    Solving VFD-sourced Bearing CurrentProblems in AC Motors.

  • 8/8/2019 Bearing Erosion AC Motors

    2/17

    The 2 main sources of motor shaft voltage are:

    1. Asymmetric Motor construction The stator and rotor magnetic circuits within the motor

    itself are unbalanced (current path stays within the

    motor)2. Unbalanced supply voltage (current path is

    between the motor and VFD) Unbalance is between the motor and power source

    Operation from a VFD creates an unbalanced supplycondition. The 3 phase output waveform is produced by

    switching DC voltage On & OFF

    Common Mode Voltage (CMV) results from the voltagewave forms from each of the three phases notsumming to zero

  • 8/8/2019 Bearing Erosion AC Motors

    3/17

    Common Mode Voltage (CMV):

    Voltages should sum to zero butdont if the 3 phases are unbalanced.Neutral might reach 20-30 volts withsevere unbalance.

    Problem is worse on 460 V VFDpower. Motor neutral reaches 375 V!

    Unbalanced line voltage VFD voltage is inherently unbalanced

  • 8/8/2019 Bearing Erosion AC Motors

    4/17

  • 8/8/2019 Bearing Erosion AC Motors

    5/17

    What effect does this have on the bearings?

    Rotor charge builds up untilit exceeds the insulationlevel of the bearings oil film

    The stored energyproduces an arc as therotor voltage collapses

    It arcs from the inner racethrough the rollingelements to the outer race,

    then to ground Current flow is

    concentrated in a pinpoint-sized area where the ballmeets the races

    Such high energyconcentration melts thebearing metal, creatingmicroscopic pits

  • 8/8/2019 Bearing Erosion AC Motors

    6/17

    Repeated discharges can

    be seen on the raceways: Both races and rolling

    elements are affected

    Inner race & rollingelements will becomefrosted

    Vibrations + arcing = Fluting Flutes form on outer race Noise, temperature &

    vibration increasedramatically

  • 8/8/2019 Bearing Erosion AC Motors

    7/17

    Roller bearings are affected too!

  • 8/8/2019 Bearing Erosion AC Motors

    8/17

    Which motors are susceptible?

    ALL OF THEM

    All motors powered by VFDs, which by design produce CMVAll manufacturers/brands of AC Induction motorsAll motor frame size

    All horsepower ratingsAll speeds

    All bearing typesAll duty cyclesAll applications

    * Variable Torque* Constant Torque

    * Constant Horsepower All the time

  • 8/8/2019 Bearing Erosion AC Motors

    9/17

    To eliminate VFD-sourced bearing currents:

    1. Reduce or cancel CMV before it reaches therotor:

    Install CM loading filter (with RC network toground) at the VFD output Add Marathons patented Faraday shield in the

    stator windings---OR---

    2. Protect the motor bearings by one or acombination of devices:

    Ground brush (bleeds off charge)

    Insulated bearings (insulation blocks current) Shaft Grounding Ring (bleeds off charge)

  • 8/8/2019 Bearing Erosion AC Motors

    10/17

    Do Ground Brushes really work?

    Yes! One brush will reduce shaft voltage by ~99%.......BUT

    They wear out, requiring regular maintenance AND External brushes are not permitted in Div 1/Zone 1 or Div

    2/Zone 2 Hazardous locations

    What about insulated bearings? Yes! Insulated bearings are effectiveBUT They can be up to 10 times the cost..AND Extended lead-time Insulated bearings arent permitted in Hazardous locations

    either

  • 8/8/2019 Bearing Erosion AC Motors

    11/17

    What is AEGIS Bearing Protection Ring

    Technology? AEGIS SGR is a circumferential ring of conductive

    micro fibers that reduce the shaft voltage to a safe

    level AEGIS Shaft Grounding Ring provides a reliable

    discharge path for shaft voltages AND

    Because there is no wear pressure on the fibers AEGIS SGR is the most reliable and longestlasting solution to bearing currents

    AEGIS Protects both the motor and attachedequipment

  • 8/8/2019 Bearing Erosion AC Motors

    12/17

    Comparison of Techniques.

  • 8/8/2019 Bearing Erosion AC Motors

    13/17

    Field add-on kits will be in stock soon!

    Fits 90% of all Marathon Electricfooted motors Mounts on drive end bracket or

    on encoders Takes up only 3/8 of shaft

    No machining required Fits TEFC & encoders too No Div 1 or 2

    Expect inventory during Q109

  • 8/8/2019 Bearing Erosion AC Motors

    14/17

    Kit components and instructions:

  • 8/8/2019 Bearing Erosion AC Motors

    15/17

    Bearing failures are costlytake care of themyou dont want to deal with this

    For more information, request power point file Brgcurrent25.

