bf resort presentation. supply source pagcor pumping station 230 mld putatan 200 mld bf resort...

30
BF RESORT PRESENTATION

Upload: corey-heckler

Post on 01-Apr-2015

221 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

BF RESORT PRESENTATION

Page 2: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

SUPPLY SOURCEPAGCOR PUMPING STATION

230 MLD

PUTATAN200 MLD

BF RESORT

ALABANG ZAPOTE RD

MAR

COS

ALVA

REZ

DAAN

G HA

RI

LAS PIÑAS

PARAÑAQUE

MUNTINLUPA

BACOOR1400mmø DIP

Page 3: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

3

2. New Pagcor City PS & Reservoir- September 2009 to November 2010- Accomplishment = 100%- March 2011-Start of Operation

1. Putatan Water Treatment Plants- 100 MLD, Water Production- Operational

Status of Major ProjectsAs of February 24, 2010

Page 4: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

BF RESORT SUPPLY

1400mmø DIP

ALABANG ZAPOTE RD

MAR

COS

ALVA

REZ

BF RESORT & SATELLITE SUBDIVISIONS

ARIA

ST

400m

BF R

ESORT

DR

400m

ITALIA 500

BERKELEY

BF CLASS 1

Page 5: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

LONGOS ROAD

COASTAL ROAD

QUIRINO AVENUE

GEN. A

GUINALD

O HIG

HWAY

ZAPOTE ROAD

ALABANG -

KABIHASNANLONGOS ROAD

ZAPOTE ROAD

ALABANG -

DAAN

G H

ARI

PKG -8OP-10-WN-01 1,391LM-1400 mmØ (laid 449m) D.M. CONSUNJI, IncAccomplishment – 20%

PKG -9OP-10-WN-021,440 LM-1400mmØ (laid -954m, hydro-438m, rest-362m) C.M. PANCHOAccomplishment - 52%

PKG -11OP-10-WN-041,728 LM – 1400mmØAA ALARILLA Cons.Accomplishment - 0.

PKG -10OP-10-WN-031,500 LM-1,400mmØ (laid- 820m, hydro-550m, rest-202m)CM PANCHO.Accoplishment - 34%

PKG -12 OP-10-WN-051,824 LM-1400mmØ (laid-1209, hydro-114D.M. CONSUNJI, Inc.Accomplishment 35%

Duration = 180 calendar daysTotal Length = 8 K.M.No. of Contract Packages = 5No. of Contractors = 3Expected Completion = May 2011

Page 6: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

Commercial Aspect

• Bulk Selling Scheme• Individual Metering Scheme

Page 7: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

Commercial Aspect

• Bulk Selling Scheme Maynilad to install water meter on the

supply line to be charged to the customerSupply water thru a bulk selling using a

semi-business rate Maynilad normally apply semi-business

rate to residential subdivisions only

Page 8: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

Commercial Aspect

• Bulk Selling Scheme In our proposed billing, Maynilad will

charge BF Resort using semi-business rate.

BF Resort can opt to sell it using Maynilad residential and commercial rate.

Page 9: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

BILL COMPUTATION (Bulk Sale)

Page 10: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

BILL COMPUTATION (Individual)

Page 11: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

LOCATIONS HHESTIMATED

COST MPhP

BF Resort Village 5,000 205.86Berkeley Place 75 0.80Castillan Classic 144 0.80BF Aguilar Compound 215 8.14BF Class I 277 17.41BF Homes I 122 7.63BF Vista Grande 557 35.03Venezia Homes 470 29.82Italia 500 611 38.48PNB Homes 58 4.05Veraville Villa Grande 36 2.48Camella Merida 63 3.97Casa California Exclusive 60 3.73Donnaville BF Homes 200 5.39

TOTAL 7,888 363.58

LAS PINAS

Page 12: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE
Page 13: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

B.F. Resort Village Homeowners Association, Inc.

The Committee on Water

A Special Report by

Dir. Amy Ruth E. MitreChairman

Dir. Cris O. Dela CruzAsst. Chairman

Page 14: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

FACTS

Page 15: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

B.F. Resort Village Homeowners Association, Inc. / Committee on Water

These are the FACTS …

FACT # 1

ALL BF Villages are deemed “gated” communities

This classification excludes BF Villages from Maynilad’s CAPEX(capital expenditure), as per MWSS Regulatory Office

As a “gated” community, BFRV has these options

1. Bulk Purchase of Maynilad’s water using existing pipelines

2. Individual Metering – “new” pipe-laying costs to beshouldered by the homeowners / subscribers

Page 16: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE
Page 17: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE
Page 18: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

