beth nagel construction contact construction … nagel construction contact phone: 419-372-8410...
TRANSCRIPT
Beth Nagel
Construction ContactPhone: 419-372-8410
Associate/Telephone No. Project
Bid/RFQ (If Applicable) Manager/ Prebid Meeting Bid Opening,
No. Bid Title Prints Telephone# Date/Location Date &Time Shortlisted Firms Awards
RFQ #BGU176287 City of Bowling Green & n/a Steve Krakoff n/a 9/18/2017
BGSU East Wooster Street 419.372.7127 Purchasing
Corridor Redevelopment Project 3:00 p.m.
Bid #6303 BTSU Multicultural Center Moody-Nolan Joe Phillips 8/24/2017 9/6/2017
Renovation 614.461.4664 419.372.3588 10:00 a.m. 3:00 p.m.
Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
Bid # 6298 BTSU 212 Dishwasher mda engineering, inc. Bob Boucher 7/31/2017 8/11/2017
Replacement 419.893.3141 Kevin Lafferty 419.372.7639 2:00 p.m. 10:00 a.m.
Prints @ [email protected] Purchasing Purchasing
Bid #6293 Oaks 100 Teaching the jdi group, Inc. Ryan Miller 6/19/2017 7/6/2017 The Spieker Company
Kitchen 419-725-7161 Karen Walker 419.372.9628 1:30 p.m. 11:00 a.m.
Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
Bid #6280 Business Administration & RAM USA Joe Phillips 5/9/2017 5/23/2017 Advanced Roofing
Addition Roof 216.393.7663 David Chenoweth 1:00 p.m. 3:00 p.m. Services
Replacement Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
Bid #6274 Enterprise Square JDRM Engineering, Inc. Tim Burns 4/18/2017 5/5/2017 T&C Contractors
Apartments Fiber Darren Keil 419.824.2400 419.372.7637 10:00 a.m. 10:00 a.m.
Install Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
RFQ# Hanna Hall Renvoation/ n/a Mike Schuessler/ n/a 4/21/2017 Resource International
BGU 176273 Addition (CM Advisor) Kristi Peiffer 4:00 p.m.
Bid #6269 McFall Elevator Buehrer Group Architecture & Engineering Tim Burns 3/29/2017 4/7/2017 Comte Construction
Modernization Kent Buehrer 419.893.9021 419.372.7637 1:30 p.m. 10:00 a.m.
Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
Bid #6268 Jerome Librarary 122-125 Technicon Design Group Brian Swope 3/27/2017 4/13/2017 The Spieker Company
Reno.-Innovator's Gillian Stechschulte 419.523.5323 419.372.1009 3:00 p.m. 2:30 p.m.
Space www.technicondesigngroup.com/plan-room Purchasing Purchasing
Bid #6267 2017 Classroom Upgrade Technicon Design Group Kristi Peiffer 3/27/2017 4/11/2017 Mosser Construction
Purchasing Department
Construction Refurbishing Projects1851 N. Research Drive
Bowling Green, OH 43403
Phone: 419-372-8411
Beth Nagel
Construction ContactPhone: 419-372-8410
Associate/Telephone No. Project
Bid/RFQ (If Applicable) Manager/ Prebid Meeting Bid Opening,
No. Bid Title Prints Telephone# Date/Location Date &Time Shortlisted Firms Awards
Purchasing Department
Construction Refurbishing Projects1851 N. Research Drive
Bowling Green, OH 43403
Phone: 419-372-8411
Project-Education Gillian Stechschulte 419.523.5323 419.372.3830 10:30 a.m. 1:30 p.m.
Building www.technicondesigngroup.com/plan-room Purchasing Purchasing
Bid #6266 Perry Stadium Fence O Sports - Jack Krebs Brian Swope 3/16/2017 4/4/2017 Allied Builders, Inc.
Replacement 216.861.2020 x 3035 419.372.1009 10:30 a.m. 1:30 p.m.
Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
Bid # 6264 Carl Walker Inc. Joe Phillips 3/23/2017 4/4/2017 Grunwell-Cashero
630.307.3800 William Mahler 419-372-3588 1:00 p.m. 10:30 a.m.
Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
Bid # 6263 Carl Walker Inc. Joe Phillips 3/23/2017 3/30/2017 Trisco Systems
630.307.3800 William Mahler 419-372-3588 10:00 a.m. 2:00 p.m.
Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
RFQ# Hanna Hall Renovation/ n/a Mike Schuessler/ 2/23/2017 3/3/2017 The Collaborative The Collaborative
BGU-176257 Addition (A/E) Kristi Peiffer 1:00 p.m. 2:00 p.m. Bostwick Design
Design Group
419.372.3748 & 3830
228 Bowen Thompson
Student Union Purchasing Schooley Caldwell
Bid #6256 MP FCS-West Dmo/FN The Mannik & Smith Group, Inc. Ryan Miller 3/22/2017 4/10/2017 Baumann Enterprises
Mech Well 419.891.2222 Greg Buhoveckey 419.372.9628 10:30 a.m. 1:30 p.m.
Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
Bid #6253 Ice Arena Rink Floor SHP Leading Design Tim Burns 2/9/2017 2/23/2017 Mosser Construction
Replacement 513.381.2112 Allison McKenzie 419.372.7637 3:00 p.m. 2:00 p.m.
Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
RFQ # Moore Musical Arts Center Mike Schuessler n/a 10/21/2016 IPS Holdings IPS Holdings
BGU-166241 Ductwork Replacement 419.372.3748 Infinity Construction
RFQ # East Campus/Centrex n/a Robert Boucher n/a 10/6/2016 IPS Holdings IPS Holdings
BGU 166235 Electrical Load Center 419.372.7639 1:00 p.m. The Lathrop Company
Elimination (CMR) Purchasing
The Whiting-Turner
Contracting Co.
Res Life Masonry Pointing-
FY16 Phase I (Conklin Hall
and Founders Hall)
Residence Life Masonry
Pointing- FY16 Phase II (
Kohl Hall & McDonald
Hall)
Beth Nagel
Construction ContactPhone: 419-372-8410
Associate/Telephone No. Project
Bid/RFQ (If Applicable) Manager/ Prebid Meeting Bid Opening,
No. Bid Title Prints Telephone# Date/Location Date &Time Shortlisted Firms Awards
Purchasing Department
Construction Refurbishing Projects1851 N. Research Drive
Bowling Green, OH 43403
Phone: 419-372-8411
RFQ # BGSU Ice Arena Space n/a Robert Waddle n/a 8/26/2016 SHP Leading Design SHP Leading Design
BGU-166228 Study 419.372.7132 12:00 p.m. O Sports
Purchasing The Collaborative
Crawford Architects
RFQ# Regional Engineering n/a Brian Swope 7/22/2016
BGU-166220 Services Provider 419.372.1009 10:00 a.m. BGU 166220 link
Purchasing
Bid #6217 Jerome Library- Technicon Design Group Robert Boucher 7/12/2016 7/26/2016 Comte Construction
SAS Alterations 419.523.5323 419.372.7639 3:00 p.m. 3:00 p.m.
Prints-Technicon Design Group Joe Phillips 419-372-3588 Purchasing Purchasing
RFQ# Harshman/Centrex n/a Robert Boucher n/a 7/8/2016 AECOM Technical Srvc. Prater Eng. Assoc.
BGU-166215 Load Center Electrical 419.372.7639 11:00 a.m. Prater Eng Assoc
Conversions Purchasing JDRM Engineering
RFQ# MP-FCS/West Hall n/a Ryan Miller n/a 6/24/2016
The Mannik & Smith
Group
The Mannik & Smith
Group
BGU-166211 Demotion (A/E) 419.372.9628 11:00 a.m.
