DESCRIPTION

portfolio of creative architectural work

TRANSCRIPT

Page 1: Benjamin Rosas Portfolio 2014

BENJAMINROSAS2014

Page 2: Benjamin Rosas Portfolio 2014
Page 3: Benjamin Rosas Portfolio 2014

BenjaminRosas

Portfolio 2014

Learner | Connectedness | Belief | Ideation | Input - Clifton Strengths Finder 2.0

Page 4: Benjamin Rosas Portfolio 2014

Projects

Page 5: Benjamin Rosas Portfolio 2014

East Commerce Community Cultural Library

Camelot Elementary School and Spark Park

R.E.S.T. Pavilion

01

02

03

04

05

Lantern in the Landscape

The University of Texas at Austin - Texas Advanced Computing Center

Page 6: Benjamin Rosas Portfolio 2014

The University of Texas at Austin - T.A.C.C.

01

Texas Advanced Computing Center Research Offi ces

The University of Texas at Austin - J. J. Pickle Research Campus

41,000 GSF, three-story, free-standing building connected to the existing offi ces within the Research Offi ce Complex (ROC) building by way of one-story enclosed, pedestrian walkway. The building will consist of a public fi rst level housing an open lobby/gathering space, reception area, 1,500 GSF visualization lab, auditorium for 300, fl exible training room for 50, large re-confi gurable conference room, and catering kitchen to be shared by TACC staff and public users. The two upper levels will consist of private offi ce spaces for TACC. Each level will provide 30 offi ces, a conference room for 16, an open student work area and necessary support spaces.

Role: Project DesignerClient consultation, programming analysis, site planning, contextual research, conceptual design and development, collaborative design coordination, massing studies, preliminary energy analysis, design presentation drawings, code and regulation research, cost estimating, material selection and recommendation, recommendation of technical design detail aspects of the project. Involved in all aspects of project pre-design through completion of schematic design.All responsibilities performed in a project team structure working closely with consultants and under the direct supervision of the Project Architect.

Project

Location

Program

Responsibilities

Page 7: Benjamin Rosas Portfolio 2014

“Craft a world class research facility inspired by advanced computing technology to enable research and discoveries that advance science and society.” - Project Mission Statement

U.T. - T.A.C.C.

Stampede - Existing on-site High Performance Computing (HPC) System

Context and Conceptual Development

Server Sled Assembly

O’Connell Robertson

South Elevation Study

Page 8: Benjamin Rosas Portfolio 2014

Site Plan

Basic Building

Separate Elements

Optimize Orientation Parti

N

N

N

N

1 story auditorium 3 story offi ces and support

connecting corridor

existing building

connecting corridor3 story offi ces and support

existing building

1 story auditorium

18°

1 story auditorium

connecting corridor

existing building

3 story offi ces and support

01

Page 9: Benjamin Rosas Portfolio 2014

UP

N

TRUE NORTH

N

PLAN NORTH

E1

S10S9S8S7S6

E2

E3

S5S4

E4

SW3

SW2

SW1

NW1

NW2

NW3

NW4VIZ LAB

1.135

AUDITORIUM1.103

ELEV.1.124

ELEC.1.120

STAIR1.122

FAMILYRESTROOM

1.130

WOMENSRESTROOM

1.129

DATA1.133

OFFICE1.114

PODCAST1.123

BREAK/LOUNGE1.112

MECH1.121

LOBBY/RECEPTION1.100

MENS RESTROOM1.132

ELEV. EQUIP.1.125

COPY1.127

OFFICE1.113

VIZ STORAGE1.136

A/V1.105

DISPLAYSTORAGE

1.117

WORK SHOP1.118

CONNECTOR1.111

OFFICE1.116

OFFICE1.115

CATERINGKITCHEN

1.119

STAIR1.109

MECHANICAL1.106

VESTIBULE1.104

VESTIBULE1.107

CORRIDOR1.102

CORRIDOR1.101

TRAINING1.108

STORAGE1.110

SHOWER1.131

QUIET1.128

JAN.1.126

DIRECTOR1.415

OFFICE1.417

OFFICE1.419

OFFICE1.421

OFFICE1.423

1.420

STOR.1.424 OFFICE

1.222

OFFICE1.425

OFFICE1.427

OFFICE1.429

OFFICE1.431

OFFICE1.433

DIRECTOR1.435

OFFICE1.437

DIRECTOR1.466

OFFICE1.467

OFFICE1.465

1.462

OFFICE1.464

NORTHSCALE: 1/8" = 1'-0"1 OVERALL BUILDING PLAN

U.T. - T.A.C.C.

Site

Southwest Aerial

South Entry

West Elevation

North Entry

DN

E1

S10S9S8S7S6

E2

E3

S5S4

E4

SW3

SW2

SW1

NW1

NW2

NW3

NW4

OFFICE 12.102

OFFICE 22.103

LARGE OFFICE 22.114

CORRIDOR2.100

OFFICE 242.129

OFFICE 122.115

OFFICE 102.112

LARGE OFFICE 42.130

OFFICE 202.125

MECH2.137A/V

2.141

OFFICE 32.104LARGE OFFICE 1

2.101

OFFICE 42.106

OFFICE 52.107

OFFICE 62.108

OFFICE 72.109

OFFICE 92.111

MENS2.138

LARGECONFERENCE

2.131

WOMENS2.133

LARGE OFFICE 32.117

OFFICE 192.124

OFFICE 212.126

OFFICE 222.127

OFFICE 232.128

OFFICE 162.121

OFFICE 112.113

OFFICE 152.119

OFFICE 142.118

OFFICE 262.143

OFFICE 252.132

STUDENTTOUCHDOWN

2.135

OUTDOOR TERRACEOFFICE 8

2.110

DATA2.142

STORAGE2.136

OFFICE 182.123

OFFICE 172.122

JAN.2.139

ELEV2.134

STAIR 12.105

STAIR 22.120

BRIDGE

ELEC2.140

OFFICE 132.116

OPEN TO BELOW

SCALE: 1/8" = 1'-0"1 OVERALL FLOOR PLAN LEVEL 2

S10S9S8S7S6S5S4

SW3

SW2

SW1

NW1

NW2

NW3

NW4

LARGE OFFICE 53.101

OFFICE 273.102

OFFICE 283.103

OFFICE 293.104 OFFICE 30

3.106

OFFICE 313.107

OFFICE 323.108

OFFICE 333.109

OFFICE 343.110

OFFICE 353.111

OFFICE 363.112

STORAGE3.141

LARGE OFFICE 63.114

OFFICE 513.132

OFFICE 393.116

OFFICE 523.133

SMALLCONFERENCE 1

3.143

MENS3.136

LARGE OFFICE 73.117

OFFICE 383.115

MECH3.137

OFFICE 443.123

WOMENS3.149

SMALLCONFERENCE 2

3.148OFFICE 57

3.152OFFICE 58

3.153

LARGE OFFICE 83.130

OFFICE 503.129

OFFICE 493.128

OFFICE 483.127

OFFICE 473.126

OFFICE 463.125

OFFICE 453.124

ELEC.3.135

CORRIDOR3.100

PATIO

OFFICE 373.113

A/V3.151

OFFICE 403.118

OFFICE 433.122

OFFICE 423.121

BREAK3.131

PATIO

JAN.3.134

ELEV.3.146

STAIR 13.105

STAIR 23.120

DATA3.150

OFFICE 533.138

OFFICE 543.139

OFFICE 553.140

OFFICE 563.144

OFFICE 413.119

LOBBY3.145

MECH3.142

MECH3.147

SCALE: 1/8" = 1'-0"1 OVERALL FLOOR PLAN LEVEL 3

Massing and Material Study

First Floor Plan

Second Floor Plan

Third Floor Plan

N

Page 10: Benjamin Rosas Portfolio 2014

01

South Elevation

South Entry

Page 11: Benjamin Rosas Portfolio 2014

Southwest Aerial

U.T. - T.A.C.C.

