    BILL NO 1: BEME FOR CONSTRUCTION OF SEWER NETWORK

    ITEM DESCRIPTION QTY

    1.1 BILL 1.1: PRELIMINARIES

    A

    B

    C Provide, furnish and maintain one site office

    D

    E  Allow for the cost of progress photographs

    TOTAL OF BILL NO.1: PRELIMINARIES TO MAIN SUMMARY

     Allow for mobilization and demobilization i.e plant, machinery, other equipments includingwork force etc to the site

    The ontractor shall safeguard the !orks, materials and plant against damage, loss orin"ury,including all necessary watching and lighting for the safety and security of the !orksand the protection of the public and provide shelter and reasonable accommodation

    The contractor shall provide and maintain temporary sheds for the storage of materials,tools, and tackle and the use of all persons employed on the #ite. Those used for thestorage of cement and other perishable materials and the like are to be weatherproofed atall times

     Allow for provision of of water for the works including drinking water, and paying all

    charges and other e$penses in connection with the supply, storage and distribution. %t isthe sole responsibility of the contractor to ensure steady, uninterrupted adequate supply ofwater required for main contract work.

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    2/54

    ITEM DESCRIPTION QTY

    1.2 BILL 1.2: EXCAVATION AND EARTHWORKS

    1.2.1 EXCAVATION

    A &reak up e$isting road pavement '.(m wide in preparation for pipe trenches e$cavation '),*+*.*

    B (,'*./*

    1.2.2 DISPOSAL OF WATER

    A  Allow for keeping surface of the site and e$cavation free of water for secondary sewerline ,'-).**

    B  Allow for keeping surface of the site and e$cavation free of water for primary sewewrline ,*'.**

    1.2.3 SOIL TREATMENT

    A ,-(.*

    B 0itto #ides of e$cavations (',-*/.**

    1.2.4 FILLING

    A 1eturn, fill and well ram e$cavated material around

    pipe as described (),-(.+(

    1.2. DISPOSAL OF EXCESS EXCAVATED MATERIAL

    A (,'.*/

    1.2.! PUMP LIFT STATIONS

    A %nstal lation of pump l ift stations at depth not e$ceeding (.-m at every distance of '+m '.**

    B  Allow for electrification of pump station and central control2monitor panel

    TOTAL OF BILL NO.2: EXCAVATION AND EARTHWORK TO MAIN SUMMARY

    3$cavate Pipe trenches '.(m wide and not e$ceeding m depth as specified in the detaileddrawings.

    Treat the surface of filling under surface2bottom of e$cavations as described with anapproved ant4proofing poison

    Load e$cess e$cavated material and spread on site as 0irected by 3ngineer 5srepresentative

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    3/54

    ITEM DESCRIPTION QTY

    1.3 BILL 1.3: CONCRETE " BLOCK WORK

    6ote

    1.3.1 IN#SITU CONCRETE AS DESCRIBED INCLUDING ALL NECESSARY FORMWORK

    A '*,+-.**

    B oncrete haunching 7'8)84(*mm aggr9 around imbeded pipes not e$ceeding 'm interval '*,+-.**

    C (.**

    1.3.2 INSPECTION CHAMBER

    A *.**

    7ii9 *.-m not e$ceeding '.*m *.**

    1.3.3 SEWER PROTECTION CONCRETE WORKS

    A ,-').**

    TOTAL OF BILL NO.3: TOTAL OF CONCRETE " BLOCK WORKS TO MAIN SUMMARY

    1ate shall include for form work depositing, handling, hoisting into position, vibrating, curing

    , reinforcements etc. and making good after removal of formwork etc.

    +- mm thick concrete 7'8)8 4 (*mm aggr9 in Pipe trenches to serve as base2bedding forsewer pipe

    1einforced concrete simplified '(**mm bo$es as manholes ma$imum depth not e$ceeding)m. :anholes shall be complete with steps, frames and cover and made water tight andwith benching.