Munger Munger &
Assoc
Purchasing
Bid #6210 2016 Res Life Masonry Carl Walker, Inc. Joe Phillips 6/15/2016 Bid Cancelled
Pointing 216.264.2900 419.372.3588 2:00 p.m.
Founders South Elevation Prints @ Becker Impression 419.385.5303 Purchasing
Bid #6207 Jerome Library Phase II Buehrer Group Architecture & Engineering Tim Burns/Joe Phillips 6/1/2016 6/15/2016 Advanced Roofing
Concrete Deck Renovation 419.893.9021 419.372.7637 10:00 a.m. 10:00 a.m.
& Roof Replacement Prints @ Becker Impression 419.385.5303 419.372.3588 Purchasing Purchasing
Bid #6206 Central Chiller Plant #3 HAWA, Inc. Robert Boucher 6/20/2016 7/11/2016 Industrial Power Systems
in Olscamp (CCP3) 614.451.1711 419.372.7639 2:00 p.m. 2:00 p.m.
Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
Bid #6204 2016 Res Life Masonry Carl Walker, Inc. Joe Phillips 5/25/2016 6/8/2016 Bid Cancelled
Pointing 216.264.2900 419.372.3588 1:00 p.m. 2:00 p.m.
(Conklin Hall) Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
Beth Nagel
Construction ContactPhone: 419-372-8410
Associate/Telephone No. Project
Bid/RFQ (If Applicable) Manager/ Prebid Meeting Bid Opening,
No. Bid Title Prints Telephone# Date/Location Date &Time Shortlisted Firms Awards
Purchasing Department
Construction Refurbishing Projects1851 N. Research Drive
Bowling Green, OH 43403
Phone: 419-372-8411
Bid #6196 Doyt L. Perry Stadium Sportworks Field Design Brian Swope 4/21/2016 5/13/2016 Shaw
Synthetic Turf 513.779.7851 419.372.1009 3:00 p.m. 2:00 p.m.
Replacement Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
Bid #6195 MP-E McDonald Annex Technicon Design Group Joe Phillips 4/19/2016 5/3/2016 Trisco Systems
Phase 1 419.523.5323 419.372.3588 10:00 a.m. 10:00 a.m.
Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
Bid #6194 Conklin North Prater Engineering Robert Boucher 4/18/2016 4/28/2016 Westfield Electric
Residence Hall 614.766.4896 419.372.7639 2:00 p/.m. 1:00 p.m.
Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
Bid #6192 2016 Repaving Star Consultants, Inc. Mike Schuessler 4/5/2016 4/18/2016 Geddis Paving
614.538.8445 419.372.3748 10:00 a.m. 10:30 a.m.
Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
Bid #6191 Kreischer Hall-Building StructureTec Corporation Joe Phillips 4/13/2016 4/25/2016 Trisco Systems
Envelope Restoration 248.848.1791 419.372.3588 10:30 a.m. 3:30 p.m.
Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
Bid #6189 University Hall BHDP Architecture-Loren Brockway Brian Swope 3/31/2016 4/14/2016 Mosser Construction
Renovation 614.827.9597 419.372.1009 10:00 a.m. 2:00 p.m.
Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
Bid #6187 A&S Eyewash Stations MDA Engineering, Inc. Robert Boucher 3/17/2016 4/4/2016 Marlin P. White & Sons
419.893.3141 419.372.7639 2:00 p.m. 2:00 p.m.
Prints @ MDA 419.893.3141 Purchasing Purchasing
RFQ #BGU 166184 Regional Architectural n/a Brian Swope n/a 3/28/2016
http://www.bgsu.edu/con
tent/dam/BGSU/design-
and-
construction/documents/a
rchitect-consultants-
list/Approved%20List.pd
Services Provider 419.372.1009 2:30 p.m.
Purchasing-Huntington
Bid #6180 Jerome Library Phase II Buehrer Group Architecture & Engineering Tim Burns 3/3/2016 3/18/2016 Bid cancelled with
Beth Nagel
Construction ContactPhone: 419-372-8410
Associate/Telephone No. Project
Bid/RFQ (If Applicable) Manager/ Prebid Meeting Bid Opening,
No. Bid Title Prints Telephone# Date/Location Date &Time Shortlisted Firms Awards
Purchasing Department
Construction Refurbishing Projects1851 N. Research Drive
Bowling Green, OH 43403
Phone: 419-372-8411
Reroofing 419.893.9021 419.372.7637 10:00 a.m. 10:00 a.m. no award made
Prints @ Becker Impression 419.385.5303 Purchasing-Huntington Bldg.Purchasing-Huntington Plan to re-bid
RFQ #BGU 166176 Residence Life N/a Joe Phillips n/a 2/29/2016 Carl Walker, Inc. Carl Walker, Inc.
Masonry Pointing-FY 16 419.372.3588 3:00 p.m.
Purchasing-Huntington
Bid #6174 BTSU Career Center, Davis Wince, LTD-Kathleen Kelly Brian Swope 2/11/2016 2/24/2016 Elford, Inc.
Student Employment 614.785.0505 419.372.1009 10:30 a.m. 2:00 p.m.
Services & BGSU Store Prints @ DC Reprographics 614.297.1200 Purchasing-Huntington 104 Purchasing-Huntington
Bid #6171 University Hall BHDP Architecture-Loren Brockway Brian Swope 1/26/2016 2/9/2016 Mosser Construction
Renovation-Demolition 614.827.9597 419.372.1009 10:00 a.m. 2:00 p.m.
Package Prints @ Becker Impressions 419.385.5303 Purchasing Purchasing
Bid #6162 MP E-Founders Kitchen Poggemeyer Design Group Ryan Miller 12/4/2015 12/21/2015 No Award
Renovation 419.352.7537 Bill Steele 419.372.9628 10:00 a.m. 2:00 p.m.
Prints @ Becker Impressions 419.385.5303 Purchasing Purchasing
Bid #6161 Book Depository-HVAC AECOM Robert Boucher 11/18/2015 12/3/2015 Warner Mechanical
Generator @ Levis 216.622.2400 Paul Goth 419.372.7639 10:00 a.m. 11:00 a.m.
Commons Prints @ Becker Impressions 419.385.5303 Book Depository Purchasing
RFQ # Olscamp Central Chiller n/a Robert Boucher n/a 12/11/2015 Motz Consulting Eng HAWA Incorporated
BGU 156158 Plant CCP-3 (A/E) 419.372.7639 2:00 p.m. KZF Design
Purchasing Heapy Engineering
HAWA Inc.
Fishbeck, Thompson,
Carr & Huber
Prater Eng Assoc
Bid #6157 Stadium Phase 1 O'Sports Brian Swope 11/10/2015 11/24/2015 The Spieker Company
Repairs Upgrade 216.861.2020x3035 419.372.1009 10:00 a.m. 11:00 a.m.
Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
RFQ# Perry Stadium Phase II n/a Brian Swope n/a 10/23/2015 O Sports O Sports
BGU 156153 Renovation (A/E) 419.372.1009 Moody Nolan
Beth Nagel
Construction ContactPhone: 419-372-8410
Associate/Telephone No. Project
Bid/RFQ (If Applicable) Manager/ Prebid Meeting Bid Opening,
No. Bid Title Prints Telephone# Date/Location Date &Time Shortlisted Firms Awards
Purchasing Department
Construction Refurbishing Projects1851 N. Research Drive
Bowling Green, OH 43403
Phone: 419-372-8411
Rossetti Assoc.