O’Connell Robertson

Page 12: Benjamin Rosas Portfolio 2014

West Elevation

North Entry

01

Page 13: Benjamin Rosas Portfolio 2014

O’Connell Robertson

Patio

U.T. - T.A.C.C.

Page 14: Benjamin Rosas Portfolio 2014

Lantern in the Landscape

02

Faith Community Hospital 3 Building Campus90,000 s.f. Replacement Facility

Jacksboro, TexasPop.: 4,511 (U.S. Census 2010)

New comprehensive, acute care hospital with clinic consisting of approximately 80,000 square feet. New EMS facility with heli-pad of approximately 2,000 square feet. New free-standing Wellness Center of approximately 8,000 square feet. All facilities located on a 9-10 acre site requiring extensive site development with access from US Highway 281 and Texas Highway 148 Jacksboro, Texas.

Role: Project Designer and BIM Project ManagerSite planning of three building campus, contextual research, exterior architectural design of campus, cross-discipline drawing and model coordination, presentation drawings, code and regulation research, material research and selection, recommendation of technical design detail aspects of the project. Involved in all aspects of project design, documentation, and current construction administration.All responsibilities performed in a project team structure working closely with consultants and under the direct supervision of the Project Architect.

Half-size CD set available upon request.

Project

Location

Program

Responsibilities

Page 15: Benjamin Rosas Portfolio 2014

O’Connell Robertson

Lantern in the Landscape

Houston

San Antonio

Austin

DallasJacksboro

Context and Conceptual Development

Page 16: Benjamin Rosas Portfolio 2014

EMS BUILDING4,193 SQ FT

MRI TRUCK

AMBULANCEENTRY

ER WALK-INENTRY

HOSPITALENTRY

CLINICENTRY

LOADINGDOCK

FUTUREMOB

FUTURE PARKING

NEW HOSPITAL

60,556 SQ FT

OUTPATIENT

CLINIC

12,638 SQ FT

EXPANSION ZONE

FUTUREMOB

880.35'

676.

83'

773.

61'

875.02'

WELLNESSCENTER9,000 SQ FT

FIR

E LA

NE

FIRE LANE

FIRE LANE

COMMUNITY

GARDEN

RV PARKING(WATER/ELEC/SEWER HOOK UP)

STORAGESHED

H H

MECHANICAL YARD

DUMPSTER

ENCLOSURE

02

First Floor Plan

Wellness Center Floor PlanSite Plan

N

NN

Page 17: Benjamin Rosas Portfolio 2014

Lantern in the Landscape

Main Entry Studies

Page 18: Benjamin Rosas Portfolio 2014

LEVEL 1100' - 0"

LEVEL 1100' - 0"

LEVEL 2114' - 8"

LEVEL 2114' - 8"

T.O.S @ VALLEY129' - 0"

T.O.S @ VALLEY129' - 0"

4.0 4.2 5.04.7 5.4 5.9 6.0 7.0 7.9 8.5 9.3 10.19.6 10.8 11.311.010.09.08.07.2

A5.21

10.74.5

A8.17

DINING1800

T.O. PARAPET - HIGH132' - 4"

T.O. PARAPET - HIGH132' - 4"

T.O. PARAPET - LOW118' - 0"

T.O. PARAPET - LOW118' - 0"

T.O.P. - OFFICES131' - 2"

T.O.P. - OFFICES131' - 2"

9.1 9.7 10.610.29.87.87.15.85.3

A7.55

7.7 9.4

LEVEL 1100' - 0"

LEVEL 1100' - 0"

LEVEL 2114' - 8"

LEVEL 2114' - 8"

11.3 12 13.5 14.4 15.0 16.0 17.0 18.011.0 16.413 13.4

A5.22

OUT PATIENT CLINICCORRIDOR

1904

CORRIDOR1952

T.O. PARAPET - LOW118' - 0"

T.O. PARAPET - LOW118' - 0"

11.9 14.2 15.113.6

LEVEL 1100' - 0"

LEVEL 1100' - 0"

LEVEL 2114' - 8"

LEVEL 2114' - 8"

T.O.S @ VALLEY129' - 0"

T.O.S @ VALLEY129' - 0"

S.0 R.0 Q.2 Q.0 P.0 N.0 M.0 L.0 K.0 J.4 J.0 H.0 G.0A5.1

1

A5.13

P.8S.3 N.8

A5.12

A5.14

ENTRY1101

WAITING2101

OFFICE2108

OFFICE2109

OFFICE2110

OFFICE2111

OFFICE2112

CORRIDOR1200

CORRIDOR1400

T.O. PARAPET - HIGH132' - 4"

T.O. PARAPET - HIGH132' - 4"

T.O. PARAPET - LOW118' - 0"

T.O. PARAPET - LOW118' - 0"

T.O.P. - OFFICES131' - 2"

T.O.P. - OFFICES131' - 2"

N.3P.1P.5R.8S.5

T.2

G.9

5A7.5

T.1

T.O. CMU FIREWALL119' - 3"

T.O. CMU FIREWALL119' - 3"

LEVEL 1100' - 0"

LEVEL 1100' - 0"

LEVEL 2114' - 8"

LEVEL 2114' - 8"

G.0 F.4 F.0 E.0 D.0 C.0 B.0 A.0A5.15

A5.24

B.6

A6.23

CORRIDOR1400

CORRIDOR1401

T.O. PARAPET - LOW118' - 0"

T.O. PARAPET - LOW118' - 0"

T.O.P. - PENTHOUSE128' - 6 1/2"

T.O.P. - PENTHOUSE128' - 6 1/2"

A.2B.2B.9F.2

PENTHOUSE

C:\R

evit

Proj

ects

\112

600_

13_F

aith

Hos

pita

l_A

rch\

Mod

el\b

rosa

s_11

2600

_13_

Faith

Hos

pita

l_Ar

ch_C

entra

l.rvt

3/6/

2014

3:38

:06

PM

REPL

ACEM

ENT

FACI

LITY

SCALE: 1/8" = 1'-0"2 E-W BUILDING SECTION

E-W BUILDING SECTION CONTINUED

SCALE: 1/8" = 1'-0"1 N-S BUILDING SECTION

N-S BUILDING SECTION CONTINUED

LEVEL 1100' - 0"

LEVEL 1100' - 0"

LEVEL 2114' - 8"

LEVEL 2114' - 8"

T.O.S @ VALLEY129' - 0"

T.O.S @ VALLEY129' - 0"

1.0 2.0 2.6 3.0 4.0 4.2 5.04.7 5.4 5.9 6.0 7.0 7.9 8.5 9.3 10.19.6 10.8 11.311.010.09.08.07.24.8 10.74.5

312

304

305

305

301

300

302

306

308

307

309

T.O. PARAPET - HIGH132' - 4"

T.O. PARAPET - HIGH132' - 4"

T.O. PARAPET - LOW118' - 0"

