bcpt iupui ready - protect iu: indiana university contains tabs for instruction o common use by...

19
BCPT IU READY IUPUI Training Sept. / Oct. 2012 Emergency Management & Continuity Business Continuity Planning 1 Mary Lou East-Emmons Business Continuity Planning Manager [email protected] 812.855.8975 THE OLD: BCPT -> THE NEW: IU READY Emergency Management & Continuity October, 2012 Carlos Garcia, IUPUI Director Emergency Management & Continuity [email protected] 317.274.1802 2 IUPUI – Business Continuity Planning – Phase #2 Part of the ongoing BCP process … Phase #2 Conversion of plans from BCPT > IU READY o Review past BCP plans o Train YOUR internal staff o Exercise the plan (2013) by VC Dawn M. Rhodes 3 IU READY – Why? Why go from BCPT to IU READY? o Online continuity planning tool housed at UC Berkeley o Newest version of the UC Berkeley planning tool o Contains tabs for INSTRUCTION o Common use by other college and universities o A professional look and feel

Upload: lydung

Post on 20-Jun-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

BCPT IU READY ‐ IUPUI Training  Sept. / Oct. 2012

Emergency Management & Continuity ‐ Business Continuity Planning 1

Mary Lou East-EmmonsBusiness Continuity Planning [email protected]

THE OLD: BCPT -> THE NEW: IU READYEmergency Management & Continuity

October, 2012

Carlos Garcia, IUPUI DirectorEmergency Management & Continuity

[email protected]

2

IUPUI – Business Continuity Planning – Phase #2

Part of the ongoing BCP process … Phase #2

Conversion of plans from BCPT ‐> IU READY

o Review past BCP planso Train YOUR internal 

staffo Exercise the plan 

(2013)by VC Dawn M. Rhodes

3

IU READY – Why?

Why go from BCPT to IU READY?

o Online continuity planning tool housed at UC Berkeleyo Newest version of the UC Berkeley planning toolo Contains tabs for INSTRUCTIONo Common use by other college and universitieso A professional look and feel

BCPT IU READY ‐ IUPUI Training  Sept. / Oct. 2012

Emergency Management & Continuity ‐ Business Continuity Planning 2

4

Find IU READY - OneStart

Easy access to the IU READY tool. ONESTART requires CAS – an IU User Name and Passphrase for access.

5

Find IU READY - OneStart

Within ONESTART –CLICK ON  ‐ Services Tab  “Protect IU” (Left Menu)

6

Find IU READY - OneStart

Within ONESTART –CLICK ON ‐ Go to IU READY Portal (Upper Right Box)

Also access our email address        [email protected]

BCPT IU READY ‐ IUPUI Training  Sept. / Oct. 2012

Emergency Management & Continuity ‐ Business Continuity Planning 3

7

Find IU READY - OneStart

Within ONESTART –CLICK ON – 1st listing “IUPUI” (for the IUPUI version of the IU READY tool)CLICK ON – 2nd listing for old BCPT tool

8

IU READY – Opening Screen

IU READY – Opening Screen ‐Displays the chosen campus – IUPUICLICK ON ‐ ‐ “Begin” button to continue

9

IU READY – Important Buttons

Important Action Buttons ‐It is important to remember that content will not be saved if you don’t utilize the above buttons – DO NOT MOVE from one screen to the next by clicking on the tabs.

= at the bottom of each screen

BCPT IU READY ‐ IUPUI Training  Sept. / Oct. 2012

Emergency Management & Continuity ‐ Business Continuity Planning 4

10

BCPT -> IU READY (IUPUI)

Welcome Screens ‐Shows similar content and access buttons or pull down menus. To access plans, click on “Begin or Edit Your Plan” button 

11

List of Plans Menu –Accessible plans will be at the top of the overall list with a blue “Go to this Plan”button at the right of the plan name.  Delete keys will not appear on your screens. 

IU READY – List of Plans

12

Create a New Plan –The campus location is already chosen. Know the Head of the Unit  (head of the unit 

covered by this plan); Pick the Acronym (created by the BCP Team for organization of plans); Pick the Org Chart  (top level under the Chancellor); PlanName (name of the unit)

IU READY – Create a New Plan

Start from the bottom – up.