Bid #6150 BTSU Parking Lot 7 The Mannik & Smith Group Mike Schuessler 9/29/2015 10/12/2015 Russ James Contracting
Renovations - Phase 1 419.891.2222 419.372.3748 9:00 a.m. 10:00 a.m.
Prints @ Becker Impression 419.385.5303 10th floor Admin Bldg Purchasing
RFQ# University Hall Renovation n/a Brian Swope n/a 8/28/2015 Resources International Resources International
BGU-156146 CM Advisor 419.372.1009 1:00 p.m. Hill International
Purchasing
Constr. Support
Solutions
RFQ# Campus Energy & n/a Brian Swope n/a 9/2/2015 Black & Veatch Corp. SHP Leading Design
BGU-156144 Sustainability Study 419.372.1009 1:00 p.m. Heapy Engineering
Purchasing AECOM Technical Srvc.
SHP Leading Design
RFQ# Auxiliary Property n/a Mark Hester n/a 8/7/2015 K2M Design EMG
BGU-156139 Condition Assessment 419.372.7686 2:00 p.m. EMG
Purchasing VFA, Inc.
Bid #6136 Eppler North Renovations Buehrer Group Architecture & Engineering Tim Burns 7/10/2015 7/22/2015 Midwest Contracting, Inc.
419.893.9021 419.372.7637 10:00 a.m. 1:30 p.m.
Prints @ Becker Impression 419.385.5303 Campus Oper. Rm 112 Purchasing
RFQ# University Hall n/a Brian Swope n/a 7/17/2015
Baxter Hodell Donnelly
Preston
Baxter Hodell Donnelly
Preston
BGU-156135 Renovation (A/E) 2:00 p.m. SSOE, Inc.
Purchasing Stantec Architecture
Bid #6133 Founders Hall Elevators Buehrer Group Architecture & Engineering Tim Burns 7/1/2015 7/9/2015 Comte Construction
419.893.9021 419.372.7637 10:00 a.m. 1:30 p.m.
Prints @ Becker Impression 419.385.5303 Campus Oper. Rm 112 Purchasing
RFQ# Architect & Landscape Architect Brian Swope n/a 7/8/2015 Cancelled with no
BGU-156129 Consultant List 2015-2017 n/a 419.372.1009 4:00 p.m. awards made
Purchasing
Bid #6128 Perry Field House Track/ The Collaborative Inc. Ryan Miller 6/22/2015 7/7/2015 Keifer Specialty Flooring
Beth Nagel
Construction ContactPhone: 419-372-8410
Associate/Telephone No. Project
Bid/RFQ (If Applicable) Manager/ Prebid Meeting Bid Opening,
No. Bid Title Prints Telephone# Date/Location Date &Time Shortlisted Firms Awards
Purchasing Department
Construction Refurbishing Projects1851 N. Research Drive
Bowling Green, OH 43403
Phone: 419-372-8411
Court 4 Flooring 419.242.7405 419.372.9628 10:00 a.m. 2:00 p.m.
Replacement Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
Bid # 6123 Park Avenue Warehouse SHP Leading Design Joe Phillips 6/9/2015 6/23/2015 The Spieker Company
Renovation 614.223.2124 Ivan Vukcevich 10:30 a.m. 2:00 p.m.
Prints Becker Impressions 419.385.5303 Purchasing Purchasing
Bid # 6119 BGSU Football RossettiAssociates, Inc. Brian Swope 5/7/2015 5/27/2015 The Spieker Company
Training Facility 313.463.5151 3:00 p.m. 2:00 p.m.
Prints Toledo Blue Print 419.661.9841 Campus Operations Purchasing
RFQ # Moseley Hall Tim Burns n/a 5/29/2015 Ruscilli Construction The Lathrop Company
BGU 156118 Renovation (CMR) 419.372.7637 12:00 p.m. Shook Touchstone
Purchasing The Lathrop Company
Bid # 6117 2015 Repaving Star Consultants Mike Schuessler 5/12/2015 5/28/2015 Gerken Paving
614.538.8445 419.372.3748 10:00 a.m. 10:00 a.m.
Prints Becker Impressions 419.385.5303 Purchasing Purchasing
Bid FY13 Roof Replacement- Technicon Design Group Tim Burns 5/7/2015 5/20/2015 Nordmann Roofing
6116 Founders 419.372.8410 3:30 p.m. 3:30 p.m.
Purchasing Purchasing
RFQ # Moseley Hall n/a Tim Burns n/a 5/13/2015 BHDP Architecture Design Group
BGU 156115 Renovation (A/E) 419.372.7637 2:00 p.m. Hasenstab Architecture
Stantec Architecture
Purchasing Design Group
Stantec Architecture Moody Nolan
RFQ # Bowen Thompson Student Robert Waddle n/a 4/30/2015 Moody Nolan
BGU 156113 Union Space Study n/a 419.372.7132 12 Noon The Collaborative
Purchasing WTW Architects
RFQ # Bowen Thompson Student Brian Swope n/a 4/30/2015 Davis Wince, Ltd. Davis Wince, Ltd.
Beth Nagel
Construction ContactPhone: 419-372-8410
Associate/Telephone No. Project
Bid/RFQ (If Applicable) Manager/ Prebid Meeting Bid Opening,
No. Bid Title Prints Telephone# Date/Location Date &Time Shortlisted Firms Awards
Purchasing Department
Construction Refurbishing Projects1851 N. Research Drive
Bowling Green, OH 43403
Phone: 419-372-8411
BGU 156112 Union 2nd Floor Career Center n/a 419.372.1009 2:00 p.m.
Garmann/Miller &
Assoc.Annette Miller
Architects
Conklin N Student Room
Renovation BGSU Office of Capital Planning Brett Pogan 3/13/2015 4/3/2015 Van Tassel Construction
Bid #6110 419.372.3853 1:30 p.m. 2:00 p.m.
Purchasing Purchasing
Huntington Building
Renovation Annette Miller Architects Kristi Hafer 2/19/2015 3/10/2015 Infinity Construction
Bid #6093 937.228.7841 419.372.3830 2:00 p.m. 2:00 p.m.
Purchasing Purchasing
Residence Life 2015 MDA Engineering, Inc. Brett Pogan 2/12/2015 2/26/2015 Torrence Sound
Bid #6090 Security Upgrades 419.893.3141 419.372.3853 1:30 p.m. 2:00 p.m.
Prints @ MDA 419.893.3141 Purchasing Purchasing
RFQ # Perry Stadium Phase 1 n/a Brian Swope 2/27/2015 Osborn Engineering Co.
BGU-156088 Repairs/Upgrades 419.372.1009 n/a 1:00 p.m.
Purchasing
RFQ#
Classroom Upgrade
Project n/a Swope/Burns 2/13/2015 Mosser Construction Elford, Inc.
BGU-146081 419.372.1009 n/a 1:00 p.m. The Lathrop Company
419.372.7637 Purchasing Elford, Inc.
RFQ#
Infrastructure Upgrades
and CCP2 n/a Robert Boucher n/a 1/6/2015 IPS Holdings IPS Holdings
BGU-146078 419.372.7639 1:00 p.m. Quandel Construction
Purchasing Shook TouchstoneFY13 Roof
Replacements- Technicon Design Group, Inc. Tim Burns 10/16/2014 11/4/2014 E. Lee Construction
Bid #6071 Overman South 419.523.5323 419.372.7637 2:00 p.m. 2:00 p.m.
Prints @ Becker Impression 419.385.5303 Purchasing PurchasingOverman Hall Physics
Lab MDA Engineering, Inc. Fritz Roberson 10/14/2014 10/31/2014 Warner Mechanical
Bid #6070 419.893.3141 419.372.7730 10:00 a.m. 10:00 a.m.
Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
Beth Nagel
Construction ContactPhone: 419-372-8410
Associate/Telephone No. Project
Bid/RFQ (If Applicable) Manager/ Prebid Meeting Bid Opening,
No. Bid Title Prints Telephone# Date/Location Date &Time Shortlisted Firms Awards
Purchasing Department
Construction Refurbishing Projects1851 N. Research Drive
Bowling Green, OH 43403
Phone: 419-372-8411
Jerome Library Deck
Renovation Buehrer Group Architecture & Engineering Tim Burns 7/22/2014 8/5/2014 Lithko
Bid 6044 (Roof-Masonry 2013) 419.893.9021 419.372.7637 1:30 p.m. 11:00 a.m.
Prints @ Becker Impression 419.385.5303 Purchasing PurchasingFirelands Foundation
Hall MDA Engineering, Inc. Robert Boucher 8/6/2014 8/15/2014 Warner Mechanical
Bid 6021 Chiller Replacement 419.893.3141 419.372.7639 10:00 a.m. 10:00 a.m.
Prints @ Becker Impression 419.385.5303 Firelands Purchasing
RFQ# Engineering Services- Tim Burns 7/14/2014
BGU 146036 Pre-Qualified Consultant List n/a 419.372.7637 n/a 3:00 p.m.
PurchasingFY13 Classroom
Upgrades Technicon Design Group, Inc. Kristi Hafer 5/14/2014 5/30/2014 Lake Erie Technologies
Bid #6030 210 & 220 Math Science 419.523.5323 419.372.3830 3:00 p.m. 10:00 a.m.
Prints @ Becker Impression 419.385.5303 Purchasing PurchasingOffenhauer Residence
Hall MDA Engineering, Inc. Brett Pogan 5/20/2014 6/2/2014 Torrence Sound
Bid #6029 2014 Security Upgrades 419.893.3141 419.372.3853 1:30 p.m. 2:00 p.m.Prints @ MDA
[email protected] Purchasing PurchasingFY14 Roof
Replacements Technicon Design Group, Inc. Tim Burns 5/8/2014 4/22/2014 Wolfe's Roofing
Bid #6026 419.523.5323 419.372.7637 11:00 a.m. 11:00 a.m.
Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
PSLB 418-419 URS Corporation Robert Boucher 5/13/2014 5/29/2014 The Spieker Company
Bid #6023 216.622.2400 419.372.7639 11:00 a.m. 2:00 p.m.
Prints @ Becker Impression 419.385.5303 Purchasing Purchasing2014 Parking Lot
Repaving Star Consultants, Inc. Mike Schuessler 4/1/2014 4/15/2014 Schoen, Inc.
Bid #6009 614.538.8445 419.372.3748 10:00 a.m. 2:00:00 p.m.
Prints @ Becker Impression 419.385.5303 Purchasing Purchasing2014 Exterior
Restoration StructureTec Corporation Tim Burns 3/26/2014 4/14/2014 Trisco Systems, Inc.
Bid #6006 248.848.1791 419.372.7637 10:00 a.m. 4:30 p.m.
Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
Northwest Ohio Regional Buehrer Group Architecture & Engineering Tim Burns 1/10/2014 1/21/2014 Nordmann Roofing
Beth Nagel
Construction ContactPhone: 419-372-8410
Associate/Telephone No. Project
Bid/RFQ (If Applicable) Manager/ Prebid Meeting Bid Opening,
No. Bid Title Prints Telephone# Date/Location Date &Time Shortlisted Firms Awards
Purchasing Department
Construction Refurbishing Projects1851 N. Research Drive
Bowling Green, OH 43403
Phone: 419-372-8411
Bid #5992
Book Depository Re-
Roof 419.893.9021 419.372.7637 2:00 p.m. 10:30 a.m.
Prints @ Becker Impression 419.385.5303 Book Depository Purchasing
Offenhauer Elevators Buehrer Group Architecture & Engineering Tim Burns 12/17/2013 1/3/2014 Comte Construction
Bid #5985 West Hall Renovations 419.893.9021 419.372.7637 2:00 p.m. 2:00 p.m.
Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
RFQ# Moseley, Hanna, South, n/a Robert Boucher 12/23/2013 EMH&T EMH & T
BGU-135984
University Halls
Infrastructure 419.372.7639 n/a 2:00 p.m.
Fishbeck, Thompson,
Carr & Huber
Engineering Purchasing URS Corporation
RFQ# Renovation of Firelands n/a Robert Boucher 12/20/2013 Hammond Construction Hammond Construction
BGU-135982 Allied Health & Sciences 419.372.7639 n/a 2:00 p.m. The Krill Company
Quandel Construction
The Apostolos Group Purchasing Lend Lease (US) Const.
RFQ # Replacement Greek n/a Mike Schuessler 12/15/2013 The NRP Group Elford, Inc.
BGU-135978 (Design-Build Contract) 419.372.3748 n/a 4:00 p.m. Thomas & Marker
Purchasing Quandel Construction
LathropElford, Inc.
RFQ# Replacement Greek Housing n/a Steve Krakoff 12/6/2013 K2F Design CBT Architects
BGU-135974 (Criteria Architect) 419.372.7127 n/a 3:00 p.m. City Architects
Design Group
TKA Architects
CBT ArchitectsPurchasing Perspectus Architects
RFQ# Huntington Building n/a Kristi Hafer 11/21/2013 Annette Miller Annette Miller
BGU-135972 Renovation 419.372.3830 n/a 3:00 p.m. BHDP Architecture
Purchasing URS Corp.Champlin Architecture
RFQ # Multi-year Parking Lot n/a Marc Brunner 10/23/2013
BGU-135964 Renovation 419.372.7793 n/a 4:00 p.m. Star ConsultantsPurchasing
RFQ# Moseley Hall n/a Tim Burns 5/13/2013 Lathrop/DAG
BGU-135906 Renovation (CMR) 419.372.7637 n/a 2:00 p.m.Purchasing
RFQ# South Hall Ryan Miller n/a 5/13/2013 Mosser Construction, Regency Construct. Srvcs.
BGU-135905 Renovation (CMR) 419.372.9628 2:00 p.m. Regency Construction,
Purchasing Rudolph/Libbe, Inc. ,
Beth Nagel
Construction ContactPhone: 419-372-8410
Associate/Telephone No. Project
Bid/RFQ (If Applicable) Manager/ Prebid Meeting Bid Opening,
No. Bid Title Prints Telephone# Date/Location Date &Time Shortlisted Firms Awards
Purchasing Department
Construction Refurbishing Projects1851 N. Research Drive
Bowling Green, OH 43403
Phone: 419-372-8411
Thomas & Marker Cons.
RFQ# Moseley Hall n/a Tim Burns 4/12/2013 Domokur Architects
BGU-135903 Renovation (A/E) 419.372.7637 n/a 2:00 p.m.Purchasing
RFQ# South Hall Ryan Miller n/a 4/12/2013 Champlin Architecture
BGU-135902 Renovation (A/E) 419.372.9628 2:00 p.m.Purchasing
RFQ# College of Health & Bostwick Design Partnership Barry Quattromani 4/22/2013 Lathrop Corporation
BG-135892 Human Services 419.372.8829 n/a 2:00 p.m.Purchasing
2013 Kreischer Hall Interior BGSU Office of Design and Construction Kristi Hafer 3/21/2013 4/8/2013 Adohr Corp
Bid #5889 Painting 419.372.2511 419.372.3830 3:00 p.m. 3:00 p.m.Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
2013 Parking Lot Repaving Star Consultants, Inc. Marc Brunner 3/12/2013 3/26/2013 Miller Brothers
Bid #5878 614.538.8445 419.372.7793 10:30 a.m. 1:30 p.m.Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
Organic Chemistry Laboratory BHDP Architecture Robert Boucher 2/26/2013 3/15/2013 Comte Construction
Bid #5871 Renovation 614.486.1960 419.372.7639 10:30 a.m. 10:00 a.m.