T.O. PARAPET - LOW118' - 0"

9.1 9.7 10.610.29.87.87.15.8

303

5.3

311

7.7 9.4

LEVEL 1100' - 0"

LEVEL 1100' - 0"

LEVEL 2114' - 8"

LEVEL 2114' - 8"

10.8 11.3 12 13.5 14.4 15.0 16.0 17.0 18.011.0 16.41310.7 13.4

300 306 312305

304

301

302313

305

T.O. PARAPET - LOW118' - 0"

T.O. PARAPET - LOW118' - 0"

319

11.9 14.2 15.113.6

LEVEL 1100' - 0"

LEVEL 1100' - 0"

LEVEL 2114' - 8"

LEVEL 2114' - 8"

T.O.S @ VALLEY129' - 0"

T.O.S @ VALLEY129' - 0"

T.0 S.0 R.0 Q.2 Q.0 P.0 N.0 M.0 L.0 J.4 H.0 G.0 F.4 F.0

301

303

P.8S.3 N.8S.1

312

305 306301 302

309

300 300

306

316

316302

317

T.O. PARAPET - HIGH132' - 4"

T.O. PARAPET - HIGH132' - 4"

T.O. PARAPET - LOW118' - 0"

T.O. PARAPET - LOW118' - 0"

T.O.P. - OFFICES131' - 2"

T.O.P. - OFFICES131' - 2"

319

F.2N.3P.1P.5R.8S.5S.6S.9T.2U.0 G.9T.3 T.1

LEVEL 1100' - 0"

LEVEL 1100' - 0"

LEVEL 2114' - 8"

LEVEL 2114' - 8"

16.017.018.0 16.4

312

304

302

301

305

302

T.O. PARAPET - LOW118' - 0"

T.O. PARAPET - LOW118' - 0"

LEVEL 1100' - 0"

LEVEL 1100' - 0"

LEVEL 2114' - 8"

LEVEL 2114' - 8"

CCBBAA

300

T.O. STEEL114' - 8"

T.O. STEEL114' - 8"

DD

300302

306

312

302305

318 304317 316

301

T.O. PARAPET - LOW118' - 0"

T.O. PARAPET - LOW118' - 0"

T.O. CMU FIREWALL119' - 3"

T.O. CMU FIREWALL119' - 3"

LEVEL 1100' - 0"

LEVEL 1100' - 0"

LEVEL 2114' - 8"

LEVEL 2114' - 8"

EEFFGG

T.O. STEEL114' - 8"

T.O. STEEL114' - 8"

300312

305

301

304

302300 316

302

T.O. PARAPET - LOW118' - 0"

T.O. PARAPET - LOW118' - 0"

T.O. CMU FIREWALL119' - 3"

T.O. CMU FIREWALL119' - 3"

SAW CUT AUSTIN BROWN STONE VENEER

4" STONE BANDING

HORIZONTAL METAL WALL PANEL

EIFS WALL PANEL SYSTEM

C:\R

evit

Proj

ects

\112

600_

13_F

aith

Hos

pita

l_A

rch\

Mod

el\b

rosa

s_11

2600

_13_

Faith

Hos

pita

l_Ar

ch_C

entra

l.rvt

3/6/

2014

3:37

:27

PM

REPL

ACEM

ENT

FACI

LITY

KEYNOTE LEGEND300 PRE-ENGINEERED PRE-FINISHED ALUMINUM CANOPY

301 EIFS FIELD PLASTER - STO CORPS. STO 10511 PACIFIC SANDFINISH

302 1/2" EIFS REVEAL TYP.

303 MBCI ECO-FICIENT INSULATED 7.2 PANEL SIGNATURE 300SLATE GREY FINISH

304 CREAM COLOR CAST STONE SILL TYP.

305 SAW CUT AUSTIN BROWN LIMESTONE VENEER

306 4" "DARK SIDE OUT" AUSTIN BROWN LIMESTONE 1/2" REVEAL

307 HOSPITAL LOGO SIGNAGE

308 CLEAR ANODIZED ALUMINUM CURTAIN WALL SYSTEM

309 STONE VENEER COLUMN COVER TO MATCH WALL PATTERN

311 LANTERN ELEMENT FINISH TO MATCH METAL WALL PANEL -RE: STRUCT. AND ARCH. DETAIL.

312 PRE-FINISHED ALUMINUM PARAPET COPING TYP. COLOR TOMATCH SLATE GREY

313 CLEAR ANODIZED ALUMINUM STOREFRONT SYSTEM

316 PRE ENGINEERED PRE-FINISHED AWNING SYSTEM

317 CLEAR ANODIZED ALUMINUM STOREFRONT AS SCHEDULEDTYP.

318 STONE VENEER PLANTER - RE: 4/A1.2

319 1" EXPANSION JOINT RE: STRUCTURAL

SCALE: 1/8" = 1'-0"1 FRONT ELEVATION

SCALE: 1/8" = 1'-0"2 FRONT OUTPATIENT CLINIC ELEVATION

SCALE: 1/8" = 1'-0"4 PARTIAL EAST ELEVATION

SCALE: 1/8" = 1'-0"3 ELEVATION AT BACK OF OUTPATIENT CLINIC

SCALE: 1/8" = 1'-0"5 E.D. ENTRY ELEVATIONSCALE: 1/8" = 1'-0"6 E.D. AMBULANCE ENTRY ELEVATION

MATERIALS LEGEND

02

Page 19: Benjamin Rosas Portfolio 2014

Lantern in the Landscape

S.3

2x WOOD BLOCKING WITH BREAKMETAL PLATE TO MATCHALUMINUM WINDOW MULLION

CONT. BACKER ROD &SEALANT ON BOTH SIDES.NOTE: PERIMETER SEALANTSHALL NOT COME INCONTACT WITH SELF-ADHERED MEMBRANE, TYP.

ALUMINUM CURTAINWALLAS SCHEDULED

CONT. THERMALFLAT FILLER

2 CONT. LAYERS OF 3/4"PLYWOOOD

CONT. METAL SOFFITTRIM W/ DRIP EDGE

CONT. SELF-ADHEREDHIGH TEMPERATURESEPARATION SHEET

CONT. METAL FASCIA

0'-1

"0'

-1"

CONT. METAL TRIM

0'-1

"0'

-1"

CONT. 2X WOOD BLOCKING

CUT-EDGE SEALANTAS SPECIFIED 1 1/2" MIN.

HOT-AIR WELD1 1/2" MIN.

1/4" COVER BOARD

TWO LAYERS OF 2"RIGID INSULATION ASSPECIFIED

TPO ROOFING SYSTEMAS SPECIFIED

METAL DECK(RE: STRUCT.)

JOIST EXTENSION(RE: STRUCT.)

7/8" FURRINGCHANNELS

MEMBRANE AIR BARRIERON 1/2" SHEATHING

1" METAL SOFFIT PANEL

CONT. SEALANT AND BACKER ROD 2 CONT. LAYERS OF 3/4"PLYWOOOD

CONT. METAL SOFFITTRIM W/ DRIP EDGE

CONT. SELF-ADHEREDHIGH TEMPERATURESEPARATION SHEET

CONT. METAL FASCIA

CONT. SEALANTAND BACKER ROD

3' - 0"

CONT. METAL TRIM

3' - 3"

T&G WOOD CEILING AS SPEC.

T&G WOODCEILING AS SPEC.

