIt TOUOHENED~L.ASS
Q) 1
..,.
-""':::L-+.--- PPC ALUMINUM GUTTER
q) 1 I
ROOfAlI7.S·PllCH INTERLOCKING ClAYT!LES.
-+-.- ._._.~.+--,!,~8.:.!.·?.st . ..!Q~.Q!'Y~~!"" AL~MINUM GUTTER
....... TOPOF8EAM ..2.. LEV + 101.'5 ___ ==t=::a®O~O~:.lZ.1!y+~6~:_
I , : I I . : I I
STONE C~RCWAU
~~~~~~~~~~~~~~~~~~~~-1~~ ______ ~~~·_·~R~~~~V~~~?L~_._ 12m~ F.RAMELEsS·TOUOHENEDGtASS
PAINTED CEMENT PLASTER WAll ." SA~U TIM~ER 8OX20
rOARDING
. ...!..~~.'L._
_ ._.~.l.D~liS . .2..~<!':.OFBEAM
ARH JURUKIJR BAHAN SPN BHD
DRAWING RECETVED ON. '. ~ 4 ~3
rOI{ : ... ~~.~~\~.~~.~~~~;'~:'::::::"""""""
NOTES:
FOR CONSTRUCTION REV. DATE REASON FOR ISSUE CHECKED BY
01 05105/03 FOR TENDER
01 19/05/03 FOR CONSTRUCTION
02 30105{O3 fOR CONSTRUCTION
03 07/07/03 FOR CONSTRUcnON
I
.. -
KEY PLAN:
~~. ~ .0. "~r~l~ ....J .,'
"'?r . Ti1.: \ ~:I 1"%'1.1 \ b 'r; , ~ 1:~ ,
I
~ \9 I
HTA HIN TAN ARCHITECT ArchitttturtandOtsign
B1ockB,UnitF-LG6-3,BayuAngka$3, TElEPHONE: 603·22892812 4 Jalan Mtdang Kapas fAX: 603·22892813
8.ngsar, 59100 Kuala lumpur, WP, MALAYSIA
CLIENT:
EN. MOHD. SIDIK bin SHAIK OSMAN 119 Jalan Oatuk Sulaiman, Taman Tun Or. Ismail 60000 Kuala Lumpur, WP
PROJECT : :
CADANGAN MENDIRIKAN SEBUAH RUMAH BANGLO DUA TINGKAT DAN BLOK SERVIS SATU TlNGKAT BERSERTA "PLUNGE POOL" 01 ATAS LOT NO. PI 54, NO.12)ALAN PERMATA 1/1 ,SEKSYEN 1 40000 BANDAR SHAH ALAM, SELANGOR OARUL EHSAN
DRAWING TITlE :
GENERAL ARRANGEMENT FRONT ELEVATION REAR ELEVATION
J08NO: ORIGINATED: SCALE; SHEET NO;
~ 02/005 HTA 1:100
DATE lOCATION: DRAWN BY:
28/02/2003 A3101 , :
" . .,f ~
. NOTES: '.It
,'0 1
0) ! ~ 1
0) I
(£) I
I
FOR CONSTRUCTION 'EV. OATE REASON FOR ISSUE CHECKED BY 01 oslO5J03 fORTENOER
01 19/05/03 FOR CONSTRUCTION
02 30/05/03 FOR CONSTRUCTION
03 01(07/03 FOR CONSTRUCTION
...
RETAINING WALL
I----
KEY PLAN: ,
•
1 ~,~.~T SIDE ELEVATION
(9 1
® 1
I /
~~ ~ ~:.\ U!\ . n. '-.-~ ~\ .
_~i I~\
I rij-~" 0 w Li \ , Bbb- \ . :( \\
• , "
~ ,
HTA 6100
I~
•_u~ I .--+--------------t-
. ________ ....... ________ T~O~y~TSLl~+~81~5 r---t--- PAINTeo CEMENT !
'::::.:=:=~_.., / I PLASTER WAll •
STAI~lE5SSTEEl~ 1----1
, i
PPC ALUMINliM GunER
HIN TAN ARCHITECT Arehitttture and Oesigfl
Blocl: 8. Unit F-lG6-3, Bayu Angkasa. TELEPHONE: 603·22892812 4 Jalan M(dang K3pas FAX: 603·22892813 Bangsar. 59100 Kuala lumpur, WP, MALAYSIA
CLIENT.