RFQ# Olscamp Prototype Learning Marc Brunner 3/15/2013 Lathrop Corporation
BGU-135868 Space CMR n/a 419.372.7793 n/a 2:00 p.m.Purchasing
Kreischer Hall Fire Alarm MDA Engineering,Inc Robert Boucher 2/21/2013 3/7/2013 Regent Electric
Bid #5865 Upgrades 419.893.3141 419.372.7639 1:30 p.m. 1:30 p.m.Prints @ MDA 419.893.3141 Ann Purchasing Purchasing
Campus Sidewalk Upgrades - Duket Architects Planners Mike Schuessler 2/20/2013 3/6/2013 Midwest Contracting
Bid #5867 Phase VIII 419.255.4500 419.372.3748 10:00 a.m. 1:30 p.m.Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
2013 Firelands Fire Alarm Upgrades Karpinski Engineers-Jim Cicero Marc Brunner 2/19/2013 3/4/2013 Westfield Electric
Bid #5866 216.391.3700 419.372.7793 9:30 a.m. 2:00 p.m.Prints @ Becker Impression 419.385.5303 Firelands Purchasing
Offenhauer East Hall Elevator ModernizationBuehrer Group Architecture & Engineering Tim Burns 1/29/2013 2/20/2013 Comte Construction
Bid #5863 419.893.9021 419.372.7637 2:00 p.m. 2:00 p.m.Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
Firelands Foundation Hall/ Buehrer Group Architecture & Engineering Tim Burns 1/3/2013 1/15/2013
Bid #5855 West Elevator 419.893.9021 419.372.7637 2:00 p.m. 10:00 a.m. KF ConstructionPrints @ Becker Impression 419.385.5303 Fireland West 115 Purchasing
RFQ # MMAC HVAC System Upgrade Robert Boucher 11/27/2012 Schooley Caldwell
BGU 125842 n/a 419.372.7639 n/a 3:30 p.m.
Beth Nagel
Construction ContactPhone: 419-372-8410
Associate/Telephone No. Project
Bid/RFQ (If Applicable) Manager/ Prebid Meeting Bid Opening,
No. Bid Title Prints Telephone# Date/Location Date &Time Shortlisted Firms Awards
Purchasing Department
Construction Refurbishing Projects1851 N. Research Drive
Bowling Green, OH 43403
Phone: 419-372-8411
Purchasing
Business Administration Building JDRM Engineering, Inc. Mike Schuessler 10/29/2012 11/13/2012 Mel Lanzer
Bid #5836 Room 1007 Renovation 419.824.2400 419.372.3748 3:00 p.m. 10:00 a.m.Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
Physical Science Building-Cooling JDRM Engineering, Inc. Robert Boucher 10/9/2012 10/25/2012 Warner Mechanical
Bid #5833 Tower Replacement 419.824.2400 419.372.7639 3:00 p.m. 3:30 p.m.Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
Olscamp Hall Room 101 JDRM Engineering, Inc. Mike Schuessler 9/24/2012 10/10/2012
Bid #5827 Lighting Upgrade - Phase II 419.824.2400 419.372.3748 1:30 p.m. 3:00 p.m. Westfield ElectricPrints @ Becker Impression 419.385.5303 Purchasing Purchasing
RFQ# Organic Chemistry Lab Robert Waddle 10/4/2012 Baxter Hodell Donnelly
BGU-125826 n/a 419.372.7132 n/a 12:00 p.m. Preson Inc.Purchasing
RFQ# Doyt Perry Stadium Study Robert Waddle 10/4/2012 Rossetti Associates, Inc.
BGU-125825 n/a 419.372.7132 n/a 12:00 p.m.Purchasing
RFQ# Ohio Bureau of Criminal Robert Waddle 10/4/2012
BGU-125824 Identification & Investigation 419.372.7132 n/a 12:00 p.m. SSOEon BGSU Campus n/a Purchasing
RFQ# Student Recreation Center Ryan Miller 9/7/2012
BGU-125819 Addition & Renovation n/a 419.372.9628 n/a 5:00 p.m.Commissioning Provider Purchasing
URS Corporation Robert Boucher 8/21/2012 9/6/2012 The Spieker Company
Bid # 5816 McFall Tunnel Renovation 216.622.2400 419.372.7639 2:00 p.m. 2:00 p.m.Prints: APEX Micrographics Purchasing Purchasing
Student Recreation Center Ryan Miller 8/17/2012 Barton Malow Gilbane Bldg. Co.
RFQ #5815 Renovation\ n/a 419.372.9628 4:30 p.m. Mosser Construction,Purchasing Gilbane Bldg. Co.;
Firelands N&W Building Structure Tec Corporation Tim Burns 6/26/2012 7/9/2012 Trisco
Bid #5800 Masonry Repair 269.353.9944 Russ Thurston 419.372.7637 1:30 p.m. 1:30 PMPrints: Becker Impressions 419.385.0529 Firelands Purchasing
RFQ# Engineering Services Ryan Miller 6/15/2012
BGU 125793 Pre-Qualified Consultant List n/a 419.372.9628 n/a 4:30 p.m.Purchasing
ESA Engineers, Surveyors & Assoc. Mike Schuessler 5/23/2012 6/6/2012
Bid #5790 436 N. Enterprise Street 419.475.9445 - Jeff Ruch 419.372.3748 10 a.m. 10 a.m. Evans GroupDemolition Prints @ Becker Impression 419.385.5303 Purchasing Purchasing
JDRM Engineering, Inc. Mike Schuessler 5/16/2012 5/31/2012 Westfield Electric
Bid #5785 Mathematical Sciences Building 419.824.2400 419.372.3748 10:00 a.m. 3:00 p.m.ITS Classroom Upgrade Prints @ AMI 419.476.6535 Purchasing Purchasing
Beth Nagel
Construction ContactPhone: 419-372-8410
Associate/Telephone No. Project
Bid/RFQ (If Applicable) Manager/ Prebid Meeting Bid Opening,
No. Bid Title Prints Telephone# Date/Location Date &Time Shortlisted Firms Awards
Purchasing Department
Construction Refurbishing Projects1851 N. Research Drive
Bowling Green, OH 43403
Phone: 419-372-8411
Structure Tec Corporation248.848.1791 Tim Burns 5/3/2012 5/16/2012 Trisco Systems, Inc.
Bid #5781 2012 Masonry Restoration 419.372.7637 1:30 p.m. 1:30 p.m.Prints @ Cannell Graphics 614.781.9760 Purchasing Purchasing
5/1/2012 5/15/2012 Gradell LLC
Bid #5779 Parking Lot Repaving Star Consultants 614.538.8445 Marc Brunner 10:30 a.m 2:00 p.m.Prints @ Becker Impression 419.385.5303 419.372.7793 Purchasing Purchasing
RFQ# BGSU Firelands Campus Robert Boucher 4/27/2012 Bostwick Design Group, Boswick Design Group
BGU-125778 New Allied Health Sciences n/a 419.372.7639 n/a 3:30 p.m. Braun & Steidle Arch
Weber Murphy Fox, IncBuilding Purchasing Domokur Arch
Technicon Design Group Tim Burns 4/17/2012 4/26/2012 Nordmann Roofing Co.