BCPT IU READY ‐ IUPUI Training  Sept. / Oct. 2012

Emergency Management & Continuity ‐ Business Continuity Planning 5

13

Plan Home –Similarities – (6) Work Areas (top tabs); Left Menu – Status Button, Edit Name, Add/Remove 

Users, Print Menu, Choose a Different Plan; Guidance, HandyLinks

IU READY – Plan Home

14

MAIN TABS – Plan Home //  STEP 1 – Department Identifications //

STEP 2 – Critical Functions //   STEP 3 – Information Technology //   STEP 4 – Instruction //   STEP 5 – Key Resources // Action Item Summary

IU READY – Main Tabs

15

MENU BUTTONS – 1) Edit Your Depart Info //  2) Add / Remove Users //

3) Interview Forms //   4) Print Menu //   5) Choose a Different Plan //   6) Copy Entire PlanPost Production Steps (cover at the end of the presentation)

IU READY – Plan Home

BCPT IU READY ‐ IUPUI Training  Sept. / Oct. 2012

Emergency Management & Continuity ‐ Business Continuity Planning 6

16

Create or Edit your plan ‐( organize the listed functions into GROUPS by area using initials )

Edit the Plan Name –Looks like the CREATE A PLAN screen

IU READY – Plan Home

17

Manage Users –> Add or Remove Authorized Users ‐Know the user names prior to adding users to the list; the use of ‘IU People Finder’ is no longer available. Access = FULL or VIEW ONLY

IU READY – Add / Remove Users

18

Step #1 ‐ Departmental Identification (part 1) – Demographics of this plan

Personnel – expanded; Type of Department – new; Locations – pull‐down menu with 

comment field; 

IU READY – STEP #1

BCPT IU READY ‐ IUPUI Training  Sept. / Oct. 2012

Emergency Management & Continuity ‐ Business Continuity Planning 7

19

Step #1 ‐ Departmental Identification (part 2) – Demographics of this plan

Evacuation Plans; Cost Center – N/A; 

IU READY – STEP #1

20

Step #2 – Critical Functions –Name the FUNCTIONS (all of them); Assign “Level of Criticality”; Add Function to List; “GO TO DETAIL SCREEN”  ‐ Click on this yellow button for each function to add the needed 

detail about the each specific function.

To assist you with a list of functions, utilize the “Typical Functions” document found on our website 

http://protect.iu.edu/emergency/bcp/training

IU READY – STEP #2

21

Critical Functions  – – “Go To Detail Screens” button ‐Click on this yellow button to enter needed details specific to each function.  An additional set of (6) sub‐tabs allow depth/detail to be entered into the tool.

Documenting exactly how you perform a function within your office NOW, will allow a faster/speedier, more efficient RECOVERY of that function following a crisis.

IU READY – STEP #2

BCPT IU READY ‐ IUPUI Training  Sept. / Oct. 2012

Emergency Management & Continuity ‐ Business Continuity Planning 8

22

BCPT ‐ ‐ ‐a. Description

b. Peak Periods

c. How to Cope

d. Vital Records

e. Consequences

f. Key Documents

g. Action Items

h. Description

i. Documentse

j. Consequences

IU READY ‐ ‐ ‐a. Description

b. Peak Periods

c. Documents

d. Dependencies

e. Consequences

f. How to Cope

g. Action Items

Step #2 – Critical Functions – Sub‐Tabs: Change: appearance of the buttons …and… are in a different order

IU READY – STEP #2

23

Step #2 – Critical Functions – Sub‐Tabs:                 (a) DESCRIPTION Change: Dependencies – it’s own sub‐tab; Responsible Person ‐ should contain name, email, office phone, title

IU READY – STEP #2

24

Step #2 – Critical Functions – Sub‐Tabs:               (b) PEAK PERIODS Change: If NO peak periods, but this is an annual, year‐round function – say so in the comment section.

IU READY – STEP #2

BCPT IU READY ‐ IUPUI Training  Sept. / Oct. 2012

Emergency Management & Continuity ‐ Business Continuity Planning 9

25

Step #2 – Critical Functions – Sub‐Tabs:                  (c) DOCUMENTSIdentify and upload any documents that are very important to this functionChange: Additional fields of information are requested

IU READY – STEP #2

26

Step #2 – Critical Functions – Sub‐Tabs:              (d) DEPENDENCIES Change: pull‐down menu – UPSTREAM & DOWNSTREAM DependenciesDependencies can be other units, systems, people outside of your control

IU READY – STEP #2

27

Step #2 – Critical Functions – Sub‐Tabs:           (e) CONSEQUENCES Change: Check box format – IF YOU CHECK IT – TELL ME WHY YOU CHECKED IT IN THE COMMENT LINE.

