beartooth electric cooperative board of trustees …...three example rate designs: • base, demand,...
TRANSCRIPT
BEC BOARD OF TRUSTEESJulie Lindgren, President District 3—Roberts, Bearcreek [email protected] 406-671-1086
Bill Pascoe, Vice PresidentDistrict 6—Nye [email protected]
Arleen Boyd, Secretary/TreasurerDistrict 5—Fishtail [email protected]
Dan DuttonDistrict 1—Bridger, MT, Clark, WY [email protected]
Roxie MeltonDistrict 2—Boyd, Joliet [email protected]
Richard NolanDistrict 4—Red Lodge [email protected] 406-425-2269
Ralph LewisDistrict 7—Columbus, Rapelje, Reed [email protected]
__________________________
Kevin P. Owens, PEGeneral ManagerPO Box 11101306 Broadway Ave NRed Lodge, MT [email protected]
Beartooth Electric Cooperative Board of Trustees Meeting
September 24, 2019
BEC Board Book | September 24, 2019 | Page 1
Beartooth Electric Cooperative Regular Board Meeting Tuesday, September 24, 2019
Noon | Beartooth Electric Office Agenda
1. Call Meeting to Order
2. Pledge
3. Visitors Comments
4. Approve Agenda
5. Approve Minutes
• August 27, 2019 Board Meeting
6. Committee/Trustee/Attorney Reports
• Finance Committee (Julie Lindgren)• Risk Management Committee (Arleen Boyd)• Bylaw Committee (Arleen Boyd)• Policy Committee (Roxie Melton)• Communication Committee (Richard Nolan)• Treasurer’s Report (Arleen Boyd)
CONSENT AGENDA (Items 7-9, shown in blue)
7. Membership Connections and Cancellations, Capital Credit to Estates, Registers, Reports, and Summary of Disbursements
8. Financials – Brad Prophet
• 2019 – August Financial Statements• Revised 2019 Budget
9. Staff Reports
• General Manager Report – Kevin Owens• Member Communication & Services Report – Kaaren Robbins• Line Superintendent Report – Eric Elton
BEC Board Book | September 24, 2019 | Page 2
10. New Business• Policies
-- Trustee Policy 207 Evaluation of the General Manager -- Trustee Policy 207 General Manager Performance Evaluation -- Financial Policy 307 Power Supply and Transmission
10. Old Business
• Board Strategic Planning Session (October 2-3, 2019) – Julie Lindgren
11. Upcoming Meetings
• BEC Bylaw Committee Meeting | BEC Office | October • BEC Strategic Planning Meeting | Carbon Fork, Red Lodge, MT | October 2-3, 2019• MECA Annual Meeting | Great Falls, MT | October 7-9, 2019• BEC Policy Committee Meeting | BEC Office | October 16, 2019 | 2 PM• BEC Communication Committee Meeting | BEC Office | October 22, 2019 | 2 PM• BEC Finance/Risk Management Committee Meeting | BEC Office | October 24, 2019 | 2 PM• BEC Regular Board Meeting | BEC Office | October 29, 2019 | Noon
12. Executive Session
13. Executive Action
14. Adjourn
BEC Board Book | September 24, 2019 | Page 3
Beartooth Electric Cooperative Regular Board Meeting Tuesday, August 27, 2019 | Noon
Beartooth Electric Office Minutes
Beartooth Electric Cooperative will be referred to as BEC herein. The Glossary of Terms and Acronyms website link is http://www.BeartoothElectric.com/content/glossary.
1. Call to Order: Board President, Julie Lindgren, called themeeting to order at 12:03 p.m.
2. Pledge of Allegiance
Present: Presiding: Julie Lindgren, Bill Pascoe, Arleen Boyd, DanDutton, Roxie Melton, and Ralph Lewis
Staff:Kevin P. Owens, General ManagerEric Elton, Line SuperintendentBrad Prophet, AccountantKaaren Robbins, Member Communication & Services
Via telephone:Larry Martin, Legal Counsel
Visitors:Jim Rodgers, Risk Management Committee MemberFrank Willett, Finance and Risk Management Committee Member
3. Visitor CommentsNone.
4. Approve Agenda
MOTION A motion was made by Arleen Boyd and seconded by Daniel Dutton, to accept the August 27, 2019, agenda with edits. Motion carried. Voting was unanimous.
5. Approve Minutes
MOTION A motion was made by Bill Pascoe and seconded by Arleen Boyd to accept the minutes of the July 30, 2019, regular board meeting as presented in the hard copy board book. Motion carried. Voting was unanimous.
BEC Board Book | September 24, 2019 | Page 4
6. Committee/Trustee/Attorney Reports• Finance Committee (Julie Lindgren)
The Finance Committee met at the open of the Risk ManagementCommittee meeting, August 19, 2019.
Brad Prophet walked through the second quarter financial reportwith the finance committee and risk management and board members inattendance. Final results held no surprises since the board hadpreviously reviewed monthly reports. In response to committeecomments, Brad will, before the August 26 Board meeting, add the2014 annual meeting expense on page 28. He also will provide anexplanation of why the year-end long-term debt numbers in thefinancial forecast for 2017, 2018, and 2019 are not the same numberas the beginning long-term debt for the following year. He seesthis as the result of a CFC forecast calculation that does notprecisely reflect BEC numbers but believes they are the correctnumbers.
Recommendation: The committee recommends acceptance by the Board ofthe Q2 financial statements with recommended changes.
MOTION A motion was made by Roxie Melton and seconded by Daniel Dutton to accept second-quarter financial statements with recommended changes. Motion carried. Voting was unanimous.
There was a discussion of creating a revised budget to reflect two issues affecting the 2019 budget: depreciation and the allocation of employee time between the capital and operating expenses. There also could be a significant increase in NWE transmission expense, which was not budgeted. At the board meeting Julie Lindgren will announce a decision reached with Manager Kevin Owens to authorize creation of a revised budget six months into the year under set circumstances (corrections or updates identified to exceed $100,000).
Recommendation: The committee recommends acceptance by the Board of the Q2 financial statements with recommended changes.
MOTION A motion was made by Ralph Lewis and seconded by Roxie Melton to implement a board practice to annually allow a revised budget if, at the six-month review significant change in spending, revenue or margins are $100,000 or more and the revision clearly indicates the changes. Motion carried. Voting was unanimous.
• Risk Management Committee (Arleen Boyd)Attending committee: Frank Willett, David Peterson, Jim Rodgers,Walter Clapp, Bill Pascoe, Julie Lindgren, Arleen Boyd. Board andother attendees: Dan Dutton, Richard Nolan, Roxie Melton, BradProphet, Kevin Owens, Russ Schneider (phone), Larry Martin (phone).
BEC Board Book | September 24, 2019 | Page 5
Risk Management Agenda, August 19, 2019: • Finance Committee review of Q2 financials• Rate Design Analysis — Russ Schneider, EES• BEC Forecast, Next Steps — Discussion, identify what-if runs• Catastrophic Risk Developments (TBD) — Walter Clapp• Update, Shares du Soleil and NWE OATT Filing — Kevin Owens
Risk Management report – Bill Pascoe and Kevin Owens worked with Russ Schneider on calculations and framing for the EES presentation -- Arleen and Bill reviewed the presentation with Russ to prepare for the Risk Management meeting on August 19.
The chair welcomed RUSS Schneider, EES Senior Financial Analyst who joined the group via phone and electronic slide presentation of Rate Design Analysis Beartooth Electric Cooperative. Bill Pascoe and Russ reported on the intent to use specific rate design examples to answer questions raised in the previous meeting – exactly how would any rate design change impact bills for various members classes, and individuals within classes.)
The presentation sets out to: • Select a few rate design examples to illustrate potential billimpacts• Develop ideas for specific customer types that are easy formembers to understand• Look at how each rate design example could affect the bills ofcustomers within different rate classes
COSA unit costs were recently calculated for all member classes. This rate design analysis starts with a focus on the residential and small commercial with initial information for later development of large commercial, industrial, and irrigation in any rate design analysis. The presentation looks at residential customers using three example rate designs: • Base, demand, and energy,• $50 minimum bill,• $50 minimum with $30 base and $2 demand.
The analysis looks at the impacts on rates/bills for each of the three approaches on low use, average use, and high use customers. The purpose of the presentation is to look at impacts on members of example rate designs and test examples and identify others for consideration
The co-op costs, reflected in the COSA and used for a rate design analysis include: paying for electricity, maintaining the system structure to deliver the power, administering member services, and meeting the obligations of running a service business. COSA assigns these items in detail to members by class. With new meters, we have the opportunity to accurately assign the costs for individual members and reach conclusions about fair payments by segments and
BEC Board Book | September 24, 2019 | Page 6
individuals within the existing classes. We can identify and discuss how costs are assigned to set rates and, with improved demand data and load factor analysis how to get a clear, granular look at members within a class and whether they are carrying their fair share of the cost assignment for their class.
Next steps will include gathering demand data for the seasonal, weekend, and net-metered accounts. Kevin is reviewing the internal data to see what is available. This will fill in data for the three example alternatives.
The minimum bill approach received skepticism and some opposition from committee members. There was agreement that it was an example, not a proposal and that other examples will be examined.
Recommend updating the presentation and posting it after the next meeting with clear statements that this is an analysis exercise in-progress, to look at examples, not a proposal for new rate design.
The committee postponed the remaining agenda items until its scheduled September 10 meeting due to time constraints. The chair circulated a “starter” list of questions about the rate design analysis process, objectives, and terms and approach. The committee and board members are examining the list, adding question and comments – especially to the basic question: what are the reasonsfor considering a change to the BEC rate design? The list will be a discussion topic at the next meeting.
• Bylaw Committee (Arleen Boyd)The committee is reviewing the Bylaws in order to define theagenda for our next meeting. The approach the committee is takingis to define several categories of review:
1. Identify bylaws that are not as clear as they might be andwould make more sense if rewritten
2. Identify bylaws that are confusing the bylaws themselvesseem quite confusing
3. Identify bylaws which are Montana Code Annotated law orstill law, and if they read according to the law.
Committee Chair, Boyd has sent counsel a few items which require legal review to provide direction to the committee.
Trustee Lewis inquired why is State of Montana law in the cooperatives’ bylaws. Counsel Martin provided this explanation: The State of Montana in its statutes defines rights and obligations of cooperatives. Therefore, the cooperative bylaws need to reflect and be in compliance with the state statutes.
The Committee will teleconference on September 6, 10:00 AM for a review meeting to define the agenda for the next face-to-face meeting.
BEC Board Book | September 24, 2019 | Page 7
• Policy Committee (Roxie Melton)The Committee is scheduled to meet Thursday, September 17, 2019,at the BEC Office, at 2 PM. A review will begin on the 200Trustee and Manager policies. In addition, General Manager Owenswill present a draft PrePay Policy. Trustee Pascoe state he isworking on the rough draft of Financial Policy-309 he will haveprepared for presentation.
• Communication Committee (Richard Nolan)Committee Chair Nolan is absent today due to a medical condition.Kaaren Robbins will conduct the Communication Committee reportduring the Consent Agenda.
• Treasurer’s Report (Arleen Boyd)Treasurer Boyd reported she has a meeting planned withAccountant Prophet in the next week to review the accountingsystem and its functions. Treasurer Boyd will report on thesystem next month.
CONSENT AGENDA (Items 7-9, shown in blue)
7. Membership Connections and Cancellations, Capital Credit toEstates, Registers, Reports, and Summary of Disbursements
8. Financials—Brad Prophet• Accountant Brad Prophet presented the July 2019 financials.
Questions:• Trustee Dutton asked about the forms that appear on pages 46-47,
are they sent to RUS? Accountant Prophet stated no, these areinternal forms, The Cooperative reports to the RUS annually.
• Trustee Dutton asked if the budget changes previously discussedwill be made in these reports as well? Accountant Prophet statedyes, and the same change notes will appear in this document asin the revised budget.
• Trustee Pascoe commented on Prophet’s review of the reduction inkWh sales and its effect on revenue. Pascoe commented there is adifference in how that effects revenue between the Residentialand Small Commercial-where it is heating/air driven, and theIrrigation class and the difference is in the rate design. Inthe residential/small commercial classes we are charging 9 centsa kwh because we are collecting a lot of non-energy costs in theenergy charge. So, if heating/air sales are down we lose the 9cents in kWh revenue, save 4 cents in power costs, so we losenet 5 cents. On the irrigation rate, we have a demand charge.Assuming irrigators turn on irrigation, we collect the demandrevenue, we lose 5 cents of energy revenue, save 4 cents inpower costs, so we lose net 1 cent. This is a perfect example of
BEC Board Book | September 24, 2019 | Page 8
what we are looking at in our rate design study. How do we make our revenues more stable and how do we make the member bills more stable? This is what we are talking about in that forum.
9. Staff Reports
General Manager’s Report—Kevin Owens
• Shares du Soleil community solar project was put out for bid July1. Bids were received August 1. Sundance Solar Systems was the solebidder for the project. The bid was substantially over the projectbudget. I met with the contractor on August 13 to fully understandthe project cost drivers. The soil conditions at the project sitesignificantly impacted excavation and foundation costs. TheContractor was asked to revise their bid to reflect a roof mountsystem to maximize energy output within the project budget. AProject History summary is attached, reflecting how the project hasevolved over the past year. Technology improvements and pricinghave improved substantially over the past year, providingparticipating members a better return on their investment. Whilethe Scope of Work has changed significantly over the past year,participating members will benefit immensely. The project is slatedfor completion mid-October. Project History and Contract forApproval are attached.
MOTION A motion was made by Bill Pascoe and seconded by Roxie Melton to approve the Sundance Solar, $77,500 turnkey, fixed price contract for the Shares du Soleil, Beartooth Electric Shared Solar Array. Motion carried. Voting was unanimous.
• Sen. Steve Daines held a Town Hall Meeting in Red Lodge this pastmonth. NWPPA provided talking points (attached) for utility Boardmembers and staff should they attend any of the Town Hall meetingsduring the recess. I requested support from the Senator on a coupleof the Bills important to Cooperatives.
• Considerable time was spent over the past month to support the RMCommittee on Rate Design matters.
• Considerable time was spent over the past month preparing for theSeptember Policy Meeting. Rules and Regulations are going through asignificant update and rewrite. In the future, they will exist asseparate R & R’s for Montana and Wyoming.
• A new policy for PrePay Accounts was drafted in the past month andwill be ready for discussion at the September Policy Meeting.
BEC Board Book | September 24, 2019 | Page 9
• Met with Meg Hatch to review progress on Operation Round Up priorto the Board Meeting.
Member Communication & Service—Kaaren Robbins 1. Communication Committee Meeting
August 20, 2019, BEC Red Lodge Office, 2 PMAttendees included: Chair, Richard Nolan, Janet Luloff, JulieLindgren, Arleen Boyd, Kevin Owens, and Kaaren Robbins.
Agenda• Google Analytics
o How do our visitors come to www.beartoothelectric.com? 65% desktop 35% mobile (29% smartphone/6% tablet) Apple iOS is the top operating system followed by Samsung
Galaxyo How have visitors used our website over the last year? Top Ten• Bill Pay• Contact Us• Welcome BEC Members• About• Employment Opportunities• Report an Outage• Board• Board Meeting Minutes• 8-Websites Energy Calculators Can Help You Save Energy• Service Area Map
• Award-Winning Electric Co-op Websiteso Wells REC (www.wrec.coop)o Umatilla Electric Cooperative (www.umatillaelectric.com)o Flathead Electric (www.flatheadelectric.com)o SMUD (www.smud.org) Committee Member Boyd added Pedernales as a good reference
for the Board section (www.pec.coop)• Current Website and Proposed Website Site Map
o White Board Exercise The Committee built a wireman site map to have developed and
sent to all Committee members (all committees) to review andcomment. Timeframe for development 4-6 wks. Kaaren will developand distribute for comment.
2. Work in Progress• October Rural Montana
- Shares du Soleil –Breaking Ground- Washington D.C. Youth Tour 2020 Applications- Getting ready for fall-Energy Efficiency
• October Billing Insert
BEC Board Book | September 24, 2019 | Page 10
• September Billing Memo
• Member eNewsletter- Post-Board meeting email scheduled for September 7- Pre-Board meeting email scheduled for September 21
• NEW Billing Statement Development- The new billing statement data flow from Aclara to NISC isunder construction. Once complete, this data will allow thedevelopment of the new usage graphs.- The Shares du Soleil reporting prework is complete. Dataflow will be tested once the system is constructed.- The rollout will occur upon completion of the meterupgrade project — projected rollout early 2020.
• SmartHub Update & Rollout- New SmartHub communication, marketing, and reportingcapabilities will be available with the installation of thedigital meters. Prework is being completed.- The rollout will occur upon completion of the meterupgrade project — projected rollout early 2020.
• Shares du Soleil- Solar Power Up ceremony- Monitor system TBD upon system design- Signage TBD upon system design and highway easements- Partner Certificate (Can complete once system specs are
defined)
• MECACommunication Committee
• Printer OptionsMembers Services• Today’s Member Course (MECA Annual Meeting October 2019) –
BEC sponsoring new member(s)?
• Coop Day at the Capital (January 2020)
• Electronic Forms Development- Numerous BEC forms are required from member including Aid-
to-Construction, Membership, etc. A move to electronicforms would significantly assist both members and internaloperations.
- In addition to electronic forms, an electronic signatureis also under evaluation.
- An analysis of available systems/processes is underway.
• Current Website (Discussion Topic August 20 CommunicationCommittee meeting)- NEW Website design is in progress
BEC Board Book | September 24, 2019 | Page 11
- Continue content updates to the current site- New headers- Post new press releases- Post financials- Update calendar- Continue redesign website sitemap
• BEC App Development- Research new BEC app development to incorporate BEC
specific needs and SmartHub
• FacebookContent follows board meeting information, press releases,and RM
• BEC Membership ApplicationA new review is scheduled with the Policy Committee
• BEC New Member Welcome (email & hard copy package)Work is progress-awaiting membership application
• CCC Certificate Portfolio DevelopmentCertificate work continues.
• Operation Round UpOperation Round Up received $116.01 billed 08/07/2019. 202Accounts and 186 Customers. Current Balance for OperationRound Up is $6,059.37.
• LISD/LIDDTotal LISC/LID Discount Accounts for July 2019 billed08/07/2019. WY: $33.60 and MT: $185.10 = Total $218.70. Totalnumber of accounts are 38.
The Member Services department suggests a review of ourLISD/LIDD programs on two fronts:- Can we open up this program to all Low-Income Members? Why
just Seniors and Disabled?- Can we provide a service that truly benefits our members
in need (a few dollars a month –10% of the total kWh usedcharge). How about the full base rate?
BEC Board Book | September 24, 2019 | Page 12
NISC Enterprise System Update July 2019
Process Reviews • Several internal process reviews are taking place (SO/WO/Street
light).• New system capabilities are being implemented into processes as
available.
Installed Systems (Updates) • ABS• Customer Information System (CIS)• CashRegister• RemitPlus• SmartHub
NEW System Installations• E&O App Suite
o Automated Meter Information (AMI)--Installed
o Work Management Solutions (WMS)--Installed
o DocuVault--Installed
o CallCapture--Installed
• Mapwise-Mappingo Work in Progress
• Mapwise-Stakingo Work in Progress
• ESRI GISo Installed with MapWise
• Meter Data Management System (MDMS)o Work in Progress
o OMS--2020
o Prepaid--2020
OTHER
Billing Statement Programming• Work in Progress
o Aclara-MDMS data flow
BEC Board Book | September 24, 2019 | Page 13
Line Superintendent Report—Eric Elton
CONSTRUCTION, OPERATIONS & MAINTENANCE • The Red Lodge crews are still busy putting in new services. It’s
been a really interesting summer with wind, hail, and lightning.
• We have finished the meter change-outs on the Roberts Sub, and wewill be starting Columbus and Red Lodge Subs next. So far, we haveBelfry, Absarokee, Luther, Edgar, Reed Point and Roberts completed.All of the TWACS equipment has been installed in all the subsexcept Nye. (We will be waiting on installing this equipment untilthe 100 KV upgrade is completed).
• Columbus crew has been busy with new services.
• Par Contractors have been working on the Nye substation rebuild. Weenergized the temp transformer on the 15th, and the contractors havestarted rebuilding the permanent tap. The new power transformer istwo weeks ahead of schedule and should arrive on the 20th ofSeptember.
• We have started placing ocrs on one shot with the conditions dryingout.
• We installed 13 new services in July.
• There was a total of 20 outages system-wide in July.
• We had 417 individual consumers out of power at some point in July,having a duration of 1850 minutes.
EDUCATION, SAFETY & LOSS • Next MECA safety meeting is September 4th.
• No lost time accidents to report for the month of July.
TRUCK, TOOLS & EQUIPMENT • The digger derrick being repaired is Salt Lake City should be back
together and heading to the paint shop this shortly.
10. New Business
• Operation Round Up Presentation—Meg Hatch
President Hatch provided this report:1. New Status: Independent 501c3 organization, but still
BEC Board Book | September 24, 2019 | Page 14
reporting to BEC Board of Trustees. The Board stated that BEORU does not need to report to this board.
2. Current Operation Round Up© Board of Trustees: President-Meg Hatch (Nye)Vice-President-Judy Strobbe (Roberts) Secretary-KarenReiner (Fishtail) Treasurer-Greg Waite (Absarokee)At-Large Members-Janet Luloff (Roberts)Peggy Joki (Fishtail)BEC Staff Support-Stephanie Fletcher
3. Financial Status: $6249.32 as of July 26, 2019--Generous donations from Yellowstone Bank--206 members currently contributing to ORU out of 4500+
4. By Laws Revisions are in process, due to new 501c3 statusand due to changing focus.*We're continuing to clarify our relationship to the BECBoard of Trustees in order to maintain our accountabilityto them and to all BEC members, at the same time that weestablish our independent status.
The BEC Board stated they would enjoy the information of the ORU Bylaws. Also, perhaps the BEC Board Bylaws Committee could assist with their bylaw review. And if required, the BEC counsel could also lend review and assistance directly to the ORU as an independent charitable foundation.
5. Mission and Vision: This year we will be expanding ourpurpose beyond simply helping co-op members pay theirelectric bills to living out co-op principle seven,"Concern for Community," in accordance with the original
vision of Operation Round Up©.
Trustee Pascoe noted there is also way to increase revenues as each member can make a larger flat rate or one-time donation. ORU President noted to date the foundation has approved all requests received, funding was available. Trustee Melton suggested the foundation officers contact cooperatives in our area to see how they operate. President Lindgren thanked Meg for her presentation and her work with Operation Round Up.
• Shares du Soleil—Project History & ContractGeneral Manager Owens presented the Shares du Soleil projecthistory & contract during Consent Agenda.
11. Old Business
• MECA Annual Meeting (October 7-9, 2019)- Board of Director’s Certification
BEC Board Book | September 24, 2019 | Page 15
- MECA Voting Credentials
Arleen Boyd is the designated BEC primary voter. Bill Pascoe is the designated BEC alternate voter. Roxie Melton is the designated BEC second voter.
General Manager Owens noted Bill Pascoe and he are on the Legislative Committee agenda to discuss escheated funds.
• NRECA Voting Delegate—Region IX
Daniel Dutton is the designated BEC primary voter.
• Board Strategic Planning Session (October 2-3, 2019) – JulieLindgren
A questionnaire will be emailed to you from CoBank for theStrategic Planning session. Keep a look out.
12. Upcoming Meetings
• BEC Bylaw Committee Meeting | BEC Office | September 6, 2019 |Teleconference 10 AM
• BEC Communication Committee Meeting | BEC Office |October 22, 2019 | 2 PM
• BEC Finance/Risk Management Committee Meeting | BEC Office |September 10, 2019 | BEC Office | 2 PM
• BEC Policy Committee Meeting | BEC Office|September 17, 2019|2 PM• BEC Regular Board Meeting | BEC Office | September 24, 2019 |Noon• BEC Strategic Planning Meeting | The Carbon Fork | October 2-3,
2019
• MECA Annual Meeting | Great Falls, MT | October 7-9, 2019
13. Executive Session
• General Manager Evaluation
14. Executive Action
• In Executive Session, the board discussed the General Manager’s Evaluation. President Lindgren and Counsel Martin will negotiate the General Manager’s 2020 compensation on September 24, 2019 after the board meeting.
BEC Board Book | September 24, 2019 | Page 16
15. Adjourn
President Julie Lindgren adjourned the August 27, 2019, BEC Board ofTrustees meeting at 3:35 p.m.
ATTEST:
Arleen Boyd, Secretary
BEC Board Book | September 24, 2019 | Page 17
Board Report – Risk Management September 2019 Risk Management Meeting, Tuesday September 10, BEC Red Lodge Office, 2:00 Committee Attendees: Frank Willett, David Peterson, Bill Pascoe, Arleen Boyd. Board and Guests Attending: Roxie Melton, Kevin Owens, Russ Schneider via telephone), Jim Movius. AGENDA
• Rate Design Analysis — Bill Pascoe, Russ Schneider, EES• BEC Financial Forecast Demonstration and Next Steps — Brad Prophet and
Frank Willett• Update, Shares du Soleil and NWE OATT Filing — Kevin Owens• Strategic Planning CoBank Webinar
Rate Design – The committee examined rate design issues and discussed how to define and examine potential alternative rate designs. Bill Pascoe led discussion of next steps and a detailed schedule for the committee’s analysis of rate design alternatives and examination of alternatives with the board. The committee’s proposed schedule is attached.
The list of questions raised by BEC members and trustees was discussed at the last committee meeting and has been resent to the board and committee members. We continue to add to the list and it will be organized for wider distribution before the next committee meeting.
EES Senior Analyst Russ Schneider joined the meeting and discussion by phone. Preparing for the October 24 committee meeting, Russ will work on pros and cons of potential rate design alternatives including: implementation of a 3-part rate that includes demand charges across rate classes, billing for energy costs accurately with all other expenses reflected in the base rate, minimum bill structure, block rates, keeping the current rate structure, and others. The October meeting may include phone discussions with some Montana co-ops that have implemented demand charges across member classes.
The rate design analysis process will look at all alternatives as revenue-neutral, based on current BEC forecasts that show no need for rate changes to increase revenue.
Recommendations – Timing for reaching a decision about possible rate design recommendations to the board includes a recommendation to aggressively inform members of the ongoing discussions of rate design at the committee and board meetings and to encourage their input and participation. The committee recommends the attached schedule showing review of the impacts and pros and cons of potential alternatives starting in October, full discussion of alternatives by the committee in November, and recommendations of alternatives to the board for discussion and further analysis by the committee and board in December and
BEC Board Book | September 24, 2019 | Page 18
January to prepare for a board decision in February. If a rate design change is recommended, an implementation plan could launch in April of 2020.
Financial Forecast – Frank Willett and Brad Prophet outlined the status of the financial forecast and how it can now be used to test scenarios in real time. Using the just revised budget Brad showed the financial impacts of the two hypothetical scenarios: occurrence of a $300,000 storm within two years and a reduction in capital credit payments from 5% to 4%. The resulting impacts on our financial reports were calculated and shown in the reports within minutes.
Shares di Soleil – Kevin Owens reported on the very positive developments for the Shares du Soleil project, which are featured in this month’s manager’s report to the board. The project is ahead of schedule and under projected cost. The project capacity is greater than anticipated and members who invested in will see their investment returned sooner than expected. Construction will start soon.
Pre-Payment – The October 24 Risk Management Committee meeting will include a presentation by General Manager Kevin Owens taking a close look at a proposal to introduce a prepayment billing option for BEC members. A report on prepayment provisions prepared by EES is attached. Other co-ops’ experiences with pre-payment and a discussion of benefits and challenges are briefly outlined in the attached EES report.
Strategic Planning – The Committee viewed an outstanding webinar presentation on strategic planning by Karl Hiesterman, Vice President, Process Change Management at CoBank. With the board scheduled to conduct a strategic planning session in early October the presentation was timely. Hiesterman outlines effective strategic planning as a best business practice that starts with defining the organization’s mission (what you do now) and vision (what you want to do) and then sets a process in place that works in two complementary directions -- from planning forward to set direction and from budget back through the plans and objectives with metrics to test effectiveness. The process steps are: setting the vision, defining strategies, developing a strategic plan, documenting an operational plan and forming a budget.
Arleen Boyd Co-chair
BEC Board Book | September 24, 2019 | Page 19
BEC Rate Design Process Tentative Schedule
September 2019 RMC • Review where we’ve been and where we’re going
o scheduleo information needso analysis tools
October 2019 RMC • Review Q&A answers to date• Review preliminary pros/cons of different rate designs• Select rate designs for analysis
November 2019 RMC • Initial review of analysis of rate designs (pros/cons, bill impacts)• Review Q&A answers
December 2019 RMC • Final review of analysis of rate designs (pros/cons, bill impacts)• Final Q&A answers• Recommendations to BOT
January 2020 BOT • Initial consideration of RMC rate design recommendations
February 2020 BOT • Rate design decisions
April 1, 2020 • New rate designs (if any) implemented (bills go out in early May)
Pascoe 9-5-19
BEC Board Book | September 24, 2019 | Page 20
September 10, 2019
TO: Kevin Owens Beartooth Electric Cooperative
FROM: Russ Schneider
SUBJECT: Background on Residential Pre-Pay Programs
The purpose of this memo is to provide background information with respect to residential customer pre-pay programs. There are good examples of successful pre-pay programs in the region. Beartooth Electric Cooperative could select the components of pre-pay programs already implemented by other utilities to develop its own pre-pay rate.
Pre-pay programs have become more popular in recent years for several reasons. First, metering technology and supporting back-office systems for pre-pay programs are now widely available at more reasonable costs. Second, pre-pay programs have proven to reduce utilities’ write-downs of uncollectible debt and unpaid disconnect/reconnect fees. Third, the average pre-pay customer reduces their energy consumption by 7 to 12 percent. As such, pre-pay programs have proven to be effective at incentivizing behaviors that conserve energy. And lastly, it is considered good customer service to provide a pre-pay rate option to customers.
Many utilities with pre-pay programs use a web-based consumer interface like SmartHub from National Information Solutions Cooperative1 to interact with participating customers. Vendors typically provide customers with account access and two-way communication with their utility or telecommunications provider online or via smartphone. This allows users to manage payments, notify customer service of account and service issues, check their usage, and receive special messaging from their utility. Vendors supply an App for Android and iOS smartphones and tablets. Most have a tool that estimates how much customers need to pre-pay to cover a period selected by the customer.
1 https://www.nisc.coop/utility-solutions/customer-care-billing/payments/smarthub/
BEC Board Book | September 24, 2019 | Page 21
EES surveyed the pre-pay programs at several utilities. Below are observations made based on this survey:
• Most utilities do not have separate rate schedules for pre-pay customers, but insteadapply the standard residential rate schedule to pre-pay customers.
• Most utilities allow pre-pay customers to switch back to the traditional residential rateschedule at any time; though two of the utilities surveyed require customers to remainon the program for at least 12 months.
• Utilities typically do not supply monthly billing statements to pre-pay customers; dailyenergy consumption and account balances are available at any time through the utility’swebsite or smartphone app (e.g. SmartHub or other App).
• The name of the pre-pay program is important from a marketing standpoint. Somecustomers may not sign up for a program called “pre-pay” as the word “pre” has anegative connotation for some customer groups. Several utilities, such a Clallam PUD with“SmartPay”, Flathead Electric Cooperative with “FlexPay” and Lincoln Electric Cooperativewith “Pay As You Go” have gotten away from using the word “pre” in the program’s name.
• Non-rate schedule fee policies are an important part of program implementation,specifying how disconnect and reconnect fees related to participation in the pre-payprogram. For example, it is typically a significant fee for a customer in collection to bothpay their past due balance and pay reconnect fees. Offering some discount for pre-payparticipation can reduce the financial burden on those having difficulty paying their bills.
• The cost-benefit of pre-pay programs appears favorable for utilities as shown by thepopularity of programs across the region. However, individual utility costs and benefitswill vary based on implementation costs and the number of participants compared to theoverall size of the utility.