Bid #5774 2012 Roof Repair/Masonry 419.523.5323 419.372.7637 3:30 p.m. 3:30 p.m. Advanced Roofing Srvcs.Point Project Prints @ Becker Impression 419.385.5303 Purchasing Purchasing Quality Roofing, Inc.
ESA Engineers, Surveyors, & Associates Mike Schuessler 4/9/2012 4/19/2012
Bid #5771 2011 Property Demolition 419.475.9445 419.372.3748 10:00 a.m. 1:30 p.m. D & R Enter. of Genoa, LLCPrints @ Newfax Corp. 419.241.5157 Purchasing Purchasing
Olscamp Hall Room 101 JDRM Engineering, Inc. Mike Schuessler 4/3/2012 4/16/2012 Lake Erie Electric of Toledo
Bid #5770 Lighting Upgrade - Phase 1 419.824.2400 419.372.3748 1:30 p.m. 3:00 p.m.Prints @ AMI 419.476.6535 Purchasing Purchasing
Keischer Hall 2012 MDA Engineering,Inc Robert Boucher 3/22/2012 4/5/2012 Lake Erie Electric of Toledo
Bid #5764 Mechanical & Electrical Upgrades 419.893.3141 419.372.7639 1:30 p.m. 10:00 a.m.Prints MDA 419.893.3141 Purchasing Purchasing
Harshman Quadrangle JDRM Engineering, Inc. Robert Boucher 3/26/2012 4/5/2012 Lake Erie Electric of Toledo
Bid #5763 Security & Wireless Upgrade 419.824.2400 419.372.7639 1:30 p.m. 3:00 p.m.
Prints @ AMI 419.476.6535 Purchasing Purchasing
RFQ Executive CM Services Steve Krakoff n/a 3/22/2012 Lathrop Company
BGU 125762 n/a [email protected] 4:00 p.m.Purchasing
2012 Elevator Renovations Buehrer Group Architecture & Engineering Tim Burns 3/13/2012 3/23/2012 The Spieker Company
Bid #5757 419.893.9021 419.372.7637 1:30 p.m. 3:00 p.m.Prints Becker Impressions 419.385.5303 Purchasing Purchasing
Kreischer B & D Elevators Buehrer Group Architecture & Engineering Tim Burns 3/13/2012 3/23/2012 The Spieker Company
Bid #5756 419.893.9021 419.372.7637 1:30 p.m. 1:30 p.m.Prints Becker Impressions 419.385.5303 Purchasing Purchasing
RFQ Executive Architect/ Steve Krakoff 3/16/2012 Perkins Eastman Architects
BGU 125753 Engineering Services n/a [email protected] 4:00 p.m.Purchasing
McDonald Hall Phase II Renovations- SmithGroup JJR Marc Brunner 2/29/2012 3/21/2012 Comte Construction
Bid #5745 Bid Package 1 East Elevator 313.442.8185 419.372.7793 2:00 p.m. 2:00 p.m.Modernization Prints Becker Impressions 419.385.5303 Purchasing Purchasing
Beth Nagel
Construction ContactPhone: 419-372-8410
Associate/Telephone No. Project
Bid/RFQ (If Applicable) Manager/ Prebid Meeting Bid Opening,
No. Bid Title Prints Telephone# Date/Location Date &Time Shortlisted Firms Awards
Purchasing Department
Construction Refurbishing Projects1851 N. Research Drive
Bowling Green, OH 43403
Phone: 419-372-8411
RFQ n/a Steve Krakoff n/a 3/6/2012 Jones Lang LaSalle
BGU 125750 Program Management Services [email protected] 4:00 p.m.Purchasing
CMR for McDonald Residence Hall n/a Marc Brunner 3/1/2012 Mosser, Thomas Marker
RFQ 5742 Renovation, Phases 2 and 3 419.372.7793 n/a 4:30 p.m. Quandel, Gilbane QuandelPurchasing Rudolph Libbe
Hayes Hall Active Learning JDRM Engineering, Inc. Marc Brunner 2/7/2012 2/21/2012 Surface Enterprises, Inc.
Bid 5741 Classroom 419.824.2400 419.372.7793 10:00 a.m. 10:00 a.m. Lake Erie ElectricPrints AMI Imaging 419.476.6535 Purchasing Purchasing
Campus Wide Sidewalk Upgrade Duket Architects Planners Mike Schuessler 1/13/2012 1/25/2012
Bid 5735 419.255.4500 419.372.3748 1:30 p.m. 10:00 a.m. ACI Const. Co.Prints Newfax Corp. 419.241.5157 Purchasing Purchasing
AR1-R2 Renovation of PSLB URS Corporation Robert Boucher 12/21/2011 1/13/2012 Total Environmental Srvcs.
Bid 5732 216-622-2400 419.372.7639 10:00 a.m. 10:00 a.m. Westfield ElectricPrints Apex Micrographics 419.476.6177 Purchasing Purchasing Warner Mechanical
RFQ # 2012 Parking Lot Repaving n/a Marc Brunner n/a 10/14/2011
BGU115709 419.372.7793 4:30 p.m. Star Consultants
ITS Classroom Technology JDRM Engineering, Inc. - Darren Keil Mike Schuessler 10/24/2011 11/2/2011
Bid #5711 4193824.24 419.372.3748 2:00 p.m. 3:00 p.m. Lake Erie Electric of Toledoprints Becker Impressions 419.385.5303 Purchasing Purchasing
RFQ # Park Avenue Warehouse Renovations n/a Bob Waddle n/a 10/5/2011
BGU115706 419.372.7132 4:30 p.m. Project on HoldPurchasing
The Collaborative, Inc. Bob Waddle 8/18/2011 9/1/2011 Dotson Company
Bid #5691 College of Education 419.242.7405 419.372.7132 2:00 p.m. 10:00 a.m. Westfield ElectricStudent Services prints Becker Impressions 419.385.5303 Purchasing Purchasing VM Systems
Doyt Perry Stadium Video Board JDRM Engineering Robert Boucher 7/28/2011 8/12/2011
Bid #5688 419.824.2400 419.372.7639 10 a.m. 10 a.m. Daktronicsprints Becker Impressions 419.385.5303 Purchasing Purchasing
Falcon's Landing Renovation Design Group Barry Quattromani 6/23/2011 7/8/2011 Dotson Company
Bid #5674 aka Haven House 614.255.0515 419.372.8829 9:00 a.m. 1:00 p.m. Henson Plumbing & Htg.prints Becker Impressions 419.385.5303 Purchasing Purchasing
Elevator Renovations for Buehrer Group Architecture & Engineering Tim Burns 6/30/2011 7/8/2011 The Spieker Company
Bid #5672 Jerome Library 419.893.9021 419.372.7637 10:30 a.m. 11:00 a.m. Marlin White & Sonsprints Becker Impressions 419.385.5303 Purchasing Purchasing Lake Erie Electric of Toledo
Learning Commons Office of Design and Construction Marc Brunner 6/22/2011 7/5/2011 Laibe Electric
Bid #5666 419.372.7793 419.372.7793 10:00 a.m. 2:00 p.m. The Spieker Companyprints Becker Impressions 419.385.5303 Purchasing Purchasing
JDRM Engineering Barry Quattromani 6/21/2011 7/1/2011
Beth Nagel
Construction ContactPhone: 419-372-8410
Associate/Telephone No. Project
Bid/RFQ (If Applicable) Manager/ Prebid Meeting Bid Opening,
No. Bid Title Prints Telephone# Date/Location Date &Time Shortlisted Firms Awards
Purchasing Department
Construction Refurbishing Projects1851 N. Research Drive
Bowling Green, OH 43403
Phone: 419-372-8411
