belatio march 34110,( e61timated) - nova scotia · 2019-06-23 capital budget review - 2019120...
TRANSCRIPT
2019- 06- 23
Capital Budget Review - 2019120
Capital Operating Gas Tax Wind Revenue Recreation Parkland Landfill Close, Equipment Sewer Grants/ Other Fund from Fund from Fund from
Project Name Location Project Cost Reserve Reserve Reserve Reserve Reserve Reserve Reserve Reserve Reserve Funds Operations Area Rate Borrowing
BelatiO March 34110,( E61timated) ` .: 5$,100 7,¢ 87,36ll.' 4; 559;$$ 3.7fi$, 034 43;427 186, 4241
RECREATION & PARKS
Trails - Surface Upgrades - Trail surface in this Western Shore 24, 000
area has many potholes and protruding rocks. Requires repair for a consistent surface for all trail
users. The improved surface is especially importantfor pedestrians and cyclists. 24, 000
Trail swing gates - Improved and safe access for Various locations 7, 800
emergency and maintenance vehicles to the trail. 7, 800
East River trail foot bridge - Improved access and East River 25,000
navigation of East River property. The bridge link
would create a walking loop for hikers or analternative route from the rail trail. Signage will help
hikers navigate the property and learn more about
the property, natural features and historicalsi nificance. 9, 000 16, 000
Trails - Bridge Evaluation - This project ensures East River and Goat 25, 000
safe trail infrastructure for all trail users. The Lake
inspections will indicate any immediate work requiredas well as recommendations for future repairs.
25,000
East River trail - trail head parking - Improved East River 15, 000
safe parking for trail users. Prevent members of the
public from parking on the side of the road and in
front of LP " No Parking" areas. 15, 000
96, 800
Information Services
Ortho Photography - used for Asset Management, 53, 000
Landfill Cell Management, Erosion Characteristics,
Urban and Municipal Planning, Tax Base Correction,
Government4 Mapping, Watershed Mapping.
53, 000
53, 000:
Solid Waste
Landfill Only Projects ( Valley) Road Improvements Kaizer Meadows 50, 000 50, 000
3/ 4 Tonne Truck - Providing efficient service to the Kalzer Meadows 55, 000
park users such as Sustane, and ensuring theroadways are safe staff and public. 55, 000
KM storage building - roof replacement - Kaizer Meadows 10, 000
Prevents the existing building from leaking andprovides protection to the firetruck on site. 10, 000
Second Tower Site ( Valley) Kaizer Meadows 90, 000 90, 000
Chlorine Contact Chamber ( not valley) Kaizer Meadows 30, 00030, 000
Leachate treatment plant upgrade Kaizer Meadows 2, 500, 000 2,500,000
Dozer D6 and trade- in Dozer D5 Kaizer Meadows350, 000 350, 000
Geo -tube replacement for septage lagoon ( 8 Kaizer Meadows
tubes) 100, 000 100, 000
Scalehouse software
25, 000 25, 000
3, 210, 000
Community Development
Joint Bldg Inspection software - This will allow 101, 826
inspectors and front line staff to accesss files,
schedule inspectors and manage permits between
departments. 65, 871 35, 955
2019- 06- 23
Capital Budget Review - 2019/ 20
Project Name Location Project Cost
Capital
Reserve
OperatingReserve
Gas Tax Wind Revenue
Reserve ReserveRecreation ParklandLandfill Close.
Reserve Reserve Reserve
Equipment
Reserve'
Sewer
Reserve
Grants/ Other ` Funds
Fund fromOperations
Fund from Fund from -:
Area Rate Borrowing
Highway 3 Streetscape Implementation - Improved infrastructure to accommodate all roadwayusers.
Various
450, 000 450,000
Kaizer Meadows - Industrial Park Development -
To be able to market the park to tenants with similar
businesses and promote any synergies, along with
Increasing commercial tax assessment.
Kaiser Meadows
50, 000 50, 000
Inland Floodplain modeling 78, 638 40, 052 38, 586 FRIIP
Coastal Floodplain modeling 100, 000 100, 000
780, 464
Public Works
Universal Sewer Projects:
Truck Mounted - Crane Various 15, 000 15, 000
Maintenance hole Repairs & Infiltration
Reduction - Improve wastewater treatment, reduce
the cost of pump wastewater and reduce the potentialfor overflows and the release of untreated
wastewater Into the environment.
