Barrel end services 10.03.08 TJF UCL ee Materials Spreadsheet ‘ATLASupgrade060308.xls’ e Spreadsheet at present has cooling pipes and power tapes. her items will be added as more information becomes available riations on all components at the barrel end will be included bsequent versions. The Spreadsheet is designed to work with e corresponding drawings (X-sections in Z and A0 R/PHI drawin d will not be changed without the equivalent changes to the awings. e following 2 drawings show x-sections of the SS (Short stave d LS (Long stave) barrel ends. ‘Strawman’ has become ‘Spiderman’!

Upload: lorna

Post on 06-Jan-2016

21 views

Category:

Documents


0 download

DESCRIPTION

Barrel end services 10.03.08 TJF UCL. See Materials Spreadsheet ‘ATLASupgrade060308.xls’ The Spreadsheet at present has cooling pipes and power tapes. Other items will be added as more information becomes available. Variations on all components at the barrel end will be included in - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Barrel end services      10.03.08  TJF  UCL

Barrel end services 10.03.08 TJF UCL

See Materials Spreadsheet ‘ATLASupgrade060308.xls’

The Spreadsheet at present has cooling pipes and power tapes.Other items will be added as more information becomes available.Variations on all components at the barrel end will be included insubsequent versions. The Spreadsheet is designed to work withthe corresponding drawings (X-sections in Z and A0 R/PHI drawings)and will not be changed without the equivalent changes to thedrawings.

The following 2 drawings show x-sections of the SS (Short stave)and LS (Long stave) barrel ends.

‘Strawman’ has become ‘Spiderman’!