Bid #5661 Cochrane Field Soccer Field Lighting 419.824.2400 419.372.7793 10:00 a.m. 10:00 a.m. Westfield Electricprints Becker Impressions 419.385.5303 Purchasing Purchasing
2011 Parking Lot Improvements URS Corporation Marc Brunner 6/14/2011 6/28/2011
Bid #5656 Phase II 216.622.2400 419.372.7793 1:30 p.m. 1:30 p.m. Miller Contracting Groupprints Becker Impressions 419.385.5303 Purchasing Purchasing
RFQ # McDonald Hall Phase III Marc Brunner 5/12/2011 5/27/2011 SmithGroup, PLLC
BG115646 Feasibility Study n/a 419.372.7793 10:30 a.m. 4:30 p.m.Purchasing Purchasing
2011 Parking Lot Improvements DGL Consulting Engineers Marc Brunner 5/9/2011 5/24/2011
Bid 5644 419.535.1015 419.372.7793 2:00 p.m. 1:00 p.m. Jenniteprints Becker Impressions 419.385.5303 Purchasing Purchasing
Doyt Perry Stadium Video Board JDRM Engineering Bob Boucher 5/10/2011 5/23/2011
Bid #5642 Upgrade 419.824.2400 419.372.7639 10:00 a.m. 8:30 a.m. Bids Rejectedprints Becker Impressions 419.385.5303 Purchasing Purchasing
Ice Arena Interior Technicon Design Group Tim Burns 5/3/2011 5/16/2011 The Spieker Company
Bid #5632 Renovations 419.523.5323 419-372.7637 3:30 p.m. 3:30 p.m. Henson Plmbg, Noron, Inc.prints Becker Impressions 419.385.5303 Purchasing Purchasing Lake Erie Electric of Toledo
2011 Masonry Restoration StructureTec Corporation Tim Burns 4/28/2011 5/10/2011 Ram Construction
Bid #5627 248.848.1791 419.372.7637 10:30 a.m. 2:00 p.m. Trisco Systemsprints Cannel Graphics 614.781.9759 Purchasing Purchasing Cusacks Masonry
2011 Roof Repair/Replacement Technicon Design Group Tim Burns 4/26/2011 5/10/2011
Bid #5626 Williams Hall & Moore Musical 419.523.5323 419-372.7637 3:30 p.m. 3:30 p.m. Wolfe's Roofing Co.Arts Center prints Becker Impressions 419.385.5303 Purchasing Purchasing
College of Education The Collaborative, Inc. Bob Waddle 4/19/2011 5/3/2011 Westfield Electric
Bid #5622 Building Enhancements 419.242.7405 10:00 a.m. 10:00 a.m. The Delventhal Companyprints Becker Impressions 419.385.5303 Purchasing Purchasing VM Systems
Elevator Renovations for South HallBuehrer Group Architecture & Engineering Tim Burns 4/7/2011 4/21/2011 Mosser Construction
Bid 5615& Physical Science Laboratory Buildings 419.893.9021 419.372.7637 10:30 a.m. 10:00 a.m. Lake Erie Electric of Toledoprints Becker Impressions 419.385.5303 Purchasing Purchasing Marine Building Group
Architectural Services Consultant List Mike Schuessler n/a 4/4/2011
RFQ 5603 419.372.3748 4:30 p.m.Purchasing
Firelands Primary Electrical MDA Engineering Bob Boucher 3/10/2011 3/24/2011
Bid 5602 Service Upgrade 419.893.3141 419.372.7639 2:30 p.m. 1:30 p.m. Fresch Electricprints MDA Engineering Firelands Purchasing
Enabling Projects-Phase 2 JDRM Engineering Barry Quattromani 3/1/2011 3/16/2011 Comte Construction Co.
Bid #5601 419.824.2400 419.372.8829 10:00 a.m. 10:00 a.m. Marine Building Groupprints Becker Impressions 419.385.5303 Purchasing Purchasing Romanoff Electric Co., LLC
Boiler No. 2 Stack URS Corporation Bob Boucher 3/10/2011 3/24/2011
Bid # 5600 Economizer 216.622.2400 419.372.7639 11:30 a.m. 1:30 p.m. Walters Boiler Works
Beth Nagel
Construction ContactPhone: 419-372-8410
Associate/Telephone No. Project
Bid/RFQ (If Applicable) Manager/ Prebid Meeting Bid Opening,
No. Bid Title Prints Telephone# Date/Location Date &Time Shortlisted Firms Awards
Purchasing Department
Construction Refurbishing Projects1851 N. Research Drive
Bowling Green, OH 43403
Phone: 419-372-8411
prints Apex 419.476.6535 Purchasing Purchasing
Demolition and RenovationBuehrer Group Architecture & Engineering Marc Brunner 2/24/2011 3/8/2011 HJ Schodorf
Bid #5598 for McDonald Hall East 4193893.902 419.372.7793 1:30 p.m. 2:00 p.m. Midwest Contractingprints Becker Impressions 419.385.5303 Purchasing Purchasing Lake Erie Electric of Toledo
Elevator Modernization for Buehrer Group Architecture & Engineering Marc Brunner 2/25/2011 3/8/2011 Comte Construction Co.
Bid #5597 McDonald Hall West 4193893.902 419.372.7793 1:30 p.m. 3:30 p.m. Lake Erie Electric of Toledoprints Becker Impressions 419.385.5303 Purchasing Purchasing
URS Corporation Bob Boucher 2/24/2011 3/9/2011 Spieker Co.; IPS
Bid #5595 Science Tunnel Renovations 216.622.2400 Paul Goth 419.372.7639 11 :00 a.m. 1:30 p.m. Midwest Environmental Controlprints Apex 419.476.6535 Purchasing Purchasing Lake Erie Electric
2010 Tunnel Repairs URS Corporation Bob Boucher 2/10/2011 2/23/2011 Mosser Const.; Warner Mech.
Bid #5992 216.622.2400 Paul Goth 419.372.7639 10:30 a.m. 11:30 a.m. Lake Erie Electricprints Apex 419.476.6535 Purchasing Purchasing Total Environmental Srvcs.
Window Replacement for Buehrer Group Architecture & Engineering Marc Brunner 1/25/2011 2/8/2011
Bid #5991 McDonald Hall 4193893.902 419.372.7793 10:00 a.m. 2:00 p.m. Clyde McHenryprints Becker Impressions 419.385.5303 Purchasing Purchasing
RFQ # Bob Boucher 1/20/2011
BGU01-5585 PSLB HVAC Upgrade 419.372.7639 n/a 3:30 p.m.Purchasing
West Hall Chiller Replacement MDA Engineering Bob Boucher 12/21/2010 1/6/2011 Comte Construction Co.
Bid #5579 419.893.3141 419.372.7639 2:00 p.m. 2:00 p.m. Warner Mechanicalprints MDA Engineering Purchasing Purchasing Lake Erie Electric of Toledo, Inc.
PSLB Laser Lab 314/315 URS Corporation Barry Quattromani 12/9/2010 12/22/2010 Laibe Electric
Bid #5576 Environmental Upgrades 216.622.2400 419.372.8829 2:00 p.m. 10:30 a.m. VM Systemsprints Apex Micrographics 419.476.6535 Purchasing Purchasing The Spieker Company
Enabling Projects-Phase IV JDRM Engineering, Inc. Brett Pogan 11/12/2010 11/29/2010 The Spieker Company
Bid #5563 419.824.2400 419.372.3853 10:00 a.m. 10:00 a.m. Industrial Power Systemsprints Becker Impressions 419.385.5303 Purchasing Purchasing Lake Erie Electric
Firelands 230-238 North Renovations Weber Murphy Fox Barry Quattromani 10/26/2010 11/9/2010 Coastal Quality Const.