There are costs and benefits of a pre-pay program to both utilities and consumers and each cost or benefit depends upon the perspective. Below is a list of common categories.
BEC Board Book | September 24, 2019 | Page 22
Table 1 Costs, Benefits and Concerns with Pre-Pay Electric Service Programs2
Consumer benefits Utility Benefits Public Concerns
A greater sense of control. Better-informed consumers. Prepay often bypasses traditional notification requirements regarding termination of service.
No surprises on their utility bill. Debt recovery through prepay payments. Critics consider prepay an inferior service.
Prepay can prevent consumers from always being behind.
Reduced write-offs and bad debt risk. Marketing to low-income consumers.
A clear link between daily electricity use and electricity spending.
Disconnections occur quickly with prepay Doing without an essential service.
Empowered to manage budgets and prioritize spending.
Safety benefits of remote disconnect
Affordability, doesn’t resolve the underlying problem of utility service being too expensive for some consumers.
Can act to reduce bills. Avoiding initial fees. Rapid reconnection.
Some utilities have significant fee revenues from various service fees related to disconnection, reconnection and non-payment. It is likely that this revenue would decline with movement of customers to a pre-pay program. However, operation and maintenance costs should also decline and, if the current fees are appropriate and based on the actual costs incurred by the utility, then there should be no net impact on non-participating customers or the utility. If the current fees do not align with costs and net revenue collection, then there may be a net impact on non-participating customers and the utility.
Some utilities recognize the added administrative cost of pre-pay programs in a separate charge or with a higher facilities charge. However, it is more common and less controversial to keep rates and charges the same as non-pre-pay customers to avoid the appearance of collecting more for those that take part. If there is truly a net savings to the utility due to increased participation in a prepay program, a lower average rate would follow based on cost causation.
Beartooth may wish to re-evaluate the appropriateness of its fees before implementing a pre-pay program.
All utilities surveyed disconnect customers if their account balances go negative (i.e. less than $0). The timing of the disconnects and the requirements for re-connection vary by utility. Table 2 below supplies a comparison of some of the key part of pre-pay programs implemented at other utilities.
2 Bridging the Gaps on Prepaid Utility Services - U.S. Department of Energy |September 2015 https://www.energy.gov/sites/prod/files/2015/11/f27/Bridging%20the%20Gaps%20on%20Prepaid%20Utility%20Service_0.pdf
BEC Board Book | September 24, 2019 | Page 23
Table 2 Key Components of Pre-Pay Programs
Utility Initial
Balance Notification of Low Balance Disconnect Policy
Cowlitz PUD $25 “low balance” set by customer
Accounts are disconnected immediately if account balance is below $0; $25 minimum balance required to restore service.
Clallam PUD > $40 If balance is $20 or less
Customers notified if balance goes below $0 and have 30 minutes to add money to account before disconnection; $40 minimum balance required to restore service.
Mason PUD #3 $30 Definition of “low” not provided
Accounts are disconnected immediately if account balance is below $0; $50 minimum balance required to restore service.
Clearwater Power $50 If balance is less than $20
Accounts are disconnected immediately if account balance is below $0; a positive account balance is required to restore service.
Consumers Power $25 If balance is less than $20
Accounts are disconnected if balance is below $0; accounts will not be disconnected on a Thursday, Friday, weekend, or holiday. $50 minimum balance is required to restore service.
Kootenai Electric $50 Not specified Accounts with negative balances are disconnected at 12:30 pm daily; $5 minimum balance required to restore service.
Flathead Electric $50 Not specified Accounts with negative balances are disconnected immediately except on weekends, holidays and at times when the overnight temperature is predicted to be less than 15 degrees.
Sun River Electric $100 If balance is less than $20
Accounts with negative balances are disconnected after 10 am on Monday through Friday (except holidays); $40 minimum balance plus $10 reconnect charge required to restore service.
Missoula Electric $25 If balance is less than $25
Accounts are disconnected immediately if account balance is below $0; $10 minimum balance required to restore service.
Lincoln Electric $50 If balance is less than $50
Accounts with negative balances are disconnected after 10 am on Monday through Wednesday (except holidays); must pay off outstanding balance and a $30 reconnect fee to restore service.
* Most utilities notify customers of low balances and impending disconnects only via text messages, the SmartHubapp and emails. Some utilities offer a phone call as an alternative.
No security deposits are required for pre-pay customers. The utilities surveyed allow customers to convert their security deposits over to pre-pay programs to establish initial balances. Since service can be disconnected if account balances fall below $0, pre-pay customers are not subject to late fees or collection-related fees.
A good example of a pre-pay program is Clallam PUD’s SmartPay program. Below is a link to Clallam PUD’s website, along with links to several other programs.
Please let us know if you would like further research on this topic.
BEC Board Book | September 24, 2019 | Page 24
Selected Examples of Pre-Pay Programs
Cowlitz PUD: https://www.cowlitzpud.org/customer-services/prepaid-billing/
Clallam PUD’s Smart Pay: https://www.clallampud.net/smartpay/
Mason PUD #3: http://www.pud3.org/uploads/pdf/fees-and-policies/prepayaccountsadm-prepay-c.pdf http://www.pud3.org/service/manage-your-account/prepay (video that explains pre-pay)
Clearwater Power Company: https://www.clearwaterpower.com/webform/mypower_pre_pay_enrollment
Consumers Power Inc.: https://www.cpi.coop/my-account/prepay/
Kootenai Electric Cooperative’s Smart Pay: https://www.kec.com/prepaid-rate
Flathead Electric Cooperative’s Flex Pay https://www.flatheadelectric.com/account/payment-billing-options/
Sun River Electric Cooperative http://www.sunriverec.com/sites/sunriverelectric/files/PDF/Pre-PayAgreement.pdf
Missoula Electric Cooperative https://missoulaelectric.com/wp-content/uploads/prepay-agreement.pdf
Lincoln Electric Cooperative’s Pay As You Go https://www.lincolnelectric.coop/index.php/billing/pay-as-you-go-program
BEC Board Book | September 24, 2019 | Page 25
Bylaw Committee Report
The current Bylaw Committee review started with questions about updating the bylaws for issues that have changed since the major rework of that produced the 2013 Amended Bylaws. One example is the requirement for communicating with members that calls for using a range specified channels that various members might use to receive information. Current technology enables wide range of electronic devices and applications that did not exist in 2013, which people rely on for information today. The board asked the committee, which includes members who wrote the 2013 and later amendments, to look thoroughly at the bylaws.
We are outlining areas/categories for the board to consider: changes to bring bylaws into alignment with Montana Code Annotated; changes to clarify incorrect or ambiguous language that can be misunderstood; changes that permit rate design change if needed; changes to bylaw provisions that conflict with each other.
Larry Martin has drafted, with committee input, language to accurately define and separate the requirements for petitions and member meetings which are separate legal issues mixed together in the current version. The committee has reviewed additional issues and some remain for discussion at a fourth telephone conference in October. We anticipate having the issues identified for a board report in October.
BEC Board Book | September 24, 2019 | Page 26
MONICA ALRIFAIE RACHEL MEIGGSNANCY ARTHUN JOHN MOOREBRIAN BAILEY AMY & KEN OLINGERJASON & EMILY BARLOW PAR ELECTRICAL CONTRACTORS INCCHERYL BASS KIRK PAYOVICHPATRICK & LISA BEDDOW ANGIE & CRAIG REYNOLDSJOSEPH COPPER PETER & MARIA SCHICKMICHAEL CROFT MICHAEL SHEPHERDLEONARD EASTBURN ERICA & SCOTT STEMMANNETTE & DARRELL GILLESPIE JAY STERNADKEN & MERRY HALL WILLIAM TESKECHAD JESTER TRAILHEAD BUILDERS OF MTLONE TREE STOCK TYNER'S TOWERSELINA MANWARING STACIE WAREHIMEBRITTANY MCCALLUM TANA WEIMERHEATHER MEIER & DEVON PINKAL KAY WILLIAMS
1ST CLASS REALTY WM D HEATHMARK & VALERIE ALLEN JULIE & MIKE JONESLAVERNE BASS FRANK KELLEYJIM BENNETT STACI & ZARRIN MALISKEMARK CARTMELL SARAH MCBRIDEWESLEY & KAREN CHAPMAN WILLIAM V MILLER IIGABE & SARAH DEAN JOE MOFFETJANEALE & MITCHELL DURAND ROBERT PETERS JRHEATHER GONZALES ADAM RICEGREG HADFIELD CLARENCE WAHL
MEMBERSHIP CANCELLATIONS
SEPTEMBER 24, 2019AUGUST 2019
MEMBERSHIP CONNECTIONS
CAPITAL CREDITS Capital Credits Allocated
Discounted Refund to Member Retained by Co-Op
TOTALS $851.84 $664.92 $186.92
DOROTHY BOGGS $319.60 $319.60 $0.00RUTH WHITMYER $532.24 $345.32 $186.92
BEC Board Book | September 24, 2019 | Page 27
OPE
N B
ALA
NC
E R
EGIS
TER
09/1
7/20
198:
05:0
9 am
Page
: 1
Rev
isio
n: 1
8847
Bea
rtoot
h El
ectri
c C
o-O
p.,In
c.
Tot
alA
R A
mt
Cur
rent
AR
Am
t30
Day
60 D
ay90
Day
Tot
alB
ill A
mt
Tot
alB
ill P
ast
Cur
rent
Bill
Am
t
7,37
8.19
573.
2651
1.53
310.
375,
983.
03
Bud
get A
mt D
ue
Tot
al A
R A
mt
Cur
rent
90 D
ay
60 D
ay
30 D
ay
0.00
0.00
0.00
Tot
Act
ive
Dol
lars
Act
ive
Acc
ts 000
0.00
0.00
0.00
000
Tot
Inac
tive
Dol
lars
Inac
tive
Acc
ts
0.00
7,37
8.19
573.
26
5,98
3.03
310.
37
511.
53
038192087
Gra
nd T
otal
s:
Act
ive
Cre
dit $
Act
ive
Cre
dit A
ccts
0.00
0.00
0.00
0.00
0.00
0.00
000000
Inac
tive
Cre
dit $
Inac
tive
Cre
dit A
ccts
0.00
-32.
80
-32.
80
0.00
0.00
0.00
011000
Act
ive
Deb
it $
Act
ive
Deb
it A
ccts
0.00
0.00
0.00
0.00
0.00
0.00
00000
Inac
tive
Deb
it $
Inac
tive
Deb
it A
ccts
0.00
7,41
0.99
606.
06
5,98
3.03
310.
37
511.
53
037182087
GR
AN
D T
OT
AL
SU
MM
AR
Y IN
FOR
MA
TIO
N
6,80
4.93
7,37
8.19
573.
26
0
/pro
/rptte
mpl
ate/
cis/
2.45
.1/O
PEN
_BA
LAN
CE.
xml.r
ptsf
letc
her
2801
9
Accu
mul
ated
pro
visi
ons
set a
side
for U
ncol
lect
able
Writ
e-O
ff ac
coun
ts a
s of
Aug
ust 3
1, 2
019
is $
56,4
50.2
5.C
apita
l cre
dits
to b
e ap
plie
d w
ith G
ener
al R
etire
men
ts.
BEC
Boa
rd B
ook
| S
epte
mbe
r 24,
201
9 |
Pag
e 28
RED LODGE(RDL)
COLUMBUS (CMB)
DATE CITY SERVICE LOC# LOCATION ACCOUNT AREA DISCONNECTED RECONNECTED
August 2018 TOTAL DISCONNECTS NON-PAY = 20 August 2, 2018
TOTAL RECONNECTS = 16 August 2, 2018
September 2018 TOTAL DISCONNECTS NON-PAY = 18 September 26, 2018
TOTAL RECONNECTS = 17 September 26, 2018
October 2018 NO DISCONNECTS
November 2018 NO DISCONNECTS
December 2018 NO DISCONNECTS
January 2019 NO DISCONNECTS
February 2019 NO DISCONNECTS
March 2019 NO DISCONNECTS
April 2019 TOTAL DISCONNECTS NON-PAY = 1 April 25, 2019TOTAL RECONNECTS = 1 June 7, 2019
May 2019 TOTAL DISCONNECTS NON-PAY = 5 May 28, 2019
TOTAL RECONNECTS = 5 August 22, 2019
June 2019 TOTAL DISCONNECTS NON-PAY = 5 June 24, 2019
TOTAL RECONNECTS = 5 June 24, 2019
July 2019 TOTAL DISCONNECTS NON-PAY = 3 July 30, 2019
TOTAL RECONNECTS = 3 August 12, 2019
August 2019 BELFRY 8S 22E 26 725 A 391608 RL August 22, 2019 August 23, 2019
BRIDGER 5S 23E 27 611 106307 RL August 22, 2019 August 22, 2019
GREYCLIFF 1S 16E 17 1376 Q 542303 CMB August 22, 2019
JOLIET 4S 23E 32 577 B 527904 RL August 22, 2019
NYE 4S 17E 04 01 A5 461500 CMB August 22, 2019 August 26, 2019
POWELL 58N 102W 33 798-15 388303 RL August 22, 2019 August 22, 2019
ROBERTS 6S 20E 26 413 218703 RL August 22, 2019 August 22, 2019
Notices went out with Past Due Balances due 8/7/2019.
Delinquent accounts were called 8/16/2019 and Disconnecting Accounts 60-90 days in arrears 8/22/2019.
DISCONNECT NON PAY
BEC Board Book | September 24, 2019 | Page 29
According to the Paperwork Reduction Act of 1995, an agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a valid OMBcontrol number. The valid OMB control number for this information collection is 0572-0032. The time required to complete this information collection is estimated to average 15 hours perresponse, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
BORROWER DESIGNATIONMT0019
PERIOD ENDEDFINANCIAL AND OPERATING REPORT August 31, 2019
BORROWER NAMEINSTRUCTIONS-See help in the online application BEARTOOTH ELEC COOP INC
This information is analyzed and used to determine the submitter's financial situation and feasibility for loans and guarantees. You are required by contract
and applicable regulations to provide the information. The information is subject to the Freedom of Information Act (5 U.S.C. 552)
CERTIFICATION
We recognize that statements contained herein concern a matter within the jurisdiction of an agency of the United States and the making
of a false, fictitious or fraudulent statement may render the maker subject to prosecution under Title 18, United States Code Section 1001.
___X___ All of the obligations under the RUS loan documents have been fulfilled in all material respects.
_________ There has been a default in the fulfillment of the obligations under the RUS loan documents. Said default(s) is/arespecifically described in Part D of this report.
9/19/2019 DATE9/19/2019 DATE
YEAR-TO-DATEITEM LAST YEAR THIS YEAR BUDGET THIS MONTH
(a) (b) (c) (d)1. Operating Revenue and Patronage Capital................................... 5,753,051 5,940,707 5,785,700 738,213
2. Power Production Expense............................................................... 0 0 0 03. Cost of Purchased Power............................................................... 2,113,407 2,237,623 2,100,188 300,127
4. Transmission Expense..................................................................... 6,613 2,995 3,438 368
5. Regional Marketing Expense………………………………………….. 0 0 0 0
6. Distribution Expense-Operation...................................................... 644,024 737,458 639,801 90,533
7. Distribution Expense-Maintenance................................................. 398,314 467,458 453,616 96,455
8. Consumer Accounts Expense.......................................................... 217,156 212,527 263,564 24,526
9. Customer Service and Informational Expense............................... 81,294 80,675 93,006 8,671
10. Sales Expense................................................................................. 3,747 5,140 3,938 520
11. Administrative and General Expense........................................... 746,807 821,405 753,478 77,794
12. Total Operation and Maintenance Expense (2 thru 11)................. 4,211,362 4,565,281 4,311,029 598,994
13. Depreciation and Amortization Expense........................................ 669,869 723,819 679,589 92,135
14. Tax Expense - Property and Gross Receipts.................................. 0 0 0 0
15. Tax Expense - Other......................................................................... 1,464 1,328 1,874 204
16. Interest on Long-Term Debt............................................................ 396,828 402,745 404,822 49,948
17. Interest Charged to Construction - Credit...................................... 0 0 0 0
18. Interest Expense - Other.................................................................... 799 1,018 800 127
19. Other Deductions............................................................................. 1,200 1,200 1,200 150
20. Total Cost of Electric Service (12 thru 19).................................... 5,281,522 5,695,391 5,399,314 741,558
21. Patronage Capital and Operating Margins (1 minus 20)............... 471,529 245,316 386,386 (3,345)
22. Non Operating Margins - Interest................................................... 87,073 83,524 73,338 9,485
23. Allowance for Funds Used During Construction.............................. 0 0 0 0
24. Income (Loss) from Equity Investments........................................ 0 0 0 0
25. Non Operating Margins - Other................................................... (4,444) 511 1,655 3,864
26. Generation and Transmission Capital Credits............................. 0 0 0 0
27. Other Capital Credits and Patronage Dividends............................. 41,657 51,322 43,600 18,760
28. Extraordinary Items.......................................................................... 0 0 0 029. Patronage Capital or Margins (21 thru 28)..................................... 595,815 380,673 504,979 28,764
Rev 2010
BRAD PROPHET, ACCOUNTANTDRAFT
KEVIN P. OWENS, GENERAL MANAGER
PART A. STATEMENT OF OPERATIONS
RUS Financial and Operating Report Electric Distribution
PERIOD AND RENEWALS HAVE BEEN OBTAINED FOR ALL POLICIES.DURING THE PERIOD COVERED BY THIS REPORT PURSUANT TO PART 1718 OF 7 CFR CHAPTER XVII
(check one of the following)
DRAFT
UNITED STATES DEPARTMENT OF AGRICULTURERURAL UTILITIES SERVICE
ELECTRIC DISTRIBUTION
We hereby certify that the entries in this report are in accordance with the accounts and other records of the
system and reflect the status of the system to the best of our knowledge and belief.
ALL INSURANCE REQUIRED BY PART 1788 OF 7 CFR CHAPTER XVII, RUS, WAS IN FORCE DURING THE REPORTING
BEC Board Book | September 24, 2019 | Page 30
USDA - RUS BORROWER DESIGNATIONMT0019
FINANCIAL AND OPERATING REPORT PERIOD ENDED
PART B. DATA ON TRANSMISSION AND DISTRIBUTION PLANT
YEAR-TO-DATE YEAR-TO-DATEITEM LAST YEAR THIS YEAR ITEM LAST YEAR THIS YEAR
(a) (b) (a) (b)
1. New Services Connected 51 58 5. Miles Transmission 15.21 15.21
6. Miles Distribution-2. Services Retired 5 26 Overhead 1,310.34 1,307.02
7. Miles Distribution-3. Total Services in Place 6,643 6,705 Underground 495.55 503.50
4. Idle Services 8.Total Miles Energized(Exclude Seasonal) 459 431 (5 + 6 + 7) 1,821.10 1,825.73
PART C. BALANCE SHEET
ASSETS AND OTHER DEBITS LIABILITIES AND OTHER CREDITS
1. Total Utility Plant in Service.................................................33,707,714 30. Memberships................................................................... 0
2. Construction Work in Progress........................................... 255,717 31. Patronage Capital............................................................. 8,224,753
3. Total Utility Plant (1 + 2).......................................................33,963,431 32. Operating Margins - Prior Years...................................... 0
4. Accum. Provision for Depreciation and Amort.................. 16,425,450 33. Operating Margins - Current Year..................................... 245,316
5. Net Utility Plant (3 - 4)...........................................................17,537,981 34. Non-Operating Margins................................................... 540,257
6. Non-Utility Property - Net.................................................... 0 35. Other Margins and Equities............................................. 220,028
7. Investments In Subsidiary Companies............................... 0 36. Total Margins and Equities (30 thru 35)............................. 9,230,354
8. Invest. In Assoc. Org. - Patronage Capital....................... 454,799 37. Long-Term Debt - RUS (Net).......................................... 408,981
9. Invest. In Assoc. Org. - Other - General Funds................. 0 38. Long-Term Debt - FFB - RUS Guaranteed......................... 6,438,572
10. Invest. In Assoc. Org. - Other -Nongeneral Funds.......... 285,418 39. Long-Term Debt - Other - RUS Guaranteed....................... 0
11. Investments In Economic Development Projects............ 0 40. Long-Term Debt - Other (Net).............................................5,654,603
12. Other Investments.............................................................. 0 41. Long-Term Debt - RUS - Econ. Devel. (Net)........................ 0
13. Special Funds.................................................................... 0 42. Payments-Unapplied 1,755,602
14. Total Other Property and Investments (6 thru 13)........ 740,217 43. Total Long-Term Debt (37 thru 41-42)...................................10,746,554
15. Cash - General Funds....................................................... 181,912 44. Obligations Under Capital Leases-Noncurrent.................................... 0
16. Cash - Construction Fund - Trustee.................................. 1 45. Accumulated Operating Provisions................................... 0
17. Special Deposits................................................................ 0 and Asset Retirement Obligations18. Temporary Investments.................................................... 902,562 46. Total Other Noncurrent Liabilities (44+45)......................... 0
19. Notes Receivable (Net)...................................................... 0 47. Notes Payable.................................................................. 0
20. Accounts Receivable - Sales of Energy (Net).................. 807,561 48. Accounts Payable........................................................... 485,374
21. Accounts Receivable - Other (Net)................................... 118,912 49. Consumers Deposits........................................................ 106,372
22. Renewable Energy Credits.......................................... 0 50. Current Maturities Long-Term Debt................................... 0
23. Materials and Supplies - Electric and Other.................... 263,749 51. Current Maturities Long-Term Debt-Ec.Dev...................... 0
24. Prepayments....................................................................... 143,025 52. Current Maturities Capital Leases..................................... 0
25. Other Current and Accrued Assets................................... 4,762 53. Other Current and Accrued Liabilities................................ 681,701
26. Total Current and Accrued Assets (15 thru 25)............... 2,422,484 54. Total Current and Accrued Liabilities (47 thru 53)................1,273,447
27. Regulatory Assets.............................................................. 470,170 55. Regulatory Liabilities...................................................... 0
28. Other Deferred Debits......................................................... 119,011 56. Other Deferred Credits................................................... 39,508
29. Total Assets and Other Debits (5+14+26 thru 28)............21,289,863 57. Total Liabilities and Other Credits (36+43+46+54 thru 56).......................................................21,289,863
PART D. NOTES TO FINANCIAL STATEMENTS
THIS SPACE IS PROVIDED FOR IMPORTANT DISCLOSURE NOTES TO THE FINANCIAL STATEMENT CONTAINED IN THIS REPORT.
(A SEPARATE SHEET MAY BE USED IF ADDITIONAL SPACE IS NEEDED.)
RUS Financial and Operating Report Electric Distribution Rev 2010
ELECTRIC DISTRIBUTION August 31, 2019
CFC Line of Credit Balance as of 8/31/2019 = $0CoBank Line of Credit Balance as of 8/31/2019 = $0Contributions-In-Aid of Construction received through 8/31/19 totaled approximately $17,840,437
BEC Board Book | September 24, 2019 | Page 31
BOR
RO
WER
DES
IGN
ATIO
NBO
RR
OW
ER D
ESIG
NAT
ION
MT
019
PER
IOD
EN
DED
RU
S U
SE O
NLY
PER
IOD
EN
DED
RU
S U
SE O
NLY
INST
RU
CTI
ON
S - S
ee R
US
Bulle
tin 1
717B
-2IN
STR
UC
TIO
NS
- See
RU
S Bu
lletin
171
7B-2
CO
NSU
MER
CLA
SSIF
ICAT
ION
SALE
SJA
NU
ARY
FEBR
UAR
YM
ARC
HAP
RIL
MAY
JUN
EJU
LYAU
GU
STSE
PTEM
BER
OC
TOBE
RN
OVE
MBE
RD
ECEM
BER
TOTA
LAN
DR
EVEN
UE
DAT
A(a
)(b
)(c
)(d
)(e
)(f)
(g)
(h)
(i)(j)
(k)
(l)(C
onta
ins a
thru
l)
a. N
o.C
onsu
mer
s Se
rved
5,61
15,
612
5,61
95,
613
5,62
85,
637
a.#C
onsu
mer
s5,
660
5,67
10
00
0 1
. R
esid
entia
l Sal
esb.
kW
h So
ld5,
746,
047
6,67
0,50
35,
882,
975
4,02
3,55
33,
885,
500
3,28
1,30
2 1
. R
esid
entia
l Sal
esb. k
Wh
Sold
3,70
7,92
03,
828,
069
00
00
37,0
25,8
69(e
xclu
din
g s
easonal)
c. R
even
ue69
7,62
1$
779,
617
$
70
9,94
6$
543,
420
$
53
2,64
8$
479,
279
$
(e
xclu
din
g s
easonal)
c. R
even
ue51
7,54
4$
528,
574
$
-
$
-
$
-
$
-
$
4,
788,
649
$
a.
No.
Con
sum
ers
Serv
eda.
#Con
sum
ers
2.
Res
iden
tial S
ales
-b.
kW
h So
ld 2
. R
esid
entia
l Sal
es-
b. k
Wh
Sold
0 S
easo
nal
c. R
even
ue S
easo
nal
c. R
even
ue-
$
a.
No.
Con
sum
ers
Serv
ed0
00
121
121
122
a.#C
onsu
mer
s12
212
20
00
0 3
. Irr
igat
ion
Sale
sb.
kW
h So
ld0
00
61,8
6035
,951
488,
422
3.
Irrig
atio
n Sa
lesb
. kW
h So
ld70
9,39
21,
026,
426
00
00
2,32
2,05
1c.
Rev
enue
-$
-$
-$
20,2
14$
22,1
46$
73,3
95$
c. R
even
ue89
,978
$
10
8,54
0$
-$
-$
-$
-$
314,
271
$
a.
No.
Con
sum
ers
Serv
ed48
347
947
947
948
048
1a.
#Con
sum
ers
482
480
00
00
4.
Com
m. A
nd In
d.b.
kW
h So
ld1,
006,
236
1,09
1,59
696
9,46
277
5,57
575
7,46
967
9,24
2 4
. C
omm
. And
Ind.b.
kW
h So
ld72
0,07
872
1,21
70
00
06,
720,
875
1000
kVa
or L
ess
c. R
even
ue10
1,86
6$
108,
968
$
99
,466
$
83
,848
$
83
,712
$
77
,485
$
10
00 k
Va o
r Les
sc.
Rev
enue
80,6
48$
81,1
23$
-$
-$
-$
-$
717,
115
$
a.
No.
Con
sum
ers
Serv
ed1
11
11
1a.
#Con
sum
ers
11
00
00
5.
Com
m. A
nd In
d.b.
kW
h So
ld10
8,30
011
8,20
012
9,90
011
3,70
014
1,90
021
7,50
0 5
. C
omm
. And
Ind.b.
kW
h So
ld13
4,40
022
2,60
00
00
01,
186,
500
Ove
r 100
00 k
Vac.
Rev
enue
8,58
0$
9,13
2$
9,97
0$
9,06
7$
14,5
45$
18,8
53$
Ove
r 100
00 k
Vac. R
even
ue11
,988
$
18
,579
$
-
$
-
$
-
$
-
$
10
0,71
5$
a. N
o.C
onsu
mer
s Se
rved
a.#C
onsu
mer
s
6.
Publ
ic S
treet
and
b.
kW
h So
ld 6
. Pu
blic
Stre
et a
ndb. k
Wh
Sold
0H
ighw
ay L
ight
ing
c. R
even
ueH
ighw
ay L
ight
ingc. R
even
ue-
$
a.
No.
Con
sum
ers
Serv
eda.
#Con
sum
ers
7.
Oth
er S
ales
tob.
kW
h So
ld 7
. O
ther
Sal
es to
b. k
Wh
Sold
0Pu
blic
Aut
h.c.
Rev
enue
Publ
ic A
uth.
c. R
even
ue-
$
a.
No.
Con
sum
ers
Serv
eda.
#Con
sum
ers
8.
Sale
s fo
r Res
ale
-b.
kW
h So
ld 8
. Sa
les
for R
esal
e-
b. k
Wh
Sold
0R
US
Borro
wer
sc.
Rev
enue
RU
S Bo
rrow
ersc. R
even
ue-
$
a.
No.
Con
sum
ers
Serv
eda.
#Con
sum
ers
9.
Sale
s fo
r Res
ale
- b.
kW
h So
ld 9
. Sa
les
for R
esal
e-
b. k
Wh
Sold
0O
ther
sc.
Rev
enue
Oth
ers
c. R
even
ue-
$
10.
TO
TAL
No.
Con
sum
ers
(line
s 1a
- 9a
)6,
095
6,09
26,
099
6,21
46,
230
6,24
1 1
0. T
OTA
L N
o. C
onsu
mer
s (li
nes
1a -
9a)
6,26
56,
274
00
00
11.
TO
TAL
kWh
Sold
(lin
es 1
b - 9
b)6,
860,
583
7,88
0,29
96,
982,
337
4,97
4,68
84,
820,
820
4,66
6,46
6 1
1. T
OTA
L kW
h So
ld (l
ines
1b
- 9b)
5,27
1,79
05,
798,
312
00
00
47,2
55,2
95 1
2. T
OTA
L R
even
ue R
ecei
ved
From
Sal
es o
f 1
2. T
OTA
L R
even
ue R
ecei
ved
From
Sal
es o
f
Elec
tric
Ener
gy (l
ines
1c
- 9c)
808,
068
$
89
7,71
7$
819,
382
$
65
6,54
9$
653,
051
$
64
9,01
0$
El
ectri
c En
ergy
(lin
es 1
c - 9
c)70
0,15
8$
736,
815
$
-
$
-
$
-
$
-
$
5,
920,
751
$
13.
Tra
nsm
issio
n R
even
ue 1
3. T
rans
miss
ion
Rev
enue
-$
14.
Oth
er E
lect
ric R
even
ue 1
4. O
ther
Ele
ctric
Rev
enue
-$
15.
kW
h - O
wn
Use
51,1
5762
,792
46,7
8526
,015
23,1
1911
,024
15.
kW
h - O
wn
Use
11,5
4412
,465
00
00
244,
901
16.
TO
TAL
kWh
Purc
hase
d7,
617,
102
8,60
8,46
07,
705,
162
5,44
9,33
65,
295,
862
5,13
4,19
5 1
6. T
OTA
L kW
h Pu
rcha
sed
5,77
2,54
86,
416,
552
00
00
51,9
99,2
17
17.
TO
TAL
kWh
Gen
erat
ed0
00
00
0 1
7. T
OTA
L kW
h G
ener
ated
00
00
00
0
18.
Cos
t of P
urch
ases
and
Gen
erat
ion
311,
706
$
34
8,05
3$
319,
282
$
23
3,60
1$
230,
739
$
23
0,56
6$
18.
Cos
t of P
urch
ases
and
Gen
erat
ion
263,
549
$
30
0,12
7$
-$
-$
-$
-$
2,23
7,62
3$
19.
Int
erch
ange
- kW
h - N
et0
00
00
0 1
9. I
nter
chan
ge -
kWh
- Net
00
00
00
0 2
0. P
eak
- Sum
All k
Wh
Inpu
t (M
eter
ed)
20.
Pea
k - S
um A
ll kW
h In
put (
Met
ered
)o
Coi
ncid
ent
x N
on-C
oinc
iden
t15
,853
17,6
8818
,541
11,2
7810
,880
11,0
90o
Coi
ncid
ent x
Non
-Coi
ncid
ent
13,7
9114
,124
00
00
18,5
41
RU
S F
orm
7 (
Rev. 6-9
4)
Lin
e L
os
se
s9
.26
%7
.73
%8
.77
%8
.23
%8
.53
%8
.90
%8
.47
%9
.44
%#
DIV
/0!
#D
IV/0
!#
DIV
/0!
#D
IV/0
!8
.65
%
Lin
e L
os
se
s p
lus
Tra
ns
mis
sio
n L
os
se
s1
3.4
7%
12
.01
%1
3.0
0%
12
.49
%1
2.7
8%
13
.13
%1
2.7
2%
12
.62
%#
DIV
/0!