  • 8/8/2019 Bearing Erosion AC Motors

    16/17

    A c c e s s o r y

    K i t s -

    M u

    l t i p l i e r S

    y m

    b o

    l S 4

    G r o u n

    d i n g

    K i t s

    S h a

    f t G r o u n

    d i n g

    S h a

    f t g r o u n

    d i n g

    i s r e c o m m e n

    d e d

    ( N E M A M G 1 3 1

    . 4 . 4 . 3

    ) a s a n e

    f f e c t

    i v e m e a n s o f

    b e a r i n g p r o

    t e c t

    i o n

    f o r m o

    t o r s o p e r a

    t e d

    f r o m

    i n v e r t e r p o w e r .

    O n e g r o u n d i n g

    d e v i c e

    i s a

    d e q u a

    t e t o

    b l e e

    d d o w n

    i n v e r t e r - s o u

    r c e

    d s h a

    f t v o

    l t a g e s ,

    t h e r e

    b y p r o

    t e c t

    i n g

    b o

    t h b e a r

    i n g s

    f o r m o

    t o r s a s

    l a r g e a s

    6 0 8 5 f r a m e .

    K i t s i n c l u

    d e s g r o u n

    d i n g r i n g ,

    m o u n

    t i n g

    h a r d w a r e a n

    d i n s t r u c t

    i o n s .

    S h a

    f t g r o u n

    d r i n g s

    f i t t h e s e

    N E M A

    s h a

    f t e x t e n s i o n

    f r a m e s

    l i s t e d b e

    l o w ,

    t h e y a r e

    d e s i g n e

    d t o m o u n

    t o n

    t h e s h a

    f t e n

    d .

    S H A F T

    G R O U N D I N G R I N G ( S G R )

    F r a m e

    K i t N o .

    C a t

    N o .

    S T O C K

    B u

    i l d - U p

    K i t s

    M O D

    C e n

    t r a

    l

    ( i n s

    t a l l e

    d )