MEMBRANE AIRBARRIER ON 3/4"PLYWOODSHEATHING

STEEL BEAM (RE: STRUCT.)

3 5/8" METAL STUD

WOOD BLOCKING ASREQUIRED

6" METAL STUD W/ BATT INSULATION

A.F.F.28'-7"

CONTINUOUS BATT INSULATION

2"1/

2"2

1/2"

5.0

T.O. PARAPET - HIGH132' - 4"

DEFLECTION CLIP AT EACH STUD

CONT. TRANSITION MEMBRANE

CONT. ALUMINUM PARAPET COPING

CONT. STRIP OF 1/4" ROOF BOARD

CONT. STRIP OF TAPERED PERLITEINSULATION FROM 0" TO 1/2"

CONT. P.T. 2X6 WOOD NAILER W/SEPARATOR SHEET BETWEENTRACK AND WOOD NAILER

MIN.

1 1/2"

TPO ROOFING SYSTEMAS SPECIFIED

TWO LAYERS OF 2" RIGIDINSULATION AS SPEC.

METAL DECK(RE: STRUCT.)

STEEL ANGLE

1/4" COVER BOARD

CUT-EDGE SEALANTHOT AIR WELD 1 1/2" MIN.

STEEL JOIST(RE: STRUCT.)

4" 3"3"

8"M

IN.

1/2"

CONT. CLEAT

CONT. SEALANT & BACKER ROD

STONE VENEER AS SPEC.

2" BOARD INSULATION

1/2" GLASS FACED GYP. SHEATHING

FLUID APPLIED MEMBRANE AIR BARRIER

7X4X3/8 STEEL ANGLE

CONT. SELF-ADHERED MEMBRANE LAP OVERMETAL RECEIVER AND WOOD NAILERSCONT. BACKER ROD & SEALANTCONT. SHEET METALRECEIVER IN BED OF SEALANT

CONT. TERMINATION BARCONT. REMOVABLE SHEET METALCOUNTERFLASHING

1/2" ROOF BOARD

TPO REINFORCED MEMBRANE,FASTEN @ 12" O.C. MAX

TWO LAYERS OF 5/8" PLYWOOD SHEATHING

CONT. P.T. 2X6 WOOD NAILER

2" BOARD INSULATION

1/2" GLASS FACED GYP. SHEATHING

1/2" ROOF BOARD

6" METAL STUDS @ 16" O.C.

STEEL BEAM (RE: STRUCT.)

7X4X3/8 STEEL ANGLE

CONT. SEALANT & BACKER ROD

CONT. SHEET METAL FLASHINGIN BED OF SEALANT

STONE VENEER AS SPEC.

2" BOARD INSULATION

1/2" GLASS FACEDGYP. SHEATHING

FLUID APPLIEDMEMBRANE AIR BARRIER

ADJUSTABLE TWOPIECE MASONRYVENEER ANCHOR

CONT. SEALANTTERMINATION BAR

E.J

.

. 3/4"

ALUMINUM CURTAINWALLAS SCHEDULED

CONT. SEALANT & BACKERROD BOTH SIDES

STONE VENEER AS SPEC.

CONT. SELF-ADHEREDMEMBRANE

MIN.

3"

MEMBRANEAIR BARRIER

1/2" GLASS MATFACED GYP.SHEATHING

6" METAL STUDS

WOODBLOCKING

R-19 BATTINSULATION

LEVEL 1100' - 0"

ALUMINUM CURTAINWALLAS SCHEDULED

CONT. SEALANT & BACKERROD BOTH SIDES

CONCRETE PAVING(RE: CIVIL)

CONCRETE FOUNDATION(RE: STRUCT.)

S.3

3"

MIN.

1 1/2"

7 1/2"4 1/2"

ALUMINUM SUB SILL WITH END DAMS

CONT. BACKER ROD & SEALANT

CONT. P.T. 2X6 WOOD BLOCKING

STONE VENEER AS SPEC.

ADJUSTABLE 2 PIECE MASONRY VENEER ANCHOR

CONT. BACKER ROD & SEALANT, ALL SIDES

1' - 3 3/8"1/2"

6 3/8"

1'-8

"

TWO LAYERS OF 5/8" PLYWOOD SHEATHING

STEEL BEAM (RE: STRUCT.)

2 1/2" METAL STUDS ATTACHED TO STRUCTURAL BEAM

5/8" GYP. BOARD

ALUMINUM CURTAINWALL AS SCHED.

CONT. BACKER ROD & SEALANT

7"X4"X3/8" PTD. STEEL ANGLE

ALUMINUM STOREFRODNT AS SCHED.

5/8" GYP. BOARD

CEILING AS SCHED.

6"

6" METAL STUDS @ 16"O.C. SECURE STUD TOEACH VERTICAL CHANNEL

C5X9 CHANNEL@ 4'-0" O.CSHOWN BEYOND

STEEL ANGLE

METAL DECK(RE: STRUCT.)

TWO LAYERS OF 2"RIGID INSULATIONAS SPEC.

1/4" COVERBOARD

TPO ROOFINGSYSTEM AS SPEC.

CUT-EDGESEALANT

HOT AIR WELD1 1/2" MIN.

TPO REINFORCED MEMBRANE,WRAP OVER WOOD BLOCKINGAND FASTEN @ 12" O.C. MAX.

1/2" ROOF BOARD

R-19 BATT INSULATIONCONT. REMOVABLE SHEETMETAL COUNTER FLASHING

CONT. SHEET METAL RECEIVER

CONT. TERMINATION BAR

CONT. P.T. 2X WOOD BLOCKINGWITH TAPERED TOP

CONT. SEALANT & BACKER ROD

C:\R

evit

Proj

ects

\112

600_

13_F

aith

Hos

pita

l_A

rch\

Mod

el\b

rosa

s_11

2600

_13_

Faith

Hos

pita

l_Ar

ch_C

entra

l.rvt

3/6/

2014

3:38

:46

PM

REPL

ACEM

ENT

FACI

LITY

SCALE: 3" = 1'-0"1 EAVE @ ENTRY / CURTAINWALL HEAD

SCALE: 3" = 1'-0"3 SECTION DETAIL - COPING AT STONE VENEER

SCALE: 3" = 1'-0"4

CURTAINWALL JAMB -STONE ON STUD BACKUP

SCALE: 3" = 1'-0"5 CURTAINWALL SILL

SCALE: 3" = 1'-0"2 CURTAINWALL @ VESTIBULE

UP

DN

7.0

7.0

4A8.1

SB1

ENTRY1101

12A8.1

6'-8" CLR

2'-5

"3'

-6"

2'-5

"

8W18W1

8W18W1

MM

QQ

M

7.7

7.7

8' -

4" C

LR

LEVEL 1100' - 0"

LEVEL 1100' - 0"

LEVEL 2114' - 8"

LEVEL 2114' - 8"

HIGH ROOF129' - 4"

HIGH ROOF129' - 4"

7.0

14' -

8"

12A8.1

7.7

1A8.1

5' - 11 1/4"

11" EACH = 11'

12 TREADS4' - 10"

4' -

10"

1' -

2 1/

8"4'

- 10

"

SB1

SB2

STAIR1811

1811

1A8.1

4' - 10"

11" EACH = 11'

12 TREADS 13' - 5 3/4"

4' -

10"

1' -

2 1/

8"4'

- 10

"

2208

SB1

SA1

STAIR2208

LEVEL 1100' - 0"