#D
IV/0
!#
DIV
/0!
#D
IV/0
!1
2.7
6%
Red
Lod
ge H
eatin
g D
egre
e D
ays
1,1
32
1
,43
7
1,0
67
6
25
6
60
2
40
7
9
75
5
,31
5
Cur
rent
Mon
th Y
TD
1,1
32
2
,56
9
3,6
36
4
,26
1
4,9
21
5
,16
1
5,2
40
5
,31
5
5,3
15
5
,31
5
5,3
15
5
,31
5
+/- P
erce
ntag
e vs
. 201
8 H
isto
ry C
urre
nt M
onth
YT
D1
%7
%1
0%
6%
15
%1
7%
18
%1
8%
+/- P
erce
ntag
e vs
. 15
Yr.
Ave
. Cur
rent
Mon
th Y
TD
-4%
16
%2
0%
17
%2
2%
24
%2
5%
26
%
Red
Lod
ge H
eatin
g D
egre
e D
ays H
isto
ry (2
018)
1,1
23
1
,28
6
89
7
70
2
28
0
13
2
15
8
2
28
1
63
3
98
3
1,0
90
7
,50
4
Cur
rent
Mon
th Y
TD
201
8 H
isto
ry1
,12
3
2,4
09
3
,30
6
4,0
08
4
,28
8
4,4
20
4
,43
5
4,5
17
4
,79
8
5,4
31
6
,41
4
7,5
04
Red
Lod
ge H
eatin
g D
egre
e D
ays H
isto
ry (1
5 Y
r. A
ve.)
1,1
81
1
,03
4
80
5
63
1
38
8
12
6
14
4
2
20
5
57
2
88
0
1,2
25
7
,10
4
Cur
rent
Mon
th Y
TD
15
Yr.
Ave
.1
,18
1
2,2
15
3
,02
0
3,6
51
4
,03
9
4,1
65
4
,17
9
4,2
21
4
,42
6
4,9
98
5
,87
9
7,1
04
Decem
ber
31, 2019
PA
RT
R. P
OW
ER
RE
QU
IRE
ME
NT
S D
AT
A B
AS
E
LIN
EIT
EMN
UM
BER
US
DA
- R
US
US
DA
- R
US
FIN
AN
CIA
L A
ND
ST
AT
IST
ICA
L R
EP
OR
TM
T019
FIN
AN
CIA
L A
ND
ST
AT
IST
ICA
L R
EP
OR
T
Decem
ber
31, 2019
BEC
Boa
rd B
ook
| S
epte
mbe
r 24,
201
9 |
Pag
e 32
BEARTOOTH ELECTRIC COOPERATIVE, INC.
COMPARATIVE BALANCE SHEET
August 31, 2019
CURRENT YEAR LAST YEAR DIFFERENCE
ASSETS AND OTHER DEBITS
-----------------------
TOTAL UTILITY PLANT IN SERVICE $33,707,713.97 $32,066,967.65 $1,640,746.32
CONSTRUCTION WORK IN PROGRESS 255,717.52 444,745.09 -189,027.57
TOTAL UTILITY PLANT $33,963,431.49 $32,511,712.74 $1,451,718.75
-------------------- -------------------- --------------------
ACCUMULATED PROVISION FOR DEPRECIATION -$16,425,450.40 -$15,862,736.22 -$562,714.18
-------------------- -------------------- --------------------
NET UTILITY PLANT $17,537,981.09 $16,648,976.52 $889,004.57
-------------------- -------------------- --------------------
INVEST. IN ASSOC. ORG.-PATRONAGE CAPITAL $454,799.26 $438,637.84 $16,161.42
INVEST. IN ASSOC. ORG. NON-GENERAL FUNDS 285,417.76 287,267.24 -1,849.48
-------------------- -------------------- --------------------
TOTAL OTHER PROPERTY & INVESTMENTS $740,217.02 $725,905.08 $14,311.94
-------------------- -------------------- --------------------
CASH - GENERAL FUNDS $181,912.32 $871,841.48 -$689,929.16
CASH - CONSTRUCTION FUND - TRUSTEE 1.00 1.00 0.00
TEMPORARY INVESTMENTS 902,561.71 1,296,079.89 -393,518.18
-------------------- -------------------- --------------------
TOTAL CASH ON HAND $1,084,475.03 $2,167,922.37 -$1,083,447.34
NOTES RECEIVABLE $0.00 $0.00 $0.00
ACCOUNTS RECEIVABLE SALES OF ENERGY (NET 807,560.46 767,324.34 40,236.12
ACCOUNTS RECEIVABLE - OTHER (NET) 118,912.21 40,870.51 78,041.70
MATERIAL AND SUPPLIES - ELECTRIC & OTHER 263,749.24 488,025.21 -224,275.97
PREPAYMENTS 143,025.09 125,515.50 17,509.59
OTHER CURRRENT AND ACCRUED ASSETS 4,761.82 7,919.64 -3,157.82
-------------------- -------------------- --------------------
TOTAL CURRENT AND ACCRUED ASSETS $2,422,483.85 $3,597,577.57 -$1,175,093.72
-------------------- -------------------- --------------------
OTHER DEFERRED DEBITS $589,180.81 $736,204.74 -$147,023.93
-------------------- -------------------- --------------------
TOTAL ASSETS AND OTHER DEBITS $21,289,862.77 $21,708,663.91 -$418,801.14
==================== ==================== ====================
LIABILITIES AND OTHER CREDITS
-----------------------------
MEMBERSHIPS $0.00 $0.00 $0.00
PATRONAGE CAPITAL 8,224,753.18 8,160,390.76 64,362.42
OPERATING MARGINS- PRIOR YEAR 0.00 0.00 0.00
OPERATING MARGINS- CURRENT YEAR 245,316.28 471,529.45 -266,213.17
NON-OPERATING MARGINS 540,256.40 399,891.87 140,364.53
OTHER MARGINS AND EQUITIES 220,028.33 162,485.84 57,542.49
-------------------- -------------------- --------------------
TOTAL MARGINS AND EQUITIES $9,230,354.19 $9,194,297.92 $36,056.27
-------------------- -------------------- --------------------
LONG-TERM DEBT -RUS (NET) $408,981.02 $435,678.67 -$26,697.65
LONG-TERM DEBT-FFB-RUS GUARANTEED 6,438,571.73 6,632,678.81 -194,107.08
OTHER LONG-TERM DEBT (NET) 5,654,602.87 6,664,058.49 -1,009,455.62
ADVANCE PAYMENTS UNAPPLIED-RUS LOANS -1,755,602.23 -2,173,696.98 418,094.75
-------------------- -------------------- --------------------
TOTAL LONG-TERM DEBT $10,746,553.39 $11,558,718.99 -$812,165.60
-------------------- -------------------- --------------------
NOTES PAYABLE $0.00 $0.00 $0.00
ACCOUNTS PAYABLE 485,373.98 401,090.41 84,283.57
CONSUMERS DEPOSITS 106,371.62 62,153.80 44,217.82
OTHER CURRENT AND ACCRUED LIABILITIES 681,701.34 472,076.03 209,625.31
-------------------- -------------------- --------------------
TOTAL CURRENT AND ACCRUED LIABILITIES $1,273,446.94 $935,320.24 $338,126.70
-------------------- -------------------- --------------------
OTHER DEFERRED CREDITS $39,508.25 $20,326.76 $19,181.49
-------------------- -------------------- --------------------
TOTAL LIABILITIES AND OTHER CREDITS $21,289,862.77 $21,708,663.91 -$418,801.14
==================== ==================== ====================
BEC Board Book | September 24, 2019 | Page 33
Fin
anci
al In
form
atio
n A
ugu
st 2
01
9
Act
ual
Bu
dge
t2
01
8A
ctu
alB
ud
get
20
18
Op
erat
ing
Re
ven
ue
$5
,94
0,7
07
$5
,78
5,7
00
$5
,75
3,0
51
$7
38
,21
3$
71
1,1
00
$7
07
,94
6
Co
st o
f P
ow
er
$2
,23
7,6
23
$2
,10
0,1
88
$2
,11
3,4
07
$3
00
,12
7$
25
1,7
20
$2
53
,30
5
$-
$1
,00
0,0
00
$2
,00
0,0
00
$3
,00
0,0
00
$4
,00
0,0
00
$5
,00
0,0
00
$6
,00
0,0
00
$7
,00
0,0
00
Rev
en
ue
& C
ost
of
Po
we
r -
20
19
Act
ual
Bu
dge
t2
01
8A
ctu
alB
ud
get
20
18
Ad
min
. & G
en.
$8
21
,40
5$
75
3,4
78
$7
46
,80
7$
77
,79
4$
90
,21
6$
88
,79
5
Cu
st. S
erv.
$2
97
,72
8$
36
0,5
07
$3
02
,19
7$
33
,10
2$
50
,66
9$
44
,55
5
Op
er &
Mai
nt
$1
,20
7,9
11
$1
,09
6,8
54
$1
,04
8,9
51
$1
87
,35
6$
16
7,8
81
$1
69
,55
4
$-
$5
00
,00
0
$1
,00
0,0
00
$1
,50
0,0
00
$2
,00
0,0
00
$2
,50
0,0
00
Op
era
tin
g Ex
pe
nse
s -
20
19
YTD
AU
G
$-
$1
00
,00
0
$2
00
,00
0
$3
00
,00
0
$4
00
,00
0
$5
00
,00
0
$6
00
,00
0
$7
00
,00
0
$8
00
,00
0
Jan
Feb
Mar
Ap
rM
ayJu
nJu
lA
ug
Sep
tO
ctN
ov
De
c
YTD
Cu
mu
lati
ve M
argi
ns
-2
01
9
Act
ual
Bu
dge
t2
01
8
$(1
00
,00
0)
$(5
0,0
00
)
$-
$5
0,0
00
$1
00
,00
0
$1
50
,00
0
$2
00
,00
0
$2
50
,00
0
Jan
Feb
Mar
Ap
rM
ayJu
nJu
lA
ug
Sep
tO
ctN
ov
De
c
Mo
nth
ly M
argi
ns
-2
01
9
Act
ual
Bu
dge
t2
01
8
YTD
AU
G
BEC
Boa
rd B
ook
| S
epte
mbe
r 24,
201
9 |
Pag
e 34
Fin
anci
al In
form
atio
n T
hro
ugh
Au
gust
20
19
chan
ge d
ate
in h
ead
er
Rat
ios:
Dec
emb
er 3
1, 2
01
8 a
nd
Au
gust
31
, 20
18
& 2
01
9YE
20
18
8/3
1/1
88
/31
/19
Qu
ick
Rat
io *
2.4
23
.18
1.5
8
Cu
rren
t R
atio
2.9
23
.85
1.9
0
Equ
ity
as a
% o
f N
et U
tilit
y P
lan
t5
2.9
5%
55
.22
%5
2.6
3%
Equ
ity
as a
% o
f To
tal A
sset
s**
41
.55
%4
2.3
5%
43
.36
%
Net
TIE
R *
** (
YTD
)2
.16
2.5
01
.95
Jan
-Sep
t 1
5O
ct 1
4-D
ec1
4D
SC *
***
1.3
21
.19
1.1
8
Mo
dif
ied
DSC
w/o
CO
C L
oan
1.8
61
.87
1.7
1
71
92
57
.72
34
82
0.8
Cas
h &
Inve
stm
ents
1,7
19
,87
1
2,1
67
,92
2
1,0
84
,47
5
43
79
17
.91
50
49
7.7
Rec
eiva
ble
s9
34
,02
2
8
08
,19
5
9
26
,47
3
57
96
96
.82
,65
3,8
93
2
,97
6,1
17
2
,01
0,9
48
58
24
13
.51
76
33
5.9
Less
Pay
able
s(4
48
,55
1)
(40
1,0
90
)
(48
5,3
74
)
10
37
02
4Li
qu
idit
y2
,20
5,3
42
2
,57
5,0
27
1
,52
5,5
74
2.3
3O
ther
Pay
men
ts D
ue:
Du
e$
2.7
99
06
04
5 R
US
Loan
Pay
men
t9
/30
/20
19
4,1
26
(f
rom
CO
C a
cco
un
t)
FFB
Lo
an P
aym
ent
9/3
0/2
01
91
16
,33
7
(f
rom
CO
C a
cco
un
t)
CFC
Lo
an P
aym
ent
10
/31
/20
19
15
3,7
81
No
te: R
ecei
ved
are
pay
men
ts r
ecei
ved
th
rou
gh S
epte
mb
er 1
5th
of
the
corr
esp
on
din
g ye
ar C
oB
ank
Loan
Pay
men
t9
/20
/20
19
59
,82
0
* Q
uic
k ra
tio
=mea
sure
s th
e ab
ility
of
a co
mp
any
to u
se it
s ca
sh a
nd
sh
ort
-ter
m/
dem
and
dep
osi
ts t
o e
xtin
guis
h c
urr
ent
liab
iliti
es im
med
iate
ly**
Eq
uit
y Ta
rget
- 4
0%
***
Net
TIE
R=T
imes
Inte
rest
Ear
ned
Rat
io (
TIER
) m
ean
s th
e ra
tio
of
ab
orr
ow
er’s
net
inco
me
(aft
er t
axes
) p
lus
inte
rest
exp
ense
,al
l div
ided
by
inte
rest
exp
ense
Net
TIE
R T
arge
t =
RU
S C
ove
nan
t =
1.2
5 (
met
2 o
f 3
yea
rs)
****
DSC
=Deb
t Se
rvic
e C
ove
rage
is a
mea
sure
men
t to
gen
erat
e su
ffic
ien
t fu
nd
s
to c
ove
r p
rin
cip
al a
nd
inte
rest
of
lon
g-te
rm d
ebt
on
an
an
nu
al b
asis
DSC
Tar
get
= 1
.25
(R
US
Co
ven
ant
= 1
.25
, met
2 o
f 3
yea
rs)
3,5
00
,00
0
4,0
00
,00
0
4,5
00
,00
0
5,0
00
,00
0
5,5
00
,00
0
6,0
00
,00
0
6,5
00
,00
0
7,0
00
,00
0
7,5
00
,00
0
8,0
00
,00
0
8,5
00
,00
0
Jan
Feb
Mar
Ap
rM
ayJu
nJu
lA
ug
Sep
tO
ctN
ov
De
c
Mo
nth
ly k
Wh
Sal
es
20
19
20
19
Bu
dge
t/2
01
8 A
ctu
al2
01
7
$-
$2
0,0
00
.00
$4
0,0
00
.00
$6
0,0
00
.00
$8
0,0
00
.00
$1
00
,00
0.0
0
$1
20
,00
0.0
0
30
Day
s6
0 D
ays
90
Day
sTo
tal P
ast
Du
e
Au
gust
Age
d P
ast
Du
e A
cco
un
ts R
ecei
vab
le
20
19
20
19
Re
ceiv
ed2
01
82
01
8 R
ecei
ved
$-
$2
0,0
00
$4
0,0
00
$6
0,0
00
$8
0,0
00
$1
00
,00
0
$1
20
,00
0
Jan
20
19
Feb
Mar
Ap
rM
ayJu
ne
July
Au
gSe
pt
De
linq
ue
nt
List
ing
-P
aym
en
ts r
ece
ive
d t
hru
0
9/1
5/2
01
9 -
Ove
r 3
0 D
ays
Cu
sto
me
r In
form
atio
n S
yste
mP
aym
en
ts R
ece
ived
Bal
ance
Du
e
BEC
Boa
rd B
ook
| S
epte
mbe
r 24,
201
9 |
Pag
e 35
BEARTOOTH ELECTRIC COOPERATIVE, INC.
SIMPLIFIED CASH FLOW
As of August 31, 2019
Black = creates cash
Red = uses cash
Thousands (000s) Actual Budget*
CASH FROM OPERATIONS
Margins 380.7$ -$
Add back Depreciation 723.8 -
Add back Regulatory Asset Amortization 94.0 -
Cost from retirement of assets (poles, etc.) (512.1) -
Cash from Operations 686.4 -
Uses of Cash in Operations
Change in Ending Receivable Balance 7.5 -
Change in Ending Inventory Balance 160.2 -
Change in Ending Prepaid Expense Balance (23.0) -
Reduction of (payment for) other Current Assets 9.7 -
Change in Ending Accounts Payable Balance 36.9 -
Accrual/(payment) of other Current Liabilities 129.3 -
Cash created by (used in) operations 320.6 -
Capital Spending
Utility Plant (1,180.1) -
Construction Work in Progress 282.9 -
Other Property & Investments (12.7) -
Cash (used in) Capital Spending (909.9) -
Increase of debt (borrowing) - -
New debt -
Pay down of debt (829.6) -
Advance Payments Unapplied 203.6 -
Other creation (use of) cash (Estate Retirement) (64.7) -
Other Deferred Credit (41.8) -
Change in cash from all activities (635.4) -
Cash and Investments beginning 1,719.9 1,719.9
Change in cash (635.4) -
Cash and Investments ending 1,084.5 1,719.9
Payroll 1,008.4 996.0
Benefits 707.1 608.9
Total 1,715.4 1,604.9
*Note: Cash Flow Budget was forecasted on a quarterly basis. August 2019 is the second month of third quarter (September 2019).
BEC Board Book | September 24, 2019 | Page 36
Firs
t Int
erst
ate
Ban
k - C
heck
ing
1/1/
2019
2/1/
2019
3/1/
2019
4/1/
2019
5/1/
2019
6/1/
2019
7/1/
2019
8/1/
2019
9/1/
2019
10/1
/201
911
/1/2
019
12/1
/201
9To
tals
Beg
inni
ng B
alan
ce36
1,30
1
176,
165
23
7,28
8
261,
510
19
7,71
5
180,
071
39
3,75
8
174,
339
88
,284
21
9,04
7
(161
,684
)
(270
,368
)
361,
301
Tran
sfer
s In
- 19
8,84
3
900,
000
70
0,00
0
200,
000
50
0,00
0
2,49
8,84
3
Tran
sfer
s Out
- (1
98,8
43)
(7
00,0
00)
(6
00,0
00)
(4
00,0
00)
(1
,898
,843
)
Rec
eipt
s82
5,60
4
826,
315
91
4,46
0
855,
958
73
3,75
2
747,
483
70
4,38
5
790,
933
79
9,91
3
638,
900
63
6,80
0
729,
500
9,
204,
004
- -
- -
- -
- -
- -
- -
-
Paym
ent Pa
yrol
l E
mpl
oyee
s(1
20,7
68)
(6
9,71
6)
(69,
704)
(6
9,10
8)
(70,
865)
(7
3,29
5)
(118
,958
)
(75,
973)
(7
0,00
0)
(70,
000)
(7
0,00
0)
(70,
000)
(8
27,6
18)
Tax
es(4
9,84
3)
(23,
485)
(4
6,43
2)
(35,
109)
(3
3,52
5)
(34,
819)
(3
6,16
3)
(56,
755)
(3
2,00
0)
(32,
000)
(3
2,00
0)
(32,
000)
(3
94,2
88)
R&
S/40
1k(6
4,45
4)
(62,
248)
(5
0,28
2)
(54,
441)
(5
1,01
8)
(52,
268)
(6
2,31
7)
(51,
891)
(2
9,00
0)
(29,
000)
(2
9,00
0)
(29,
000)
(5
00,4
66)
Loan
s R
US*
- -
- -
- -
- -
- -
- -
-
CFC
(153
,759
)
- -
(153
,754
)
- -
(153
,781
)
- -
(153
,759
)
- -
(461
,294
)
FFB
*-
- -
- -
- -
- -
- -
- -
CoB
ank
(59,
927)
(5
9,93
5)
(59,
619)
(5
9,92
4)
(59,
833)
(5
9,93
2)
(59,
820)
(5
9,92
4)
(59,
935)
(5
9,93
5)
(59,
935)
(5
9,93
5)
(658
,728
)
Insu
ranc
e G
roup
(64,
699)
(1
3,57
2)
(13,
572)
(5
9,41
7)
(13,
572)
(1
3,57
2)
(61,
521)
(1
0,85
8)
(14,
000)
(6
0,00
0)
(14,
000)
(1
4,00
0)
(288
,083
)
Gen
eral
- -
- -
- -
- -
- -
- -
-
WC
(25,
279)
-
(1,2
31)
-
- -
- -
- -
- -
(1,2
31)
A/P
(147
,544
)
(154
,201
)
(241
,200
)
(231
,481
)
(176
,180
)
(82,
495)
(2
07,6
35)
(4
44,4
89)
(1
75,0
00)
(1
75,0
00)
(1
75,0
00)
(1
75,0
00)
(2
,237
,681
)
Pow
er(3
22,4
30)
(3
05,2
28)
(3
64,7
85)
(3
17,3
63)
(2
24,9
33)
(2
39,1
54)
(2
06,0
76)
(2
75,5
59)
(2
59,6
65)
(2
39,0
08)
(2
38,5
49)
(2
66,1
38)
(2
,936
,458
)
Prop
erty
Tax
es-
- -
(8,8
68)
(1
23,4
69)
-
- -
- (1
0,00
0)
(125
,000
)
- (2
67,3
37)
Met
er P
roje
ct-
(74,
898)
(4
1,20
5)
(128
,251
)
(95,
854)
(1
76,2
55)
(1
5,43
0)
- (2
7,55
0)
(188
,929
)
- -
(748
,371
)
Oth
er(2
,039
)
(1,9
08)
(2
,210
)
(2,0
38)
(2
,147
)
(2,0
06)
(2
,102
)
(1,5
39)
(2
,000
)
(2,0
00)
(2
,000
)
(2,0
00)
(2
1,95
0)
Tota
l Pay
men
ts(1
,010
,741
)
(765
,192
)
(890
,238
)
(1,1
19,7
53)
(8
51,3
96)
(7
33,7
96)
(9
23,8
04)
(9
76,9
88)
(6
69,1
50)
(1
,019
,631
)
(745
,484
)
(648
,073
)
(9,3
43,5
05)
Endi
ng B
alan
ce17
6,16
5
237,
288
26
1,51
0
197,
715
18
0,07
1
393,
758
17
4,33
9
88,2
84
219,
047
(1
61,6
84)
(2
70,3
68)
(1
88,9
41)
82
1,80
0
*Beg
Sep
t 201
8 Pd
thru
CO
C1/
31/2
019
2/28
/201
93/
31/2
019
4/30
/201
95/
31/2
019
6/30
/201
97/
31/2
019
8/31
/201
99/
30/2
019
10/3
1/20
1911
/30/
2019
12/3
1/20
19
Firs
t Int
erst
ate
Ban
k - S
avin
gs
Beg
inni
ng B
alan
ce52
7,15
3
540,
964
56
7,45
5
1,29
5,76
0
396,
966
42
7,54
3
245,
814
24
9,70
9
372,
886
38
4,88
6
396,
886
40
8,88
6
527,
153
Tran
sfer
s In
- 70
0,00
0
700,
000
60
0,00
0
2,00
0,00
0
Tran
sfer
s Out
- (9
00,0
00)
(7
00,0
00)
(2
00,0
00)
(5
00,0
00)
(2
,300
,000
)
Rec
eipt
s13
,811
26
,492
28
,304
1,
206
30
,577
18
,271
3,
895
23
,177
12
,000
12
,000
12
,000
12
,000
19
3,73
3
Tota
l Pay
men
ts-
- -
- -
- -
- -
- -
- -
Endi
ng B
alan
ce54
0,96
4
567,
455
1,
295,
760
39
6,96
6
427,
543
24
5,81
4
249,
709
37
2,88
6
384,
886
39
6,88
6
408,
886
42
0,88
6
420,
886
All
Oth
er A
ccou
nts
Beg
inni
ng B
alan
ce83
1,41
6
838,
230
84
1,40
0
143,
316
92
3,41
2
823,
318
82
3,42
8
823,
305
62
3,30
5
623,
306
62
3,30
7
211,
035
83
1,41
6
Tran
sfer
s In
700,
000
60
0,00
0
600,
000
40
0,00
0
2,30
0,00
0
Tran
sfer
s Out
- (7
00,0
00)
(7
00,0
00)
(6
00,0
00)
(6
00,0
00)
(2
,600
,000
)
Rec
eipt
s6,
814
3,
170
1,
917
80
,096
(9
4)
110
(1
23)
-
1 1
1 1
91,8
93
Tota
l Pay
men
ts/G
en.R
etire
- -
- -
- -
- -
- -
(412
,273
)
- (4
12,2
73)
Endi
ng B
alan
ce83
8,23
0
841,
400
14
3,31
6
923,
412
82
3,31
8
823,
428
82
3,30
5
623,
305
62
3,30
6
623,
307
21
1,03
5
211,
036
21
1,03
6
TO
TA
L A
LL
AC
CO
UN
TS
1,55
5,35
8$
1,64
6,14
3$
1,70
0,58
6$
1,51
8,09
3$
1,43
0,93
2$
1,46
3,00
0$
1,24
7,35
3$
1,08
4,47
5
1,
227,
239
$
85
8,50
9$
349,
553
$
44
2,98
1$
1/31
/201
92/
28/2
019
3/31
/201
94/
30/2
019
5/31
/201
96/
30/2
019
7/31
/201
98/
31/2
019
9/30
/201
910
/31/
2019
11/3
0/20
1912
/31/
2019
BEC
Boa
rd B
ook
| S
epte
mbe
r 24,
201
9 |
Pag
e 37
BEA
RTO
OTH
ELE
CT
RIC
CO
OPE
RA
TIV
E, I
NC
.C
FC S
ELEC
T N
OTE
S IN
VES
TMEN
TS 1/31
/201
92/
28/2
019
3/31
/201
94/
30/2
019
5/31
/201
96/
30/2
019
7/31
/201
98/
31/2
019
9/30
/201
910
/31/
2019
11/3
0/20
1912
/31/
2019
1,55
5,35
8$
1,64
6,14
3$
1,
700,
586
$
1,51
8,09
3$
1,
430,
932
$
1,46
3,00
0$
1,
247,
353
$
1,08
4,47
5$
1,
227,
239
$
858,
509
$
349,
553
$
442,
981
$
6/29
/201
83/
26/2
019
70
0,0
00
m
atur
ity4/
10/2
019
(70
0,0
00
)
in
vest
- 48
day
s5/
28/2
019
70
0,0
00
mat
urity
5/29
/201
9(6
00
,00
0)
inve
st -
51 d
ays
7/19
/201
96
00
,00
0
m
atur
ity7/
19/2
019
(60
0,0
00
)
in
vest
- 31
day
s8/
19/2
019
60
0,0
00
mat
urity
(40
0,0
00
)
in
vest
- 49
day
s4
00
,00
0
m
atur
ity
(70
0,0
00
)
(70
0,0
00
)
-
(70
0,0
00
)
(60
0,0
00
)
(6
00
,00
0)
(60
0,0
00
)
(4
00
,00
0)
(40
0,0
00
)
-
- -
WO
RK
ING
CA
SH A
VA
ILA
BL
E85
5,35
8$
94
6,14
3$
1,
700,
586
$
818,
093
$
830,
932
$
863,
000
$
647,
353
$
684,
475
$
827,
239
$
858,
509
$
349,
553
$
442,
981
$
Inte
rest
Rat
e2
.64
%2
.64
%2
.64
%2
.67
%2
.67
%
1,5
69
.53
$
1
,41
7.6
4$
1,3
16
.42
$
1
,02
4.1
1$
1,4
33
.75
$
3128
26
2
0
28
216
244
270
20 48
Inte
rest
Rat
e2
.62
%2
.62
%2
.62
%
86
.14
$
1
,29
2.0
5$
81
8.3
0$
2 30
192
3251
Inte
rest
Rat
e2
.48
%2
.48
%
48
9.2
1$
77
4.5
7$
1219
1231
2.2
3%
2.2
3%
2.2
3%
24
.44
$
73
3.1
5$
43
9.8
9$
130
181
3149
Mon
thly
Inte
rest
Inco
me
1,56
9.53
$
1,41
7.64
$
1,31
6.42
$
1,02
4.11
$
1,51
9.89
$
1,29
2.05
$
1,30
7.51
$
799.
01$
73
3.15
$
439.
89$
To
tal I
nter
est I
ncom
e14
,694
.25
$
2,45
7.86
$
2,
196.
49$
1,26
3.78
$
1,
197.
48$
BEC
Boa
rd B
ook
| S
epte
mbe
r 24,
201
9 |
Pag
e 38
BEARTOOTH ELECTRIC COOPERATIVE, INC.