B.F. Resort Village Homeowners Association, Inc. / Committee on Water

FACT # 2

The entry of Maynilad into BFRV is possible, via

1. Turnover of the open spaces of the Village (including roads) to the LP City Government, based on PD 1216

These are the FACTS …

Page 19: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

B.F. Resort Village Homeowners Association, Inc. / Committee on Water

FACT # 3

The entry of Maynilad into BFRV is possible, via

2. Turnover of the existing water system by BF Waterworks, via a pay-off scheme

Maynilad is no longer willing to buy the right of way from BF Waterworks, as was the case in the LP part of BF Paranaque

Maynilad is only willing to “advance” the turnover cost of the water system to the BFRV homeowners through the BFRV-HAI

This turnover cost shall be amortized by the BFRV homeowners over a period of five (5) years, or 60 months

These are the FACTS …

Page 20: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

B.F. Resort Village Homeowners Association, Inc. / Committee on Water

FACT # 4

The entry of Maynilad into BFRV is possible, via

3. Legal means, through

a) “Expropriation” by MWSS

b) Foreclosure of BF Homes, Inc. open spaces (including roads), by the LP City Government

These are the FACTS …

Page 21: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

OPTIONS

Page 22: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

B.F. Resort Village Homeowners Association, Inc. / Committee on Water

These are Our OPTIONS …

OPTION # 1

Maynilad Water to help BFRV to buy the right of way from BF Waterworks, at no cost to BFRV-HAI

Probability : Low

Page 23: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

B.F. Resort Village Homeowners Association, Inc. / Committee on Water

OPTION # 2

“Expropriation”MWSS to expropriate the water system of BF Waterworks

Effects

1. Homeowners will continue to bear amortization costs of the expropriation

2. The amount of expropriation will be based on the issue of “just compensation” if the court decides on a high compensation, then homeowners will also pay for a higher amortization

3. Long Term

These are Our OPTIONS …

Page 24: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

B.F. Resort Village Homeowners Association, Inc. / Committee on Water

OPTION # 3

Foreclosure of the BF Homes, Inc. open spaces by the LP City Government, resulting to an auction process

Effects

1. The auction process will be long and tedious

2. After auction, it will still be subject to a “one (1) year redemption period”

These are Our OPTIONS …

Page 25: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

B.F. Resort Village Homeowners Association, Inc. / Committee on Water

OPTION # 4

Negotiated Solution

The BFRV-HAI, Maynilad Water, and BF Waterworks negotiate on the best payment amount, and then enter into a tripartite agreement.

These are Our OPTIONS …

Page 26: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

Computation:

No. of Homeowners (conservative estimate) 8,000Amount to be Advanced by Maynilad for BFRVHAI to BF/PWCC P25MAmount of Pipelaying Cost by Maynilad P286MMeter Deposit (@HO) P500Amount of Meter and Security Deposit to be Refunded by BF/PWCC P10MTotal Amount to be paid to BF/PWCC for the "right of way" (incl. of deposit refund) P43MAdd'l Outright Cash Outlay of BFRV HO's (P1,000 x 8,000) P8MCalculation of Amortization Per Homeowner: Right of Way BF/PWCC P 25 M Maynilad (pipelaying) 286 M

311 MHomeowners ÷ 8,000

38,875Months ÷ 60

P 648

Page 27: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

PASTMEETINGS

Page 28: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

B.F. Resort Village Homeowners Association, Inc. / Committee on Water

A review of my past meetings for BFRV’s Water solution

December 7, 2010 Exploratory Talks

January 26, 2011 Maynilad presentation for BFRVHAI

February 22, 2011 Data gathering/inspection of BFRV

March 4, 2011 Clarification meeting on certain Maynilad rulings

April 8, 2011 Submission of initial budgetary cost of pipe laying by Maynilad

April 14, 2011 Submission of new adjusted budgetary cost of

pipe laying by Maynilad for the whole BFRV area

Page 29: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

April 20, 2011 Presentation of “sample contract” by and between Maynilad and

HOA

April 30, 2011 Maynilad informed BFRVHAI that only P30M was approved by

Maynilad

May 2, 2011 Meeting called by BF/PWCC as start of official negotiation; right of way given out by BF/PWCC

May 5, 2011 Presentation by BFRVHAI to BF/PWCC of a payment scheme to augment the fund source for the payment of the “right of

way”

Page 30: BF RESORT PRESENTATION. SUPPLY SOURCE PAGCOR PUMPING STATION 230 MLD PUTATAN 200 MLD BF RESORT ALABANG ZAPOTE RD MARCOS ALVAREZ DAANG HARI LAS PIÑAS PARAÑAQUE

May 13, 2011 Meeting with Coun. Danny Hernandez

May 19, 2011 Meeting with Mayor Nene Aguilar, Vice-Mayor Louie Bustamante, City Councilors and BFHI Representative of Mr. Bobby Aguirre, Ms. Malou Vasquez