LEVEL 1100' - 0"

LEVEL 2114' - 8"

LEVEL 2114' - 8"

T.O.S @ VALLEY129' - 0"

T.O.S @ VALLEY129' - 0"

4.0 5.04.7

6 3/

4" E

AC

H =

7'-4

"

13 R

ISER

S

6 3/

4" E

AC

H =

7'-4

"

13 R

ISER

S

T.O. PARAPET - HIGH132' - 4"

T.O. PARAPET - HIGH132' - 4"

LEVEL 1100' - 0"

LEVEL 1100' - 0"

LEVEL 2114' - 8"

LEVEL 2114' - 8"

T.O.S @ VALLEY129' - 0"

T.O.S @ VALLEY129' - 0"

S.0

7A8.1

T.O.P. - OFFICES131' - 2"

T.O.P. - OFFICES131' - 2"

EQ EQ EQ EQ

R.8

2' - 0"2' - 0"

26' - 0"

5' -

8"

T.1

63/

4"E

ACH

=5'

-73/

4"10

RIS

ERS

63/

4"E

ACH

=9'

-01/

4"16

RIS

ERS

7.0

7.0

4A8.1

2'-5

"3'

-6"

2'-5

"

6'-8" CLR

8W18W1

8W18W1

Q

Q

MM

Q

12A8.1

7.7

7.7

8'-4

"CLR

8A8.1

5'-0

"11

"EAC

H=

13'-9

"15

TREA

DS

4'-1

11/

2"

CW2

CW3

1117A

1117B

8A8.1

7A8.1

1' - 0"2' - 6"2' - 0"6' - 6"1' - 0"

2'-0

"EQ

EQEQ

EQ2'

-0"

4' - 6"8' - 6"

PRE-ENGINEERED PREFINISHEDALUMINUM CANOPY SYSTEM WITHINTERNAL DRAINAGE.8

A8.1

4'-1

11/

2"11

"EA

CH

=8'

-3"

9TR

EAD

S10

'-6"

1541

CW2

CW3

10' - 8 3/8"

4' - 8" 9 1/2" 4' - 8"

T.O.S @ VALLEY129' - 0"

T.O.S @ VALLEY129' - 0"

9.3 9.6

T.O. PARAPET - HIGH132' - 4"

T.O. PARAPET - HIGH132' - 4"

6" FLATBOTTUM DECKSLATE GRAY FINISH

3' - 7 5/8"

6" ALUMINUM FACIA

STONE WHITE FINISHALUMINUM BEAMSAND COLUMNS WITHINTERNAL DRAINAGE

2" 12"

2" 12"

DAYLIGHTABOVE ROOF 5'

-8"

LEVEL 1100' - 0"

LEVEL 1100' - 0"

LEVEL 2114' - 8"

LEVEL 2114' - 8"

T.O.S @ VALLEY129' - 0"

T.O.S @ VALLEY129' - 0"

4A8.1

C:\R

evit

Proj

ects

\112

600_

13_F

aith

Hos

pita

l_A

rch\

Mod

el\b

rosa

s_11

2600

_13_

Faith

Hos

pita

l_Ar

ch_C

entra

l.rvt

3/6/

2014

4:05

:56

PM

REPL

ACEM

ENT

FACI

LITY

SCALE: 1/4" = 1'-0"6 FIRST FLOOR ELEVATOR PLAN

SCALE: 1/4" = 1'-0"4 E-W ELEVATOR SECTION

SCALE: 1/4" = 1'-0"3 FIRST FLOOR FIRE STAIR PLAN

SCALE: 1/4" = 1'-0"2 SECOND FLOOR FIRE STAIR PLAN

SCALE: 1/4" = 1'-0"1 STAIRWELL SECTIONSCALE: 1/4" = 1'-0"8 N-S LOBBY STAIR SECTION

SCALE: 1/4" = 1'-0"9

SECOND FLOOR ELEVATORPLAN

SCALE: 1/4" = 1'-0"10

FIRST FLOOR LOBBY STAIRPLAN

SCALE: 1/4" = 1'-0"11 LANTERN PLANSCALE: 1/4" = 1'-0"5

SECOND FLOOR LOBBY STAIRPLAN

SCALE: 1/4" = 1'-0"7 LANTERN SECTION

SCALE: 1/4" = 1'-0"12 N-S ELEVATOR SECTION

Page 20: Benjamin Rosas Portfolio 2014

02

Wellness Center

Main Hospital

Page 21: Benjamin Rosas Portfolio 2014

O’Connell Robertson

Lantern in the Landscape

EMS Building

Page 22: Benjamin Rosas Portfolio 2014

Camelot E.S. and Spark Park

03

NEISD Camelot Elementary School 54,259 sq. ft. Addition, Renovations, and Public Park

San Antonio, Texas

New 2-story facility addition including classrooms, library, administrative, counseling, & clinic suites, teacher resource areas, parking improvements, site utilities, landscaping/irrigation, and central plant expansion for the new addition, and selective campus renovations including a public park.

Role: Project TechnicianPre-design planning, programming and analysis, conceptual massing studies, site planning, contextual research, presentation drawings, graphic illustrator, code and regulation research, technical drawing assistant. Involved in pre-design phases through schematic design, assisted in construction documentation, and construction administration.All responsibilities performed in a project team structure working closely with consultants and under the direct supervision of the Project Architect.

Half-size CD set available upon request.

Project

Location

Responsibilities

Program

Page 23: Benjamin Rosas Portfolio 2014

Camelot E.S. and Spark Park

O’Connell Robertson

Existing Site Plan

Ray

Bon

Driv

e

3 - L

ane

Dro

p-of

f/Pi

ck-u

p

Merlin Drive

LancelotDrive

Parking(65)

Kitchen ServiceEntry

Cafetorium

Admin.

ClassroomBuilding

MainPlayground

KinderPlayground

Gym

Gym

Portables

Park

ing

(27)

Merlin Drive

NEISD - Camelot Elementary

25’

75’

150’

N

Ray

Rayyyyy

Ray

Ray

Bon

Bon

Bonnn

Bonnn

Driv

Driv

Drivrivrrr

eeeee

3 -

333La

neane

ane

ane

anD

roD

roD

rD

rp-

ofp-

ofp-

ofofp-

op-

o-op-o

p-o

p-o

p-o-op-o

p-o-o-p-pp

f/Pi

f/Pi

ffck

-uku

ck-u

pppppp

Merlin Drive

LanLancelotDrivDrivD ee

(65)(65)(65)(65)(65)(65))(65)

KitcKitcKK tcK tcccchenhenhenhhhennn ServSeS icececeeeEntEntryy

CafeCafetoritorioroo umumm

AdmiAdmdmimimimimimiinnnnn.n

ClasClasassClassrosrosroroorosroosrosro mmmmBuilildingdingd

MMaMaiMMaMaMaiMaMMaMaMaMainMaMaMaMaMMaMaMMMMMaaMaiMMaiMaiMaiMaMMMaMaiaPlayPlayPlPlaPlayPlayPlaPlayPlayayayPPlayPlayylayyPlaPlayPlayyyyyyyyayyyyya grgrogrogrgrogroggrogrgrgrgrgrrogrouggrogrorrroggrorgroggrorro nddndddndddnddndndddnd

KinKindKinKKiKinKinKindKindinKinKindKindKindKinKKiKinKiK eerereerrerrererrPPPlayPlayPlayPPPPPlayPPPPPPPPla ggrougrougrougggg nndndn