Accounts Payable
Check Register
8/16/2019 To 9/15/2019
Bank Account: 1 - GENERAL FUND
Check / Date Pmt Vendor Name Reference Amount
Tran Listed Type
1917 8/16/2019 WIRE INTERNAL REVENUE SERVICE FEDERAL TAXES WITHHELD & FICA 15,144.46
1918 8/20/2019 WIRE COBANK PRINCIPAL & INTEREST 59,923.60
1919 8/20/2019 WIRE MORGAN STANLEY CAPITAL GROUP INC. POWER BILL 190,579.32
1920 8/20/2019 WIRE DEPARTMENT OF ENERGY POWER BILL 11,288.49
1921 8/22/2019 WIRE NATIONAL RURAL ELEC COOP ASSOC R & S PLAN 33,427.87
1922 8/28/2019 WIRE PAYROLL PAYROLL 37,102.42
1923 8/28/2019 WIRE NRECA 401k PENSION PLAN 8,444.70
1924 8/28/2019 WIRE NRECA 401k PENSION PLAN LOAN REPAYMENT 1,014.04
1925 8/28/2019 WIRE NORTHWESTERN ENERGY TRANSMISSION BILL 73,691.17
1926 8/29/2019 WIRE INTERNAL REVENUE SERVICE FEDERAL WITHHELD & FICA 14,973.86
1927 8/30/2019 WIRE NATIONAL RURAL UTILITES FIB CHECKING TO CFC SELECT NOTES INVESTM 400,000.00
1928 9/4/2019 WIRE PAYROLL PAYROLL-PTO LIMITS 21,341.44
1929 9/6/2019 WIRE INTERNAL REVENUE SERVICE FEDERAL WITHHELD & FICA 9,755.80
1930 9/11/2019 WIRE PAYROLL PAYROLL 35,175.03
1931 9/11/2019 WIRE NRECA 401k PENSION PLAN 8,035.03
1932 9/11/2019 WIRE NRECA 401k PENSION PLAN LOAN REPAYMENT 1,014.04
1933 9/10/2019 WIRE US BANK MONTHLY CORPORATE CREDIT CARD STATEMENT 5,803.97
1934 9/13/2019 WIRE INTERNAL REVENUE SERVICE FEDERAL WITHHELD & FICA 16,282.43
60484 8/16/2019 CHK ANIXTER INC METERS 129,571.00
60485 8/16/2019 CHK BORDER STATES ELECTRIC SUPPLY MATERIAL 77,133.11
60486 8/16/2019 CHK CARBON COUNTY TREASURER UNIT #64 & UNIT #82 REGISTRATION 299.48
60487 8/16/2019 CHK DANIEL DUTTON BOARD FEE & OTHER MEETING 375.00
60488 8/16/2019 CHK EES CONSULTING RATE STUDY CONSULTING 5,747.50
60489 8/16/2019 CHK GENERAL PACIFIC, INC. METERING SUPPLIES 340.00
60490 8/16/2019 CHK MCFARLAND CASCADE HOLDINGS POLES FOR NYE SUBSTATION REBUILD 7,007.00
60491 8/16/2019 CHK MONTANA DEPT OF REVENUE MT WITHHELD TAXES 2,704.00
60492 8/16/2019 CHK RICHARD T NOLAN BOARD FEE, MILEAGE, EM, & OTHER MEETINGS 1,342.83
60493 8/16/2019 CHK NORTHWEST PUBLIC POWER ASSOC COMMUNICATIONS CONFERENCE 795.00
60494 8/16/2019 CHK QUILL CORPORATION OFFICE SUPPLIES 116.68
60495 8/16/2019 CHK STILLWATER CO CLERK & RECORDER NYE SUBSTATION REBUILD EASEMENT 5.00
60496 8/16/2019 CHK TERRELL'S OFFICE MACHINES, INC. KYOCERA MAINTENANCE 296.80
60497 8/16/2019 CHK UTILITIES UNDERGROUND LOCATE BILLABLE TICKETS 580.90
60498 8/23/2019 CHK ACLARA TECHNOLOGIES LLC ADDITIONAL MDMS CUSTOM FILE CHARGE 3,500.00
60499 8/23/2019 CHK ALTEC INDUSTRIES INC UNIT #6 PART 54.80
60500 8/23/2019 CHK BOBCAT OF BIG SKY, INC. UNIT #90 PART 26.90
60501 8/23/2019 CHK CREDIT ASSOCIATES, INC. COLLECTION FEES 63.76
60502 8/23/2019 CHK FELT, MARTIN, FRAZIER & WELDON, P.C. ATTORNEY STATEMENT 438.25
60503 8/23/2019 CHK HDR ENGINEERING INC NYE SUBSTATION REBUILD ENGINEERING 6,751.21
60504 8/23/2019 CHK JACK HENRY & ASSOCIATES ACH PROCESSING FEES 76.20
60505 8/23/2019 CHK KEN'S I-90 UNIT #63 R & R FUEL FILTERS 1,239.83
60506 8/23/2019 CHK MONTANA MOBILE MONTHLY OFFICE SHREDDING SERVICE 45.00
60507 8/23/2019 CHK MORRISON MAIERLE SYSTEMS CORP TEN SUBSTATIONS FIREWALL SUPPORT 307.00
60508 8/23/2019 CHK NORTHWEST PUBLIC POWER ASSOC LINEMAN AD 165.00
60509 8/23/2019 CHK NRECA TRUSTEE GUEST REGISTRATION 25.00
60510 8/23/2019 CHK ONE CALL LOCATORS, LTD BILLABLE TICKETS - MT & WY 10,664.93
60511 8/23/2019 CHK ONE SMART CONFERENCE, INC. CONFERENCE SERVICE 33.97
60512 8/23/2019 CHK RONNING AUTO TRUCK TRACTOR SERVICE UNITS #6 & #58 OIL CHANGE AND #60 BRAKES & OIL CHANGE 1,609.00
60513 8/23/2019 CHK SOUTHERN STATES FUSES FOR NYE SUBSTATION REBUILD 18,767.12
60514 8/23/2019 CHK WYOMING DEPT OF REVENUE WY SALES & USE TAX 1,859.74
60515 8/23/2019 CHK MEMBER ESTATE RETIREMENT JULY 2019 3,749.65
60516 8/23/2019 CHK MEMBER REWRITE FOR UNCLAIMED CC 3.81
60517 8/30/2019 CHK AMERICA FAMILY LIFE INSURANCE CO PAYROLL DEDUCTION INSURANCE 270.92
60518 8/30/2019 CHK ASPLUNDH TREE EXPERT CO. TREE TRIMMING 35,370.00
60519 8/30/2019 CHK BOOSTER CLUB PLATINUM MEMBERSHIP 150.00
60520 8/30/2019 CHK CENTURYLINK RL FAX, COLUMBUS & FIVE SUBSTATIONS 552.94
60521 8/30/2019 CHK CHARTER COMMUNICATIONS RL INTERNET 99.97
60522 8/30/2019 CHK FARMER BROS CO COFFEE 117.70
60523 8/30/2019 CHK GENERAL PACIFIC, INC. METERS 2,343.48
60524 8/30/2019 CHK HDR ENGINEERING INC ENGINEERING CONSULTING 407.50
60525 8/30/2019 CHK LANDIS+GYR TECHNOLOGY, INC. JULY & AUG HOSTING FEE AND JUNE & JULY LONG DISTANCE 1,960.44
60526 8/30/2019 CHK LOCAL UNION 44 UNION DUES 1,103.70
60527 8/30/2019 CHK METLIFE PAYROLL DEDUCTION INSURANCE 25.00
60528 8/30/2019 CHK MONTANA CSED SDU MONTANA CSED 389.52
60529 8/30/2019 CHK MONTANA DEPT OF REVENUE MT WITHHELD TAXES 2,859.00
60530 8/30/2019 CHK MONTANA ELECTRIC COOP ASSN., INC. GENERAL & SAFETY DUES, RM & N.BROADCSTNG 8,040.18
60531 8/30/2019 CHK NISC MISC, MDMS IMPLEMENTATION, AMS, NEWSLETTER 17,617.21
60532 8/30/2019 CHK KAAREN S ROBBINS EXPENSE REIMBURSEMENT 55.46
60533 8/30/2019 CHK TOWN AND COUNTRY SUPPLY ASSO. FUEL 2,412.14
60534 8/30/2019 CHK VERIZON WIRELESS COLUMBUS MAPPING INTERNET 314.73
60535 8/30/2019 CHK MEMBER REWRITE FOR UNCLAIMED CC 3,749.65
60536 8/30/2019 CHK MEMBER INACTIVE REFUND 28.38
60537 8/30/2019 CHK MEMBER ESTATE RETIREMENT JULY 2019 2,079.75
60538 8/30/2019 CHK MEMBER CHECK REWRITE FOR UCLAIMED CC 145.82
60539 8/30/2019 CHK MEMBER REWRITE FOR UNCLAIMED CC 43.71
60540 8/30/2019 CHK MEMBER INACTIVE REFUND 29.96
60541 9/6/2019 CHK BIG SKY LINEN SUPPLY RL & COLUMBUS RUG CLEANING 110.39
60542 9/6/2019 CHK BOBCAT OF BIG SKY, INC. UNIT #90 PART 92.73
60543 9/6/2019 CHK CENEX FUEL 1,567.66
60544 9/6/2019 CHK CENTURYLINK COLUMBUS FAX LONG DISTANCE 2.57
60545 9/6/2019 CHK CITY OF RED LODGE MONTHLY WATER & SEWER 356.57
60546 9/6/2019 CHK COLUMBUS TIRE & SERVICE CENTER UNIT #63 FOUR (4) TIRES 1,069.80
60547 9/6/2019 CHK ECOLAB PEST ELIM DIV RL & COLUMBUS PEST CONTROL 190.59
60548 9/6/2019 CHK FAST INITIAL RESPONSE SYSTEMS & TRAINING TWO AED BATTERIES 350.47
60549 9/6/2019 CHK STEPHANIE FLETCHER AUGUST FITNESS REIMBURSEMENT 24.79
60550 9/6/2019 CHK GALVANIZERS, INC. NYE SUBSTATION UPGRADE MATERIAL 577.80
60551 9/6/2019 CHK HELI LLC POWER LINE INSPECTION AND GPS MAPPING 1,812.72
60552 9/6/2019 CHK MAID IN COLUMBUS LLC CLEANING COLUMBUS SHOP 200.00
60553 9/6/2019 CHK MONTANA DEPT OF REVENUE MT WITHHELD TAXES 1,500.00
60554 9/6/2019 CHK NEMONT TWO SUBSTATIONS 131.16
60555 9/6/2019 CHK ONE SMART CONFERENCE, INC. CONFERENCE CALLING 70.24
60556 9/6/2019 CHK KEVIN P OWENS MONTHLY AUTO ALLOWANCE 400.00
60557 9/6/2019 CHK ROLLING RIGHT DOOR SERVICE RESET BACK DOOR OPENER 92.00
BEC Board Book | September 24, 2019 | Page 39
Check Register
8/16/2019 To 9/15/2019
Bank Account: 1 - GENERAL FUND
Check / Date Pmt Vendor Name Reference Amount
Tran Listed Type
60558 9/6/2019 CHK SELBY'S ESSCO MAPPING SUPPLIES 60.78
60559 9/6/2019 CHK CONSTANCE S TEACHOUT MILEAGE REIMBURSEMENT 32.19
60560 9/6/2019 CHK VERIZON WIRELESS POLE GPS,TWACS IPADS, TRUCK, COLUM&CELLS 355.90
60561 9/6/2019 CHK MEMBER REWRITE FOR UNCLAIMED CC 133.84
60562 9/6/2019 CHK VOID VOID -
60563 9/9/2019 CHK PAYROLL PAYROLL 3,706.10
60564 9/13/2019 CHK ALTEC INDUSTRIES INC UNIT #9 REPAIRS 1,096.64
60565 9/13/2019 CHK EES CONSULTING RATE STUDY CONSULTING 4,640.00
60566 9/13/2019 CHK FELT, MARTIN, FRAZIER & WELDON, P.C. MONTHLY ATTORNEY STATEMENT 33.25
60567 9/13/2019 CHK STEPHANIE FLETCHER MILEAGE REIMBURSEMENT 13.05
60568 9/13/2019 CHK LINECO LINEMAN INSURANCE 10,857.60
60569 9/13/2019 CHK MONTANA CSED SDU MONTANA CSED 194.76
60570 9/13/2019 CHK MONTANA DEPT OF REVENUE MT WITHHELD TAXES 3,062.00
60571 9/13/2019 CHK MONTANA MOBILE MONTHLY OFFICE SHREDDING SERVICE 45.00
60572 9/13/2019 CHK ONLINE INFORMATION SERVICES MONTHLY EXCHANGE SERVICE 8.10
60573 9/13/2019 CHK P D Q JANITORIAL SERVICE INC JULY & AUGUST RL CLEANING SERVICE 1,880.26
60574 9/13/2019 CHK SUNDANCE SOLAR SYSTEMS LLC PHASE 1 SHARES DU SOLEIL 36,540.00
60575 9/13/2019 CHK MEMBER PD Engineering fee 2X 250.00
60576 9/13/2019 CHK MEMBER INACTIVE REFUND 101.89
60577 9/13/2019 CHK MEMBER INACTIVE REFUND 241.10
60578 9/13/2019 CHK MEMBER INACTIVE REFUND 412.40
60579 9/13/2019 CHK MEMBER PARTIAL REFUND PLOWING 2,300.00
Total Payments for Bank Account - 1 : (113) 1,369,625.00
Total Voids for Bank Account - 1 : (1) 3,749.65
Total for Bank Account - 1 : (114) 1,373,374.65
BEC Board Book | September 24, 2019 | Page 40
Beartooth Electric Cooperative, Inc.
Revised2019 Budget
2nd Quarter Review Footnotes:
Only the Operating Budget, Cash Budget and Projected Balance Sheet are adjusted in this Revised Budget.
$92,859 increase for July-Dec Cost of Purchased Power, which includes 75% of the NWE FERC raterequested increase that went into effect July 1, 2019
$68,496 increase for Jan-Dec Depreciation Expense under allocation $100,824 for Jan-Dec Payroll Benefit (primarily PTO) due to an under allocation
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 41
Table of Contents
Narrative Summary…………………………………………………………….………………..……. 3
Operating Budget with Comparison to Prior Year……………….……….….……….. 10
Cash Budget …............................................………………………………...…….…….…………… 15
Projected Balance Sheet …............................................…………………….………...……….. 17
Revenue…………………………………………………………………….……………………………. 19
Cost of Power …………………………………………...……….……………………………………. 27
Payroll …………………………………………………………………………..………………………… 30
Capital Budgets ………………………………………………………………….….……………….. 33
Depreciation ……………………………………………………….……………….………………….. 39
Debt Service/Interest ……………………………………….…………………..………………….. 41
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 42
Narrative Summary
Introduction:
There is no planned increase in rates contained within the 2019 Budget.
The Financial Forecast indicates solid cash levels, strong ratios and growing equity. The Forecast also indicates that revenue requirements will not call for a rate increase for the next five years.
Excluding Montana electric cooperatives served by the Bonneville Power Administration for wholesale power supply, Beartooth Electric residential rates are 2% below the remaining Montana electric cooperative average residential bill for 1000 kWh per month.
The 2019 Budget remains focused on the safety and reliability of BEC’s electric distribution system, capital improvements, member communication and a major step forward in displaying Beartooth’s support and commitment to renewable energy (Shares du Soleil).
The Cooperative will maintain focus on completing the TWACS digital meter upgrade in 2019. The NISC back office technology and software upgrades will continue through 2019 with the balance completed in 2020. Many of the NISC app-suites implemented in 2019 will significantly enhance communication between the Cooperative and the Member respective to outages, energy-use, bill payment and bill presentation. Members will start to see real value in the TWACS meter/NISC back-office upgrade project in 2019.
Financial thresholds have been established by the Board to maintain $500,000 in cash reserves. Beartooth’s lenders require that we maintain a Debt Service Coverage Ratio (DSCR) of 1.25 and a TIER Ratio of 1.25 throughout the period of the Work Plan 2018-2022. The 2019 Budget and 5 Year Financial Forecast maintains those levels. The Cooperative maintains a $2 million line of credit with both CFC and CoBank. The Board has chosen to access these funds primarily for unforeseen emergency situations. The Finance Committee and Board have also recognized debt management/borrowing as a financial tool for distributing investment costs over time (and generations of members) and even taking advantage of programs and interest rate developments such as cushion of credit.
The calculated percentage of Administrative & General Expense to Total Operating and Maintenance Expense has dropped from the 2018 ProForma of 18.5% to 17.2% in 2019.
The Board desires to maintain a target of retiring (payment to Members) 5% of Equity (outstanding Capital Credits). The 2019 Budget includes a 5% Capital Credit payout consistent with the Cooperative’s Equity Management philosophy. The Board will discuss this matter later in 2019 as they have done in the past.
The 2019 Capital Budget is approximately $1.4 million with nearly 60% dedicated to finishing the TWACS/NISC Project.
Planning and land acquisition for the East Columbus Substation will begin in 2019 with construction and energization to take place in 2021.
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 43
Looking forward in the 5-year Capital Work Plan, capital work dedicated to electric system improvements will typically run between $700,000 and $850,000. However, capital expenditures in 2019 are estimated at $1,495,675 to complete the TWACS project. Similarly, capital expenditures in 2021 are estimated at $1,171,509 which includes completion of the East Columbus Substation.
The Vegetation Management Plan (tree trimming) will be in the second year of a five year cycle in 2019. Funding will replicate 2018 with $220,000. The Vegetation Management Plan is a key element of the Cooperative’s preventative maintenance efforts. It directly benefits Members with fewer outages but also reduces the risk and liability associated with range/forest fires ignited from electrical facilities. The first year of the Plan showed promising results. Overtime hours normally associated with after hour customer outages in 2018 were 45% below overtime hours in 2017. Weather, NWE transmission outages, trees, animals, equipment failure etc. directly impact customer outages. Customer Outage Minutes were also 29% below 2017.
Power costs remain stable for 2019 with no planned increases. BEC’s transmission provider (NWE) will be seeking an increase in transmission rates to be reviewed by the Federal Energy Regulatory Commission (FERC) sometime in 2019. This unknown increase has not been incorporated into the 2019 Budget. It would be pure speculation on how much of an increase to expect and when it might occur in 2019.
There are no planned increases in staffing for 2019. There will be one retirement in January 2019. That employee was replaced in October 2018.
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 44
2019 Capital Budget
A. Electric Distribution Extensions- $1,710 Meters will need to be purchased for new construction in the state of Wyoming. Montana meters are paid by the member as a contribution in aid of construction. 2 three phase meters @ $500 each. 3 single phase meters at $120 each. 2- 320 amp meters @ $175 each= $1,710
2019 2020 2021 2022 2023
$1,710 $1,710 $1,710 $1,710 $1,710
B. Miscellaneous Electric Distribution- $200,000 Replacement Transformers- To be used for replacement of faulty or damaged
transformers. Any given variety, $20,000
2019 2020 2021 2022 2023
$20,000 $20,600 $21,218 $21,855 $22,510
OH Miscellaneous Conductor Replacement- Hard drawn copper and steelconductor replacements as deemed necessary.
2019 2020 2021 2022 2023
$20,000 $80,000 $84,000 $84,000 $88,200
UG Ordinary Replacements – Replace underground cable as needed. Undergroundcable is replaced after three faults. $45,000
2019 2020 2021 2022 2023
$45,000 $46,350 $47,741 $49,173 $50,648
Sectionalizing Equipment- Equipment to replace outdated line oil circuit breakers.The new breakers will be “one shot” capable, whereas the old ones are not. This is asafety measure for working on the power lines and during dry conditions to preventrange fires. This program is as much about lineworker safety as it is about riskmanagement and liability. The 5 Year Capital Plan is built around 10 breakerreplacements in 2019 and then 18 per year for the next 5 years. $15,000
2019 2020 2021 2022 2023
$15,000 $27,000 $27,000 $27,000 $27,000
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 45
Distribution Line Conversions- MDOT road widening from Red Lodge toBeartooth Hospital in 2022.
2019 2020 2021 2022 2023
$0 $0 $0 $77,000 $0
Electronic OCR’s (NOVA’s) - This is the second year of a multi-year replacementprogram. Oil-filled substation circuit breakers will be replaced with new electroniccircuit breakers that will be compatible with the TWACS system and provideindividual circuit information. Compatibility with the TWACS system is importantto us because of the new information we will be able to gather from each circuit inour system as we seek to pinpoint high-loss circuits, analyze power quality andimprove service to members. The new electronic breakers require minimalmaintenance and negate the exposure of an oil spill. The 5 Year Capital Plan includes5 NOVA’s in 2019which will complete all substations. $100,000
2019 2020 2021 2022 2023
$100,000
New Voltage Regulators- HDR identified in their system model runs that BEC mayneed up to 18 new regulators installed to alleviate low voltage problems in specificareas. BEC operations staff will validate system model results during extreme coldperiods this winter. Capital budgets will be adjusted accordingly following fieldverifications.
2019 2020 2021 2022 2023
$40,000 $42,000 $52,500 $52,500
C. TWACS Boxes- Nine boxes required to communicate between OCR’s (NOVA’s) and TWACS transformer in substations. $22,000
2019 2020 2021 2022 2023
$22,000
D. Pole Replacements – 100 poles will be changed out due to age and condition. Reduced availability of man-hours because of the TWACS deployment necessitates the reduction in pole replacements in 2018 and 2019. 2020 and thereafter 200 poles per year. $150,000
2019 2020 2021 2022 2023
$150,000 $300,000 $315,000 $315,000 $330,750 DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 46
E. Construction Work Plan- East Columbus Substation $70,000 Land purchase in 2019. Engineering/ Grading/ Fencing/ foundation in 2020. Substation construction and distribution getaways in 2021.
2019 2020 2021 2022 2023
$70,000 $130,000 $485,000 $0 $0
F. General Plant Total: $21,050
Facility Upgrade 2019 Shares du Soleil Fencing $7,500 2019 Mini-Split Heat-Pump for Board Room $9,550 2019 Front Desk Security $1,500 2019 Front Driveway Signage $2,500 2020 Office Furniture (3 work stations) $8,500 2020 Parking Lot Paving- Phase I $35,000 2021 Parking Lot Paving- Phase II $20,000 2020 Well/ Irrigation $8,500 2022 Main Office Remodel $100,000
2019 2020 2021 2022 2023
$21,050 $52,000 $0 $100,000 $0
G. TWACS- Meter Upgrade Total: $808,200 The TWACS system will replace our existing outdated AMR system. The new TWACS technology offers significant operating efficiencies, system information and improved customer service to members. Replacement meters are no longer available and need to be acquired from other utilities going through a similar upgrade to digital meters. Meter replacements were delayed in 2018 as previously planned. Meter replacements will continue in 2019 with project completion still planned for the end of the year. $805,000 Five more substations will be equipped with TWACS equipment completing this work in 2019.
TWACS transformer pads. Four each for 2019. $3200
2019 2020 2021 2022 2023
$808,200 $0 $0 $0 $0
H. Transportation General Plant- Total: $0 Nothing planned for 2019. The bucket on #7 will be transferred to a new chassis in 2020. The bucket on #9 will be transferred to a new chassis in 2022.
2019 2020 2021 2022 2023
$70,000 $70,000
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 47
I. Equipment Total: $7,500
2019 Computer hardware (laptops and iPads). $2,500 2019 TWACS desktop meter test station. $5,000 2020 Portable primary cable fault detector (Thumper). $15,000
2019 2020 2021 2022 2023
$7,500 $15,000 $0 $0 $0
J. Vegetation Management (O&M) $220,000 2019 will be the second year of the 5 Year Plan- $220,000. In 2020 the Plan will drop to $200,000 going forward.
2019 2020 2021 2022 2023
$220,000 $200,000 $200,000 $200,000 $200,000
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 48
2019 Communication & Member Services
2019 will be a most exciting year for member communication and services. There are a number of major initiatives taking place in 2019 that will require an increased level of communication with members. Communication channels will need to be optimized. Again the challenge will be to communicate “where our members are” in contrast to what is convenient or less costly for BEC.
The communication strategy is to lead monthly with the Rural Montana newsletter content, tie storylines and new content across all media including billing statement memos, billing statement inserts, website, Facebook, articles and press releases. We will continue to focus on growing member-owner engagement throughout 2019.
2019 Initiatives
1. A monthly theme across all media.2. Direct mail marketing initiatives (a top contender in the member annual meeting survey results).3. Town Hall meetings scheduled at strategic service area locations. Topics: Irrigators
and General Member-Owner Rate Design.4. Shares du Soleil-Ownership certificates, outdoor signage.5. New member package (welcome letter, BEC bylaws, construction follow-up survey to ensure we
are meeting expectations).6. Internal communications; i.e. employees and Board Members are our top
ambassadors will always receive a pre-release of all communication.7. Local tie-ins with coupons, special offers, find an icon to win, etc.8. Adherence to the 7 C’s of communication (clear, concise, concrete, correct, coherent, complete and
courteous).
Rural Montana Magazine 12 issues $24,500 Billing statement notice 12 statements $0 Billing statement inserts 12 statements $12,500 Website (Go Daddy) Annual Hosting $22 Website Template (Touchstone) Annual Hosting $0 Facebook Annual Hosting $0 Facebook Annual Ad Boosting $1,080 Articles/Press releases As required $0 Marketing initiatives Print $33,000 Town Hall meetings Strategic Service Area locations $2,000 Annual Member Meeting May 4-Anipro Event Center $20,000
(includes labor) All new members $1,000 Monthly subscriptions $1,800 Outdoor Signage $10,000 Ownership Certificates $250
New Member Welcome Package Adobe systems and graphic images Shares du Soleil Shares du Soleil Lobby DisplayPortable/Collapsible Tent with BEClogo for Community Events
Real-time Shares du Soleil reporting $11,000 $1,200
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 49
Operating Budget With Comparison to Prior Year
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 50
Operating Statement Compared to Prior Year
Line Description 2018 Budget 2018
Audited 2019 Budget 2020 Forecast 2021 Forecast 2022 Forecast 1 Operating Revenue and Patronage Capital 8,393,700$ 8,577,258$ 8,631,900$ 8,685,824$ 8,740,085$ 8,794,684$
2 Power Production Expense - - - - - - 3 Cost of Purchased Power 3,134,994 3,175,631 3,248,628 3,268,922 3,289,343 3,309,892 4 Transmission Expense 7,458 11,551 8,853 8,942 9,031 9,121 5 Regional Market Expense - - - - - - 6 Distribution Expense - Operation 915,491 966,566 1,035,393 1,054,237 1,073,424 1,092,960 7 Distribution Expense - Maintenance 629,649 614,084 696,264 688,936 701,475 714,242 8 Customer Accounts Expense 349,788 331,930 392,952 400,576 408,347 416,269 9 Customer Service and Informational Expense 149,042 115,535 142,978 145,809 148,696 151,640
10 Sales Expense 5,145 6,966 5,488 5,598 5,710 5,824 11 Administrative and General Expense 1,083,103 1,205,931 1,151,308 1,208,644 1,232,091 1,255,994 12 Total Operation & Maintenance Expense (2 thru 11) 6,274,670 6,428,194 6,681,865 6,781,663 6,868,117 6,955,942 13 Depreciation & Amortization Expense 1,014,390 1,016,306 1,092,359 1,102,560 1,112,856 1,123,248 14 Tax Expense - Property & Gross Receipts - - - - - - 15 Tax Expense - Other 2,811 2,011 2,811 2,839 2,868 2,896 16 Interest on Long-Term Debt 591,144 605,310 600,739 606,746 612,813 618,942 17 Interest Charged to Construction - Credit - - - - - - 18 Interest Expense - Other 1,200 1,192 1,200 1,200 1,200 1,200 19 Other Deductions 1,800 1,800 1,800 1,800 1,800 1,800 20 Total Cost of Electric Service (12 thru 19) 7,886,015 8,054,813 8,380,773 8,496,808 8,599,654 8,704,028 21 Patronage Capital & Operating Margins (1 minus 20) 507,685 522,445 251,127 189,016 140,431 90,656 22 Non Operating Margins - Interest 118,065 132,513 98,218 75,070 38,287 16,607 23 Allowance for Funds Used During Construction - - - - - - 24 Income (Loss) from Equity Investments - - - - - - 25 Non Operating Margins - Other 1,967 (3,219) (548) (554) (559) (565) 26 Generation and Transmission Capital Credits - - - - - - 27 Other Capital Credits and Patronage Dividends 46,200 50,232 50,600 51,106 51,617 52,133 28 Extraordinary Items - - - - - - 29 Patronage Capital or Margins (21 thru 28) 673,916$ 701,970$ 399,397$ 314,639$ 229,776$ 158,831$ 30 Operating - Margin 507,685$ 522,445$ 251,127$ 189,016$ 140,431$ 90,656$ 31 Non Operating - Margin 166,231$ 179,525$ 148,270$ 125,623$ 89,345$ 68,175$ 32 Times Interest Earned Ratio - Operating 1.86 1.86 1.42 1.31 1.23 1.15 33 Times Interest Earned Ratio - Net 2.14 2.16 1.66 1.52 1.37 1.26
Beartooth Electric Cooperative, Inc.2019 Budget
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 51
Account Description 2018 Budget 2018
Audited 2019 Budget 440.1 REVENUE - RESIDENTIAL 6,771,800$ 6,933,663$ 7,021,900$
440.11 REVENUE-RES. NET METERED 46,000 59,137 46,000 440.2 REVENUE - SEASONAL - - -
441 REVENUE - IRRIGATION 406,200 351,945 361,200 442.1 REVENUE - SM.COMM - 50 KVA OR LESS 734,600 771,221 774,300
442.105 REVENUE - SM.COMM NET METERED 3,600 5,268 3,600 442.11 REVENUE - LG. COMM - >50 & < 1,000 KVA 237,500 236,920 231,500 442.15 REVENUE - LRG.COMM NET METERED 21,600 24,567 21,600
442.2 REVENUE - INDUSTRIAL 1,000 KVA OR MORE 134,500 146,174 133,900 447 REVENUE - SALES FOR RESALE - - - 450 FORFEITED DISCOUNTS 21,500 16,993 21,500 454 REVENUE - POLE RENTAL 12,000 12,031 12,000 456 REVENUE - OTHER 4,400 19,340 4,400
1 Operating Revenue and Patronage Capital 8,393,700 8,577,258 8,631,900
555 PURCHASED POWER 3,134,994 3,175,631 3,248,628 555.1 PURCHASED POWER-ACCRUED - - - 555.2 SOUTHERN A&G - - - 555.3 SOUTHERN EXIT AMORTIZATION - - -
3 Cost of Purchased Power 3,134,994 3,175,631 3,248,628
570.3 TRANS - PROPERTY TAXES 4,308 3,803 4,010 570.4 TRANS - INSURANCE ALLOCATION 835 827 838 571.1 TRANS - MAINT - LABOR 2,314 6,922 4,006
4 Transmission Expense 7,458 11,551 8,853
580.1 DISTR-OPERATIONS-SUPERVISION 116,285 126,302 105,752 580.11 DIST OPERATIONS SUPERVISION - WY 177 - -
582.1 STATION EXPENSE-LABOR 69,147 62,490 68,686 582.11 STATION EXPENSE-WY 432 - 320
583.1 DIST - OPERATIONS - LABOR 169,162 228,491 215,643 583.11 DIST - OPERATIONS -WY 7,964 2,924 4,147
583.9 DIST. OPERATIONS-POLE INSPECTIONS - - - 583.91 DIST. OPERATIONS-POLE INSPECTIONS-WY - - -
584.1 URD LINE EXPENSE-LABOR 11,886 8,494 12,387 584.11 URD LINE EXPENSE - WY 4,235 199 146
584.5 OPERATIONS-UG LINE LOCATES 48,782 39,935 48,782 584.51 OPERATIONS-UG LINE LOCATES-WY 5,556 6,236 5,556
586.1 METER EXPENSE - LABOR 62,517 29,877 96,555 586.11 METER EXPENSE - WY 4,696 8,597 5,487
587.1 CUSTOMER PREMISES - MT 5,097 1,996 1,346 587.11 CONSUMER PREMISES - WY 158 1,681 1,031
588.1 DIST - OPERATIONS - PROPERTY TAXES 263,679 243,367 245,402 588.2 DIST - OPERATIONS - INSURANCE ALLOCATION 53,399 52,800 53,542 588.3 DIST - OPERATIONS - MAPPING 38,321 53,212 52,135 588.4 DIST. OPERATIONS-POLE GPS 52,617 91,427 110,695
588.41 DIST. OPERATIONS-POLE GPS-WY - 6,978 6,401 589 DIST - OPERATIONS - RENT 1,380 1,560 1,380
6 Distribution Expense - Operation 915,491 966,566 1,035,393
590.1 DISTR-MAINTENANCE-SUPERVISION - - 977 590.11 DIST-MAINT- SUPERVISION-WY - - -
592.1 DIST - MAINT - SUBSTATIONS - LABOR 10,130 9,862 11,789 592.2 DIST. MAINT - PORTABLE SUBSTATION 72 - - 593.1 DIST - O/H MAINT- LABOR 226,535 240,360 272,439
593.11 DIST - O/H MAINT- WY 31,549 22,067 26,089 593.2 DIST - O/H MAINT - TREE TRIMMING 254,253 246,882 269,059
593.21 DIST - O/H MAINT - WY TREE TRIMMING 232 5,178 4,487 594.1 DIST - MAINT - U/G - LABOR 65,864 58,688 73,934
594.11 DIST - URD MAINT - WY 2,719 6,904 4,195 595.1 DIST - MAINT - TRANSFORMERS - LABOR 37,959 23,867 32,768
595.11 DIST - TRANSFORMERS - WY 337 275 528 597.1 DIST - MAINT - METERS - LABOR - - -
597.11 DIST-METER MAINT-WY - - - 598.1 MAINTENANCE-CONSUMER PREMISE - - -
598.11 MAINTENANCE-CONSUMER PREMISE/WY - - -
7 Distribution Expense - Maintenance 629,649 614,084 696,264
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 52
Account Description 2018 Budget 2018
Audited 2019 Budget
901 CUSTOMER ACCTS OPERATIONS-SUPERVISION - - - 902.1 METER READING EXP - LABOR 32,988 44,791 8,608
902.11 METER READING EXPENSE - WY 3,505 5,678 617 903.1 CONSUMERS RECORD & COLLECTION EXP 261,895 252,209 329,294
903.11 CONSUMER RECORD & COLLECTION EXP-WY 38,200 29,252 41,234 903.2 CONSMR RCRD EXP-NET METER MT - - -
903.21 CONSMR RCRD EXP-NET METER WY - - - 904 UNCOLLECTIBLE ACCOUNTS 13,200 - 13,200
8 Customer Accounts Expense 349,788 331,930 392,952
907 CUSTOMER SERVICE & INFO.-SUPERVISION - - - 908.1 CONSUMER ASSISTANCE - LABOR 3,747 8,833 5,098
908.11 CUSTOMER ASSISTANCE - WY 247 150 73 908.2 CUSTOMER ASSIST-RENEWABLES - - -
908.21 CUSTOMER ASSIST-RENEWABLES-WY - - - 909.1 INFORMATIONAL ADVERTISING 145,049 106,552 137,807 909.2 MERGER INFORMATIONAL ADVERTISING - - -
9 Customer Service and Informational Expense 149,042 115,535 142,978
912 ECONOMIC DEVELOPMENT - KEY ACCOUNTS - - - 912.1 DEMO & SELLING EXPENSE - LABOR 5,145 6,966 5,488
912.11 DEMO & SELLING EXPENSE-LABOR-WY - - -
10 Sales Expense 5,145 6,966 5,488
920.1 ADMIN & GENERAL LABOR 102,830 109,815 117,971 920.11 ADMIN & GENERAL LABOR - WY - - - 920.12 ADMIN & GENERAL ADMIN LEAVE OF ABSENCE - - -
920.2 ADMIN & GENERAL - GENERAL MANAGER 181,571 210,160 207,455 920.3 PAYROLL SALARIED EMPLOYEE HOURLY ADJUSTM - - -
920.31 MANAGER SUPERVISION - - - 920.4 ADMIN & GENERAL - BOARD MEETINGS & PREP 29,079 49,020 44,022 920.5 ADMIN & GENERAL - FORECASTING&REPORTING - - - 920.6 ADMIN & GENERAL - BUDGETING 1,014 3,901 1,959 920.7 ADMIN & GEN - ADMIN MEETINGS GM OUT 6,000 4,701 6,000 920.8 INSIDE EMPLOYEE BONUSES 7,000 7,500 9,500 920.9 EMPLOYEE GOAL BONUSES 34,000 12,882 -
921 OFFICE SUPPLIES & EXPENSE 47,591 54,044 50,591 921.11 OFFICE SUPPLIES & EXPENSE-WYOMING - 19 - 921.31 RATE & COST OF SERVICE STUDY 13,500 7,376 31,500 921.32 RATE & COST OF SERVICE STUDY-WY 1,500 820 3,500
921.4 DEPT HEADS - STAFF MEETINGS 24 - 80 921.5 EMPLOYEE MEETINGS 22,850 8,286 11,463 923.1 OUTSIDE SERVICES - ATTORNEY 38,800 62,459 46,800
923.11 OUTSIDE SERVICES-WY ATTORNEY 1,200 - 1,200 923.2 OUTSIDE SERVICES - ENGINEERING 7,500 20,120 7,500
923.21 OUTSIDE SERVICES - PLANT APPRAISAL - - - 923.3 OUTSIDE SERVICES - AUDITOR 6,500 7,140 11,000 923.4 OUTSIDE SERVICES - OTHER 15,000 25,296 15,000
924 PROPERTY INSURANCE 15,386 15,555 15,427 925 INJURIES & DAMAGES INSURANCE 9,180 7,344 9,180 926 EMPLOYEES PENSIONS & BENEFITS 10,620 18,645 16,620
926.2 EMPLOYEE BENEFITS-EDUCATION 44,991 73,134 61,918 926.7 SERVICE ORGANIZATIONS - - - 926.8 COMMUNITY SUPPORT - - - 930.1 MISC GENERAL EXPENSE - LABOR - - - 930.2 MISC GENERAL EXPENSE - DUES & ADVERT 72,143 73,167 72,981 930.3 MISC GENERAL EXPENSE - DIRECTORS 100,000 80,140 80,000 930.4 MISC GENERAL EXPENSE - OTHER 5,250 11,581 5,250
930.41 MISC. GENERAL EXP-DONATIONS 11,000 1,510 3,000 930.42 MISC. GENERAL EXP - DONATED LABOR 6,255 5,576 2,910 930.43 MISC GENERAL EXPENSE - LVE MGMT - - -
930.5 ADMIN - PROPERTY TAXES 19,245 17,506 17,911 930.6 MONTHLY NEWSLETTER 10,290 9,198 9,031 930.7 ANNUAL MEETING 27,410 28,214 20,291 930.8 A & G - SOUTHERN EXIT AMORTIZATION 141,051 141,051 141,051 935.1 MAINT OF GENERAL PLANT 94,323 139,771 130,198
11 Administrative and General Expense 1,083,103 1,205,931 1,151,308
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 53
Account Description 2018 Budget 2018
Audited 2019 Budget
403.5 DEPRECIATION - TRANSMISSION - - - 403.6 DEPRECIATION - DISTRIBUTION 864,960 865,848 909,710
403.61 DEPRECIATION-DISTRIBUTION-WY 84,660 83,616 83,696 403.7 DEPRECIATION - GENERAL 64,770 66,842 98,953
13 Depreciation & Amortization Expense 1,014,390 1,016,306 1,092,359
408.1 PROPERTY TAX EXPENSE - - -
14 Tax Expense - Property & Gross Receipts - - -
408.2 TAX - FEDERAL UNEMPLOYMENT - - - 408.3 TAX - FICA - - - 408.4 TAX - STATE UNEMPLOYMENT - - - 408.7 TAX - OTHER 2,811 2,011 2,811
15 Tax Expense - Other 2,811 2,011 2,811
427.1 INTEREST EXPENSE - REA 23,756 23,756 22,780 427.2 INTEREST EXPENSE - CFC 215,690 212,119 193,624 427.4 INTEREST EXPENSE - FFB 276,061 274,551 268,030 427.5 INTEREST EXPENSE - CoBank 75,636 94,884 116,304
16 Interest on Long-Term Debt 591,144 605,310 600,739
427.3 INTEREST EXPENSE - PAST SERVICE - - - 431 INTEREST EXPENSE - OTHER 1,200 1,192 1,200
18 Interest Expense - Other 1,200 1,192 1,200
428 AMORTIZATION OF DEBT DISCOUNT 1,800 1,800 1,800
19 Other Deductions 1,800 1,800 1,800
419 INTEREST & DIVIDEND INCOME 118,065 132,513 98,218
22 Non Operating Margins - Interest 118,065 132,513 98,218
415 REVENUE FROM MERCHANDISING 13,000 48,999 13,000 415.11 REVENUE FROM MERCHANDISING-WY - 3,439 -
416 COSTS FROM MERCHANDISING (10,523) (54,167) (12,013) 416.11 COST FROM MERCHANDISING - WY (511) (1,664) (1,536)
421.1 GAIN ON DISPOSITION OF PROPERTY - 175 - 421.2 LOSS ON DISPOSITION OF PROPERTY - - -
25 Non Operating Margins - Other 1,967 (3,219) (548)
423 G & T COOP CAPITAL CREDITS - - -
26 Generation and Transmission Capital Credits - - -
424 OTHER CAPITAL PATRONAGE 46,200 50,232 50,600
27 Other Capital Credits and Patronage Dividends 46,200$ 50,232$ 50,600$
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 54
Cash Budget
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 55
Cas
h B
udge
t by
Qua
rter
Des
crip
tion
Q1
Q2
Q3
Q4
Tot
al
Cas
h fr
om O
pera
tions
Mar
gins
406,
834
(91,
088)
(22,
917)
106,
568
399,
397
Dep
reci
atio
n26
6,69
7
27
3,43
0
27
5,82
7
27
6,40
5
1,
092,
359
N
on-c
ash
patro
nage
allo
catio
ns(1
9,00
0)
-
(2
4,60
0)
(7
,000
)
(50,
600)
Sout
hern
exi
t am
ortiz
atio
n35
,263
35
,263
35
,263
35
,263
14
1,05
1
Tota
l cha
nge
in c
ash
from
ope
ratio
ns68
9,79
3
21
7,60
5
26
3,57
3
41
1,23
5
1,
582,
206
Cas
h fr
on In
vest
ing
Act
iviti
esC
apita
l out
lay
(231
,507
)
(1
40,1
78)
(502
,278
)
(5
18,2
78)
(1,3
92,2
39)
Lo
ss fr
om re
tirem
ent o
f ass
ets
(52,
071)
(35,
967)
(34,
403)
(32,
002)
(154
,443
)
To
tal c
hang
e in
cas
h fro
m in
vesti
ng a
ctiv
ities
(283
,577
)
(1
76,1
44)
(536
,681
)
(5
50,2
80)
(1,5
46,6
82)
Cas
h fr
om F
inan
cing
Act
iviti
esD
ebt p
rinci
pal r
epay
men
t(3
08,3
46)
(310
,425
)
(3
11,2
46)
(311
,582
)
(1
,241
,599
)
Deb
t pay
men
t fro
m C
OC
Acc
ount
(inc
lude
d in
abo
ve)
56,0
20
55,8
90
55,7
70
56,3
63
224,
044
CO
C In
tere
st In
com
e in
to C
OC
Acc
ount
(24,
035)
(22,
670)
(21,
304)
(14,
171)
(82,
180)
CO
C In
tere
st Ex
pens
e fr
om C
OC
Acc
ount
72,6
88
70,9
22
72,9
53
72,3
44
288,
907
Gen
eral
Ret
irem
ent (
5% o
f Equ
ity)
-
-
-
(412
,273
)
(4
12,2
73)
Cap
ital c
redi
t ret
irem
ent (
esta
tes)
(7,5
00)
(7
,500
)
(7,5
00)
(7
,500
)
(30,
000)
New
LD
T - N
ew C
olum
bus S
ubsta
tion
Land
-
-
-
-
-
Tota
l cha
nge
in c
ash
from
fina
ncin
g ac
tiviti
es(2
11,1
72)
(213
,783
)
(2
11,3
28)
(616
,819
)
(1
,253
,102
)
Tota
l cha
nge
in c
ash
195,
044
(172
,322
)
(4
84,4
36)
(755
,863
)
(1
,217
,577
)
Beg
inni
ng c
ash
1,71
9,87
1
1,91
4,91
4
1,74
2,59
2
1,25
8,15
6
1,71
9,87
1
Endi
ng c
ash
1,91
4,91
4
1,74
2,59
2
1,25
8,15
6
502,
293
502,
293
Bea
rtoo
th E
lect
ric
Coo
pera
tive,
Inc.