Bid #5552 216.623.3700 419.372.8829 2:00 p.m. 2:00 p.m. Marine Building Groupprints eBlueprint 888.443.2583 Firelands Foundation Hall Purchasing South Shore Electrc
ECM-2 URS Corporation Tim Burns 10/19/2010 11/3/2010 Westfield Electric
Bid #5551 Energy Conservation Measures 216.622.2400 419-372-7637 2:00 p.m. 2:00 p.m. Industrial Power Systems, Inc.prints Becker Impressions 419.385.5303 College Park Rm #2 Purchasing Midwest Environ. Control
Hayes Hall 127 & 203 Renovation Duket/Architects/Planners Mike Schuessler 9/21/2010 10/5/2010 Midwest Contracting
Bid #5542 419.255.4500 419.372.3748 3:00 p.m. 1:00 p.m. Westfield Electric prints Apex Micrographics 419.476.6535 Purchasing Purchasing
Thurstin Center Renovation JDRM Engineering, Inc. Brett Pogan 7/15/2010 7/30/2010
Bid #5532 Phase I 419.824.2400 419.372.3853 2:00 p.m. 10:00 a.m. Cancelledprints Becker Impressions 419.385.5303 Purchasing Purchasing
Beth Nagel
Construction ContactPhone: 419-372-8410
Associate/Telephone No. Project
Bid/RFQ (If Applicable) Manager/ Prebid Meeting Bid Opening,
No. Bid Title Prints Telephone# Date/Location Date &Time Shortlisted Firms Awards
Purchasing Department
Construction Refurbishing Projects1851 N. Research Drive
Bowling Green, OH 43403
Phone: 419-372-8411
Energy Conservation Measures URS Corporation Tim Burns 6/22/2010 7/21/2010 Regent Electric
Bid #5525 ECM-1 216.622.2400 419-372-7637 2:00 p.m. 2:00 p.m. Total Environmental Servicesprints Becker Impressions 419.385.5303 College Park Rm #2 Purchasing Industrial Power Systems, Inc.
Lot 6 Improvement The Collaborative, Inc. Bob Boucher 6/10/2010 6/21/2010 ACI Construction
Bid #5522 419.242.7400 Phil Enderle 419-372-7639 2:00 p.m. 2:00 p.m. Romanoff Electric Co., LLCprints Becker Impressions 419.385.5303 Purchasing Purchasing
2010 Roof Repair/ Technicon Design Group Tim Burns 6/8/2010 6/22/2010
Bid #5521 Replacement 419.523.5323 419-372-7637 3:00 p.m. 11:30 a.m. Wolfe's Roofing Co.Prints Becker Impressions 419-385.5303 Purchasing Purchasing
New Small Parking Lots DGL Consulting Engineers Bob Boucher 5/26/2010 6/10/2010 7L Construction
Bid #5520 419-535-1015 419-372-7639 2:00 p.m. 10:00 a.m. Lake Erie Electricprints Becker Impressions 419.385.5303 Purchasing Purchasing
2010 Masonry StructureTec Tim Burns 5/17/2010 6/4/2010
Bid #5518 Restoration 248.848.1791 419.372.7637 10 a.m. 10 a.m. Cusacks Masonryprints Cannell graphics 614.781.9759 Purchasing Purchasing
Vice President of Finance and Office of Design & Construction Marc Brunner 5/12/2010 5/24/2010 The Spieker Co.
Bid #5512 Administration Area RenovationPrints Becker Impressions 419.385.5303 419.372.7793 10:00am 2:00pm Lake Erie ElectricCPOB #2 Purchasing
Family & Consumer Science MDA Engineering Ryan Miller 4/23/2010 5/10/2010
Bid #5507 Room 202 Renovation 419.893.3141 419.372.9628 10:30 a.m. 2:00 p.m. Lake Erie Electric of Toledo, Inc.prints MDA Engineering Purchasing Purchasing
Demolition & Renovation for Buehrer Group Architecture & Eng. Marc Brunner 3/25/2010 4/12/2010 Willson Builders
Bid #5498 McDonald Hall West 419.893.9021 Ed Glowacki 419.372.7793 11:00 a.m. 2:00 p.m. Lake Erie ElectricPrints - Becker Impressions 419-385-5303 Purchasing Purchasing Complete Refrigeration
Business Administration Poggemeyer Design Group Barry Quattromani 4/6/2010 4/19/2010 Chapel Romanoff Technologies
Bid #5500 105-109 Rooms 419-352-7537 419.372.8829 10:30 a.m. 2:00 p.m. Comte Construction Co.Renovation prints Apex Micrographics 419.476.6535 Purchasing Purchasing
Lobby Upgrades Kreischer Technicon Design Group, Inc. Barry Quattromani 4/1/2010 4/13/2010 Westfield Electric, The Spieker Co.
Bid #5499 Residence Hall 419.523.5323 419.372.8829 3:30 p.m. 3:00 p.m. Tuttle ConstructionPrints - Becker Impressions 419-385-5303 Purchasing Purchasing Marine Building Group
Health Center Renovations Bostwick Design Partnership Marc Brunner 3/24/2010 4/1/2010 Miller Contracting Group
Bid #5496 Item #2-Site, Landscaping Rich Ortmeyer - 216-621-7900 419-372-7793 2:00 p.m. 10:00 a.m. Transtar ElectricParking & Road ImprovementsPrints -Becker Impressions 419-385-5303 College Park Purchasing
MBA Program Facility Hasenstab Architects, Inc. Barry Quattromani 3/28/2010 4/8/2010 Marlin White & Sons
Bid # 5494 at Levis Commons 330.434.4464 Greg Chaplin 419.372.8829 3:00pm 1:00pm Westfield Electric, The Spieker Co.Phase II Prints - Becker Impressions 419-385-5303 Levis Park Purchasing Hensons Plumbing & Heating
Kreischer Mechanical MDA Engineering 419-893-3141 Bob Boucher 3/11/2010 3/26/2010 Lake Erie Electric
Bid # 5492 System Upgrade Prints - MDA Engineering 419-893-3141 419.372.7639 2:00pm 2:00pm Industrial Power Systems, Inc.Purchasing Purchasing
Bid # 5476 Kreischer MDF/ JDRM Engineering, Inc. 419-824-2400 Tim Burns 2/17/2010 3/3/2010 Stark's Inc., Border Fire Protection
Beth Nagel
Construction ContactPhone: 419-372-8410
Associate/Telephone No. Project
Bid/RFQ (If Applicable) Manager/ Prebid Meeting Bid Opening,
No. Bid Title Prints Telephone# Date/Location Date &Time Shortlisted Firms Awards
Purchasing Department
Construction Refurbishing Projects1851 N. Research Drive
Bowling Green, OH 43403
Phone: 419-372-8411
East Campus Data Ring Prints Becker Impressions 419.385.5303 419-372-7637 10:00am 2:00pm Lake Erie Electric
CPOB #2 Purchasing The Spieker Co.
Bid #5471 Residence Life Master Plan Buehrer Group Architecture & Marc Brunner 1/6/2010 2/2/2010 Paschal Bihn and Sons Excavating
Phase 1 Demolition Engineering, Inc. 419.893.9021 419.372.7793 10 a.m. 2:00 p.m. Lake Erie Electric of Toledo, Inc.
Prints Becker Impressions 419.385.5303 Purchasing Purchasing