    Particulars Sub-category

    Fuel

    Conveyor system

    Feeding chutes

    Drum feeder

    Bunker

    Grate

    Grate bars

    Hydraulic system

    Grate area

    Ash disposal system

    Sub merge ash conveyor

    Pressure part

    Water

    BFP

    Header piping Feed !ater

    "conomi#er $ube

    Steam Drum

    Do!n comers

    %ud Drum

    Bank #one

    &ater !all

    Front !ater !all tubes at roof 

    'ear !all tube

    Steam

    Steam drum

    Super heater ( Primary

    Super heater ( %iddle

    Super heater ( Final

    Air FD fan

    SA fan

  • 8/15/2019 Basic Data Sheet V1

    2/30

     $ertiary air

    Steam Drum center line

    Flue gas

    )D fan

    "SP* Dust collector

    PRDS Availability

    De-aerator

    +alves

    Safety valve

    Check valve

    Valves

    Attemperator system

    Safety valves

    %SS+

    &ater line

    Blo! do!n valves condition

    ,'+ ( BFP

    Instruments

    For layout

    Fuel feeding

    Height of the feeding conveyor

    Soot blo!ers

    Super heater (-

    Super heater .

    Bank #one

    APH( "C/

    Drum safety valve

    Steam line safety valve

    Soot blo!ing P'+ station

    Silencer %issing

    Layout Areafounation

    Log boo! ata if t"ere

  • 8/15/2019 Basic Data Sheet V1

    3/30

    Deaerator Steam control valve

    &ater feed control valve

    Header for process

    Start up vent

    CBD )BD System

    'oof tiles

     $iles

    %CC

    %otors

    Boiler au0iliary panel

    Feed !ater station

    pumping valve

  • 8/15/2019 Basic Data Sheet V1

    4/30

    Assessment stuy

    P"ysical assessment #! conition

     1

     1 -

     1 -

    ,A

     1

    -

     1 -

     1 -

     1

     1

    -

     1 -

     1

     1 -

     1 -

     1

    -

     1

    -

     1

    -

     1

    -

     1

    ,A

     1

     1

    -

     1

    -

    #!$ but neeover"auling

  • 8/15/2019 Basic Data Sheet V1

    5/30

    na

    -234 %

     1 -

     1

    ,A

    ,A

     1 -

     1 -

     1 -

    ,A

    5 valves -

     1

     1

     1

     1

    ,A

     1es

    'otary -

    6'S+ -

    'otary -

    7

     1 -

     1 -

    -

  • 8/15/2019 Basic Data Sheet V1

    6/30

     1 -

     1 -

     1

    -

    n

     1

    - 1

    -

    %issing -8(-49

    %issing or failure 49 physically

    ACB

    Start delta starter

     1es

  • 8/15/2019 Basic Data Sheet V1

    7/30

    %annot be use Remar!s &"ic!ness

    -

    Clips %issing as per discussion

    : ;

  • 8/15/2019 Basic Data Sheet V1

    8/30

    na

    na

    -

    /ne de(aerator for three boilers

    ,eeds overhauling

    Boiler( - !as last operated in .8-8?this boiler !ere in operation till H"co(generation is installed

  • 8/15/2019 Basic Data Sheet V1

    9/30

    ,ot there

    -.48 A

    ,o +FD

    /ne spare header is there !ithvalves can be used

    All valves? pots sampling pointsthere

  • 8/15/2019 Basic Data Sheet V1

    10/30

    'rosion e(ternal Speci)c - Point

    %otor missing for boiler number(.

    Clips !ere missing33 Fe! bars are missing

    "lectrical panel to be upgraded

    Cinder recovery from bank

    /verhauling reuired motor missing

    less $ubes there

    ,A

    ,il Scaling in do!n comers

    no Do!n incomer to side header is missing

    ,/

    Corrosion

    Demister condition*Sepheron ( condition ok

     1es ,A

    ,A

    ,A

    na Fans seems physically ok

    na Fans seems physically ok

    Scalinginternal

    System need to be checked ( Control valvemissing

    Scaling in tubes o0idation seen in internalpipes !hen vie! from drum

    &ater !all corossion is more as compared toB.

     $hickness is higher than actual thickness oftube

  • 8/15/2019 Basic Data Sheet V1

    11/30

    na Fans seems physically ok

    ,A ,ot in !orking condition

    Captured

  • 8/15/2019 Basic Data Sheet V1

    12/30

  • 8/15/2019 Basic Data Sheet V1

    13/30

    Particulars Sub-category

    Fuel

    Conveyor system

    Feeding chutes

    Drum feeder

    Bunker

    Grate

    Grate bars

    Hydraulic system

    Grate area

    Ash disposal system

    Sub merge ash conveyor

    Pressure part

    Water

    BFP

    Header piping Feed !ater

    "conomiser $ube

    Steam Drum

    Do!n comers

    %ud Drum

    Bank #one

    &ater !all

    Steam

    Steam drum

    Super heater ( Primary

    Super heater ( %iddle

    Super heater ( Final

    FD fan

    SA fan

     $ertiary air

    Steam Drum center line

    )D fan

    "SP* Dust collector

  • 8/15/2019 Basic Data Sheet V1

    14/30

    Avalability

    De-areator

    +alves

    Saftey valve

    Check valve

    Attemperator system

    Saftey valves

    %SS+

    &ater line

    Blo! do!n valves condition

    ,'+ ( BFP

    For layout

    Fuel feeding

    Height of the feeding conveyor

    Soot blo!ers

    Super heater (-

    Super heater .