2019
Bud
get
DRAFT For Disc
ussio
n Purp
oses
Only
BEC
Boa
rd B
ook
| S
epte
mbe
r 24,
201
9 |
Pag
e 56
Projected Balance Sheet
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 57
Projected Summary Balance Sheet
Assets and Other Debits 2019 2018 Liabilities and Other Credits 2019 2018Utility Plant Patronage Capital and Other Equities
Utility Plant 34,652,105 33,066,182 Patronage Capital 7,974,035 7,762,289 Accum. Depreciation (17,083,111) (16,213,691) Deferred Credit from NW Energy Settlement - -
Net Utility Plant 17,568,993 16,852,491 Current Year margins 661,576 704,619 Other Property & Investments Other Margins and Equities 459,641 459,641
Investments in Assoc. Org. - Patronage Capital 431,728 431,728 Total Patronage Capital and Other Equities 9,095,252 8,926,549 Investments in Assoc. Org. - Non-General Funds 287,267 287,267 Long-Term Debt
Total Other Property & Investments 718,995 718,995 Long-Term Debt 12,090,177 13,331,776 Current Assets Advance Payments Unapplied/COC (1,528,475) (1,959,245)
Cash 502,293 1,719,871 Total Long-Term Debt 10,561,702 11,372,531 Temporary Investments - - Curent LiabilitiesAccounts Receivable 933,359 933,359 Notes Payable - - Material & Supplies 423,987 423,987 Accounts Payable 436,623 436,623 Prepayments 120,021 120,021 Consumer Deposits 96,905 96,905 Other Current Assets 12,215 12,215 Other Current & Accrued Liabilities 552,497 552,497
Total Current Assets 1,991,876 3,209,453 Total Current Liabilities 1,086,025 1,086,025 Other Debits Other Credits
Regulatory Assets 423,153 564,204 Other Deferred Credits 81,329 81,329 Other Deferred Debits 121,291 121,291 Deferred Credit from NW Energy Settlement - -
Total Other Debits 544,444 685,495
Total Assets & Other Debits 20,824,308 21,466,434 Total Liabilities and Other Credits 20,824,308 21,466,434
Equity as a % of Assets 44% 42%
Beartooth Electric Cooperative, Inc.2019 Budget
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 58
Revenue
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 59
2019 Budget
2015 Normalized 2016 Normalized 2017 Actual2018 Pro Forma Low Projection
Median Projection High Projection
ResidentialNumber of customers 5,476 5,546 5,556 5,574 5,591 5,648 5,704 Average kWh per customer 751 750 792 804 790 798 805 Annual kWh sold 49,337,838 49,885,215 52,798,797 53,785,705 52,972,700 54,048,200 55,134,600
IrrigationNumber of customers 110 110 113 117 117 118 119 Average kWh per customer 4,277 5,276 5,425 3,656 3,790 3,829 3,867 Annual kWh sold 2,831,416 3,487,554 3,667,430 2,558,958 2,656,700 2,710,600 2,765,100
Small CommercialNumber of customers 353 355 413 457 456 461 466 Average kWh per customer 1,295 1,277 1,252 1,285 1,271 1,284 1,297 Annual kWh sold 5,479,904 5,444,169 6,199,881 7,051,093 6,963,100 7,104,500 7,247,300
Large CommercialNumber of customers 18 20 20 20 20 20 20 Average kWh per customer 11,022 10,343 10,849 10,488 10,402 10,507 10,612 Annual kWh sold 2,336,706 2,420,222 2,603,738 2,517,096 2,471,500 2,521,700 2,572,400
IndustrialNumber of customers 1 1 1 1 1 1 1 Average kWh per customer 112,475 113,925 120,775 136,700 122,562 123,800 125,038 Annual kWh sold 1,349,700 1,367,100 1,449,300 1,640,400 1,470,700 1,485,600 1,500,500
Total Average Customers 5,957 6,031 6,102 6,168 6,184 6,247 6,309
Annual Power RequirementsTotal kWh sold 61,335,564 62,604,260 66,719,146 67,553,252 66,534,700 67,870,600 69,219,900BEC system use 294,169 309,134 320,561 297,234 292,753 298,631 304,568 NW Transmission loss charge 2,723,299 2,779,629 2,962,330 2,904,790 2,860,992 2,918,436 2,976,456 System losses 6,001,258 6,813,741 7,003,651 6,079,793 5,988,123 6,108,354 6,229,791Total kWh requirements 70,354,290 72,506,764 77,005,688 76,835,069 75,676,568 77,196,020 78,730,714
Percent change -3.92% 3.06% 9.45% 5.97% -1.51% 0.47% 2.47%
kW demand 17,500 17,500 17,572 16,996 17,900 18,200 18,600Load factor 45.9% 47.3% 50.0% 51.6% 48.3% 48.3% 48.3%
Beartooth Electric Cooperative, Inc.
Projections of Electric Sales by Customer Class
2019 Projection
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 60
Bea
rtoo
th E
lect
ric
Coo
pera
tive,
Inc.
2019
Bud
get
Ele
ctri
c R
even
ue b
y M
onth
Mon
th R
esid
entia
l Ir
riga
tion
Sm
all
Com
mer
cial
L
arge
C
omm
erci
al
Indu
stri
al
Tot
al B
illed
R
even
ue
Oth
er
Ele
ctri
c R
even
ue
Tot
al R
even
ue
Janu
ary
721,
000
-
73,9
00
22,1
00
8,20
0
825,
200
2,
200
827,
400
Fe
brua
ry73
6,10
0
- 75
,600
24
,300
7,
800
84
3,80
0
2,20
0
84
6,00
0
Mar
ch62
9,50
0
- 67
,400
21
,400
5,
100
72
3,40
0
14,2
00
737,
600
A
pril
571,
600
21
,000
64,2
00
27,6
00
6,40
0
690,
800
2,
400
693,
200
M
ay48
6,90
0
28,8
00
56
,500
16
,800
13
,100
60
2,10
0
2,30
0
60
4,40
0
June
468,
400
52
,900
56,2
00
18,6
00
13,5
00
609,
600
2,
300
611,
900
Ju
ly54
7,30
0
108,
200
61
,500
18
,400
16
,400
75
1,80
0
2,30
0
75
4,10
0
Aug
ust
518,
600
93
,400
60,4
00
19,9
00
16,5
00
708,
800
2,
300
711,
100
Se
ptem
ber
487,
100
56
,900
57,1
00
18,9
00
17,0
00
637,
000
1,
900
638,
900
O
ctob
er54
0,30
0
- 62
,200
20
,500
11
,900
63
4,90
0
1,90
0
63
6,80
0
Nov
embe
r62
5,70
0
- 70
,700
20
,800
10
,400
72
7,60
0
1,90
0
72
9,50
0
Dec
embe
r73
5,40
0
- 72
,200
23
,800
7,
600
83
9,00
0
2,00
0
84
1,00
0
Tota
l7,
068,
100
$
36
1,20
0$
778,
100
$
25
3,10
0$
134,
100
$
8,
594,
000
$
37
,900
$
8,
631,
900
$
GL
Acc
t 4
40.1
00/4
40.2
00
441
.000
44
2.10
0 44
2.11
0 44
2.20
0
DRAFT For Disc
ussio
n Purp
oses
Only
BEC
Boa
rd B
ook
| S
epte
mbe
r 24,
201
9 |
Pag
e 61
2019
Bud
get
Mon
th R
esid
entia
l Ir
riga
tion
Sm
all
Com
mer
cial
L
arge
C
omm
erci
al
Indu
stri
al
Tot
al B
illed
Pe
rcen
tJa
nuar
y5,
987,
600
-
702,
200
25
4,30
0
91,0
00
7,03
5,10
0
10
.37%
Febr
uary
6,15
6,60
0
- 72
2,00
0
257,
400
86
,100
7,
222,
100
10.6
4%M
arch
4,96
1,50
0
- 62
0,30
0
227,
200
56
,800
5,
865,
800
8.64
%A
pril
4,31
0,50
0
58,7
00
585,
000
33
5,10
0
70,9
00
5,36
0,20
0
7.
90%
May
3,35
9,90
0
105,
200
49
3,00
0
97,4
00
145,
100
4,
200,
600
6.19
%Ju
ne3,
144,
200
29
0,60
0
490,
000
15
8,60
0
149,
700
4,
233,
100
6.24
%Ju
ly4,
037,
200
1,
090,
300
55
2,20
0
176,
100
18
2,00
0
6,03
7,80
0
8.
90%
Aug
ust
3,73
4,70
0
794,
800
53
7,50
0
178,
300
18
2,30
0
5,42
7,60
0
8.
00%
Sept
embe
r3,
352,
000
37
1,00
0
499,
000
17
4,40
0
188,
600
4,
585,
000
6.76
%O
ctob
er3,
941,
600
-
558,
300
20
0,50
0
132,
000
4,
832,
400
7.12
%N
ovem
ber
4,89
8,70
0
- 66
0,30
0
209,
500
11
5,50
0
5,88
4,00
0
8.
67%
Dec
embe
r6,
163,
700
-
684,
700
25
2,90
0
85,6
00
7,18
6,90
0
10
.59%
Tota
l54
,048
,200
2,71
0,60
0
7,10
4,50
0
2,
521,
700
1,48
5,60
0
67,8
70,6
00
100.
00%
Bea
rtoo
th E
lect
ric
Coo
pera
tive,
Inc.
Ele
ctri
c kW
h Sa
les b
y M
onth
DRAFT For Disc
ussio
n Purp
oses
Only
BEC
Boa
rd B
ook
| S
epte
mbe
r 24,
201
9 |
Pag
e 62
Beartooth Electric Cooperative, Inc.2019 BudgetProjections of Customer by Customer Class
New Customer AllocationResidential 75
Irrigation - Small commercial - Large commercial -
Industrial - Total 75
2013 2014 2015 2016 20172018
ProForma2017-18 Change
2019 Changes Projected
ResidentialJanuary 5,331 5,391 5,440 5,516 5,572 5,543 2 - February 5,335 5,394 5,446 5,512 5,570 5,542 (28) 1 March 5,340 5,400 5,447 5,521 5,574 5,538 (36) 2 April 5,349 5,410 5,454 5,519 5,591 5,557 (34) 10 May 5,354 5,412 5,474 5,534 5,585 5,561 (24) 10 June 5,369 5,411 5,472 5,539 5,522 5,572 50 12 July 5,393 5,415 5,476 5,556 5,524 5,578 54 12 August 5,396 5,431 5,491 5,568 5,529 5,586 57 12 September 5,391 5,441 5,499 5,567 5,567 5,588 21 10 October 5,395 5,441 5,504 5,566 5,551 5,608 57 6 November 5,391 5,441 5,499 5,576 5,543 5,608 65 - December 5,391 5,441 5,511 5,578 5,541 5,608 67 -
Average/total 5,370 5,419 5,476 5,546 5,556 5,574 251 75
IrrigationJanuary - - - - - - - - February - - - - - - - - March - - - - - - - - April 102 105 107 111 111 114 3 - May 103 105 110 107 111 115 4 - June 102 105 112 109 115 117 2 - July 103 107 111 110 113 118 5 - August 103 107 111 112 113 118 5 - September 103 107 111 112 113 118 5 - October - - - - - - - - November - - - - - - - - December - - - - - - - -
Average/total 103 106 110 110 113 117 24 -
Small CommercialJanuary 339 343 350 354 359 453 94 - February 340 343 351 355 360 454 94 - March 339 346 352 355 362 454 92 - April 339 347 352 356 361 454 93 - May 340 344 352 359 361 454 93 - June 338 345 352 354 448 454 6 - July 339 347 352 354 448 458 10 - August 339 349 353 354 448 459 11 - September 339 347 353 354 448 459 11 - October 339 347 354 354 453 465 12 - November 340 347 355 355 450 461 11 - December 340 347 354 359 453 461 8 -
Average/total 339 346 353 355 413 457 535 -
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 63
Beartooth Electric Cooperative, Inc.2019 BudgetProjections of Customer by Customer Class
New Customer AllocationResidential 75
Irrigation - Small commercial - Large commercial -
Industrial - Total 75
2013 2014 2015 2016 20172018
ProForma2017-18 Change
2019 Changes Projected
Large CommericalJanuary 18 18 17 19 20 20 - - February 18 18 17 19 20 20 - - March 18 18 17 19 20 20 - - April 18 18 17 19 20 20 - - May 18 18 17 19 20 20 - - June 18 18 18 19 20 20 - - July 18 18 18 20 20 20 - - August 18 17 18 20 20 20 - - September 18 17 18 20 20 20 - - October 18 17 18 20 20 20 - - November 18 17 18 20 20 20 - - December 18 17 19 20 20 20 - -
Average/total 18 18 18 20 20 20 - -
IndustrialJanuary 1 1 1 1 1 1 - - February 1 1 1 1 1 1 - - March 1 1 1 1 1 1 - - April 1 1 1 1 1 1 - - May 1 1 1 1 1 1 - - June 1 1 1 1 1 1 - - July 1 1 1 1 1 1 - - August 1 1 1 1 1 1 - - September 1 1 1 1 1 1 - - October 1 1 1 1 1 1 - - November 1 1 1 1 1 1 - - December 1 1 1 1 1 1 - -
Average/total 1 1 1 1 1 1 - -
Total 5,831 5,890 5,958 6,032 6,102 6,169 786 75
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 64
Beartooth Electric Cooperative, Inc.2019 BudgetProjections of Electric Revenue by Customer Class
2018 Pro Forma Low Projection Median Projection High ProjectionResidential
kWh sold 53,785,705 52,972,700 54,048,200 55,134,600Average revenue per kWh 0.13021 0.13077 0.13077 0.13077Total revenue $7,003,346 $6,927,500 $7,068,100 $7,210,200
IrrigationkWh sold 2,558,958 2,656,700 2,710,600 2,765,100Average revenue per kWh 0.13753 0.13325 0.13325 0.13325Total revenue $351,945 $354,000 $361,200 $368,500
Small CommercialkWh sold 7,051,093 6,963,100 7,104,500 7,247,300Average revenue per kWh 0.10938 0.10952 0.10952 0.10952Total revenue $771,220 $762,600 $778,100 $793,700
Large CommercialkWh sold 2,517,096 2,471,500 2,521,700 2,572,400Average revenue per kWh 0.10441 0.10037 0.10037 0.10037Total revenue $262,808 $248,100 $253,100 $258,200
IndustrialkWh sold 1,640,400 1,470,700 1,485,600 1,500,500Average revenue per kWh 0.08813 0.09027 0.09027 0.09027Total revenue $144,560 $132,800 $134,100 $135,400
Total Electric RevenueTotal revenue from sales $8,533,879 $8,425,000 $8,594,600 $8,766,000Other operating revenue 35,000 37,900 37,900 37,900Total operating revenue $8,568,879 $8,462,900 $8,632,500 $8,803,900
Revenue growth -1.24% 0.74% 2.74%
2019 Projection
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 65
Beartooth Electric Cooperative, Inc.2019 BudgetOther Electric Revenues by Month
MonthForfeited
Discounts 450Pole
Rental 454 Other 456 TotalJanuary 2,000 - 200 2,200 February 2,000 - 200 2,200 March 2,000 12,000 200 14,200 April 1,800 - 600 2,400 May 1,700 - 600 2,300 June 1,700 - 600 2,300 July 1,700 - 600 2,300 August 1,700 - 600 2,300 September 1,700 - 200 1,900 October 1,700 - 200 1,900 November 1,700 - 200 1,900 December 1,800 - 200 2,000 Total 21,500 12,000 4,400 37,900
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 66
Cost of Power
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 67
2019
Bud
get
Tota
lJa
nFe
bM
arA
pr
May
Jun
Jul
Au
gSe
pO
ctN
ov
Dec
Sum
mar
y
Ener
gy L
oad
(M
Wh
)77
,196
7,
400
7,
566
6,
596
6,
199
5,
405
5,
472
6,
744
6,
359
5,
714
5,
695
6,
524
7,
521
Po
wer
Co
sts
WA
PA
131,
623
$
12
,338
$
12,9
51$
10
,420
$
11,1
80$
9,
041
$
10
,309
$
11,2
88$
11
,681
$
9,88
5$
8,97
3$
10,9
77$
12
,579
$
Mo
rgan
Sta
nle
y2,
447,
985
$
234,
631
$
239,
232
$
210,
515
$
195,
100
$
172,
216
$
172,
835
$
214,
302
$
200,
035
$
181,
174
$
181,
627
$
207,
212
$
239,
105
$
Tota
l Po
wer
Co
sts
2,57
9,60
9$
24
6,96
9$
25
2,18
3$
22
0,93
5$
20
6,28
1$
18
1,25
7$
18
3,14
4$
22
5,59
1$
21
1,71
6$
19
1,05
9$
19
0,60
0$
21
8,18
9$
25
1,68
4$
A
vg. C
ost
($
/MW
h)
33.4
2$
33
.38
$
33
.33
$
33
.49
$
33
.27
$
33
.53
$
33
.47
$
33
.45
$
33
.29
$
33
.44
$
33
.47
$
33
.44
$
33
.46
$
Tran
smis
sio
n C
ost
s
NW
C T
ran
smis
sio
n47
0,81
5$
39,2
35$
39
,235
$
39,2
35$
39
,235
$
39,2
35$
39
,235
$
39,2
35$
39
,235
$
39,2
35$
39
,235
$
39,2
35$
39
,235
$
NW
C S
ched
ule
125
,329
$
2,
111
$
2,
111
$
2,
111
$
2,
111
$
2,
111
$
2,
111
$
2,
111
$
2,
111
$
2,
111
$
2,
111
$
2,
111
$
2,
111
$
N
WC
Sch
edu
le 3
41,7
18$
3,47
6$
3,47
6$
3,47
6$
3,47
6$
3,47
6$
3,47
6$
3,47
6$
3,47
6$
3,47
6$
3,47
6$
3,47
6$
3,47
6$
NW
C S
ched
ule
5&
638
,298
$
3,
511
$
3,
511
$
3,
128
$
3,
128
$
3,
128
$
3,
128
$
3,
128
$
3,
128
$
3,
128
$
3,
128
$
3,
128
$
3,
128
$
To
tal T
ran
smis
sio
n C
ost
s57
6,16
0$
48,3
33$
48
,333
$
47,9
49$
47
,949
$
47,9
49$
47
,949
$
47,9
49$
47
,949
$
47,9
49$
47
,949
$
47,9
49$
47
,949
$
Avg
. Co
st (
$/M
Wh
)7.
46$
6.53
$
6.39
$
7.27
$
7.73
$
8.87
$
8.76
$
7.11
$
7.54
$
8.39
$
8.42
$
7.35
$
6.38
$
Tota
l Su
pp
ly C
ost
s3,
155,
769
$
295,
302
$
300,
516
$
268,
885
$
254,
230
$
229,
207
$
231,
094
$
273,
540
$
259,
666
$
239,
009
$
238,
549
$
266,
139
$
299,
633
$
Avg
. Su
pp
ly C
ost
($
/MW
h)
40.8
8$
39
.91
$
39
.72
$
40
.76
$
41
.01
$
42
.40
$
42
.23
$
40
.56
$
40
.83
$
41
.83
$
41
.89
$
40
.79
$
39
.84
$
WA
PA
Po
we
r
Pea
k (k
w)
11,6
981
,06
71
,10
99
33
95
48
41
96
81
,01
21
,01
28
92
79
39
83
1,1
34
Ener
gy (
MW
h)
5,72
25
49
58
14
50
50
33
77
42
64
87
51
94
24
39
24
74
54
0
Pea
k R
ate
($/k
w-m
o)
5.25
$
5.25
$
5.25
$
5.25
$
5.25
$
5.25
$
5.25
$
5.25
$
5.25
$
5.25
$
5.25
$
5.25
$
Ener
gy R
ate
($/M
wh
) 13
.27
$
13
.27
$
13
.27
$
13
.27
$
13
.27
$
13
.27
$
13
.27
$
13
.27
$
13
.27
$
13
.27
$
13
.27
$
13
.27
$
Pea
k C
ost
($
)6
1,4
15
$
5
,60
2$
5
,82
2$
4
,89
8$
5
,00
9$
4
,41
5$
5
,08
2$
5
,31
3$
5
,31
3$
4
,68
3$
4
,16
3$
5
,16
1$
5
,95
4$
Ener
gy C
ost
($
)7
5,9
31
$
7
,28
5$
7
,71
0$
5
,97
2$
6
,67
5$
5
,00
3$
5
,65
3$
6
,46
2$
6
,88
7$
5
,62
6$
5
,20
2$
6
,29
0$
7
,16
6$
Tran
smis
sio
n d
isco
un
t-
$
(5
49
)$
(58
1)
$
(4
50
)$
(50
3)
$
(3
77
)$
(42
6)
$
(4
87
)$
(51
9)
$
(4
24
)$
(39
2)
$
(4
74
)$
(54
0)
$
Tota
l Co
st (
$)
13
1,6
23
$
12
,33
8$
1
2,9
51
$
10
,42
0$
1
1,1
80
$
9,0
41
$
10
,30
9$
1
1,2
88
$
11
,68
1$
9
,88
5$
8
,97
3$
1
0,9
77
$
12
,57
9$
Mo
rgan
Sta
nle
y P
ow
er
Tota
l En
ergy
(M
Wh
)7
1,4
74
6,85
1
6,98
5
6,14
6
5,69
6
5,02
8
5,04
6
6,25
7
5,84
0
5,29
0
5,30
3
6,05
0
6,98
1
Pri
ce (
$/M
Wh
)34
.25
$
34
.25
$
34
.25
$
34
.25
$
34
.25
$
34
.25
$
34
.25
$
34
.25
$
34
.25
$
34
.25
$
34
.25
$
34
.25
$
Bea
rtoo
th E
lect
ric
Coo
pera
tive,
Inc.
Pow
er C
ost b
y M
onth DRAFT For
Discus
sion P
urpos
es O
nly
BEC
Boa
rd B
ook
| S
epte
mbe
r 24,
201
9 |
Pag
e 68
Tota
l Co
st (
$)
2,4
47
,98
5$
234,
631
$
239,
232
$
210,
515
$
195,
100
$
172,
216
$
172,
835
$
214,
302
$
200,
035
$
181,
174
$
181,
627
$
207,
212
$
239,
105
$
NW
C T
ran
smis
sio
n
No
v13
-Oct
14
CP
(kw
)14
2,25
1
15,3
59
17
,437
16,7
58
10
,418
7,79
7
7,19
2
11,0
36
10
,639
7,85
2
8,98
7
12,2
23
16
,553
No
v13
-Oct
14
En
ergy
(M
Wh
)73
,189
7
,37
47
,72
36
,90
35
,27
34
,88
24
,87
26
,48
35
,90
34
,70
44
,73
45
,97
28
,36
6
20
18
Est
. Co
inci
den
t P
eak
(kw
)14
8,99
2
15,4
12
17
,082
16,0
14
12
,248
8,63
3
8,07
8
11,4
80
11
,462
9,53
7
10,8
11
13
,353
14,8
81
Tran
smis
sio
n R
ate
($/k
w-m
o)
3.16
$
3.16
$
3.16
$
3.16
$
3.16
$
3.16
$
3.16
$
3.16
$
3.16
$
3.16
$
3.16
$
3.16
$
Sch
edu
le 1
Rat
e ($
/kw
-mo
)0.