GymGymm

GymGyymmm

PPPPPP tPortPortoortPortPortPoroPortPoPortPortortPPPPortPorPortortPortoPortPPoPP rtPPPPortPPPP tP blblableblabableabblableableableableeableablab ebleb sssssssssss

ark

ark

Park

Parkark

ark

Park

Parkaa

ing

ing

ing

ing

ing

ing

ii(2

7)272727(2727222

MerlinDrive

Sun and Wind

summer sun path

summer south-east breezes

winter nothern breezes

winter sun path

25’

75’

150’

N

Ray

Rayyyyy

Ray

Ray

Bon

Bon

Bonnn

Bonnn

Driv

Driv

Drivrivrrr

eeeee

3 -

333La

neane

ane

ane

anD

roD

roD

rD

rp-

ofp-

ofp-

ofofp-

op-

o-op-o

p-o

p-o

p-o-op-o

p-o-o-p-pp

f/Pi

f/Pi

ffck

-uku

ck-u

pppppp

Merlin Drive

LanLancelotDrivDrivD ee

(65)(65)(65)(65)(65)(65))(65)

KitcKitcKK tcK tcccchenhenhenhhhennn ServSeS icececeeeEntEntryy

CafeCafetoritorioroo umumm

AdmiAdmdmimimimimimiinnnnn.n

ClasClasassClassrosrosroroorosroosrosro mmmmBuilildingdingd

MMaMaiMMaMaMaiMaMMaMaMaMainMaMaMaMaMMaMaMMMMMaaMaiMMaiMaiMaiMaMMMaMaiaPlayPlayPlPlaPlayPlayPlaPlayPlayayayPPlayPlayylayyPlaPlayPlayyyyyyyyayyyyya grgrogrogrgrogroggrogrgrgrgrgrrogrouggrogrorrroggrorgroggrorro nddndddndddnddndndddnd

KinKindKinKKiKinKinKindKindinKinKindKindKindKinKKiKinKiK eerereerrerrererrPPPlayPlayPlayPPPPPlayPPPPPPPPla ggrougrougrougggg nndndn

GymGymm

GymGyymmm

PPPPPP tPortPortoortPortPortPoroPortPoPortPortortPPPPortPorPortortPortoPortPPoPP rtPPPPortPPPP tP blblableblabableabblableableableableeableablab ebleb sssssssssss

ark

ark

Park

Parkark

ark

Park

Parkaa

ing

ing

ing

ing

ing

ing

ii(2

7)272727(2727222

MerlinDrive

Future Park

futurecommunity

park

25’

75’

150’

N

Ray

Ray

Ray

Ray

RRBo

nBo

nnnnBo

nBo

nnB

Driv

Driv

Drivrivr

eeeee

3 -

333La

neane

ane

ane

anD

roD

roD

roD

rp-

ofp-

ofp-

ofofp-

o-op-o-op-o

p-o

p-o

p-o

p-o-op---p-p

f/Pi

f/Pi

ffck

-uuck

uppppppppp

Merlin Drive

LanLancelotDrivDrivD ee

(65)(65)(65)(65)(65)(65)(65)

KitcKitcKKK tctcccchenhenhenhhhennn ServSeS iceceececeEntEntryy

CafeCafetoritorioroo umumm

AdmiAdmidmimimimimimiiinnnnnn.

ClasClasClassClassrosrosrosroroorosroosros mmmmBuililuilddingding

MaMaMaMaMaMaiMaiMaMaMaMainMaMaiMMMaMMMaMMaMaMaiMaMaaiMaiMaiMMaMMMaaPlayPlayPlPlaPlayPlayPlalayPlalayPlaPlayayayyyPlaPlaPlayyyyPlalayyyyyyyaa grogrgroggrogrogrgrogrogrogrgrgrogrogrouggrrgrogrorgrgrogro nddndnddnddddndddddd

KinKinKinKKinKinKiKinKindKindKindKinKiniKindKininKKinK eerererrerererrrrPPPlayPlaPlayPlayPPPPlayPPPPla ggrogrougrougggg nndnddn

GymGymm

GymGyymmm

PPPPPPPortPortoortPortPortPortPortoPoPorto tPPortPorPortPortoPortPPPoPPP rtPortPPPortPPPP blblableblabableabblablebleabableleableableabbleeblesssssssssss

ark

Park

Park

Park

Parkark

ark

ark

arin

gin

gin

gin

gin

ginin

(27)27272727(2727272

MerlinDrive

Site Circulation

pedestriantraffi c

25’

75’

150’

N

Ray

Ray

Ray

Ray

RRBo

nBo

nnnnBo

nBo

nnB

Driv

Driv

Drivrivr

eeeee

3 -

333La

neane

ane

ane

anD

roD

roD

roD

rp-

ofp-

ofp-

ofofp-

o-op-o-op-o

p-o

p-o

p-o

p-o-op---pp

f/Pi

f/Pi

ffck

-uuck

uppppppppp

Merlin Drive

LanLancelotDrivDrivD ee

(65)(65)(65)(65)(65)(65)(65)

KitcKitcKKK tctcccchenhenhenhhhennn ServSeS iceceececeEntEntryy

CafeCafetoritorioroo umumm

AdmiAdmidmimimimimimiiinnnnnn.

ClasClasClassClassrosrosrosroroorosroosros mmmmBuililuilddingding

MaMaMaMaMaMaiMaiMaMaMaMainMaMaiMMMaMMMaMMaMaMaiMaMaaiMaiMaiMMaMMMaaPlayPlayPlPlaPlayPlayPlalayPlalayPlaPlayayayyyPlaPlaPlayyyyPlalayyyyyyyaa grogrgroggrogrogrgrogrogrogrgrgrogrogrouggrrgrogrorgrgrogro nddndnddnddddndddddd

KinKinKinKKinKinKiKinKindKindKindKinKiniKindKininKKinK eerererrerererrrrPPPlayPlaPlayPlayPPPPlayPPPPPla ggrogrougrougggg nndnddn

GymGymm

GymGyymmm

PPPPPPPortPortoortPortPortPortPortoPoPorto tPPortPorPortPortoPortPPPoPPP rtPortPPPortPPPP blblableblabableabblablebleabableleableableabbleeblesssssssssss

ark

Park

Park

Park

Park

ark

ark

ark

arin

gin

gin

gin

gin

ginin

(27)27272727(2727272

MerlinDrive

Views and Landmarks

potential for defi ned

courtyard

open space to temporarily

relocateportables

potentialfor southern landmark

potentialfor northern landmark

25’

75’

150’

N

Page 24: Benjamin Rosas Portfolio 2014

03

Pare

nt D

rop-

off/

Pick

-up

New Bus Drop-off/Pick-upNew Covered Walkway

Remodel

Admin. Library

Plant

2-Level Classroom Wing

Outdoor classroom/reading garden

NewParking

(50)

KinderPlayground

Temporaryportable

relocation

Merlin Drive

LLaannceeeelllllotDDDrriivvvvee

PPPPPPPPaaaaaaaaarrkkkkkkkkkiinnnnnnnnnggggggggggg((((((((((66666666666655555555555))))))))))

KKKKKiitttttccccccchhhhhhhheeeenn SSSSSeerviiiiccccceeeeeEEnnttryy

CCaaffeettooooooorriiuumm

CCCCClaaasssssssssssssssrrrrrrrroooooooooommmmBBBBBuuiiiiiiiillllllllldddddddddddddddiiiiiinngg