    4 4

    8 8

    K K

    I IT T S SG GR R- -1 11 1. .2 2A A

    5 5

    0 0

    0 0

    - -

    5 5

    * *$ $9 92 2$

    $

    1 1

    9 9

    5 5

    $ $3 39 95 5

    5 5

    6 6

    K K

    I IT T S SG GR R- -1 14 4. .4 4A A

    5 5

    0 0

    0 0

    - -

    8 8

    * *$ $9 92 2$

    $

    1 1

    9 9

    5 5

    $ $3 39 95 5

    1 14 43 3

    - -

    1 1

    4 4

    5 5

    T T

    K K

    I IT T S SG GR R- -2 20 0. .7 7A A

    5 5

    0 0

    0 0

    - -

    1 1

    4 4

    * *$ $9 92 2$

    $

    2 2

    0 0

    7 7

    $ $4 44 41 1

    1 18 82 2

    - -

    1 1

    8 8

    4 4

    T T

    K K

    I IT T S SG GR R- -2 27 7. .1 1A A

    5 5

    0 0

    0 0

    - -

    2 2

    0 0

    * *$ $1 11 16 6$

    $

    2 2

    2 2

    5 5

    $ $4 45 56 6

    2 21 13 3

    - -

    2 2

    1 1

    5 5

    T T

    K K

    I IT T S SG GR R- -3 33 3. .4 4A A

    5 5

    0 0

    0 0

    - -

    2 2

    6 6

    * *$ $1 14 40 0$

    $

    2 2

    5 5

    4 4

    $ $4 47 72 2

    2 25 54 4

    - -

    2 2

    5 5

    6 6

    T T

    K K

    I IT T S SG GR R- -3 39 9. .8 8A A

    5 5

    0 0

    0 0

    - -

    3 3

    2 2

    * *$ $1 18 87 7$

    $

    3 3

    1 1

    3 3

    $ $6 68 81 1

    2 28 84 4

    - -

    2 2

    8 8

    6 6

    T T

    K K

    I IT T S SG GR R- -4 46 6. .1 1A A

    5 5

    0 0

    0 0

    - -

    3 3

    8 8

    * *$ $2 23 34 4$

    $

    3 3

    7 7

    4 4

    $ $7 71 11 1

    2 28 84 4- -

    2 2

    8 8

    6 6

    T T

    S S

    K K

    I IT T S SG GR R- -3 39 9. .8 8A A

    5 5

    0 0

    0 0

    - -

    3 3

    2 2

    * *$ $2 23 34 4$

    $

    3 3

    1 1

    3 3

    $ $7 71 11 1

    3 32 2

    4 4

    - -

    3 3

    2 2

    6 6

    K K

    I IT T S SG GR R- -5 52 2. .5 5A A

    5 5

    0 0

    0 0

    - -

    4 4

    4 4

    * *$ $2 28 82 2$

    $

    4 4

    3 3

    3 3

    $ $7 78 88 8

    3 32 24 4- -

    3 3

    2 2

    6 6

    T T

    S S

    K K

    I IT T S SG GR R- -4 46 6. .1 1A A

    5 5

    0 0

    0 0

    - -

    3 3

    8 8

    * *$ $2 28 82 2$

    $

    3 3

    7 7

    4 4

    $ $7 78 88 8

    3 36 6

    4 4

    - -

    3 3

    6 6

    5 5

    K K

    I IT T S SG GR R- -5 58 8. .8 8A A

    5 5

    0 0

    0 0

    - -

    5 5

    0 0

    * *$ $3 32 29 9$

    $

    4 4

    9 9

    2 2

    $ $9 95 50 0

    3 36 64 4- -

    3 3

    6 6

    5 5

    T T

    S S

    K K

    I IT T S SG GR R- -4 46 6. .1 1A A

    5 5

    0 0

    0 0

    - -

    3 3

    8 8

    * *$ $3 32 29 9$

    $

    3 3

    7 7

    4 4

    $ $9 95 50 0

    4 40 0

    4 4

    - -

    4 4

    0 0

    5 5

    K K

    I IT T S SG GR R- -7 71 1. .5 5A A

    5 5

    0 0

    0 0

    - -

    6 6

    2 2

    * *$ $5 51 19 9$

    $

    7 7

    2 2

    8 8

    $ $1 1, ,0 03 38 8

    4 40 04 4- -

    4 4

    0 0

    5 5

    T T

    S S

    K K

    I IT T S SG GR R- -5 52 2. .5 5A A

    5 5

    0 0

    0 0

    - -

    4 4

    4 4

    * *$ $5 51 19 9$

    $

    4 4

    3 3

    3 3

    $ $1 1, ,0 03 38 8

    4 44 44 4

    - -

    4 4

    4 4

    5 5

    T T

    K K

    I IT T S SG GR R- -8 84 4. .2 2A A

    5 5

    0 0

    0 0

    - -

    7 7

    4 4

    * *$ $8 89 98 8$ $

    1 1

    , ,

    0 0

    4 4

    3 3$ $1 1, ,3 32 27 7

    4 44 44 4- -

    4 4

    4 4

    5 5

    T T

    S S

    K K

    I IT T S SG GR R- -5 58 8. .8 8A A

    5 5

    0 0

    0 0

    - -

    5 5

    0 0

    * *$ $8 89 98 8$

    $

    4 4

    9 9

    2 2

    $ $1 1, ,3 32 27 7

    4 44 47 7

    / /

    4 4

    4 4

    9 9

    T T

    K K

    I IT T S SG GR R- -8 84 4. .2 2A A

    5 5

    0 0

    0 0

    - -

    7 7

    4 4

    * *$ $8 89 98 8$ $

    1 1

    , ,

    0 0

    4 4

    3 3$ $1 1, ,3 32 27 7

    4 44 47 7/ /

    4 4

    4 4

    9 9

    T T

    S S

    K K

    I IT T S SG GR R- -5 58 8. .8 8A A

    5 5

    0 0

    0 0

    - -

    5 5

    0 0

    * *$ $8 89 98 8$

    $

    4 4

    9 9

    2 2

    $ $1 1, ,3 32 27 7

    5 50 0

    0 0

    0 0

    S S

    K K

    I IT T S SG GR R- -6 65 5. .2 2A A

    5 5

    0 0

    0 0

    - -

    5 5

    6 6

    $ $1 1, ,3 30 00 0$

    $

    7 7

    2 2

    8 8

    N N/ /A A

    5 50 0

    0 0

    0 0

    L L

    S S

    K K

    I IT T S SG GR R- -7 71 1. .5 5A A

    5 5

    0 0

    0 0

    - -

    6 6

    2 2

    $ $1 1, ,3 30 00 0$

    $

    7 7

    2 2

    8 8

    N N/ /A A

    5 50 0

    0 0

    0 0

    L L

    X X

    K K

    I IT T S SG GR R- -9 96 6. .9 9A A

    5 5

    0 0

    0 0

    - -

    8 8

    6 6

    $ $1 1, ,3 30 00 0$ $

    1 1

    , ,

    6 6

    7 7

    5 5N N/ /A A

    5 50 0

    0 0

    0 0

    L L

    K K

    I IT

    T S SG GR R- -1 10 00 0. .1 1A

    A

    5 5

    0 0

    0 0

    - -

    8 8

    9 9

    $ $1 1, ,3 30 00 0$ $

    1 1

    , ,

    6 6

    7 7

    5 5N N/ /A A

    6 6

    8 8

    0 0

    5 5

    K K

    I IT

    T S SG GR R- -1 12 26 6. .5 5A

    A

    5 5

    0 0

    0 0

    - -

    1 1

    1 1

    4 4

    $ $1 1, ,4 41 19 9$ $

    2 2

    , ,

    1 1

    3 3

    2 2N N/ /A A

    G r o u n d

    i n g

    d e v

    i c e s m a y n o

    t b e

    i n s

    t a l l e

    d o n m o

    t o r s u s e

    d i n D i v i s i o n

    I o r

    D i v i s i o n

    2

    h a z a r d o u s

    l o c a

    t i o n s .

  • 8/8/2019 Bearing Erosion AC Motors

    17/17