barclay km project

Upload: aakanksha-raizada

Post on 08-Apr-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/6/2019 Barclay Km Project

    1/18

    KMS FOR B EM TG

  • 8/6/2019 Barclay Km Project

    2/18

    AGENDA

    ABOUT THE TECHNOLOGY GROUP

    PROBLEM STATEMENT

    OBJECTIVE STATEMENTPROPOSED KMS

    KPI & BENEFIT STATEMENT

    CONCLUSION

  • 8/6/2019 Barclay Km Project

    3/18

    Barclays Product Based Technology GroupBarclays Product Based Technology Group

    People

    TechnologyProducts

    Projects

    Immediate

    Outsourced

    Run The Bank

    Environment

    Systems

    FX

    FI

    Build The Bank

    GSDC & GTC*

    GSDC = Global Software Development Centre

    GTC = Global Test Centre

    Business Analysts

    Developers

    Users

    Front Office

    Operations

    Derivatives

    Production

    UA

    TDev

    IDE

    Technology

    Management

    Incident Mgmt (HPSC)

    Change Request (HPSC)

    QA

    Dev Mgmt (JIRA)

    Project Mgmt (sharepoint)

  • 8/6/2019 Barclay Km Project

    4/18

    About the technology groupAbout the technology group

  • 8/6/2019 Barclay Km Project

    5/18

    About the technology groupAbout the technology group

  • 8/6/2019 Barclay Km Project

    6/18

  • 8/6/2019 Barclay Km Project

    7/18

    DEVELOPMENT MANAGEMENTDEVELOPMENT MANAGEMENT

  • 8/6/2019 Barclay Km Project

    8/18

    KNOWLEDGE MANAGEMENTKNOWLEDGE MANAGEMENT

  • 8/6/2019 Barclay Km Project

    9/18

    Barclay EM Org ChartBarclay EM Org Chart

  • 8/6/2019 Barclay Km Project

    10/18

    Weakness of Existing KMWeakness of Existing KM

    Messy existing incident reporting database and sharepoints for report

    filing

    Scope of new functionality requirement is increasing due to Front Office

    attrition. Criticality of timing required instant problem solving for RTB but lack of

    follow up report and store the problem solving

    Ticket locked is not tracked and

    Every individual in RTB worked independently, technical skills andknowledge are not shared and impacted.

    Knowledge is loss with resignation

    Lack of platform or workflow to share knowledge and technical skills

    Learning cycle for new employee is long

    PROBLEM STATEMENT

  • 8/6/2019 Barclay Km Project

    11/18

    Objective of New KMObjective of New KM

    Convert the tacit knowledge within RTB and BTB to an explicit knowledge

    system.

    Benefits of meeting objectives : Knowledge retention within the team

    Shorten learning cycle for new employees

    Integrated organisational learning cycles

    New group learning cycle

  • 8/6/2019 Barclay Km Project

    12/18

    Proposed Knowledge CreationProposed Knowledge Creation

  • 8/6/2019 Barclay Km Project

    13/18

    Propose New Knowledge SystemPropose New Knowledge System

    New Org Structure

    Creation of Project KM group

    Existing Knowledge Database

    HPSC - Include URL to track how many people is using the KM

    Build new project database that allows :

    Tracking of projects schedule, cost, details

    Allows systematic retrievial of reports

    Centralise storage of all technical reports

    New Work Culture

    Setup daily sharing session chaired by Section Head of RTB and BTB

    where works details are reported and shared

  • 8/6/2019 Barclay Km Project

    14/18

    Learning Cycles

    Propose new group learning cycle

    weekly sharing sessions

    Organizational cycle annual town hall[story telling]

    Individual learning KPI driven

    contribution to KMS

    Brownbag sessions!

  • 8/6/2019 Barclay Km Project

    15/18

    New Organizational Structure

  • 8/6/2019 Barclay Km Project

    16/18

    KPI & BENEFIT STATEMENT

    Consultant

    RTB

    BTB

  • 8/6/2019 Barclay Km Project

    17/18

    CONCLUSION

    TACIT BENEFITS TO THE BANK

    EXPLICIT BENEFITS TO THE BANK

  • 8/6/2019 Barclay Km Project

    18/18

    ABOUT THE TECHNOLOGY GROUP

    PROBLEM STATEMENT

    OBJECTIVE STA

    TEMENTRaunak / DK

    PROPOSED KMSSussan / Doris

    KPI & BENEFIT STATEMENTCONCLUSIONDamien / Lanzi