GGyymmm

GGGyyymmmm

PPPPPPPPPPPPaaaaaaaaaaarrkkkkkkkkkkk

iiiiiinnnnnnnnnnggggggggg

(((((((((1555555))))))))))

MerlinDrive

New

Cov

ered

Wal

kway

OUOUOUOOOOOOOOOOOO TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT

ININININ

OUOUOUOUTTTTT

NewMainEntry

INI

Southern Scheme - A

25’

75’

150’

N

Design Opportunities• Street appeal• Separate Parent and Bus Drop-

Off / Pick-Up lanes• Minimal Site/Utility

Modifi cations• Preferred solar orientation• Library has good adjacency to

existing campus• Opportunity for a reading

garden/outdoor classrom

Design ChallengesMain

Playground

NEISD - Camelot Elementary

IIN

6

Southern Scheme - B

25’

75’

150’

N

Pare

nt D

rop-

off/

Pick

-up

New Bus Drop-off/Pick-upNew Covered Walkway

Remodel

Admin.Library

Plant

2-Level Classroom Wing NewParking

(50)

KinderPlayground

Temporaryportable

relocation

RRRRRaaayyyyyy

BBBBBoooooonnnnnn

DDDDDrrrrrrrivvvvv

eeeee

Merlin Drive

LLaannceeelllllotDDDrriivvvvee

PPPPPPPaaaaaarrkkkkkkiinnnnnngggggggg(((((((((((66666666666555555555555)))))))))))

KKKKKiitttttccccccchhhhhhhheeeenn SSSSSeerviiiiccccceeeeeEEnnttryy

CCaaffeettooooooorriiuumm

CCCCClaaasssssssssssssssrrrrrrrroooooooooommmmBBBBBBBuuiiiiiiiiiillllllllldddddddddddiiiiinngg

GGyymmm

GGGyyymmmm

PPPPPPPPPPPaaaaaaaaaaaarrkkkkkkkkkkkk

iiiiiinnnnnnnnnnnnggggggggg

(((((((155555))))))))

MerlinDrive

New

Cov

ered

Wal

kway

INI

OUOUOUOOOOOOOOOOO TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT

ININININ

OUOUOUOUTTTTT

NewMainEntry

Design Opportunities• Separate Parent and Bus Drop-

Off / Pick-Up lanes• Minimal Site/Utility

Modifi cations• Preferred solar orientation• Library has good adjacency to

existing campus

MainPlayground

Design Challenges• Main entry at rear of site• New address

NEISD - Camelot Elementary

IIN

7

NeNeNeNeNeNeeNeeNNNNNNNNNNN wwwwwwwwwwwwwwwww CCCoCoCoCoCoCCoCooCooCCCCCCCCCCCC veveveveveveveveveeeevevvvvvvvvvvvvvvvvv rereeeeeeeeeeeeeeeeeeeeddddddddddddddd WaWaaWaWaWaWaWaWaWaWaWaWaWaWaaWaWaaWaWaWaWaaaaWaWaWaWaWaWaaWWWWWW lkllkkkkkkkkllllkll waawawawawawawawawawawwawawawawawawawwawawawawawwwwwawwwwwwwwwww yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy

NeNeeeeeeMaMaaaaEnEnn

Outdoor classroom/reading garden

Southern Scheme - C

25’

75’

150’

N

Pare

nt D

rop-

off/

Pick

-up

New Bus Drop-off/Pick-upNew Covered Walkway

Remodel

Admin.Library

Plant2-Level Classroom Wing

NewParking

(50)

KinderPlayground

Temporaryportable

relocation

RRRRRaaayyyyyyy

BBBBBBoooooonnnnnnnn

DDDDDDDDrrrrrrrrivvvvv

eeeee

Merlin Drive

LLaannceeeelllllotDDDrriivvvvee

PPPPPPPPaaaaaaaaarrkkkkkkkkkiinnnnnnnnnggggggggggg((((((((((66666666666655555555555))))))))))

KKKKKiitttttccccccchhhhhhhheeeenn SSSSSeerviiiiccccceeeeeEEnnttryy

CCaaffeettooooooorriiuumm

CCCCClaaasssssssssssssssrrrrrrrroooooooooommmmBBBBBBBuuiiiiiiiiiiiilllllllllldddddddddddiiiiinngg

GGyymmm

GGGyyymmmm

PPPPPPPPPPPPaaaaaaaaaaarrkkkkkkkkkkk

iiiiiinnnnnnnnnnggggggggg

(((((((((1555555))))))))))

MerlinDrive

MainPlayground

New

Cov

ered

Wal

kway

INN

OOOUOUOUOOOOOOOOOO TTTTTTTTTTTTTT

ININININ

OUOUOUOUTTTTT

NewMainEntry

Design Opportunities• Street appeal• Separate Parent and Bus Drop-

Off / Pick-Up lanes• Minimal Site/Utility

Modifi cations• Preferred solar orientation• Library has good adjacency to

existing campus

Design Challenges• Detached Library

NEISD - Camelot Elementary

8

Southern Scheme Studies

Page 25: Benjamin Rosas Portfolio 2014

Camelot E.S. and Spark Park

Southeastern Scheme A

Design Opportunities• Defi nes a Courtyard - improves

site security• Separate Parent and Bus Drop-

Off / Pick-Up lanes• Improved circulation• Minimal impact to existing

conditions• Excellent Library adjacencies• Defi ned front door• Opportunity for small outdoor

space between existing building and proposed Library

Design Challenges• Undesirable solar orientation• Front door is moved (new

address)• Renovation at building

connections

2 - L

ane

Bus D

rop-

off/

Pick

-up

New Parent Drop-off/Pick-up

New Covered WalkwayNew Main Entry

Remodel

Admin. Level 2 Floor Plan

Library

Multi-Purpose

LabPlant Plant

Classroom Classroom

Classroom Classroom

Classroom

Classroom Classroom

Music RoomTeacher

ResourcesTeacher

Resources

Classroom

Classroom Classroom

Classroom Classroom

Classroom

Classroom Classroom

Classroom

NewParking

(50)

FutureCourtyard

Future OutdoorSpace

Ray

Ray

Ray

BoBBn

Dn

Dn

Dn

Dn

Dn nn

rivrivrree

MerM lililin Driive

LanLana celotDriDriD veve

ParParParParPaParParPararPaa kinkinkinkinkinkinkinkinnggggggggg(65(65(65(65656(65(65(65((6 ))))))))

KitKitKitKitiKititKitittKitchechechechechechechechechechechechec eh nnnnnnnnnnnnnnnnnnnnn SerSeS viccvicceeeeEntEEntryry

CafCaCaCaCaCaCaCaCaCaCafCa etoetooooooriuriummmmmmmmm

CCClaCCClaCC ssrsssrssrssrssrrsrssssrsrooooomoomooomoomoomoomoomoooo mmmmmmmmmmmmBuiiuiuiildildiiiiiiildingn

Gymm

GymGymGymGymGymGymymymGymmGymGymymGymGymmm

arPar

PararPar

Parr

PararrarPki

nki

nki

nki

nki

nki

nki

nki

nkiiki

gggggggg(2

7(2

72727272727272722()

Merlin Drive

25’

75’

150’