IU READY – STEP #2

BCPT IU READY ‐ IUPUI Training  Sept. / Oct. 2012

Emergency Management & Continuity ‐ Business Continuity Planning 10

28

Step #2 – Critical Functions – Sub‐Tabs:                (f) HOW TO COPE What would you do if. ….?

IU READY – STEP #2

29

Step #2.g – Action Items ‐( organize the listed functions into GROUPS by area using initials )

Step #2 – Critical Functions – Sub‐Tabs:               (g) ACTION ITEMS What can you do BEFORE any disaster strikes to lessen its impact.

IU READY – STEP #2

30

Step #3 ‐ Information Technology             (a) Applications (central)Provided a list of CENTRALIZED Applications used [mostly] by all faculty/staff.Level of Criticality based on the group covered by the plan

IU READY – STEP #3

BCPT IU READY ‐ IUPUI Training  Sept. / Oct. 2012

Emergency Management & Continuity ‐ Business Continuity Planning 11

31

Step #3 ‐ Information Technology                (b) Applications (dept.)Put in Applications specific to YOUR department.Each application will have DETAIL SCREENS that require information on how supported

IU READY – STEP #3

32

Step #3 ‐ Information Technology                                       (c) ServersPut in SERVERS specific to YOUR department located in your area.Each server will have DETAIL SCREENS that require information on how supported

IU READY – STEP #3

33

Step #3.d – Information Technology – Work Stations( organize the listed functions into GROUPS by area using initials )

Step #3 ‐ Information Technology                          (d) Work StationsHow WORK STATIONS are backed up, and who your support organization are.Filled out by your IT person / support organization

IU READY – STEP #3

BCPT IU READY ‐ IUPUI Training  Sept. / Oct. 2012

Emergency Management & Continuity ‐ Business Continuity Planning 12

34

Step #3 ‐ Information Technology                         (e) How to RestartRecovery strategies Filled out by your IT person / support organization

IU READY – STEP #3

35

Step #3.f – Information Technology – Action Items( organize the listed functions into GROUPS by area using initials )

Step #3 ‐ Information Technology                              (f) Action Items What can you do BEFORE any disaster strikes to lessen its impact.

IU READY – STEP #3

36

Step #3.f – Information Technology – Action Items( organize the listed functions into GROUPS by area using initials )

Step #4 ‐ Instruction                              Faculty Preparedness ‐> Instruction. 1) Pick the School and ADD to List; 2) GO TO 

DETAIL SCREENS for additional sub‐tabs 

#1 #2

#3

IU READY – STEP #4

BCPT IU READY ‐ IUPUI Training  Sept. / Oct. 2012

Emergency Management & Continuity ‐ Business Continuity Planning 13

37

Step #4 – Instruction                                     (a) High Priority CoursesList of HIGH Priority Courses – the courses whose interruption would most threaten the progress of our students and the integrity of the curriculumLevel of Course‐cast – use of technologies

IU READY – STEP #4

38

Step #4 – Instruction                                                     (b) ALL CoursesAll Courses (undergraduate only) – general questions regarding use of ONCOURSE, GRADES, Grad Instructors, Common MaterialsOne screen…

IU READY – STEP #4

39

Step #4 – Instruction                                 (c) Departmental PracticesDisaster Readiness Practices – Strategies for communication, academic personnel, leaves, pedagogyStrategies my vary by discipline and by course type.

IU READY – STEP #4

BCPT IU READY ‐ IUPUI Training  Sept. / Oct. 2012

Emergency Management & Continuity ‐ Business Continuity Planning 14

40

Step #4 – Instruction                                 (d) Special Teaching IssuesNeed for wet‐labs, studios, working in the field, software, access to collectionsSpecial Resources needed

IU READY – STEP #4

41

Step #4 – Instruction                                                    (e) Action ItemsList of things that could be done now to make your unit more preparedStart with a verb – Discuss, Create, Document, Build, Buy, etc….

