    Consider the case study given in assignment no. 1

    In second assignment you have identified some factors that may leadtowards project failure. Now we will enhance this activity further and willperform thorough risk analysis in this assignment.

    Question:

    Identify maximum risks that may hit our project and for each risk,identify the risk type, probability and its effects. Also specify how that

    risk relates to our application?

    Solution:

    Risk: Risk is future uncertain events with a probability of occurrenceand a potential for loss

    Types of risks: Schedule Risk

    Operational Risks Budget Risk

    Technical risks

    Programmatic Risks

    Maximum risks in the mention scenario: In the mention scenario the major risk is the technical fault

    Some time the network problem also cause major faults

    Incomplete requirement also makes the project failure

    Miss management Poor communication

    Scheduling is not proper

    Hard to manage

    Hard to understand how to use it

    project needs to be completed in six month, which poses anotherthreat towards the failure

    The team will be completely de motivated

  • 7/31/2019 Bc 060400090

    2/4

    One major cause of the project failure is that the manufacturer ofthe project doesnt properly explain or manufacture the projectrequirement and its worth

    In the mention scenario the major risk is the technical fault:

    it is included in the technical risk

    it may occur due to lack of knowledge about the technology

    or may be the software engineer doesnt fully utilize thetechnology

    Effects:

    it can leads the whole software towards the failure

    it can also cause wastage of budget and hard work

    it may impact a very bad effect on the users

    Some time the network problem also cause major faults:

    it is included in the technical risk

    sometime due to bad storm or other problem leads theproject towards the failure

    some time the heavy traffic on the network also cause theproblem

    Effects:

    it cause project hard to manage

    it may also leave bad effect on the project worth

    it also may cause major problem for the users

    Incomplete requirement also makes the project failure:

    it is included in Programmatic Risks

    incomplete knowledge about the project also leads it towards thenegative side

    or incomplete majors points in the project cause problems

    it may be not programmed well

    Effects:

    cause problem for the users and for the doctors as well

    Miss management:

    it is included in the Operational Risks

  • 7/31/2019 Bc 060400090

    3/4

    it is not designed well

    Effects:

    cause problem for the users and for the doctors as well

    it may also leave bad effect on the project worth

    Poor communication:

    poor communication and lack of interest cause heavy loss ofbudget and project worth too

    Effects:

    cause problem for the users and for the doctors as well

    it may also leave bad effect on the project worth

    Scheduling is not proper or hard to manage: it is included in scheduling risk

    if the whole project is designed well but its scheduling in not goodthen this project is nevertheless

    Effects:

    it cause problems for the users

    may be during the emergency it may fail

    it can also cause heavy loss of lives

    Project needs to be completed in six month, which posesanother threat towards the failure:

    it is Programmatic Risks

    in the limited time duration, the designer just focus on the majorrequirements and forget about the other main points also leadsthe project towards the failure

    Effects:

    it can cause problem during the usage of this project

    wastage of time as well

    The team will be completely de motivated:

    if the team of the manufacturer is not motivated towards its workthen the lack of interest cause the failure

    the designer cannot pay his full attention towards the project

  • 7/31/2019 Bc 060400090

    4/4

    Effects:

    lack of interest cause missing of may things in the project

    and the project leads towards the negative side

    One major cause of the project failure is that the manufacturerof the project doesnt properly explain or manufacture theproject requirement and its worth:

    if the designer doesnt properly explain his point of view in hisdesigning it cause the major loss of the budget, time and hardwork too

    faults in his designing

    it is programmatic risk

    Effects:

    it may cause heavy loss of budget and time leads project towards the failure