17$
0.
17$
0.
17$
0.
17$
0.
17$
0.
17$
0.
17$
0.
17$
0.
17$
0.
17$
0.
17$
0.
17$
Sc
hed
ule
3 R
ate
($/k
w-m
o)
0.28
$
0.28
$
0.28
$
0.28
$
0.28
$
0.28
$
0.28
$
0.28
$
0.28
$
0.28
$
0.28
$
0.28
$
Tran
smis
sio
n C
ost
($
) /3
47
0,8
15
$
39,2
35$
39
,235
$
39,2
35$
39
,235
$
39,2
35$
39
,235
$
39,2
35$
39
,235
$
39,2
35$
39
,235
$
39,2
35$
39
,235
$
Sch
edu
le 1
Co
st (
$)
/32
5,3
29
$
2,
111
$
2,
111
$
2,
111
$
2,
111
$
2,
111
$
2,
111
$
2,
111
$
2,
111
$
2,
111
$
2,
111
$
2,
111
$
2,
111
$
Sc
hed
ule
3 C
ost
($
) /3
41
,71
8$
3,47
6$
3,47
6$
3,47
6$
3,47
6$
3,47
6$
3,47
6$
3,47
6$
3,47
6$
3,47
6$
3,47
6$
3,47
6$
3,47
6$
Sch
edu
le 5
&6
Cap
acit
y (k
w)
/456
0
56
0
56
0
56
0
56
0
56
0
56
0
56
0
56
0
56
0
56
0
56
0
Sc
hed
ule
5&
6 R
ate
($/k
w-m
o)
/56.
27$
6.
27$
5.
59$
5.
59$
5.
59$
5.
59$
5.
59$
5.
59$
5.
59$
5.
59$
5.
59$
5.
59$
Sc
hed
ule
5&
6 C
ost
($
)3
8,2
98
$
3,
511
$
3,
511
$
3,
128
$
3,
128
$
3,
128
$
3,
128
$
3,
128
$
3,
128
$
3,
128
$
3,
128
$
3,
128
$
3,
128
$
/3 -
Bill
ed o
n 1
2 C
P b
asis
/4 -
20
17
req
uir
emen
t fr
om
NW
C (
3%
of
esti
mat
ed a
nn
ual
tra
nsm
issi
on
pea
k)
/5 -
Avg
of
curr
ent
Sch
5 (
$6
.90
) an
d S
ch 6
($
5.6
4)
rate
s fo
r Ja
n &
Feb
20
19
/5 -
Avg
of
curr
ent
Sch
5 (
$6
.10
) an
d S
ch 6
($
5.0
7)
rate
s fo
r M
ar -
Dec
20
19
DRAFT For Disc
ussio
n Purp
oses
Only
BEC
Boa
rd B
ook
| S
epte
mbe
r 24,
201
9 |
Pag
e 69
Payroll
Full-time employees are as follows:
Name Position Kevin Owens Eric Elton Jim Avent Travis Barker Guy Behrent Hunter Boos Bill Colgrove Linda Dukart Mike Ferguson Stephanie Fletcher James Pihl Brad Prophet Kaaren Robbins Connie Teachout Marty Tomlin Markus Urbanik Sam Walkowiak Jake Wright
General Manager Line Superintendent Meter Tech/Journeyman Lineman Journeyman Lineman Line Sub-Foreman Apprentice Line Foreman Member Service Representative (retiring January 2019) Journeyman Lineman Member Service Representative Line Sub-Foreman Accountant Member Services/Communications and Marketing Member Service Representative Staking Technician Warehousing and Purchasing Line Foreman Journeyman Lineman
Part-time employee is as follows:
Name Position Teresa Newcomer Plant Accountant
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 70
BEA
RTO
OTH
ELE
CTR
IC C
OO
PER
ATI
VE,
INC
.R
evis
ion:
781
51
BU
DG
ETC
FC B
UD
GET
PR
O -
PAY
RO
LL/L
AB
OR
12/2
1/20
18 1
0:44
:40
amPa
ge:
1
Dra
ft: 2
019
Sum
mar
y
Febr
uary
Janu
ary
Mar
chA
pril
May
June
July
Aug
ust
Sept
embe
rO
ctob
erN
ovem
ber
Dec
embe
rD
escr
iptio
nT
otal
Hou
rsB
ase
Hou
rs3,
496.
002,
880.
003,
024.
003,
168.
003,
312.
002,
880.
003,
312.
003,
168.
003,
024.
003,
312.
003,
024.
003,
168.
0037
,768
.00
Ove
rtim
e H
ours
88.5
088
.50
88.5
088
.50
88.5
088
.50
88.5
088
.50
88.5
088
.50
88.5
088
.50
1,06
2.00
3,58
4.50
2,96
8.50
3,11
2.50
3,25
6.50
3,40
0.50
2,96
8.50
3,40
0.50
3,25
6.50
3,11
2.50
3,40
0.50
3,11
2.50
3,25
6.50
Tot
al H
ours
:38
,830
.00
Bas
e Pa
y Pe
r B
ase
Hou
r:36
.71
37.5
037
.55
37.5
537
.55
37.5
938
.99
39.0
439
.16
39.1
939
.19
39.1
938
.26
Pays
Bas
e Pa
y12
8,33
9.81
108,
008.
0011
3,54
3.29
118,
950.
1412
4,35
6.94
108,
264.
4812
9,13
0.65
123,
685.
4111
8,40
9.10
129,
787.
1611
8,50
1.33
124,
144.
241,
445,
120.
55O
verti
me
Pay
5,13
1.19
5,13
1.57
5,13
1.57
5,13
1.57
5,13
1.57
5,13
1.57
5,47
0.52
5,47
0.52
5,47
1.13
5,47
1.54
5,47
1.54
5,47
1.54
63,6
15.8
3B
onus
Pay
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
133,
471.
0011
3,13
9.57
118,
674.
8612
4,08
1.71
129,
488.
5111
3,39
6.05
134,
601.
1712
9,15
5.93
123,
880.
2313
5,25
8.70
123,
972.
8712
9,61
5.78
Tot
al P
ays:
1,50
8,73
6.38
Ded
uctio
nsN
REC
A M
EDIC
AL
PREM
IUM
1,88
8.48
1,78
0.15
1,78
0.15
1,78
0.15
1,78
0.15
1,78
0.15
1,78
0.15
1,78
0.15
1,78
0.15
1,78
0.15
1,78
0.15
1,77
9.88
21,4
69.8
640
1K E
MPL
OY
EEC
ON
TRIB
UTI
ON
5,93
4.44
5,30
6.20
5,44
3.38
5,58
0.57
5,71
7.77
5,31
2.60
5,77
4.42
5,65
1.68
5,52
5.55
5,80
7.75
5,52
5.55
5,66
6.64
67,2
46.5
5
AFL
AC
PR
E TA
X33
8.97
338.
9733
8.97
338.
9733
8.97
338.
9733
8.97
338.
9733
8.97
338.
9733
8.97
338.
774,
067.
44A
FLA
C P
OST
TA
X49
.97
49.9
749
.97
49.9
749
.97
49.9
749
.97
49.9
749
.97
49.9
749
.97
49.8
959
9.56
401K
LO
AN
PA
YM
ENT
2,69
6.42
2,69
6.42
2,69
6.42
2,69
6.42
2,69
6.42
2,69
6.42
2,69
6.42
2,69
6.42
2,69
6.42
2,69
6.42
2,69
6.42
2,69
6.38
32,3
57.0
0M
EDIC
AL
125
340.
1634
0.16
340.
1634
0.16
340.
1634
0.16
340.
1634
0.16
340.
1634
0.16
340.
1634
0.24
4,08
2.00
MET
LIF
E25
.00
25.0
025
.00
25.0
025
.00
25.0
025
.00
25.0
025
.00
25.0
025
.00
25.0
030
0.00
EMPL
OY
EE &
DEP
END
ENT
LIFE
926.
2092
6.20
926.
2092
6.20
926.
2092
6.20
926.
2092
6.20
926.
2092
6.20
926.
2092
6.12
11,1
14.3
2
SHO
RT
TER
M D
ISA
BIL
ITY
504.
4841
6.17
436.
9845
7.81
478.
6241
6.97
494.
9647
4.50
455.
0749
8.44
455.
0747
6.77
5,56
5.84
UN
ION
DU
ES1,
085.
481,
085.
481,
085.
481,
085.
481,
085.
481,
085.
481,
085.
481,
085.
481,
085.
481,
085.
481,
085.
481,
085.
4813
,025
.76
RO
TH 4
01(k
) ELE
CTI
ON
1,11
3.76
1,11
3.76
1,11
3.76
1,11
3.76
1,11
3.76
1,11
3.76
1,11
3.76
1,11
3.76
1,11
3.76
1,11
3.76
1,11
3.76
1,11
3.68
13,3
65.0
414
,903
.36
14,0
78.4
814
,236
.47
14,3
94.4
914
,552
.50
14,0
85.6
814
,625
.49
14,4
82.2
914
,336
.73
14,6
62.3
014
,336
.73
14,4
98.8
5T
otal
Ded
uctio
ns:
173,
193.
37
Tot
al P
ay L
ess D
educ
tions
:11
8,56
7.64
99,0
61.0
910
4,43
8.39
109,
687.
2211
4,93
6.01
99,3
10.3
711
9,97
5.68
114,
673.
6410
9,54
3.50
120,
596.
4010
9,63
6.14
115,
116.
931,
335,
543.
01
Tax
able
Ben
efits
GR
OU
P TE
RM
LIF
E IN
S O
VER
50K
87.0
087
.00
87.0
087
.00
87.0
087
.00
87.0
087
.00
87.0
087
.00
87.0
087
.00
1,04
4.00
87.0
087
.00
87.0
087
.00
87.0
087
.00
87.0
087
.00
87.0
087
.00
87.0
087
.00
Tot
al T
axab
le B
enef
its:
1,04
4.00
Tax
esFE
DER
AL
UN
EMPL
OY
MEN
T69
2.45
88.9
00.
000.
000.
000.
000.
000.
000.
000.
000.
000.
0078
1.35
STA
TE U
NEM
PLO
YEM
ENT
800.
8267
8.84
652.
9764
3.65
345.
2318
9.99
86.4
458
.61
24.8
00.
000.
000.
003,
481.
35W
OR
KER
S C
OM
P IN
SID
EEM
PLO
YEE
S14
7.70
116.
6212
2.88
128.
7313
4.58
117.
4613
5.06
129.
7612
4.31
136.
4612
4.62
130.
551,
548.
73
/pro
/rptte
mpl
ate/
acct
/2.4
3.1/
bu/B
U_C
FC_P
AY
RO
LL_D
TL.x
ml.r
ptbp
roph
et28
019
DRAFT For Disc
ussio
n Purp
oses
Only
BEC
Boa
rd B
ook
| S
epte
mbe
r 24,
201
9 |
Pag
e 71
BEA
RTO
OTH
ELE
CTR
IC C
OO
PER
ATI
VE,
INC
.R
evis
ion:
781
51
BU
DG
ETC
FC B
UD
GET
PR
O -
PAY
RO
LL/L
AB
OR
12/2
1/20
18 1
0:44
:40
amPa
ge:
2
Dra
ft: 2
019
Sum
mar
y
Febr
uary
Janu
ary
Mar
chA
pril
May
June
July
Aug
ust
Sept
embe
rO
ctob
erN
ovem
ber
Dec
embe
rD
escr
iptio
nT
otal
WO
RK
ERS
CO
MP
OU
TSID
EEM
PLO
YEE
S2,
570.
042,
254.
012,
359.
372,
464.
702,
570.
042,
254.
012,
714.
032,
602.
872,
497.
772,
720.
712,
497.
772,
609.
2630
,114
.58
FIC
A8,
121.
426,
867.
587,
210.
767,
545.
997,
881.
226,
883.
488,
198.
197,
860.
587,
533.
507,
487.
696,
693.
617,
002.
4789
,286
.49
MED
ICA
RE
1,89
9.37
1,60
6.14
1,68
6.40
1,76
4.79
1,84
3.19
1,60
9.86
1,91
7.32
1,83
8.36
1,76
1.88
1,92
6.85
1,76
3.23
1,84
5.04
21,4
62.4
314
,231
.80
11,6
12.0
912
,032
.38
12,5
47.8
612
,774
.26
11,0
54.8
013
,051
.04
12,4
90.1
811
,942
.26
12,2
71.7
111
,079
.23
11,5
87.3
2T
otal
Tax
es:
146,
674.
93
Ben
efits
401K
EM
PLO
YER
CO
NTR
IBU
TIO
N9,
530.
378,
035.
848,
449.
768,
852.
169,
254.
538,
058.
939,
611.
379,
208.
688,
814.
279,
653.
788,
814.
279,
234.
0310
7,51
7.99
MED
ICA
L IN
SUR
AN
CE
24,0
09.2
723
,226
.55
23,2
26.5
523
,226
.55
23,2
26.5
523
,226
.55
23,2
26.5
523
,226
.55
23,2
26.5
523
,226
.55
23,2
26.5
523
,226
.32
279,
501.
09B
ASI
C L
IFE
272.
3022
8.52
239.
9325
1.39
262.
8022
8.81
273.
7826
2.27
251.
1127
5.05
251.
1126
3.10
3,06
0.17
LTD
910.
4376
4.07
802.
2884
0.50
878.
6676
5.05
915.
3987
6.89
839.
7191
9.67
839.
7187
9.68
10,2
32.0
4R
ETIR
EMEN
T19
,203
.81
17,8
94.2
417
,894
.24
17,8
94.2
417
,894
.24
17,8
94.2
417
,894
.24
17,8
94.2
417
,894
.24
17,8
94.2
417
,894
.24
17,8
94.1
521
6,04
0.36
MED
ICA
L H
SA D
EPO
SIT
1,80
0.00
1,57
5.00
1,57
5.00
1,57
5.00
1,57
5.00
1,57
5.00
1,57
5.00
1,57
5.00
1,57
5.00
1,57
5.00
1,57
5.00
1,57
5.00
19,1
25.0
040
1K E
MPL
OY
ER M
ATC
H2,
259.
121,
964.
432,
062.
642,
160.
862,
259.
121,
970.
832,
348.
222,
254.
572,
152.
092,
357.
062,
152.
092,
254.
5726
,195
.60
VA
CA
TIO
N9,
182.
347,
715.
298,
101.
058,
486.
848,
872.
547,
724.
899,
230.
608,
841.
968,
465.
979,
279.
868,
472.
898,
876.
3610
3,25
0.59
67,1
67.6
461
,403
.94
62,3
51.4
563
,287
.54
64,2
23.4
461
,444
.30
65,0
75.1
564
,140
.16
63,2
18.9
465
,181
.21
63,2
25.8
664
,203
.21
Tot
al B
enef
its:
764,
922.
84
Bas
e Pa
y12
8,33
9.81
108,
008.
0011
3,54
3.29
118,
950.
1412
4,35
6.94
108,
264.
4812
9,13
0.65
123,
685.
4111
8,40
9.10
129,
787.
1611
8,50
1.33
124,
144.
241,
445,
120.
55To
tal P
ay13
3,47
1.00
113,
139.
5711
8,67
4.86
124,
081.
7112
9,48
8.51
113,
396.
0513
4,60
1.17
129,
155.
9312
3,88
0.23
135,
258.
7012
3,97
2.87
129,
615.
781,
508,
736.
38To
tal O
verh
ead
81,3
99.4
473
,016
.03
74,3
83.8
375
,835
.40
76,9
97.7
072
,499
.10
78,1
26.1
976
,630
.34
75,1
61.2
077
,452
.92
74,3
05.0
975
,790
.53
911,
597.
77To
tal P
ay a
nd O
verh
ead
214,
870.
4418
6,15
5.60
193,
058.
6919
9,91
7.11
206,
486.
2118
5,89
5.15
212,
727.
3620
5,78
6.27
199,
041.
4321
2,71
1.62
198,
277.
9620
5,40
6.31
2,42
0,33
4.15
Tot
al P
ay P
er H
our:
37.2
438
.11
38.1
338
.10
38.0
838
.20
39.5
839
.66
39.8
039
.78
39.8
339
.80
38.8
5T
otal
Pay
and
Ovh
d Pe
r H
our:
59.9
462
.71
62.0
361
.39
60.7
262
.62
62.5
663
.19
63.9
562
.55
63.7
063
.08
62.3
3
Ove
rhea
d %
of B
ase
Pay
63.4
267
.60
65.5
163
.75
61.9
266
.96
60.5
061
.96
63.4
859
.68
62.7
061
.05
%%
%%
%%
%%
%%
%%
%63
.08
Ove
rhea
d %
of T
otal
Pay
60.9
964
.54
62.6
861
.12
59.4
663
.93
58.0
459
.33
60.6
757
.26
59.9
458
.47
%%
%%
%%
%%
%%
%%
%60
.42
Ove
rhea
d %
of T
otal
Pay
& O
vhd
37.8
839
.22
38.5
337
.93
37.2
939
.00
36.7
337
.24
37.7
636
.41
37.4
836
.90
%%
%%
%%
%%
%%
%%
%37
.66
/pro
/rptte
mpl
ate/
acct
/2.4
3.1/
bu/B
U_C
FC_P
AY
RO
LL_D
TL.x
ml.r
ptbp
roph
et28
019
DRAFT For Disc
ussio
n Purp
oses
Only
BEC
Boa
rd B
ook
| S
epte
mbe
r 24,
201
9 |
Pag
e 72
Capital Budget
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 73
Beartooth Electric 2019 CAPITAL BUDGET
I. DISTRIBUTION FACILITIES:A. ELECTRIC DISTRIBUTION EXTENSIONS
Budget100-16 LINE EXTENSION FOR 75 NEW ELECTRIC CUSTOMERS -$ 115-16 SUBDIVISION LINE EXTENSIONS 0660-18 ELECTRIC METERS NEW CONSTRUCTION (75) 1,710
Subtotal - Electric Distribution 1,710$
B. ELECTRIC CONVERSIONS AND LINE UPGRADESBudget
301-16 None -$ 302-16 0303-16 0
Subtotal - Electric Conversions and Line Upgrades -$
C. MISCELLANEOUS ELECTRIC DISTRIBUTIONBudget
601-18 REPLACEMENT TRANSFORMERS 20,000$ 602-18 INCREASE SERVICE CAPACITY 0603-18 CONDUCTORS 20,000603-18 SECTIONALIZING EQUIPMENT 15,000603-18a NOVA OCR's 100,000603-18a TWACS Boxes 22,000604-18 VOLTAGE REGULATORS 0605-18 CAPACITORS 0606-18 POLE REPLACEMENTS (100) 150,000608-18 ORDINARY REPLACEMENTS 45,000
Subtotal - Miscellaneous Electric Distribution 372,000$
D. CONSTRUCTION WORK PLANBudget
2019-2023 Multi Year Construction Work Plan 15,000$ Columbus New Substation (2019 - Land) (2020 & 2021 - Prep & Build) 70,000
Subtotal - Construction Work Plan 85,000$
E. GENERAL PLANTBudget
Mini-Split Heat-Pump for Board Room 9,550$ Parking Lot Paving 0Well / Irrigation 0Front Desk Security 1,500Front Driveway Signage 2,500Computer Hardware (laptops & iPads) 2,500Shares du Soleil Fencing 7,500Shares du Soleil Outdoor Signage 10,000Lobby Display Realtime Shares du Soleil reporting 11,000TWACS desktop meter test station 5,000
Subtotal - General Plant 49,550$
TWACSBudget
TWACS 808,200$ `=`` Five (5) Substation Poly Pads (included 0
0Subtotal - General Plant 808,200$
NISC UPGRADESBudget
AMI 4,000$ DocuVault 1,306Prepaid 1,536CallCapture 750Mapwise-Mapping 37,837Mapwis-Staking 11,850OMS 0MDMS 6,500Billing Statement Programming 12,000
Subtotal - General Plant 75,779$
F. TRANSPORTATION GENERAL PLANTBudget
None 00
Subtotal - Transportation General Plant -$
TOTAL CAPITAL BUDGET 1,392,239$
IV. CASH FLOW ANALYSISTOTAL CAPITAL BUDGET 1,392,239$
NET MARGINS 661,576$ PLUS DEPRECIATION 1,023,863LESS PATRONAGE CAPITAL (412,273)LESS PRINCIPLE PAYMENTS (1,099,736)CASH AVAILABLE FOR CAPITAL BUDGET ITEMS 173,430 PLUS WORKING CAPITAL AND OTHER ITEMS 0NEW LONG-TERM DEBT 0FUNDS AVAILABLE FOR CAPITAL BUDGET ITEMS 173,430$
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 74
Beartooth Electric 2020 CAPITAL BUDGET
I. DISTRIBUTION FACILITIES:A. ELECTRIC DISTRIBUTION EXTENSIONS
Budget100-16 LINE EXTENSION FOR 75 NEW ELECTRIC CUSTOMERS -$ 115-16 SUBDIVISION LINE EXTENSIONS 0660-18 ELECTRIC METERS NEW CONSTRUCTION (75) 1,710
Subtotal - Electric Distribution 1,710$
B. ELECTRIC CONVERSIONS AND LINE UPGRADESBudget
301-16 None -$ 302-16 0303-16 0
Subtotal - Electric Conversions and Line Upgrades -$
C. MISCELLANEOUS ELECTRIC DISTRIBUTIONBudget
601-18 REPLACEMENT TRANSFORMERS 20,600$ 602-18 INCREASE SERVICE CAPACITY 0603-18 CONDUCTORS 80,000603-18 SECTIONALIZING EQUIPMENT 27,000604-18 VOLTAGE REGULATORS 40,000605-18 CAPACITORS 0606-18 POLE REPLACEMENTS (200) 300,000608-18 ORDINARY REPLACEMENTS 46,350
Subtotal - Miscellaneous Electric Distribution 513,950$
D. CONSTRUCTION WORK PLANBudget
2019-2023 Multi Year Construction Work Plan -$ Columbus New Substation (2019 - Land) (2020 & 2021 - Prep & Build) 130,000
Subtotal - Construction Work Plan 130,000$
E. GENERAL PLANTBudget
Office Furniture 8,500$ Parking Lot Paving 35,000Well / Irrigation 8,500Front Desk Security 0Front Driveway Signage 0Portable Fault Detector (Thumper) 15,000TWACS desktop meter test station 0
Subtotal - General Plant 67,000$
TWACSBudget
TWACS -$ `=`` Five (5) Substation Poly Pads (included 0
0Subtotal - General Plant -$
NISC UPGRADESBudget
AMI -$ DocuVault 0Prepaid 0CallCapture 0Mapwise-Mapping 0Mapwis-Staking 0OMS 0MDMS 0Billing Statement Programming 0
Subtotal - General Plant -$
F. TRANSPORTATION GENERAL PLANTBudget
TBD 00
Subtotal - Transportation General Plant -$
TOTAL CAPITAL BUDGET 712,660$
IV. CASH FLOW ANALYSISTOTAL CAPITAL BUDGET 712,660$
NET MARGINS 589,706$ PLUS DEPRECIATION 1,033,424LESS PATRONAGE CAPITAL TBD - 5% of EquityLESS PRINCIPLE PAYMENTS TBDCASH AVAILABLE FOR CAPITAL BUDGET ITEMS TBDPLUS WORKING CAPITAL AND OTHER ITEMS 0NEW LONG-TERM DEBT 0FUNDS AVAILABLE FOR CAPITAL BUDGET ITEMS -$
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 75
Beartooth Electric 2021 CAPITAL BUDGET
I. DISTRIBUTION FACILITIES:A. ELECTRIC DISTRIBUTION EXTENSIONS
Budget100-16 LINE EXTENSION FOR 75 NEW ELECTRIC CUSTOMERS -$ 115-16 NEW TIE LINES NEW COLUMBUS EAST SUBSTATION 22,000660-18 ELECTRIC METERS NEW CONSTRUCTION (75) 1,710
Subtotal - Electric Distribution 23,710$
B. ELECTRIC CONVERSIONS AND LINE UPGRADESBudget
301-16 None -$ 302-16 0303-16 0
Subtotal - Electric Conversions and Line Upgrades -$
C. MISCELLANEOUS ELECTRIC DISTRIBUTIONBudget
601-18 REPLACEMENT TRANSFORMERS 21,218$ 602-18 INCREASE SERVICE CAPACITY 0603-18 CONDUCTORS 84,000603-18 SECTIONALIZING EQUIPMENT 27,000604-18 VOLTAGE REGULATORS 42,000605-18 CAPACITORS 0606-18 POLE REPLACEMENTS (200) 315,000608-18 ORDINARY REPLACEMENTS 47,741
Subtotal - Miscellaneous Electric Distribution 536,959$
D. CONSTRUCTION WORK PLANBudget
2019-2023 Multi Year Construction Work Plan -$ Columbus New Substation (2019 - Land) (2020 & 2021 - Prep & Build) 485,000
Subtotal - Construction Work Plan 485,000$
E. GENERAL PLANTBudget
Office Furniture -$ Parking Lot Paving 0Well / Irrigation 0Front Desk Security 0Front Driveway Signage 0Portable Fault Detector (Thumper) 0TWACS desktop meter test station 0
Subtotal - General Plant -$
TWACSBudget
TWACS -$ `=`` Five (5) Substation Poly Pads (included 0
0Subtotal - General Plant -$
NISC UPGRADESBudget
AMI -$ DocuVault 0Prepaid 0CallCapture 0Mapwise-Mapping 0Mapwis-Staking 0OMS 0MDMS 0Billing Statement Programming 0
Subtotal - General Plant -$
F. TRANSPORTATION GENERAL PLANTBudget
TBD 00
Subtotal - Transportation General Plant -$
TOTAL CAPITAL BUDGET 1,045,669$
IV. CASH FLOW ANALYSISTOTAL CAPITAL BUDGET 1,045,669$
NET MARGINS 528,027$ PLUS DEPRECIATION 1,043,075LESS PATRONAGE CAPITAL TBD - 5% of EquityLESS PRINCIPLE PAYMENTS TBDCASH AVAILABLE FOR CAPITAL BUDGET ITEMS TBDPLUS WORKING CAPITAL AND OTHER ITEMS 0NEW LONG-TERM DEBT 0FUNDS AVAILABLE FOR CAPITAL BUDGET ITEMS -$
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 76
Beartooth Electric 2022 CAPITAL BUDGET
I. DISTRIBUTION FACILITIES:A. ELECTRIC DISTRIBUTION EXTENSIONS
Budget100-16 LINE EXTENSION FOR 75 NEW ELECTRIC CUSTOMERS -$ 115-16 SUBDIVISION LINE EXTENSIONS 0660-18 ELECTRIC METERS NEW CONSTRUCTION (75) 1,710
Subtotal - Electric Distribution 1,710$
B. ELECTRIC CONVERSIONS AND LINE UPGRADESBudget
301-16 MDOT Red Lodge to Beartooth Hospital 77,000$ 302-16 0303-16 0
Subtotal - Electric Conversions and Line Upgrades 77,000$
C. MISCELLANEOUS ELECTRIC DISTRIBUTIONBudget
601-18 REPLACEMENT TRANSFORMERS 21,855$ 602-18 INCREASE SERVICE CAPACITY 0603-18 CONDUCTORS 84,000603-18 SECTIONALIZING EQUIPMENT 27,000604-18 VOLTAGE REGULATORS 52,500605-18 CAPACITORS 0606-18 POLE REPLACEMENTS (200) 315,000608-18 ORDINARY REPLACEMENTS 49,173
Subtotal - Miscellaneous Electric Distribution 549,528$
D. CONSTRUCTION WORK PLANBudget
2019-2023 Multi Year Construction Work Plan -$ Columbus New Substation (2019 - Land) (2020 & 2021 - Prep & Build) 0
Subtotal - Construction Work Plan -$
E. GENERAL PLANTBudget
Main Office Remodel 100,000$ Portable Fault Detector (Thumper) 0TWACS desktop meter test station 0
Subtotal - General Plant 100,000$
TWACSBudget
TWACS -$ `=`` Five (5) Substation Poly Pads (included 0
0Subtotal - General Plant -$
NISC UPGRADESBudget
AMI -$ DocuVault 0Prepaid 0CallCapture 0Mapwise-Mapping 0Mapwis-Staking 0OMS 0MDMS 0Billing Statement Programming 0
Subtotal - General Plant -$
F. TRANSPORTATION GENERAL PLANTBudget
TBD 00
Subtotal - Transportation General Plant -$
TOTAL CAPITAL BUDGET 728,238$
IV. CASH FLOW ANALYSISTOTAL CAPITAL BUDGET 728,238$
NET MARGINS 617,024$ PLUS DEPRECIATION 1,052,816LESS PATRONAGE CAPITAL TBD - 5% of EquityLESS PRINCIPLE PAYMENTS TBDCASH AVAILABLE FOR CAPITAL BUDGET ITEMS TBDPLUS WORKING CAPITAL AND OTHER ITEMS 0NEW LONG-TERM DEBT 0FUNDS AVAILABLE FOR CAPITAL BUDGET ITEMS -$
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 77
Beartooth Electric 2023 CAPITAL BUDGET
I. DISTRIBUTION FACILITIES:A. ELECTRIC DISTRIBUTION EXTENSIONS
Budget100-16 LINE EXTENSION FOR 75 NEW ELECTRIC CUSTOMERS -$ 115-16 SUBDIVISION LINE EXTENSIONS 0660-18 ELECTRIC METERS NEW CONSTRUCTION (75) 1,710
Subtotal - Electric Distribution 1,710$
B. ELECTRIC CONVERSIONS AND LINE UPGRADESBudget
301-16 MDOT Red Lodge to Beartooth Hospital -$ 302-16 0303-16 0
Subtotal - Electric Conversions and Line Upgrades -$
C. MISCELLANEOUS ELECTRIC DISTRIBUTIONBudget
601-18 REPLACEMENT TRANSFORMERS 22,510$ 602-18 INCREASE SERVICE CAPACITY 0603-18 CONDUCTORS 88,200603-18 SECTIONALIZING EQUIPMENT 27,000604-18 VOLTAGE REGULATORS 52,500605-18 CAPACITORS 0606-18 POLE REPLACEMENTS (200) 330,750608-18 ORDINARY REPLACEMENTS 50,648
Subtotal - Miscellaneous Electric Distribution 571,608$
D. CONSTRUCTION WORK PLANBudget
2024-2028 Multi Year Construction Work Plan 15,000$ Columbus New Substation (2019 - Land) (2020 & 2021 - Prep & Build) 0
Subtotal - Construction Work Plan 15,000$
E. GENERAL PLANTBudget
Main Office Remodel -$ Portable Fault Detector (Thumper) 0TWACS desktop meter test station 0
Subtotal - General Plant -$
TWACSBudget
TWACS -$ `=`` Five (5) Substation Poly Pads (included 0
0Subtotal - General Plant -$
NISC UPGRADESBudget
AMI -$ DocuVault 0Prepaid 0CallCapture 0Mapwise-Mapping 0Mapwis-Staking 0OMS 0MDMS 0Billing Statement Programming 0
Subtotal - General Plant -$
F. TRANSPORTATION GENERAL PLANTBudget
TBD 00
Subtotal - Transportation General Plant -$
TOTAL CAPITAL BUDGET 588,318$
IV. CASH FLOW ANALYSISTOTAL CAPITAL BUDGET 588,318$
NET MARGINS TBDPLUS DEPRECIATION TBDLESS PATRONAGE CAPITAL TBD - 5% of EquityLESS PRINCIPLE PAYMENTS TBDCASH AVAILABLE FOR CAPITAL BUDGET ITEMS TBDPLUS WORKING CAPITAL AND OTHER ITEMS 0NEW LONG-TERM DEBT 0FUNDS AVAILABLE FOR CAPITAL BUDGET ITEMS -$
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 78
Depreciation
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 79
Tot
al
Allo
catio
nA
ccou
nt
Tot
alJa
nuar
yFe
brua
ryM
arch
Apr
ilM
ayJu
neJu
lyA
ugus
tSe
ptem
ber
Oct
ober
Nov
embe
rD
ecem
ber
Dep
reci
atio
n1,
023,
863
40
3.50
- -
- -
- -
- -
- -
- -
- 40
3.60
873,
867.