    Bank #one

    APH( "C/

    Drum saftey valve

    Steam line saftey valve

    Soot blo!ing P'+ station

    Silencer %issing

    Deareator Steam contol valve

    &ater feed control valve

    Header for process

    Start up vent

    Layout Areafounation

  • 8/15/2019 Basic Data Sheet V1

    15/30

    CBD )BD System

    'oof tiles

     $iles

    %CC

    %otors

    Boiler au0iliary pannel

    Feed !ater stationpumping valve

  • 8/15/2019 Basic Data Sheet V1

    16/30

    Assessment stuy

    P"ysical assessment #! conition

     1

     1 -

     1 -

    ,A

     1

    -

     1 -

     1 -

     1

     1

    -

     1 -

     1

     1 -

     1 -

     1 -

     1

    -

     1

    -

     1 -

     1

    ,A

     1

     1 -

     1 -

    na

    -234 %

    %otor missing -

     1

    #!$ but neeover"auling

  • 8/15/2019 Basic Data Sheet V1

    17/30

    ,A

    ,A

     1 -

     1

    - 1 -

    ,A

    . valves -

     1

     1

     1

     1

    ,A

     1es

    'otary -

    6'S+ -

    'otary -

    7

     1 -

     1 -

    -

     1 -

     1 -

     1 -

  • 8/15/2019 Basic Data Sheet V1

    18/30

     1

    -

     1 -

    %issing -8(-49

    %issing or faliure 49 physically

    ACB

    Start delta starter

     1es

  • 8/15/2019 Basic Data Sheet V1

    19/30

    %annot be use Speci)c points &"ic!ness

    -

    Clips %issing as per discussion

    : ;

  • 8/15/2019 Basic Data Sheet V1

    20/30

    /ne de(aerator for three boilers

    ,eeds overhauling

    Boiler( - !as last operated in .8-8?this boiler !ere in operation till H"co(generation is installed

  • 8/15/2019 Basic Data Sheet V1

    21/30

    ,ot there

    -.48 A

    ,o +FD

    /ne spare header is there !ithvalves can be used

    All valves? pots sampling pointsthere

  • 8/15/2019 Basic Data Sheet V1

    22/30

  • 8/15/2019 Basic Data Sheet V1

    23/30

    Captured

  • 8/15/2019 Basic Data Sheet V1

    24/30

  • 8/15/2019 Basic Data Sheet V1

    25/30

    Particulars Diameter Lengt" *umber of tubes Area &"ic!ness

    mm + *o, m mm

    "conomi#er $ube

    Do!n comers

    Bank #one

    &ater !all

    'isers

    Super heater ( Primary

    Super heater ( %iddle

  • 8/15/2019 Basic Data Sheet V1

    26/30

    I.R t"ic!ness as per calculation

    mm

  • 8/15/2019 Basic Data Sheet V1

    27/30

    Physical assessment

    Fuel

    Conveyor system $ype of conveyor

    Feeding chutes

    'A+s Condition physical

    Bunker +olume if there

    GrateGrate bars Condition physical

    Hydraulic system &orking condition

    Grate area

    Ash disposal system Condition physical

    Sub merge ash conveyor

    Pressure part

    &ater

    BFP /pen

    Header piping Feed !ater

    "conomi#er $ube Physical conditionSteam Drum Physical condition

    Do!n comers Physical condition

    %ud Drum Physical condition

    Bank #one Physical condition

    &ater !all Physical condition

    'isers Physical condition

    Steam

    Steam drum Physical condition

    Super heater ( Primary Physical condition

    Super heater ( %iddle Physical condition

    Super heater ( Final Physical condition

    Air FD fan Physical condition

    SA fan Physical condition

     $ertiary air Physical condition

    Height of boiler

    Flue gas

    )D fan Physical condition

    "SP* Dust collector Physical condition

    P'DS Availability

    De(aerator Physical condition

    +alves

    Safety valve

    Check valve

    +alves

    Attemperator system

  • 8/15/2019 Basic Data Sheet V1

    28/30

    Safety valves

    %SS+

    &ater line

    Blo! do!n valves condition

    ,'+ ( BFP

    )nstruments

    6ayout Area foundation

    For layout

    Fuel feeding

    Height of the feeding conveyor

    6og book data if there

  • 8/15/2019 Basic Data Sheet V1

    29/30

     $hickness Scaling internal "rosion e0ternal Po!er consumption

    )nternal )mpeller

     $hickness)nternal Demister condition

     $hickness )nternal scaling

     $hickness )nternal scaling

     $hickness )nternal scaling

     $hickness )nternal scaling

    Demister condition

     $hickness

     $hickness

     $hickness

    )mpeller Scroll Dimensions "lectric po!er

    )mpeller Scroll Dimensions "lectric po!er

    Height

     $ank volume

  • 8/15/2019 Basic Data Sheet V1