Various 50,000
50, 000
Lift Station Panel Upgrades - Various TBD
based upon
inspections
65, 000
65, 000
Pump Replacements Various 25, 000 25, 000
Gold River - WW Improvements Gold River 20,000 20,000
W WTP Improvements - Plant Exp./ Collection SystemExt,
New Ross 40,00040, 000
Wasterwater collection - service extension Mill Cove 55,000 55,000
270, 000:
Chester Sewer:
WWTP Improvements - UV/ Sludge Chester Chester 1, 205, 000
1, 205, 000}
321, 373 883, 627 1/ 3 prov 40% Fed
Municipal Property: Exterior renovations Zoe Valle Library 75, 000 75, 000
Municipal Office Renovations Chester 275, 000275,000
Boat Launches - Deep Cove & Borgels Pt Deep Cove & 35, 00035, 000
Borgels Point
Resource Centre - Roof New Ross 25,00025,000
Fire Protection System - Pump houserehabilitation
Mill Cove 850,000
850, 000
Sidewalk Duke St., Chester 14, 100
1, 274,100114, 100
Public Works Total 2,749, 100'
Total Prolectss : Fundtr# g Gonfrlbutrons 86. 49 884, 3 064, 1. 0 85 : 8_% 2 $ 005..., OU, $ 398373" 1' 004 ' 840 05 1 "" 0.:" 4"'%%""' 3" DO"' 0`: Q,_UU . 4., 02 MOO w.
Reserve Balance 53, 100 7, 323,260 630, 530 3, 118, 034 43,427 186, 421 7, 568, 882 89, 659 276,976
Operation Expenditures 31, 250 148, 200 439, 001
Contributions 471, 257 1, 232, 300 988, 279 2, 500 562, 241 34, 150 134,300
Interest Earned 1, 062 1 154, 506 32, 740 68,353 869 3, 753 157, 000 2, 135 10, 846
BalalicelNarch. 31,. 2020 :" "" 4182' 5 , ., 1 ., : - 7 7, 773.. 1' 7" 7`370. " . 4..,, $..,., 3 735 666::. 295 " ::" " 2 6 .?::; 8 MAW %1495 $ 1ti , 70. $,. X2...,. 23. 32594 22 122`"
2019-06- 13
Capital Budget Review - 2020121
9atrbra , 2 Project frost
Capital
Reserve
OperatingReserve
Gas Tax
Reserve
Wind Revenue
Reserve
Recreation
Reserve
Parklands
Reserve
Landfill Close.
Reserve
EquipmentReserve
Sewer
Reserve
Grants/ Other Fund from Fund from
Funds Operations area Rate
Fund from
Borrowing
a a ae rch'' 1 20 str afed ....". ti3,
RECREATION & PARKS
666. 6 r _ 9 76 8 22 8'! 8 . ,., 9'.'_; 390 0.. 25 4. 41 9 $, ,.._, ,..§ 77 w- , 7777T
Trails - Surface Upgrades AT 6.20 15, 000 15, 000
Trails - Bridge Evaluation 20, 000 20, 000
35,000CAO/ Administration
KM Turbine 50, 000 50, 000
50, 000
Solid Waste
Landfill Only Projects ValleyMiscellaneous 50, 000 50, 000
Road Improvements ( Valley) 50, 000 50, 000
Heavy equipment Compactor - existing 826H upgrade350, 000 350, 000
Scalehouse Renovations/ Scales Valle 100, 000 100,000
Renovations to Public Drop off 100, 000 100,000
650, 000
Community Development
Highway 3 Streetscape Implementation 100, 000 100, 000
Kaizer Meadows - Industrial Park Development - To be
able to market the park to tenants with similar businesses
and promote any synergies, along with increasingcommercial tax assessment.