EN. MOHO. SIOIK bin SHAIK OSMAN ,
119Jalan Oatuk Svlainlan, Taman Tun Dr.l!.mail 60000 Kuala Lumpur, WP
PROJECT •
ARB JlJRUK1JJt IAHAN SDN BHD
DRAWING RI!CI!lVED ON: .... !.], .. ~Y.~.J! P3 FOR: ... ~.~.~.~!f.!: ..................... ..
CADANGAN MENDIRIKAN SEBUAH RUMAH BANGLO DUA TlNGKAT DAN BlOK SERVIS SATU TINGKAT BERSERTA "PlUIQGE POOL' 01 ATAS lOT NO. PT 54. NO.12)ALAN PERMATA 7/1 ,SEKSYEN 7 40000 BAN DAR SHAH AlAM, SELANGOR DARUl EHSAN
......................................................... DRAWING TITlE :
GENERAL ARRANGEMENT RIGHT SIDE ELEVATION
RETAINING WAll LEFT SIDE ELEVATION
2 ~~,\TooSIDE ELEVATION JOaNO; ORIGINATED: SCALE; SHEET NO:
~ 02/005 HTA 1:100
DATI LOCATION; DRAWN 8Y;
28/02/2003 A3102
!
,. '~ •
..
• 1 ~~,~!H ELEVATION
I
1-- 7200 , ...
(
2400
K '" .. j (0
!uor AT l]S PITCH IrflEltlPCKING t":i.,AYT11 f5
r-~~~- _JIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII~'il~~'~ ~I I~ SSt+l02~TOPOFBEAM ':-~: ~g~ (02.lQ..Jz. 8QlTOM OF 8}~M •
2 ~CA?~!H ELEVATION
'1<---
~I , ~!£lf.+))~~~l:':\~,t_ I ,-' -- - --
it ~i I , .~ ~-,:,99~60rN,~R~UND~~
LEV + 99.40 TURF LEVEL
ARH JURIlKUR BAHAN SDN lIHD
DRAWING RI!Ci!IVI!D ON: ... +.4-.. JUb .... 2 03 POR: ••• ~.~ ..................... .. ..................................................................
r---------------------------- -NOTES:
FOR CONSTRUCTION REV. OATE REASON FOR ISSUE ----~_LCHEC~
r00:-; -+O,.:;7JJO°':::IIO=O,'+-___ -=FO::'R=CO:::NST:::R:::UCTl==ON~ - __ _ FOR CONSTRUCTION __ _ __ _
,,-- r----
1---+--+--_ .. _---.--_ ... - ---+--t---.---...... _,--_.- -_.
.. _--_., --- .. _--1---+--+--_." -,,-- -,-- ~,,----_ .. - ,,---1---+--+--'--- .... "-_.-,,..,," ...
~r-"-!---- --"-----"--""-"" 1---+--+--- -.-----" .. ,,-
--+--- ._"----,,.,,"-- -,,-- ,,+-- ,,--+--
"'-1---+---+ --"-----,,----,, "'.-
" "
---, .... ---. 1--+--+----,,------- .. -- -,-
KEY PLAN:
HTA HIN TA;" ARCHITKT ArdllttdUrtlndDcsi~n
,,~~ \ ; p ,
8Iocl:B.UnitF.lGS·:l:,8a~-u/w;l." 04}~!1n Mtdang Kfpas
.. ~;t;P,10NE; 603-22M/2811 ,A)' 61::!.2189 ?~,~
? gSl'r,S9tOOrualalumpur.W'" 't,:"o,,<;:f.
J~Nl,
:I\j. MOHO. SIOIK bin SHAIK OSMA~ ,,;a!an D3tuk Sulaimgn, 7aman !,,;n 0 •. IYI'ail
0000 Kusla lumpur, WP
PROJECT :
CAOANGAN MENOIRIKAN SEBUAH RUMAH BANGLO OUA TlNGKAT OAN BLOK SERVIS SATU TINGKAT BERSERTA "PLUNGE POOL" 01 ATI>S LOT NO. PT 54, NO.12)ALAN PERMATA 7/1 • SEKSYEN 7 40000 BAND.'.- SHAH ALAM, SEL~NGOR CARUI EHSAN
DRAWING TIlLE:
SERVICE BLOCK ELEVATIONS AND CROSS SECTION
JOB NO IORIGINATED 'SCAlf !SHEET NO I 02/005! HTA 1 :100 : 02
, 'I I' i REV'~~ ::::212003 lOCATIO' I DRAWN BY I A 3 1 03