N

IN

OUTTO

OUTOUTOUTUT

ININ

NEISD - Camelot Elementary

New

Cov

ered

Wal

kway

Remodel

Remodel

ALEClassroom

ALEClassroom

SoutheasternScheme

Design Opportunities• Defi nes an interior courtyard -

improves site security• Separate Parent and Bus Drop-

Off / Pick-Up lanes• Improved exterior circulation• Minimal impact to existing

conditions

Design Challenges• Undesirable solar orientation• Remote from rest of campus• Front door is moved (new

address)• No improved curb appeal

2 - L

ane

Pare

nt D

rop-

off/

Pick

-up

New Bus Drop-off/Pick-up

New Covered WalkwaysNewMainEntry

Remodel

Admin. Library Plant

2-Le

vel C

lass

room

Win

g

NewParking

(50)

KinderPlayground Temporary

portablerelocation

RRRRRRaaaaayyyy

BBBBBBonnnnnnn

DDDDDrrrrriiivvvvv

eeeeee

MMerllliin Drive

LLaaanncelotDDDrriivvvvee

PPPPPPPPPPPaaaaaaaaaaarrrrrkkkkkkkkkkkiiiiiiinnnnnnnnngggggggggggg(((((((((((66666666666555555555)))))))))))

KKKKKiittttttcccccccchhhhhhheeeeeeennnnnnn SSSSSeerviiccccceeeeeEEnntttryy

CCaaffeettooooooorriiuummmmm

CCCClaaasssssssssssssssrrrrrrrroooooooooooooooommmmBuiilllddddiinngg

GGymmm

GGGyyymmmm

PPPPPPPaaaaaaaaaaaarrrrrrrrrkkkkkkkkkkkk

iiiiiiiiinnnnnnnggggggggg

((22222222222227777777777)

MerlinDrive

25’

75’

150’

N

OUUT

OUOUOUOO TTTTT

ININININ

MainPlayground

NEISD - Camelot Elementary

9

Courtyard Scheme Studies

Page 26: Benjamin Rosas Portfolio 2014

03

Site Plan

Spark Master Plan Spark Ground Breaking

Spark Entry Sketch

Axon

N

N

Page 27: Benjamin Rosas Portfolio 2014

Camelot E.S. and Spark Park

First Floor Plan

Second Floor Plan

Courtyard Panorama

East Panorama

N

Page 28: Benjamin Rosas Portfolio 2014

03

Front Entry

Courtyard Aerial

Page 29: Benjamin Rosas Portfolio 2014

O’Connell Robertson

Camelot E.S. and Spark Park

Page 30: Benjamin Rosas Portfolio 2014

East Commerce Community Cultural Library

04

Commerce and Mesquite, San Antonio, Texas - East Side

24,000 g.s.f. Branch Library

AIA Student Design Honor Award Dean’s Award for Best Master’s Project

Full project booklet available upon request

Building upon a legacy of community engagement and social activism, the library serves the Eastside of San Antonio as a symbol of societal growth and educational achievement. The library houses 40,000 volumes including a collection of culturally meaningful rare books and art. With early design input from the community, it serves as a vibrant hub in a place dense with history and civic momentum. The building is designed to restore the urbanfabric along the Commerce Street corridor, to be a steward of environmental and cultural resources, and reconnect the neighborhood to the north and south. The Library’s form and arrangement of space look to local landmarks as a basis for inspiration. The two fl oors of the library open to and face a grand mural on the neighboring building as a formal nod to the power of local art as a medium for expressing the community’s voice.

Location

Program

Awards

Objective

Page 31: Benjamin Rosas Portfolio 2014

Master’s Project - UTSA College of Architecture - M.Arch.II Sequence

E.C.C.C.L.

Page 32: Benjamin Rosas Portfolio 2014

1//////4

mi.

5 min. walk

1////////////////4

mi.

5 min. walk

Average Rainfall

Diffuse Solar Radiation (3D)

Average Temperature

Direct Solar Radiation

Prevailing Winds

Direct Solar Radiation (3D)

1//4

mi.

5 min. walk

f S l R di ti (3D)Dire DiffDiff

1//4

mi.

5 min. walk

Street Level Floor Plan

04

Page 33: Benjamin Rosas Portfolio 2014

E.C.C.C.L.

East Elevation

North-South Section

Second Level Floor Plan Roof Plan

Page 34: Benjamin Rosas Portfolio 2014

West Elevation

North Streetscape Elevation

Plaza

04

Page 35: Benjamin Rosas Portfolio 2014

E.C.C.C.L.

South Elevation

East-West Section

Plaza

Page 36: Benjamin Rosas Portfolio 2014

Rare Book Wall

04

Page 37: Benjamin Rosas Portfolio 2014

E.C.C.C.L.

Interior Atrium

Interior Atrium

Page 38: Benjamin Rosas Portfolio 2014

Commerce Streetscape

04

Page 39: Benjamin Rosas Portfolio 2014

E.C.C.C.L.

Master’s Project - UTSA College of Architecture - M.Arch.II Sequence

Page 40: Benjamin Rosas Portfolio 2014

R.E.S.T.Pavilion

05

Shade Shelter

Methodist Mission Home - San Antonio, Texas

Offer volunteer Design + Build services to the Southwest Center for Higher Independence at the Methodist Mission Home to enable young adults with disabilities to comfortably engage in social interaction and outdoor activities protected from the harsh Texas sun.

Role: Project LeaderInitial client consultation, conceptual design, presentations and presentation graphics, fundraising, consultant coordinator, site planning, contextual research, code and regulation research, material research, cost estimating, budgeting, scheduling, execution of technical design detail aspects of the project, construction. Involved in all aspects of project design, client consultation, documentation, construction administration, and execution.All responsibilities performed in a volunteer project team structure working closely with consultants, volunteers, donors, and team members.

Additional information available upon request.

Program

Location

Responsibilities

Objective

Page 41: Benjamin Rosas Portfolio 2014

Volunteer Initiative

“When you seek shelter, fi nd refuge in the shadow of His wings.When you seek knowledge, fi nd edifi cation along his paths.

When you seek courage, fi nd strength upon his rock.When you seek love, fi nd tranquility in his presence.

And when you seek God, you will be found.”

Refuge • Edifi cation • Strength • Tranquility

-Jenny Bowen

East ElevationNorth Elevation

R.E.S.T. Pavilion

Page 42: Benjamin Rosas Portfolio 2014

Phase 1 - (P1)Fence Relocation and Ramp Renovation

Phase 2 - (P2)Pavilion and Brick Paving

Phase 3 - (P3)Landscaping

(P1)

(P2)

(P1)

(P3)

05

Page 43: Benjamin Rosas Portfolio 2014

R.E.S.T. Pavilion

Page 44: Benjamin Rosas Portfolio 2014

05

Page 45: Benjamin Rosas Portfolio 2014

R.E.S.T. Pavilion

Page 46: Benjamin Rosas Portfolio 2014

05

Page 47: Benjamin Rosas Portfolio 2014

R.E.S.T. Pavilion

Volunteer Initiative

Page 48: Benjamin Rosas Portfolio 2014

05

Page 49: Benjamin Rosas Portfolio 2014

R.E.S.T. Pavilion

Volunteer Initiative

Page 50: Benjamin Rosas Portfolio 2014

Thank you.

Benjamin J. Rosas Learner | Connectedness | Belief | Ideation | Input - Clifton Strengths Finder 2.0

1127 Townsend Ave.Alamo Heights, TX 78209210.414.5576 [email protected]