Kaizer Meadows 50, 000
50, 000
150,000'
Information Services
VMWARE Infrastructure 60, 000 60, 000
Hardware Replacement 86, 600 86, 600
146,600
Public Works
Universal Sewer Projects:
Manhole Repairs & Infiltration Reduction Various 50, 000 25, 000 PCAP 25, 000
Lift Station Panel Upgrades Various 65, 000 65, 000
Pump Replacements - Allowance Various 25, 000 25, 000
Pump Station - Towable/ Permanent Generator Various 70, 000 70, 000
WWTP Improvements - Plant Exp./ Collection System Ext. - design ( New Ross) New Ross 40, 000 40, 000
Chester Sewer:
WWTP Improvements - Clarifier # 2 Rebuild - Chester Chester 100, 000 100,000
Gold River Solution - WWMD - Design Gold River 15, 000 15, 000
Chester Basin Sewer:
WWTP Improvements- Clarifier# 1 Rebuild Chester Basin 1, 425, 000 380, 000 1, 045,000 1/ 3 prov 40% Fed
Western Shore Sewer:
WWTP Upgrades - Clarifier rebuild Western Shore 200, 000 200, 000
Village of Chester:
VOC Water system - Pre -design Chester 175,000 175, 000
Municipal Property:
Municipal Office Renovations Chester 100,000 100, 000
Truck Replacement- 3/ 4 tonne - PM Various 55, 000 55, 000
Fire Protection System - Option Selected -Const Mill Cove 850, 000 850, 000
Wharf Repairs- AS/ CB/ CH Rotation of Eval and Repair) Various 30, 000 30, 000
Fr Simms Settlement School Demo 30, 000 30, 000
Public Works Total 3, 230,000'
7'otaLf'-ro ecfs , Fundi .: rontri utlon".:. ; "...",_ „.... ,.. 26 6 0; 9,.. <1, 0. 010 , 0011,. 5 0 , . "."" O OD23_, 9, 0,..>$.., . 1ti._,. P _$ .., ,,.. ,$ $ ,_ ... 146
Reserve Balance 54, 162 7, 832, 014 1, 966, 870 3, 635, 666 44, 295 192, 675 8, 288, 123 20, 656) 69, 592
Operation Expenditures 60, 000 150, 423 445, 586
Contributions 489, 869 625, 392 1, 003,103 2, 538 149, 770 34, 662 153, 100
Interest Earned 1, 083 161, 939 46,437 79, 288 886 3, 879 167, 260 1, 399 4, 739
55 245:. 2. 8 423 8 ... 882 4 276. 4 272 471r, ,....... 5 1` 4 1, 8 199119 ..`" " 8',".OS-`" 3":". 1 . „. 8 . 31.,, S, D ,-.. 1. 4 5 .., I g2 T8
2019- 06- 13
Capital Budqet Review - 2021/ 22
2019- 06- 13
Capital Budqet Review - 2022123
2019- 06- 13
Capital Budget Review - 2023/ 24
2019- 06- 13
Capital Budget Review - 2024125
Itat vil 4-016y"'O"'ho R, kv
14" t 640*00- b", 0""'0VA'Ps§' 11
N114117T
RECREATION & PARKS
Trails - Surface Upgrades ( AT 6. 20) 15, 000 15, 000
Trails - Bridge Evaluation 20, 000 20, 000
CAO/ Administration
KM Turbine 50, 000 50, 000
Solid Waste
Landfill Only Projects ( Valley) Miscellaneous 50, 000 50, 000
Road Improvements ( valley)
Heavy equipment ( valley)
50,000
300, 000
50,000
300, 000
Solid Waste Projects ( Chester only) I Ton Truck 50, 000 50, 000
Community Development
Highway 3 Streetscape Implementation 150, 000 150, 000
Kalzer Meadows - Industrial Park Development - To Kaizer Meadowsbe able to market the park to tenants with similar
businesses and promote any synergies, along withincreasing commercial tax assessment.