07
71,9
11.9
8
72,0
94.0
3
72,2
76.0
9
72,4
58.1
4
72,6
40.2
0
72,8
22.2
6
72,8
22.2
6
73,0
04.3
1
73,1
86.3
7
73,3
68.4
2
73,5
50.4
8
73,7
32.5
3
403.
6184
,980
.63
6,
993.
20
7,01
0.90
7,
028.
61
7,04
6.31
7,
064.
01
7,08
1.72
7,
081.
72
7,09
9.42
7,
117.
13
7,13
4.83
7,
152.
54
7,17
0.24
40
3.70
65,0
15.3
0
5,35
0.22
5,
363.
76
5,37
7.31
5,
390.
85
5,40
4.40
5,
417.
94
5,41
7.94
5,
431.
49
5,44
5.03
5,
458.
58
5,47
2.12
5,
485.
67
Bea
rtoo
th E
lect
ric
Coo
pera
tive,
Inc.
2019
Bud
get
Dep
reci
atio
n A
lloca
tion
Det
ails DRAFT For
Discus
sion P
urpos
es O
nly
BEC
Boa
rd B
ook
| S
epte
mbe
r 24,
201
9 |
Pag
e 80
Debt Service/Interest
DRAFT For Disc
ussio
n Purp
oses
Only
BEC Board Book | September 24, 2019 | Page 81
Bea
rtoo
th E
lect
ric
Coo
pera
tive,
Inc.
2019
Bud
get
Deb
t Ser
vice
Tot
alJa
nuar
yFe
brua
ryM
arch
Apr
ilM
ayJu
neJu
lyA
ugus
tSe
ptem
ber
Oct
ober
Nov
embe
rD
ecem
ber
RU
SBe
ginn
ing
Bala
nce
426,
960.
26
42
4,78
7.76
422,
605.
31
42
0,41
2.89
418,
210.
45
41
5,99
7.93
413,
775.
30
41
1,54
2.50
409,
299.
50
40
7,04
6.24
404,
782.
67
40
2,50
8.76
Pr
inci
pal
2,17
2.51
2,18
2.44
2,19
2.42
2,20
2.45
2,21
2.52
2,22
2.63
2,23
2.80
2,24
3.01
2,25
3.26
2,26
3.56
2,27
3.92
2,28
4.31
Inte
rest
1,95
3.81
1,94
3.88
1,93
3.90
1,92
3.87
1,91
3.80
1,90
3.69
1,89
3.52
1,88
3.31
1,87
3.06
1,86
2.76
1,85
2.40
1,84
2.01
Tota
l Pay
men
t49
,515
.84
4,
126.
32
4,
126.
32
4,
126.
32
4,
126.
32
4,
126.
32
4,
126.
32
4,
126.
32
4,
126.
32
4,
126.
32
4,
126.
32
4,
126.
32
4,
126.
32
En
ding
Bal
ance
424,
787.
76
42
2,60
5.31
420,
412.
89
41
8,21
0.45
415,
997.
93
41
3,77
5.30
411,
542.
50
40
9,29
9.50
407,
046.
24
40
4,78
2.67
402,
508.
76
40
0,22
4.44
FFB
Begi
nnin
g Ba
lanc
e6,
538,
064.
43
6,53
8,06
4.43
6,
538,
064.
43
6,48
8,59
1.42
6,
488,
591.
42
6,48
8,59
1.42
6,
439,
338.
93
6,43
9,33
8.93
6,
439,
338.
93
6,39
0,29
8.27
6,
390,
298.
27
6,39
0,29
8.27
Prin
cipa
l-
-
49
,473
.01
-
-
49
,252
.49
-
-
49
,040
.66
-
-
49
,541
.59
Inte
rest
-
-
66,8
56.8
2
-
-
67,0
84.3
1
-
-
67,3
02.8
4
-
-
66,7
86.4
6
To
tal P
aym
ent
465,
338.
18
-
-
11
6,32
9.83
-
-
116,
336.
80
-
-
11
6,34
3.50
-
-
116,
328.
05
Endi
ng B
alan
ce6,
538,
064.
43
6,53
8,06
4.43
6,
488,
591.
42
6,48
8,59
1.42
6,
488,
591.
42
6,43
9,33
8.93
6,
439,
338.
93
6,43
9,33
8.93
6,
390,
298.
27
6,39
0,29
8.27
6,
390,
298.
27
6,34
0,75
6.68
CFC
Bala
nce
3,42
1,07
2.03
3,
317,
874.
30
3,31
7,87
4.30
3,
317,
874.
31
3,21
3,23
2.80
3,
213,
232.
80
3,21
3,23
2.80
3,
107,
155.
51
3,10
7,15
5.51
3,
107,
155.
51
2,99
9,60
8.05
2,
999,
608.
05
Pr
inci
pal
103,
197.
72
10
4,64
1.50
106,
077.
29
10
7,54
7.47
Inte
rest
51,4
69.8
1
50,0
08.7
8
48,5
90.2
4
47,1
20.0
6
Disc
ount
(906
.75)
(896
.44)
(885
.96)
(875
.33)
Net
Inte
rest
50,5
63.0
6
49,1
12.3
4
47,7
04.2
8
46,2
44.7
4
Tota
l Pay
men
t61
5,08
8.39
153,
760.
78
15
3,75
3.84
153,
781.
57
15
3,79
2.20
Endi
ng B
alan
ce3,
317,
874.
30
3,31
7,87
4.30
3,
317,
874.
30
3,21
3,23
2.80
3,
213,
232.
80
3,21
3,23
2.80
3,
107,
155.
51
3,10
7,15
5.51
3,
107,
155.
51
2,99
9,60
8.05
2,
999,
608.
05
2,99
9,60
8.05
CoB
ank
Bala
nce
$2,9
47,1
44.0
9$2
,897
,796
.83
$2,8
48,3
14.8
5$2
,798
,016
.33
$2,7
48,2
61.0
1$2
,698
,151
.50
$2,6
48,1
23.1
3$2
,597
,748
.63
$2,5
47,4
45.6
0$2
,498
,724
.10
$2,4
49,5
52.1
1$2
,400
,523
.22
Prin
cipa
l49
,347
.26
49
,481
.98
50
,298
.52
49
,755
.32
50
,109
.51
50
,028
.37
50
,374
.50
50
,303
.03
48
,721
.50
49
,171
.99
49
,028
.89
49
,470
.41
Inte
rest
10,5
76.6
8
10,4
43.0
2
9,31
7.43
10,1
69.6
5
9,71
3.04
9,89
5.55
9,44
6.42
9,62
2.58
9,41
8.35
9,19
2.33
9,36
7.27
9,14
1.35
Tota
l Pay
men
t71
2,39
4.95
59,9
23.9
4
59,9
25.0
0
59,6
15.9
5
59,9
24.9
7
59,8
22.5
5
59,9
23.9
2
59,8
20.9
2
59,9
25.6
1
58,1
39.8
5
58,3
64.3
2
58,3
96.1
6
58,6
11.7
6
En
ding
Bal
ance
2,89
7,79
6.83
2,
848,
314.
85
2,79
8,01
6.33
2,
748,
261.
01
2,69
8,15
1.50
2,
648,
123.
13
2,59
7,74
8.63
2,
547,
445.
60
2,49
8,72
4.10
2,
449,
552.
11
2,40
0,52
3.22
2,
351,
052.
81
DRAFT For Disc
ussio
n Purp
oses
Only
BEC
Boa
rd B
ook
| S
epte
mbe
r 24,
201
9 |
Pag
e 82
Bea
rtoo
th E
lect
ric
Coo
pera
tive,
Inc.
2019
Bud
get
Deb
t Ser
vice
Tot
alJa
nuar
yFe
brua
ryM
arch
Apr
ilM
ayJu
neJu
lyA
ugus
tSe
ptem
ber
Oct
ober
Nov
embe
rD
ecem
ber
Sum
mar
y of
Deb
t Ser
vice
End
ing
Bala
nce
12/3
1/20
19 R
US
400,
224.
44$
FFB
6,34
0,75
6.68
CFC
2,99
9,60
8.05
CoB
ank
2,35
1,05
2.81
New
Loa
n fo
r New
Col
umbu
s Sub
stat
ion
70,0
00.0
0
C
ushi
on o
f Cre
dit -
2(2
51,3
99.4
9)
Cus
hion
of C
redi
t - 3
(1,0
57,7
87.0
0)
C
ushi
on o
f Cre
dit -
Inte
rest
Inco
me
(82,
181.
04)
End
ing
Bal
ance
12/
31/2
019
10,7
70,2
74.4
5$
Inte
rest
Exp
ense
Tota
l RU
S In
tere
st22
,780
.02
1,
953.
81
1,
943.
88
1,
933.
90
1,
923.
87
1,
913.
80
1,
903.
69
1,
893.
52
1,
883.
31
1,
873.
06
1,
862.
76
1,
852.
40
1,
842.
01
Tota
l FFB
Inte
rest
268,
030.
43
22
,285
.61
22
,285
.61
22
,285
.61
22
,361
.44
22
,361
.44
22
,361
.44
22
,434
.28
22
,434
.28
22
,434
.28
22
,262
.15
22
,262
.15
22
,262
.15
Tota
l CFC
Inte
rest
193,
624.
41
16
,854
.35
16
,854
.35
16
,854
.35
16
,370
.78
16
,370
.78
16
,370
.78
15
,901
.43
15
,901
.43
15
,901
.43
15
,414
.91
15
,414
.91
15
,414
.91
Tota
l CoB
ank
Inte
rest
116,
303.
67
10
,576
.68
10
,443
.02
9,
317.
43
10
,169
.65
9,
713.
04
9,
895.
55
9,
446.
42
9,
622.
58
9,
418.
35
9,
192.
33
9,
367.
27
9,
141.
35
Tot
al in
tere
st e
xpen
se60
0,73
8.53
51,6
70.4
5
51,5
26.8
6
50,3
91.2
9
50,8
25.7
4
50,3
59.0
6
50,5
31.4
5
49,6
75.6
5
49,8
41.6
0
49,6
27.1
1
48,7
32.1
5
48,8
96.7
4
48,6
60.4
2
Tot
al in
tere
st p
aym
ent
484,
434.
86
52
,516
.87
1,
943.
88
68
,790
.72
51
,036
.21
1,
913.
80
68
,988
.00
49
,597
.80
1,
883.
31
69
,175
.90
48
,107
.49
1,
852.
40
68
,628
.47
Tot
al p
rinc
ipal
pay
men
t1,
241,
598.
83
154,
717.
49
51
,664
.42
10
1,96
3.95
156,
599.
27
52
,322
.03
10
1,50
3.49
158,
684.
58
52
,546
.04
10
0,01
5.42
158,
983.
02
51
,302
.81
10
1,29
6.32
Tot
al P
aym
ent
1,84
2,33
7.36
21
7,81
1.04
64,0
51.3
2
180,
072.
10
21
7,80
5.13
63,9
48.8
7
180,
387.
04
21
7,72
8.81
64,0
51.9
3
178,
609.
67
21
6,28
2.84
62,5
22.4
8
179,
066.
13
Tot
al p
rinc
ipal
pay
men
t fr
om C
ash
1,01
7,55
5.26
15
2,54
4.98
49,4
81.9
8
50,2
98.5
2
154,
396.
82
50
,109
.51
50
,028
.37
15
6,45
1.79
50,3
03.0
3
48,7
21.5
0
156,
719.
46
49
,028
.89
49
,470
.41
Tot
al p
rinc
ipal
pay
men
t fr
om C
ushi
on o
f Cre
dit
Acc
ount
22
4,04
3.57
2,17
2.51
2,18
2.44
51,6
65.4
3
2,20
2.45
2,21
2.52
51,4
75.1
2
2,23
2.80
2,24
3.01
51,2
93.9
2
2,26
3.56
2,27
3.92
51,8
25.9
1
Deb
t Ser
vice
Cov
erag
e R
atio
12/
31/2
019
1.24
DRAFT For Disc
ussio
n Purp
oses
Only
BEC
Boa
rd B
ook
| S
epte
mbe
r 24,
201
9 |
Pag
e 83
419
Tot
alJa
nuar
yFe
brua
ryM
arch
Apr
ilM
ayJu
neJu
lyA
ugus
tSe
ptem
ber
Oct
ober
Nov
embe
rD
ecem
ber
FIB
Sav
ings
300.
00
25.0
0
25.0
0
25.0
0
25.0
0
25.0
0
25.0
0
25.0
0
25.0
0
25.0
0
25.0
0
25.0
0
25.0
0
Ban
k of
RL
Savi
ngs
120.
00
10.0
0
10.0
0
10.0
0
10.0
0
10.0
0
10.0
0
10.0
0
10.0
0
10.0
0
10.0
0
10.0
0
10.0
0
CFC
11,3
01.9
1
95
9.89
86
7.00
95
9.89
92
8.92
95
9.89
92
8.92
95
9.89
95
9.89
92
8.92
95
9.89
92
8.92
95
9.89
Se
lect
Not
es4,
303.
60
1,56
9.53
1,
417.
64
1,31
6.42
-
- -
- -
- -
- -
CO
C82
,181
.04
7,69
2.41
7,
702.
26
7,22
7.41
7,
237.
26
7,24
7.11
6,
772.
23
6,78
2.08
6,
791.
93
6,31
5.28
6,
316.
45
6,29
9.26
5,
797.
36
Misc
Rec
eiva
bles
12.0
0
1.00
1.
00
1.00
1.
00
1.00
1.
00
1.00
1.
00
1.00
1.
00
1.00
1.
00
Tot
al In
tere
st98
,218
.55
10,2
57.8
4
10
,022
.91
9,53
9.72
8,
202.
18
8,24
3.00
7,
737.
15
7,77
7.97
7,
787.
82
7,28
0.20
7,
312.
34
7,26
4.18
6,
793.
25
CO
CIn
itial
288,
391.
72
29
0,75
6.18
176,
790.
81
17
9,15
5.27
181,
519.
73
67
,547
.39
69,9
11.8
5
72
,276
.31
- -
- -
5%5,
526.
46
1,20
1.63
1,
211.
48
736.
63
746.
48
756.
33
281.
45
291.
30
301.
15
- -
- -
$500
K50
0,00
0.00
500,
000.
00
50
0,00
0.00
500,
000.
00
50
0,00
0.00
500,
000.
00
50
0,00
0.00
500,
000.
00
45
7,88
0.10
458,
161.
23
45
4,03
4.91
333,
580.
53
5%23
,765
.24
2,08
3.33
2,
083.
33
2,08
3.33
2,
083.
33
2,08
3.33
2,
083.
33
2,08
3.33
2,
083.
33
1,90
7.83
1,
909.
01
1,89
1.81
1,
389.
92
$1,0
57.7
87K
1,05
7,78
7.00
1,
057,
787.
00
1,05
7,78
7.00
1,
057,
787.
00
1,05
7,78
7.00
1,
057,
787.
00
1,05
7,78
7.00
1,
057,
787.
00
1,05
7,78
7.00
1,
057,
787.
00
1,05
7,78
7.00
1,
057,
787.
00
5%
52,8
89.3
5
4,
407.
45
4,40
7.45
4,
407.
45
4,40
7.45
4,
407.
45
4,40
7.45
4,
407.
45
4,40
7.45
4,
407.
45
4,40
7.45
4,
407.
45
4,40
7.45
To
tal
82,1
81.0
4
7,
692.
41
7,70
2.26
7,
227.
41
7,23
7.26
7,
247.
11
6,77
2.23
6,
782.
08
6,79
1.93
6,
315.
28
6,31
6.45
6,
299.
26
5,79
7.36
Bea
rtoo
th E
lect
ric
Coo
pera
tive,
Inc.
2019
Bud
get
Inte
rest
Inco
me
DRAFT For Disc
ussio
n Purp
oses
Only
BEC
Boa
rd B
ook
| S
epte
mbe
r 24,
201
9 |
Pag
e 84
September 2019
GM Report
Month/Year Energy WAPA Morgan Stanley Imbalance Transmission Total Cost Cost per mwh
18-Aug 6,237 $11,681 $219,645 ($26,397) $48,375 $253,305 $40.61
18-Sep 5,235 $9,885 $163,612 ($2,615) $48,716 $219,598 $41.95 18-Oct 5,640 $8,973 $196,847 ($2,716) $49,409 $252,514 $44.77 18-Nov 6,780 $10,977 $206,151 $11,179 $46,948 $275,254 $40.60 18-Dec 7,995 $12,579 $217,895 $37,219 $47,164 $314,858 $39.38 19-Jan 7,988 $12,338 $266,089 ($11,216) $44,495 $311,706 $39.02 19-Feb 9,027 $12,951 $254,529 $34,916 $45,658 $348,053 $38.56
19-Mar 8,079 $10,420 $245,420 $16,150 $47,293 $319,282 $39.52 19-Apr 5,714 $11,180 $181,115 ($3,242) $44,548 $233,601 $40.88 19-May 5,554 $9,041 $182,769 ($5,507) $44,436 $230,739 $41.54 19-Jun 5,385 $10,309 $166,776 $6,679 $46,803 $230,566 $42.82 19-Jul 6,053 $11,288 $177,870 ($419) $74,810 $263,549 $43.54
19-Aug 6,650 $11,681 $208,446 $0 $80,000 $300,127 $45.13
12 Month Total 80,100 $131,623 $2,467,518 $80,426 $620,280 $3,299,847 $41.20
Note: Imbalance adjustment for August from Morgan Stanley has not been received. Note: NorthWestern August Transmission invoice has not been received. Estimated as $80,000. • NWE OATT Rate Case- Interveners in the rate case have been submitting questions and
data requests to NWE prior to the first technical meeting between the parties scheduledfor the end of September. Bill Pascoe and I will continue to engage and offer commentsas necessary.
• Shares du Soleil- Project remains on target to be completed by mid October. Participatingmembers have been notified via direct mail of project changes and schedule. Billingadjustments/programming has been completed so members will receive energy credits ontheir November bills. Larry and I are working on a Power Purchase Agreement to besigned by participating members declaring the Terms and Conditions of the their powerpurchases to be credited to their bills.
• Policies- Significant work took place in the last month reviewing and commenting on the200 Series of policies. In addition a new PrePay policy was developed and presented to
BEC Board Book | September 24, 2019 | Page 85
the Policy Committee at their September 17 meeting. Bill Pascoe also presented his revision of Policy 302 at the Meeting.
• Work continues on the rate design project.
• WREA- As a normal course of business I monitor and engage Wyoming REA managerson a regular basis. They have had several meetings so far on amending the state’s netmeeting law. My purpose in engaging them on this project is to ensure our 400 Wyomingmembers are not disadvantaged by any legislative changes. Following is a summary oftheir current position with legislators:
Easiest way to address issues with net-metering is to repeal that statute(cooperative business model) short of that the cooperatives support the following:
Statute is intended to promote renewables and to offset part or all of customer-generators requirements for electricity, not to make money or become a generatorat the expense of non-customer-generators.
Support language in working draft that says anything above 25 kw is a privatecontract.
Support language in committee memo stating that energy consumed by customer-generator is paid at the retail rate.
Support language in committee memo amending 37-16-103 CalculationRequirements, stating that energy produced by customer-generator is credited or“bought back” by the utility at the avoided cost rate with a couple of amendments.We’d prefer language that reads
“(v) The electric utility shall at a minimum credit the customer-generator at theelectric utilities avoided cost rate for all energy that is fed back to the utility bythe customer-generator during the billing period.”
“(vi) At the beginning of each calendar year, or on a date mutually agreed to bythe utility and customer-generator, and no more than one (1) time each year, anyremaining credit during the previous year shall be paid out to the customer-generator.”
Support language in committee memo ensuring that fixed costs of energytransmission is shared fairly among all customers of the electric utility with oneamendment.
Strike “of the energy transmission.” So that it reads “May ensure that the fixedcosts is shared fairly among all customers of the electric utility.”
Support having a sunset date of no more than 5 years.
WREA testified on these suggested changes at a recent legislative committee meeting. They feel pretty good about getting support for the key elements;
Anything above 25 kw is a private contract so long as there is no cost shift(not sure who or how we prove this but that is to be considered later)
BEC Board Book | September 24, 2019 | Page 86
Energy sold to customer at retail rate, energy purchased by utility fromcustomer at avoided cost rate (our position was to have “at a minimumavoided cost rate” so as to allow for flexibility but ultimately the committeestayed with shall purchase at avoided cost.
Fixed costs shared equally among all customers (like the greater than 25 kwprivate contract language I’m not sure who or how we prove this but will beaddressed later)
Grandfathering of all existing net-metering customers for 10 years. Sunset of law at 10 years. Change the name from net-metering to something else to be determined by
LSO staff and committee On top of all this they also agreed to have a bill drafted to repeal the law all
together.
A bill is now being drafted for presentation in November.
BEC Board Book | September 24, 2019 | Page 87
Fit
it t
hro
ugh
Q3
5
30
.0%
32
.0%
34
.0%
36
.0%
38
.0%
40
.0%
42
.0%
44
.0%
Jul-
Dec
20
17
20
18
Bu
dge
t2
01
8 Y
TD2
01
9 B
ud
get
20
19
YTD
Jan
20
19
Feb
20
19
Mar
20
19
Ap
r 2
01
9M
ay 2
01
9Ju
ne
20
19
July
20
19
Au
g 2
01
9
37
.4%
37
.3%
37
.0%
36
.6%
37
.7%
38
.5%
38
.7%
39
.1%
34
.9%
35
.2%
35
.4%
37
.6%
40
.7%
Pow
er C
ost
s as
a P
erce
nta
ge o
f R
even
ue
BEC
Boa
rd B
ook
| S
epte
mbe
r 24,
201
9 |
Pag
e 88
September 6, 2019
Dear Shares du Soleil Partner,
It’s been a long, challenging road to move our community solar project from concept to construction. It is not often that a story of delays and unplanned events produces dividends. In this instance, time and technology have provided you with huge dividends. Here is the remarkable Shares du Soleil story—
Last July, the Shares du Soleil project launch offered BEC members partnership in a solar array of 40, 300-watt panels, designed as a parking structure constructed at the BEC Red Lodge office south parking lot. The array’s energy production, estimated at 15,840 kilowatt-hours (kWhs) per year, would deliver an estimated 330 kWhs per panel electricity credit ($29.00) annually to partner accounts. The project provided a miserly projected annual return for your investment portfolio with a simple payback of 25.6 years. However, that wasn’t the reason members stepped up with their checkbooks. More importantly, it was a stand for local renewables and a spirited choice to make a difference with clean energy power supply.
The Shares du Soleil project rapidly hit the Phase One goal with an early fall 2018, Phase Two offering an additional 20, 300-watt panels. Partnerships and purchase photos were streaming our social media. However, the parking structure design didn’t get off the ground when a city main sewer line was discovered running directly under the parking lot construction site. No sewer line could stop this project’s momentum-a new construction site, right across the parking lot in the front lawn area west of the main office building offered new hope for the now larger, ground mount design. Moving construction to the lawn area was not without its unique challenges, including the future road widening design of Hwy 212 cutting deeply into the available space for an 80-panel solar array. To no avail, the 80-panel, ground mount solar project was issued for bid July 1. Thirty days of patience brought the bid closing date (Aug. 1) and a bid price-tag 25% over the project budget. The bid process site test revealed dense cobble, which in turn added extensive excavation, foundation, and hardware costs to the project while adding nothing to the project’s ability to produce kWhs.
What a quandary, the project budget was set—partner contributions of $750 per panel and a grant of $15,764 from the U.S. Department of Agriculture, Renewable Energy for America Program (REAP) was the cap. Now, the great/phenomenal/incredible news! A BEC Headquarters roof-mount solar array system. The extensive excavation, foundation and heavy-duty rack-mounting hardware costs are alleviated, but even more, the roof-top design now incorporates 132, 380-watt, 19.4% efficiency panels. We clearly hit a grand slam—costs are within budget, financial returns dramatically improve, and panels/ kWhs skyrocket. Participants now own 1/80 of the total project output for every panel they initially purchased. This new 50.16 KW system will likely produce over 66,000 kWhs annually. Partner simple payback has dropped to 10.2 years and annual output credits increase 52.1%, to 832 kWhs ($73.85), in contrast to the initial project offering of 330 kWhs ($29.00 per year).
I am now literally shouting from the rooftop—the Shares du Soleil project is on the construction fast track. We took delivery of the 132 solar panels the week of Aug. 26. Preliminary electrical work has begun with rooftop construction to follow shortly. So, when you pass the Red Lodge office near the end of the month, be sure to take a look at the construction progress on the roof. The estimated construction completion date is Oct. 15. Just as soon as the completion date is firm, we’ll plan a Shares du Soleil Power-up event. We are very excited to celebrate this momentous occasion with all our partners. More event information to come as the completion date draws nearer.
In the interim, you will be mailed a Power Purchase Agreement from Beartooth Electric. This Agreement certifies the number of shares in the final project output you are entitled to, defines the term of the Agreement, transferability, etc.
Congratulations Shares du Soleil Partners on building local renewable energy. If you have questions, don’t hesitate to give me a call at 406-446-2310 or email me at [email protected].
Warm regards,
Kevin P. Owens, PE General Manager
BEC Board Book | September 24, 2019 | Page 89
SHARES DU SOLEIL PROJECT FINANCIALS
*Balance of funding will support maintenance, repair, and replacement of equipment not covered within warranty.**Based upon current BEC Residential Rates.
Initial Offering-Phase I Plan Sundance Solar-Final Construction Plan
Solar Array Location & Design BEC Headquarters Parking Structure BEC Headquarters Roof-mount Structure
Solar Array Construction 48 panels 132 panels
Panel Rated Power 300-watts 380-watts
Solar Array Total Power 14.4KW 50.16 KW
Efficiency 17% 19.4%
Output Warranty Term 25-year, Linear 25-year, LinearEstimated Annual Energy Production 15,840 kWhs 66,524 kWhs
Estimated Annual Output Per Panel (1/48): 330 kWhs per year (1/80): 832 kWhs per year
Solar Array Budget $48,820 $77,500
Solar Array Funding
Partners: 48 x 750= 36,000 REAP: 25%= $12,205
$48,205
Partners: 80 x $750= $60,000 REAP 25% Phase I (actual): $15,764 REAP 25% Phase II (est): $4,844
$80,608*
Solar Array Cost per watt $3.39 $1.54
Partner Simple Payback 25.6 years 10.2 years Estimated Partner Annual Output Credit
$29.00** Estimated monthly credit $1.31
$73.85** Estimated monthly credit $6.15
BEC Board Book | September 24, 2019 | Page 90
DEQ MT PI INTERFACE DEPARTMENT OF ENVIRONMENTAL QUALITY 1520 E 6TH AVE P O BOX 200901 HELENA MT 59620-0901
RETURN SERVICE REQUESTED
BEAR TOOTH ELECTR IC COOPERATIVE INC 1306 N B R OADWAY AVE
DATE: CHECK NUMBER: CHECK AMOUNT:
Surrvnary
9/5/2019 0026244162 $14,751.35
RED L OD GE MT 5 9068-9091 REC.F .. /\..1Ff1 rr· '
-- it/J I O 2019
Agency Contact:406/444-2442 Agency:5301Z Agency N ame:DEQ MT PI INTERFACE
Supplier ID:0000016870 Invoice Date:8/28/2019 Invoice #:51902000082819
DEQ CONTRACT 519020 DESIGN & MARKETING FOR SHARES DU SOLEIL PV ARRAYS ERVICES: 10/19/2018 - 8/28/2019
If you would like to receive
your next payment from the State of Montana electronically,
please call 406 /444-2442.
THE FACE OF THIS DOCUMENT HAS A COLORED BACKGROUND, SECURITY FEATURES INCLUDE THERMDCHROMIC INK, MICROPRINTING, A VOID PANTOGRAPH, AND AN ARTIFICIAL WATERMARK AND SECURITY SCREEN ON THE BACK.
State o
93-104/920
Check No. Date 0026244162 9/5/2019
AMOUNT Pay Exactly**FOURTEEN THOUSAND SEVEN HUNDRED FIFTY-ONE AND 35/100 DOLLARS** $14,751.35
To the Order of
BEARTOOTH ELECTRIC COOPERATIVE INC 1306 N BROADWAY AVE RED LODGE MT 59068-9091
,:o g 200 .o '1 (;1:
This account is protected by Positive Pay. Void after 180 days from date of check. Payable through U.S. Bank.
• S ti O '1 • 2 0 0 2 2 • 11• .o. BEC Board Book | September 24, 2019 | Page 91
CFC
is th
e on
ly le
nder
crea
ted
and
owne
d
by A
mer
ica'
s el
ectr
ic
coop
erat
ive
netw
ork.
At C
FC, o
ur fo
cus
on
elec
tric
coo
pera
tive
succ
ess p
erm
eate
s
ever
ythi
ng w
e do
.
Na
tio
na
l R
ura
l U
tili
tie
s C
oo
pe
rati
ve
Fin
an
ce C
orp
ora
tio
n
PA
TRO
NA
GE
CAP
ITA
L C
ER
11FI
CA
TE
Beart
ooth
Ele
ctri
c C
oopera
tive
, In
c.
MT0
19
$18
,759
.94
In a
cco
rdan
ce w
ith a
nd
su
bje
ct t
o C
FC
byl
aws,
we
at
CF
C a
re p
rou
d t
o p
rese
nt
this
cer
tific
ate
to y
ou
. It
is y
ou
r co
nti
nu
ed p
atro
nag
e th
at m
ake
s th
is d
istr
ibu
tio
n p
oss
ible
. Th
an
k yo
u fo
r yo
ur
loya
l su
pp
ort
.
�C.
.\)-,t.
_. -
She
ldo
n C
. Pet
erse
n, C
EO
BEC
Boa
rd B
ook
| S
epte
mbe
r 24,
201
9 |
Pag
e 92
BEC Member Communication & Services Board Report
September 24, 2019
1. Communication Committee MeetingThe next Communication Committee meeting is scheduled for October 22, 2019, 2 PM.
2. Work in Progress
• November Rural Montana
• October Billing Insert
• October Billing Memo
• Member eNewsletter- Post-Board meeting email scheduled for October 12- Pre-Board meeting email scheduled for October 26
• NEW Billing Statement Development- The new billing statement data flow from Aclara to NISC is under construction. Once complete,
this data will allow the development of the new usage graphs.- The Shares du Soleil reporting prework is complete. Data flow will be tested once the system is
constructed.- The rollout will occur upon completion of the meter upgrade project — projected rollout early
2020.
• SmartHub Update & Rollout- New SmarHub communication, marketing, and reporting capabilities will be available with the
installation of the digital meters. Prework is being completed.- The rollout will occur upon completion of the meter upgrade project — projected rollout early
2020.
• Shares du Soleil- Solar Power Up ceremony- Monitor system TBD upon system design- Signage TBD upon system design and highway easements- Partner Certificate (Can complete once system specs are defined)
• MECA- Communication Committee
• Printer Options- Members Services
• Coop Day at the Capital (January 2020)• Washington D.C. Youth Tour• MECA Memorial Scholarship
BEC Board Book | September 24, 2019 | Page 93
• Electronic Forms Development- Numerous BEC forms are required from member including Aid-to-Construction, Membership, etc. A
move to electronic forms would significantly assist both members and internal operations.- In addition to electronic forms – an electronic signature is also under evaluation.- An analysis of available systems/processes is underway.