IU READY – STEP #4

42

BCPT ‐ ‐ ‐a. Communication

b. Essential Personnel

c. Work from Home

d. Outside Unit Staff

e. Partners

f. Vendors

g. Clientsh. Document Summary

i. Equip. & Suppliesj. Employee Information

IU READY ‐ ‐ ‐a. Staff Basics

b. Work from Home

c. Teams  **new**

d. Skills **new**

e. Staff of Other Units

f. Stakeholders

g. Document Summary

h. Equip. & Supplies

i. Facilities & Transp.**new**

Step #5 – Key Resources                                                      (SUB‐TABS)        Changes: Some screens COMBINED and other screens NEW

RED = Combined //    BLUE = New  //    GREEN‐AQUA‐BLK = Same

IU READY – STEP #5

BCPT IU READY ‐ IUPUI Training  Sept. / Oct. 2012

Emergency Management & Continuity ‐ Business Continuity Planning 15

43

Step #5 – Key Resources                                                (a) Staff BasicsHome Contact Information // Leadership Successor // Employee InformationCan be done on a spreadsheet and uploaded through Sub‐Tab h.

IU READY – STEP #5

44

Step #5 – Key Resources                                     (b) Work from HomeList of who […faculty/staff…] could […possibly…] work from homeCan be done on a spreadsheet and uploaded through Sub‐Tab h.

IU READY – STEP #5

45

Step #5 – Key Resources                                    (c) Teams …. (d) Skills  TEAMS that are important to help your department cope … 10 teamsSKILLS ‐ skills, licenses, or certifications needed post‐disaster …

NEW NEW

NEW

IU READY – STEP #5

BCPT IU READY ‐ IUPUI Training  Sept. / Oct. 2012

Emergency Management & Continuity ‐ Business Continuity Planning 16

46

Step #5.e – Staffing Requirements( organize the listed functions into GROUPS by area using initials )

Step #5 – Key Resources                            (e) Staffing Requirements  STAFF REQ’TS ‐ The need to ramp‐up certain services – may require temp. realignment of staff.  Based on Function – “how many” and “what type”

IU READY – STEP #5

47

Step #5 – Key Resources                                  (f) Staff of Other Units  The most important people elsewhere on campus or medical centers who your staff will need to contactCan be done on a spreadsheet and uploaded through Sub‐Tab h.

IU READY – STEP #5

48

Step #5 – Key Resources                                             (g) Stakeholders  Other people your staff may need to contact after a disruptive event – vendors, partners, donors, clients, sponsors…Can be done on a spreadsheet and uploaded through Sub‐Tab h.

IU READY – STEP #5

BCPT IU READY ‐ IUPUI Training  Sept. / Oct. 2012

Emergency Management & Continuity ‐ Business Continuity Planning 17

49

Step #5 – Key Resources                               (h) Document Summary  List of all documents identified from all CRITICAL FUNCTIONSCopied and saved on a secure server, for access by authorized people only.

IU READY – STEP #5

50

Step #5 – Key Resources                              (i) Equipment & Supplies  Office Equipment  //  Other Equipment  //  SuppliesMinimum equipment needs – office and non‐office equipment

IU READY – STEP #5

51

Step #5 – Key Resources                      (j) Facilities & Transportation  Facilities ‐ Special Space needs (i.e., storage space, parking needs, secure space…)Transportation – List of special transportation needs

IU READY – STEP #5

BCPT IU READY ‐ IUPUI Training  Sept. / Oct. 2012

Emergency Management & Continuity ‐ Business Continuity Planning 18

52

Action Item SummaryCollection of all ACTION ITEMS from all tabs (additional items can be added here)Change: Title ‐ ”Final Item” ‐> “Action Item Summary”STATUS – (NEW) Ability to track progress of each listing

IU READY – Action Item Summary

53

IU READY – When Finished

SAVE and CONTINUE ‐Return to the PLAN HOME page.  Plans should be reviewed for accuracy, corrections/additions made, approval by ________, … ready to mark your plan …..

54

PLAN HOME PAGE – yellow radio buttons (left menu) –1) Instructions for Plan Sign‐Off 2) Instructions for Annual Review Sign‐Off

IU READY – When Finished

BCPT IU READY ‐ IUPUI Training  Sept. / Oct. 2012

Emergency Management & Continuity ‐ Business Continuity Planning 19

55

Mark Your Plan Complete ** Your final step **

1) Guidance Panel – instructions

a) Internal Leadership Reviewb) Plan Update Schedulec) Sign – Off

2) Who gets a HARD COPY of the plan?? – Printed version, electronic storage 

– thumb‐drive

3) Plan Annual Review Calendar

4) Begin working on ACTION ITEMS 

IU READY – When Finished

56

FOR ALL THING BUSINESS CONTINUITY PLANNING:

EMAIL CONTACT: [email protected]

WEBSITE: protect.iu.edu/bcp

IU READY – Contact Us!