50, 000
50, 000
Information Services
VMWARE Infrastructure 60, 000 60,000
Hardware Replacement 86, 600 86, 600
40XWPublic Works
Universal Sewer Projects:
Manhole Repairs & Infiltration Reduction Various 50, 000 25, 000 PCAP 25, 000
Lift Station Panel Upgrades Various 70, 000 70,000
Pump Replacements - Allowance Various 30, 000 30, 000
Forcemain - renewal Various 100, 000 100, 000
WWTP/ PS Improvements - SCADA Various 50, 000 50, 000
Pump Station - Towable/ Permanent Generator Various 70, 000 70, 000
Western Shore Sewer:
WWTP Improvements - Sludge Mang Western Shore 50, 000 50, 000
Municipal Property: Municipal Office Renovations Chester 250, 000 250, 000
Wharf Repairs- AS/ CB/ CH ( Rotation of Eval and Repair) Various 40, 000 1 40, 000
Truck Replacement - 314 tonne - WW Various 60, 000 60, 000
Public Works Total
Total_ oe " 0,o " tAReserve Balance 58,626 8, 978, 850 3, 604, 184 6, 131, 871 29, 918 207,836 9, 588, 375 19, 886) 46,430)
Operation Expenditures 2024/ 25 472, 929
Contributions 2024125 400, 000 600, 000 1, 000, 000 - 2, 500 150, 000 36, 246 130, 000
Interest Earned 1, 17.3 186, 4771 79, 934 128, 9081 598 4, 008 193, 268 1 1, 431 1 1, 071
2019-06- 13
Capital Budget Review - 2025/ 26
2019- 06- 13
Capital Budget Review - 2026/27777, 77
t ;,. 0 e f sfi W d Rev n R vreafton, . a a d.. l and Close;. = 8" Yr a Gr ts/Of er FUid frotrt: 1 Utad ft " I' ctttif fr
11 aa e rtre erg ,_.., , Furless„ , tlons ar a"Rat. ssarrsiwltl`
RECREATION & PARKS
Trails - Surface Upgrades 15, 000 15, 000
Trails - Bridge Evaluation 20, 000 20, 000
35; 000
Solid Waste
Green carts 100 7, 500 7, 500
Miscellaneous 50, 000 50,000
Community DevelopmentKaizer Meadows - Industrial Park Development
be able to market the park to tenants with similar
businesses and promote any synergies, along with
increasing commercial tax assessment.
To Kaizer Meadows 50, 000
50,000
z 50, 000
Public Works
Universal Sewer Projects:
Manhole Repairs & Infiltration Reduction Various 50, 000 25, 000 PCAP 25, 000
Lift Station Panel Upgrades Various 75, 000 75, 000
Pump Replacements - Allowance Various 30, 000 30, 000
Forcemain - renewal Various 100, 000 100, 000
Pump Station - Towable/ Permanent Generator Various 70,000 70,000
Chester Sewer:
WWTPImprovements- Automation Chester 350, 000 350, 000
Western Shore Sewer:
WWTP Improvements - pH Control Western Shore 15, 000 15, 000
Municipal Property: Municipal Office Renovations Chester 250,000 250,000
Wharf Repairs- AS/ CB/ CH ( Rotation of Eval and Repair) Various 30, 000 30, 000
Truck Replacement - SUV' s ( 2) Various 60, 000 60, 000
Public Works Total
fio. Fro ec s".& F nd n- Colltrr utroxts . :.. , ..., 0,,, r. i 280 0 ' 3. 00... 9 0 . ,... 5 000, 0,.. 0 . ,.. ,;, :.-": " 0 _.... Q. 0 i5 000.._
Reserve Balance 60, 995 9, 779, 633 4, 905, 450 7, 398,785 31, 127 220,983 10,281, 776 54,755 66, 884
Operation Expenditures 2026/27 487,223
Contributions 2026/ 27 400, 000 600, 000 1, 000, 000 2, 500 150, 000 36, 246 130, 000
Interest Earned 1, 220 202, 393 104,459 153,603 623 4, 271 207, 136 1, 458 3, 388
2"-,,...,, „. 8a1! 1re.A archr1, 20...,,_ _ .. -...w,. . , ....<.,._ ,...... ... ...:...."
25- 10382 " 6.- 58099 8- 52 . (.. $ . n .,._, 02. $.., ,. A.....,.+.., 31 r7 9; " . 227 7806 5 4 53_ _.., .; S . , .
4k 10`=638 7" _ 9c . 1 92 584 a: 20 272Ua. .
2019- 06- 13
Capital Budget Review - 2027128
Canifni Rnrinaf Rpview _ 9n9R/ 99