- Current Website- NEW Website design is in progress. In addition, industry experts are being interviewed to seehow they may fit into the BEC Website mix.- Continue content updates to the current site- New headers- Post new press releases- Post financials- Update calendar- Continue redesign website sitemap
• BEC App Development- Research new BEC app development to incorporate BEC specific needs and SmartHub
• FacebookContent follows board meeting information, press releases, and RM
• BEC Membership ApplicationA new review is scheduled with the Policy Committee
• BEC New Member Welcome (email & hard copy package)Work in progress-awaiting membership application
• CCC Certificate Portfolio DevelopmentCertificate work continues.
• Operation Round Up
- Operation Round Up received $123.34 billed 09/05/2019. 202 Accounts and 187 Customers.Current Balance for Operation Round Up is $6,182.71.
• LISD/LIDD
- Total LISC/LID Discount Accounts for August 2019 billed 09/05/2019. WY: $33.20 and MT:$190.90 = Total $224.10. Total number of accounts are 38.
The Member Services department suggests a review of our LISD/LIDD programs on two fronts: - Can we open up this program to all Low-Income Members? Why just Seniors and Disabled?- Can we provide a service that truly benefits our members in need (a few dollars a month –10%
of the total kWh used charge). How about the full base rate?
BEC Board Book | September 24, 2019 | Page 94
NISC Enterprise System Update June 2019
Process Reviews • Several internal process reviews are taking place (SO/WO/Street light).• New system capabilities are being implemented into processes as available.
Installed Systems (Updates) • ABS• Customer Information System (CIS)• CashRegister• Remitlus• SmartHub
NEW System Installations • E&O App Suite
• Automated Meter Information (AMI)o Installed
• Work Management Solutions (WMS)o Installed
• DocuVaulto Installed
• CallCaptureo Installed
• Mapwise-Mappingo Work in Progress
• Mapwise-Stakingo Work in Progress
• EZRI GISo Installed with MapWise
• Meter Data Management System (MDMS)o Work in Progress
• OMSo Implementation Prework October 2019o Implementation 2020
• Prepayo Implementation 2020
OTHER
Billing Statement Programming • Work in Progress
o Aclara-MDMS data flow
BEC Board Book | September 24, 2019 | Page 95
Bea
rto
oth
Ele
ctri
c C
oo
per
ativ
e In
c.O
per
atio
n R
ou
nd
Up
Fin
anci
al R
epo
rt
9/1
7/2
01
9
DEB
ITC
RED
ITB
ALA
NC
E
$6
,43
8.4
4
Bill
ing
Co
ntr
ibu
tio
ns
to O
RU
1/7
/20
19
$9
8.7
9$
6,5
37
.23
Bill
ing
Co
ntr
ibu
tio
ns
to O
RU
2/6
/20
19
$1
02
.82
$6
,64
0.0
5
PO
M C
on
trib
uti
on
s2
/25
/20
19
$5
2.6
5$
6,6
92
.70
Bill
ing
Co
ntr
ibu
tio
ns
to O
RU
3/6
/20
19
$9
9.1
8$
6,7
91
.88
Bill
ing
Co
ntr
ibu
tio
ns
to O
RU
4/5
/20
19
$9
6.6
6$
6,8
88
.54
Ap
plie
d t
o A
cco
un
t #3
73
80
24
/12
/20
19
($3
00
.00
)$
6,5
88
.54
Bill
ing
Co
ntr
ibu
tio
ns
to O
RU
5/7
/20
19
$1
30
.36
$6
,71
8.9
0A
pp
lied
to
Acc
ou
nt
#30
58
10
5/1
4/2
01
9($
30
0.0
0)
$6
,41
8.9
0A
pp
lied
to
Acc
ou
nt
#50
12
05
5/1
4/2
01
9($
20
0.0
0)
$6
,21
8.9
0A
pp
lied
to
Acc
ou
nt
#66
05
01
5/1
4/2
01
9($
20
0.0
0)
$6
,01
8.9
0
Bill
ing
Co
ntr
ibu
tio
ns
to O
RU
6/5
/20
19
$1
19
.21
$6
,13
8.1
1
Bill
ing
Co
ntr
ibu
tio
ns
to O
RU
7/8
/20
19
$1
11
.21
$6
,24
9.3
2
Bill
ing
Co
ntr
ibu
tio
ns
to O
RU
8/7
/20
19
$1
16
.01
$6
,36
5.3
3A
pp
lied
to
Acc
ou
nt
#79
49
00
8/2
6/2
01
9($
55
.96
)$
6,3
09
.37
Ap
plie
d t
o A
cco
un
t #7
01
10
58
/26
/20
19
($2
50
.00
)$
6,0
59
.37
Bill
ing
Co
ntr
ibu
tio
ns
to O
RU
9/5
/20
19
$1
23
.34
TOTA
LS$
1,0
50
.23
($1
,30
5.9
6)
$6
,18
2.7
1
BEC
Boa
rd B
ook
| S
epte
mbe
r 24,
201
9 |
Pag
e 96
BOARD REPORT
By: Eric Elton, Line Superintendent
September, 24 2019
CONSTRUCTION, OPERATIONS & MAINTENANCE
• The Red Lodge crew is still working on new services and they have alsocompleted a re-plow in Eagle Point Estates.
• Columbus crew has also been working on new services and some linemaintenance.
• To date we have changed out about 3900 meters. (We are working on RedLodge and Columbus substations).
• Par Contractors finished the permanent 100 KV tap to the Nye substation andall other work until the power transformer is delivered. We received and e-mail that the substation power transformer was going to ship on the 13th ofSeptember, and it now looks like the delivery is going to be closer to theoriginal date of October 4th.
• I did meet with Red Lodge Surveying and they should have the new ColumbusSubstation surveyed in a week or so.
• We did hire a new journeyman lineman, he will be starting the 1st ofNovember.
• With fall comes more opportunities, the birds are raising havoc with the linesand I receive at least 5 or 6 calls a week about blinking lights.
• We installed 11 new services in the month of August.• There was a total of 26 outages system wide in the month of August.• We had 531 individual consumers out of power at some point in the month
of August having duration of 2885 minutes. (Please see attached breakdownsheet).
BEC Board Book | September 24, 2019 | Page 97
EDUCATION, SAFETY & LOSS
• Next MECA safety meeting is October 8th.• No lost time accidents to report for the month of August.
TRUCK, TOOLS & EQUIPMENT
• The digger derrick is finally finished and we plan on sending someone downto Salt Lake the first week in October.
BEC Board Book | September 24, 2019 | Page 98
AUGUST 2019 OUTAGE SUMMARY
Da
te
Du
ratio
n (
Min
)
Nu
mb
er
of
Cu
sto
me
rs A
ffe
cte
d
RU
S
Co
de
Ke
y
Cause of Service Interruption (RUS Designation
1730A-119)
Su
bst
atio
n
OH
/ U
RD
Cu
sto
me
r M
inu
tes
of
Inte
rru
ptio
n
08/01/19 75 1 090 Fuse & arrestor blown/lightning Roberts OH 75
08/01/19 120 1 090 Fuse blown/lightning Absarokee OH 120
08/01/19 65 2 690 Fuse blown/birds Roberts OH 130
08/01/19 90 2 490 Fuse blown/trees Edg/From OH 180
08/02/19 150 13 090 Fuse blown/lightning Belfry OH 1950
08/02/19 75 3 690 Fuse blown/birds Roberts OH 225
08/04/19 120 2 690 Fuse blown/birds Roberts OH 240
08/04/19 150 18 090 Phase burned/lightning Absarokee OH 2700
08/06/19 185 23 300 Bad primary wire Edg/From URD 4255
08/07/19 40 50 790 Consumer dig in Columbus URD 2000
08/09/19 120 2 090 Fuse blown/lightning Columbus OH 240
08/09/19 90 1 090 Fuse blown/lightning Columbus OH 90
08/09/19 240 2 090 Fuse blown/lightning Columbus OH 480
08/12/19 120 1 090 Secondary tripped transformer/hail Columbus OH 120
08/15/19 90 1 090 Fuse blown/lightning Edg/From OH 90
08/17/19 80 3 690 Fuse blown/birds Columbus OH 240
08/19/19 120 1 090 Fuse blown/lightning Belfry OH 120
08/19/19 220 23 300 Faulted URD cable Edg/From URD 5060
08/19/19 40 4 690 Fuse blown/squirrel Roberts OH 160
08/21/19 90 44 unknown OCR open Belfry OH 3960
08/23/19 90 2 090 Fuse blown/lightning Columbus OH 180
08/27/19 105 20 300 Faulted URD cable Red Lodge URD 2100
08/28/19 120 1 unknown Fuse blown Red Lodge OH 120
08/28/19 195 300 300 OCR electric panel Nye OH/URD 58500
08/29/19 35 7 690 Fuse blown/birds Luther URD 245
08/30/19 60 4 690 Fuse blown/birds Belfry OH 240
TOTALS 2885 531 83625
08/15/19 150 505 000 NW Energy planned outage Nye OH/URD 75750
FOR CHARTS PLEASE SEE THE NEXT PAGE
BEC Board Book | September 24, 2019 | Page 99
AUGUST 2019 OUTAGE SUMMARY
RUS CODE KEY August YTD Substations
000 Transmission 1 4 2 Absarokee
090 Weather 11 44 4 Belfry
110 Planned Outage 0 0 7 Columbus
300 Equipment 4 24 0 E Rosebud
490 Trees 1 12 4 Edgar/Fromberg
500 Transformer 0 3 1 Luther
690 Animals 7 24 2 Nye
790 Public Caused 1 4 2 Red Lodge
Unknown 2 17 5 Roberts
{Member Minutes } NWE Major Event Planned All Other Totals
MONTH - August 75,750 0 0 83,625 159,375
YTD 213,100 94,925 0 264,305 572,330
BEC Board Book | September 24, 2019 | Page 100
Del
iver
y Po
int A
naly
sis
Fina
lA
ugus
t 201
9D
ays i
n m
onth
31
Loa
d Fa
ctor
Dem
and
Ener
gyD
eman
dEn
ergy
Purc
hase
dD
eman
dEn
ergy
Ener
gyEn
ergy
Dem
and
Ener
gykW
kWh
kWkW
h%
kWh
kWh
kWkW
hL
ine
Los
sL
ine
Los
sL
ine
Los
sL
ine
Los
sL
ast Y
ear
Las
t Mon
th2
Mon
ths P
ast
2019
2018
Aug
201
9A
ug 2
018
July
201
9Ju
ne 2
019
Abs
arok
ee1,
637
79
1,31
6
1,
854
79
4,50
4
65
.0%
-11.
7%-0
.4%
722,
134
760,
226
8.7%
4.3%
7.5%
7.7%
Bel
fry
2,85
3
1,35
1,39
4
2,92
2
1,13
2,59
8
63.7
%-2
.4%
19.3
%1,
222,
706
99
7,88
5
9.
5%11
.9%
8.1%
7.7%
Col
umbu
s2,
665
1,
048,
771
2,
705
98
3,93
7
52
.9%
-1.5
%6.
6%90
7,28
1
86
4,69
1
12
.00
2,84
0
13.2
%11
.8%
10.2
%12
.3%
E.R
oseb
ud14
1
41,7
71
15
2
46,5
31
39
.9%
-7.5
%-1
0.2%
37,3
39
41
,360
10.6
%11
.1%
11.9
%15
.8%
Edga
r1,
681
72
7,69
0
1,
656
59
0,67
4
58
.2%
1.5%
23.2
%65
9,35
3
53
8,26
8
9.
4%8.
9%8.
7%9.
3%Lu
ther
435
23
1,12
6
50
2
238,
384
71.5
%-1
3.4%
-3.0
%20
6,44
5
21
6,19
9
10
.7%
9.3%
5.5%
7.0%
Nye
1,07
5
565,
157
1,17
2
567,
426
70.7
%-8
.3%
-0.4
%52
7,45
9
51
7,54
3
6.
7%8.
8%8.
4%9.
4%R
ed L
odge
1,43
7
711,
615
1,49
2
725,
502
66.6
%-3
.7%
-1.9
%63
8,07
0
64
9,22
5
23
.40
9,62
5
9.0%
9.3%
9.4%
7.1%
Ree
d Po
int
479
22
9,11
0
54
1
225,
407
64.3
%-1
1.5%
1.6%
207,
524
206,
573
9.4%
8.4%
10.1
%9.
6%R
ober
ts1,
722
71
8,60
3
1,
744
64
2,77
4
56
.1%
-1.2
%11
.8%
670,
001
587,
688
6.8%
8.6%
6.9%
9.2%
Tota
ls14
,124
6,41
6,55
2
14,7
39
5,
947,
737
61
.1%
-4.2
%7.
9%5,
798,
312
5,
379,
658
35
.40
12,4
65
9.44
%9.
35%
8.47
%8.
90%
Not
e: A
bove
repr
esen
ts k
Wh
purc
hase
d in
form
atio
n re
ceiv
ed fr
om N
WE
base
d at
the
new
loss
per
cent
age
rate
. It
is n
ot c
lear
yet
whe
ther
they
cor
rect
ed th
e So
ld to
BEC
kW
h to
refle
ct th
e ne
w lo
ss p
erce
ntag
e nu
mbe
r or t
he o
ld lo
ss p
erce
ntag
e nu
mbe
r.C
hart
refle
cts D
istri
butio
n lo
sses
onl
y. N
WE
char
ges 2
.8%
tran
smis
sion
loss
es fo
r del
iver
y ov
er th
eir s
yste
m p
lus.
Met
erin
g ta
kes p
lace
on
the
low
side
of a
ll su
bsta
tion
trans
form
ers w
ith th
e ex
cept
ion
of C
olum
bus S
ubst
atio
n. 1
%
trans
form
er lo
sses
are
add
ed to
all
low
-sid
e m
eter
ing,
3.8
% c
umul
ativ
e tra
nsm
issi
on lo
sses
at a
ll de
liver
y po
ints
exc
ept C
olum
bus w
hich
is 2
.8%
tran
smis
sion
loss
es.
Load
Fac
tor =
It c
an b
e de
rived
from
the
load
pro
file
of th
e sp
ecifi
c de
vice
or s
yste
m o
f dev
ices
. Its
val
ue is
alw
ays l
ess t
han
one
beca
use
max
imum
dem
and
is a
lway
s mor
e th
an a
vera
ge d
eman
d. A
hig
h lo
ad fa
ctor
m
eans
pow
er u
sage
is re
lativ
ely
cons
tant
. Low
load
fact
or sh
ows t
hat o
ccas
iona
lly a
hig
h de
man
d is
set.
To se
rvic
e th
at p
eak,
cap
acity
is si
tting
idle
for l
ong
perio
ds, t
here
by im
posi
ng h
ighe
r cos
ts o
n th
e sy
stem
. El
ectri
cal r
ates
are
des
igne
d so
that
cus
tom
ers w
ith h
igh
load
fact
or a
re c
harg
ed le
ss o
vera
ll pe
r kW
h. T
his p
roce
ss a
long
with
oth
ers i
s cal
led
load
bal
anci
ng o
r pea
k sh
avin
g.
Purc
hase
dSo
ldO
wn
Use
2019
2018
2019
vs.
2018
2019
BEC
Boa
rd B
ook
| S
epte
mbe
r 24,
201
9 |
Pag
e 10
1
TO
TA
LS
YT
D
Feb
Apr
May
Jul
Sep
Dec
Lig
ht
& H
eavy D
uty
Tru
cks
25,9
1733
,182
24,3
0527
,248
26,5
3927
,368
23,5
139,
934
15,3
7311
,104
12,9
0111
,008
13,8
5914
,037
2.61
2.16
2.19
2.11
2.41
1.97
1.68
1,15
41,
352
1,52
31,
808
1,86
21,
619
1,45
98.
6111
.37
7.29
7.13
5.91
8.56
9.62
Backh
oe
s,
Tra
ilers
& C
hip
pe
r2,
758
3,69
22,
997
2,65
73,
302
4,51
32,
980
1914
93
84
1019
145.
1524
.78
999.
1133
2.15
825.
4945
1.34
161.
0852
479
1038
412
0.37
3.18
0.35
0.84
0.10
2.46
1.57
2019 F
LE
ET
TO
TA
LS
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
28,6
7536
,873
27,3
0329
,905
29,8
4131
,882
26,4
930
00
0
2018 F
LE
ET
TO
TA
LS
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
42,3
6333
,162
28,2
1427
,305
29,1
5130
,267
26,4
6926
,391
26,3
4126
,808
28,2
65
2017 F
LE
ET
TO
TA
LS
YT
DJa
nFe
bM
arA
prM
ayJu
nJu
lA
ugSe
pO
ctN
ovD
ecT
otal
32,1
7033
,652
30,9
1927
,090
26,6
5824
,831
27,0
5926
,864
28,9
4228
,665
37,6
78
2016 F
LE
ET
TO
TA
LS
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
26,4
9327
,256
24,6
3924
,154
23,8
9627
,516
26,8
7725
,866
23,6
6429
,801
33,9
64T
otal
:24
,995
319,
120
Tot
al:
32,5
4035
7,06
9
YT
DJa
nT
otal
YT
DJa
nT
otal
Tot
al:
37,2
4336
1,97
8
YT
DJa
nT
otal
Tot
al:
26,1
3823
7,10
9
Gal
lons
of G
as0
171
HPG
0.0
1.2
Hou
rs2
214
Cos
t Per
Hou
r1,
237.
211
8.8
MPG
8.0
8.2
Tot
al:
2,47
425
,374
Cos
t Per
Mile
2.52
2.17
Gal
lons
of G
as1,
169
11,9
47
Tot
al
Tot
al:
23,6
6321
1,73
5M
iles
9,39
597
,611
BEA
RTO
OTH
ELE
CTR
IC C
OO
PER
ATI
VE,
INC
.
Flee
t Man
agem
ent
Expe
nse
Tota
lsA
UG
UST
201
9
Jan
Mar
Jun
Aug
Oct
Nov
BEC
Boa
rd B
ook
| S
epte
mbe
r 24,
201
9 |
Pag
e 10
2
Beartooth Electric Cooperative, Inc.
TRUSTEE POLICY NO. 207
1. SUBJECT: EVALUATION OF THE GENERAL MANAGER
2. OBJECTIVE:
2.1. To establish a reasonable and consistent procedure for evaluating the performance ofthe Beartooth Electric Cooperative, Inc.’s (BEC) General Manager.
3. POLICY:
3.1. At least annually, at or near the employment anniversary date of the General Manager,the Board will meet in executive session for the purpose of evaluating the performance of the General Manager.
3.1. 3.2 The General Manager shall remind the Board in writing at least 60 days in advance of the date on which the evaluation of the General Manager should occur.
3.2. 3.3 The Board members will use the TP207 evaluation form.
3.3. 3.4 The Board will summarize the results of their individual evaluations and arrive at a consensus as to the overall performance of the General Manager. The results of the evaluation will be communicated to the General Manager.
4. RESPONSIBILITY:
4.1. The Board President shall ensure that the provisions of this policy are followed.
Adopted: 11/25/2014 Attest: /s/ Julie LindgrenDavid Peterson Revised: 01/31/2017 Board President Reference: BEC Policy II-A-5 Review Date: January 2019 Attest: /s/ Arleen BoydJulie Lindgren
Secretary/Treasurer
Formatted: Level 2, Indent: Left: 0.25", Hanging: 0.25",Tab stops: -1", Left + 0.63", Left
Formatted: Indent: Left: 0.25", Hanging: 0.25", No bulletsor numbering
Formatted: Font: Times New Roman, 12 pt
Formatted: Indent: Left: 0.25", No bullets or numbering
Formatted: Indent: Left: 0.25", No bullets or numbering
BEC Board Book | September 24, 2019 | Page 103
Beartooth Electric Cooperative, Inc.
TRUSTEE POLICY NO. 207
GENERAL MANAGER PERFORMANCE EVALUATION
EMPLOYEE NAME: _____________ TITLE: General Manager
EVALUATION PERIOD: _________ to _______________ DATE: ______________
Check the level that best describes the employee’s performance.
PERFORMANCE LEVELS 1 – Grounds For Dismissal 2 – Less Than Acceptable 3 – Satisfactory 4 – More Than Acceptable 5 – Excellent
OBJECTIVE 1: Board Planning, Board Controls and Policy Implementation and Administration
CHECK ONE
1. Present information and reports for Board consideration from a variety of sourcesthat includes trends, viewpoints, long-range outlooks, pertinent research data, andoptions for the Board to consider in reaching a decision.
2. Assist the Board in establishing and maintaining their role in setting policy byproviding pertinent information, comparisons with other utilities, options, anddata for the Board to review before making policy decisions.
3. Manage the affairs of the utility in accordance with Board Policy and prudentutility practices.
4. Provide staff support for BEC Board’s Committees.5. Assist Board in support, development and implementation of strategic plan.
Performance Achieved/ Comments:
□1 □2 □3 X□4
□5
Objective 2: Finance, Accounting, Information Technology and Facilities 1. Develop & implement an annual budget consistent with the BEC Business
model encompassing annual budget, multi-year capital plan, and annualoperational plan.
2. Assess and initiate potential cost-saving measures, operating efficiencies andeconomies of scale.
3. Maintain sufficient, unencumbered cash reserves to finance capital projectsand storm related and other unforeseen contingencies.
4. Deliver a clean audit.5. Support the development and implementation of multi-year financial model.6. Ensure that BEC is deploying industry best practices for its IT software,
hardware and network.7. Maintain BEC facilities to ensure a safe and productive work environment.
□1 □2 □3 X□4
□5
BEC Board Book | September 24, 2019 | Page 104
8. Maintain financial records and access for members consistent with By Lawsand policy provisions.
Performance Achieved/ Comments:
OBJECTIVE 3: Member Communication and Services □1 □2 □3 X□4
□51. Leverage multiple digital and print communication channels to deliver BEC
information to members.2. Ensure that members can access all non-confidential BEC information through
other means.3. Encourage readership through innovation and message content.4. Support and implement BEC’s Annual Meeting in accordance with By Laws.5. Engage in the business community and members throughout our service territory
to insure BEC’s presence is known and recognized.6. Ensure that member issues are responded to and resolved in a timely manner.7. Encourage member involvement in BEC committees and activities.
Performance Achieved/ Comments:
OBJECTIVE 4: Cooperative Budgets, Strategic Goals and Direction □1 □2 □3 □4 □5
1. Develop an annual budget to meet the needs and expectations of BEC’s membersto provide safe, reliable and affordable electricity at a fair price.
2. Ensure annual budget and revenues are tracked monthly and reported quarterly.3. Ensure annual work plan is consistent with Strategic Goals and Direction4. Ensure capital work plan is completed on time and on budget.5. Provide (for members and board) goals and rational for above items
Performance Achieved/ Comments:
OBJECTIVE 5: Organizational Management & Safety □1 □2 □3 □4 □5
1. No Lost Time Accidents2. Maintain a productive work environment3. Manage a workplace free from harassment or intimidation consistent with BEC
Policies.
BEC Board Book | September 24, 2019 | Page 105
4. Insure all employees receive adequate training to perform their jobresponsibilities and stimulate career growth.
5. Manage employee wages and benefits to insure they are competitive withinBEC’s regional marketplace.
6. Work with board to assist in develop strategy for succession planning. Identifyand address succession issues.
Performance Achieved/ Comments:
OBJECTIVE 6: Transmission, Distribution & Power Supply □1 □2 □3 □4 □51. Manage the operational affairs of BEC to insure a safe and reliable electric
system consistent with prudent utility practices.2. Ensure that annual capital work is accomplished.3. Ensure annual preventive maintenance work plan is completed on the system.4. Manage power supply contracts5. Manage NWE transmission contract.6. Work with board to inform members of power supply strategy and distribution
plans.
Performance Achieved/ Comments:
SECTION III – DEVELOPMENT PLAN
1. Provide examples of what employee is doing very well.
2. Provide examples of where the employee should improve or give a higher priority.
3. Provide examples of where improvement is needed over the next year.
BEC Board Book | September 24, 2019 | Page 106
SIGNATURES
Employee’s Signature __________________________________ Date:________________ (Employee’s signature only indicates a performance discussion took place on date noted)
Board President Signature:_______________________________ Date:________________
I have reviewed the job description and essential functions for this Yes□position with the employee.
Use Form ER501 for changes to wage/salary.
BEC Board Book | September 24, 2019 | Page 107
Beartooth Electric Cooperative, Inc.
FINANCIAL POLICY NO. 309
1. SUBJECT: POWER SUPPLY AND TRANSMISSION AND GENERATION
2. OBJECTIVE:
2.1. To establish responsibility for the Board in developing policies and providing direction for Beartooth Electric Cooperative (BEC) to minimizemanage the costs and risk of obtaining an adequate supply of energypower and providing transportation for that energytransmission of that power to BEC’s substations.
2.2. To provide procedures and direction to the General Manager and staff for working with state, regional and national organizations on power supply and transmission issues.
3. tGENERATIONPOWER SUPPLY POLICY:
3.1. BEC will comply with requirements applicable directions for utilitiesto BEC set byforth in the National Energy Policy Act of 1992 (EPACT92).
3.2. BEC will comply with requirements applicable to BEC set forth in Montana or Wyoming law, established by the Montana or Wyoming Public Service Commissions or set forth in BEC’s power contract with the Western Area Power Administration. review and update, if necessary, an Integrated Resource Plan (IRP) following guidelines set by EPACT92 and the Wyoming Public Service Commission (PSC).
3.2.1. The IRP will be evaluated annually to determine its continued applicability and whether or not it requires revision.
3.2.2. This plan will be used to determine the least cost mix of energy resources to meet the needs of customers. Both supply side and demand side resources will be evaluated. It is designed to consider resource needs for the long term.
3.2.3. Membership involvement is considered a critical part of the development and approval of the IRP.
3.2.4. Implementation of the IRP will be carried out by the General Manager with direction from the Board. Approvals will be obtained from the PSC, as needed.
3.3. A Power Requirements Study (PRS)A 10-year load forecast will be prepared and approved by the Board each year as part of the annual budget and financial forecast process.as the official forecast of customers, energy sales and system demand.
Formatted: No bullets or numbering
BEC Board Book | September 24, 2019 | Page 108
3.4 During the strategic planning process the Board will review planning strategies for power supply and transmission issues. These strategies will be used by the Board and management in preparation of the annual plans and budget.
3.5 The Board and General Manager will identify specific power supply and transmission tasks and objectives for the year being planned, as appropriate.
3.3.
3.3.1.The PRS will be evaluated annually to determine its continued applicability and whether or not it requires revision.
3.4.DEach year during the strategic planning process [is this process described in another policy?] the Board will review include planning strategies for power supply and transmission issues. These strategies will be used by the Board and management in preparation of the aAnnual plans and budget. Work Plan and Financial Budget. [are these terms defined in other policies?]
3.4.1. The Strategic Plan will consider short and intermediate term energy needs and the process required to obtain them. It will also coordinate with steps necessary for obtaining long-term energy requirements.
3.4.2. The Strategic Plan and planning strategies will comply with recommendations of the IRP.
3.5. The Annual Work Plan will The Board and General Manager will ooutline specific power supply and transmission tasks and objectives for the year being planned, as appropriate.
3.6.Power supply relationships are not limited to traditional or conventional methods. Future wholesale electricity may come from a mixture of suppliers including independent power producers, other utilities or member-generation. Future relationships will be defined in an approved IRP.
4. TRANSMISSION POLICY:
Coordination will be maintained with other utilities interconnected to BEC’s transmission system.BEC will proactively manage its relationship(s) with its transmission provider(s) to advocate [is there a better word?] secure or ensure for affordable, equitable and reliable transmissions service.
5. PROCEDURE:
5.1.BEC will maintain membership in those organizations which can influence the broadergoals of public power and the specific objectives and interests of cooperatives in
Formatted: Indent: Left: 0.5", No bullets ornumbering, Tab stops: Not at 0.75"
Formatted: Indent: Left: 0.5", Hanging: 0.38", Nobullets or numbering, Tab stops: Not at 0.75"
Formatted: Tab stops: 3.76", Left
Formatted: Indent: Left: 0.25", Hanging: 0.25",Outline numbered + Level: 2 + Numbering Style: 1, 2,3, … + Start at: 1 + Alignment: Left + Aligned at: 0.19"+ Indent at: 0.49", Tab stops: -1", Left + 0.75", Left
Formatted: No bullets or numbering, Tab stops: 3.76", Left + Not at -1" + 1.13"
Formatted: Indent: Left: 0.5", First line: 0", Outlinenumbered + Level: 3 + Numbering Style: 1, 2, 3, … +Start at: 1 + Alignment: Left + Aligned at: 0.5" + Indentat: 0.85", Tab stops: -1", Left + 1.13", Left
Formatted: No bullets or numbering
BEC Board Book | September 24, 2019 | Page 109
Montana and the Pacific Northwest in a manner consistent with BEC objectives. BEC will actively be involvedparticipate in the leadershipthe power supply and transmission activities of those organizations.
5.2.BEC will continually investigate opportunities to form new strategic alliances which will enhance BEC’s power supply and transmission situation. its competitive position. These alliances will be developed for the purpose of obtaining mutual benefit in either generation or transmission services or supply.
5.3.The Board will maintain a Rrisk Mmanagement Ccommittee. At a minimum this committee will consist of Board members. These Board members serving on the committee will be designated as representatives to regional or state power supply organizations, as appropriate.. The Board President may appoint additional members to this committee as appropriate. The General Manager is an ex officio member of the committee. The Rrisk Mmanagement Ccommittee established under Policy No. 211 shall have at least the following responsibilities for power supply and transmission: responsibilities will be at least as follows:
5.3.1. Board members serving on the Committee Risk Management Committee will be designated ned as BEC’s representatives for regional or state power supply and transmission organizations and activities.The committee will meet at least monthly, as neededquarterly in conjunction with regular Board meetings and, more often as needed.
5.3.2. The Ccommittee will review current regional activities and regional power supply policies which may impact BEC, give directionmake recommendations to the Board for BEC’s involvement in regional organizations and evaluate potential opportunities for new strategic alliances for power supply and transmission. Board approval will be obtained as appropriate.
5.3.3. At least once a year, Tthe Ccommittee will review developments in regional power supply markets and BEC’s current and future power supply situation give the entire Board an update report on power supply activities and request action from the Board as needed.and provide an update to the Board with any recommendations for Board action.
5.3.4. As new or revised contracts relating to power supply or transmission are developed, the committee will review them in detail and recommend action on them to by the Board.
5.4. The General Manager will monitor regional power supply and transmission developments and BEC’s power supply and transmission contracts and provide relevant information and recommendations, as appropriate, to the Board and the Risk Management Committee.
6. RESPONSIBILITY:
Formatted: Indent: Left: 0.2", Tab stops: Not at 1.13"+ 1.38"
BEC Board Book | September 24, 2019 | Page 110
The Board shall ensure that the provisions of this policy are followed.
Adopted: 11/25/2014 Attest: /s/ Julie LindgrenDavid Peterson Revised: 02/28/2017 Board President Reference: LV BP311, BEC Bylaws Articles I, II and IV, BEC III.5.A Review Date: February 2019
Attest: /s/ Arleen BoydJulie Lindgren Secretary/Treasurer
BEC Board Book | September 24, 2019 | Page 111
BEC Board Book | September 24, 2019 | Page 112
r:,11 Verizon � �:�
( lnbox
1:15 PM
2 Messages nice job!
From: [email protected]
A V
Sent: Wednesday, September 11, 2019 10:00 AM
To: Kevin Owens <[email protected]>
Subject: nice job!
Kevin, I just rec'd my new meter a couple weeks ago and was pleasantly surprised to see the article in this month's Rural Electric explaining how to read it. Perfect timing and the info is both interesting and information. Just wanted to pass this along. Thanks, Linda
Linda Halstead-Acharya
Columbus, MT
bacha [email protected]
Home: 406.322.5262
Cell: 406.321.0693
See More
BEC Board Book | September 24, 2019 | Page 113