    Provide for %nspection chambers of dimension -*mm $ -*mm 2 **mm $ **mm withthe following depth 7i9 *.)m not e$ceeding *.-m

    Precast inverted ; concrete sections as protection for sewer pipes at lenghts below roadworks

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    4/54

    ITEM DESCRIPTION QTY

    BILL 1.4: SEWER PIPING WORKS

    A #upply and fi$ '** mm dia. ;P

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    5/54

    ITEM SUMMARY

    DESCRIPTION

    A BILL 1.1: PRELIMINARIES

    B BILL 1.2: EXCAVATION AND EARTHWORKS

    C BILL 1.3: CONCRETE " BLOCK WORK

    D BILL 1.4: SEWER PIPING WORKS

    SUBTOTAL

    GRAND TOTAL TO GENERAL SUMMARY

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    6/54

    AMOUNT

    N K

    ),-**,***.**

    (,-/,-**.**

    (,++*,***.**

    (,)**,***.**

    (,(+-,***.**

    '*,***.**

    13$!%$&&.&&

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    7/54

    AMOUNT

    N K

    '>,*-,**.**

    -,)-(,***.**

    +),/),***.**

    '*-,/(),***.**

    ),((,(**.**

    '*,+-,***.**

    (-,/+>,)>(.**

    (,*>',(.**

    *,***,***.**

      '*,***,***.**

    3!$!'$4!.&&

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    8/54

    AMOUNT

    N K

    (),-/,/**.**

    (),-/,/**.**

    '-(,-*/,***.**

    *.**

    *.**

    '/(,),***.**

    E((:&2

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    9/54

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    10/54

    AMOUNT *+N+,

    '),->,-**.**

      )-,-+,-.**

    3rr8-*(

      /,+(,***.**

    E((:&2

    E((:&2

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    11/54

    BILL 2A: CIVIL WORKS FOR THE SBR WASTEWATER TREATMENT PLANT

    S"NO DESCRIPTION QTY UNIT

    (A.'

    (A.'.' BILL 2A.1.2: EXCAVATION AND EARTHWORK

    (A.'.'.' SITE CLEARANCE

     A ',)').**

    (A.'.'.( EXCAVATION

     A 3$cavate trench to a depth (.**m to .**m )-'+.-* m)

    & -*mm thick well compacted rock hardcore filling )-.)/ m)

    (A.'.'.) DISPOSAL OF WATER

     A Allow for keeping surface of the site and e$cavation free of water '.** %tem

    (A.'.'. SOIL TREATMENT

     A ',**-.**

    & 0itto #ides of e$cavations -)./*

    (A.'.'.- FILLING

     A 1eturn, fill and well ram e$cavated material around e$ternal walls ',*--.(-

    (A.'.'. DISPOSAL OF EXCESS EXCAVATED MATERIAL

     A (,(.(-

    BILL 2A.1: SBR AERATION TANK AND OTHER PROCESS UNITS

    6ote8 This bill include civil works for the (#&1 tanks, sump2inflow tank,&uffer tank, chlorination tank and equalisation tank

    lear site of bushes5 undergrowths5 hedges5 debris and rubbish,includingremoval of '-* mm top soil on treatment plant si te way then cart away fromsite as directed by 3ngineer5s representative on site m(

    Treat the surface of filling under surface2bottom of escavations as

    described with an approved ant4proofing poison m(

    m(

    m)

    Load e$cess e$cavated material and spred on4site as 0irected by 3ngineer5s representative m)

    TOTAL OF BILL NO.2A.1.1: EXCAVATION AND EARTHWORK TOSUMMARY

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    12/54

    S"NO DESCRIPTION QTY UNIT

    2A.1.2 BILL 2A.1.2: CONCRETE WORK

    (A.'.(.'

     A /'.( m(

    (A.'.(.(

     A)'-.** m)

    &'*.** m)

    (A.'.(.) REINFORCEMENT

     A '* 4 (-mm diameter bars +(.- Tons

    BILL 2A.1.2: CONCRETE WORK CARRIED FORWARD:

    PLAIN IN SITU CONCRETE POURED AGAINST THE FACES OFEXCAVATION

    Provide and place concrete mi$ '8)8 in blinding layer base +-mm prior toconstruction of base slab in accordance with the drawing and as directedby the the 3ngineer5s representative

    REINFORCED CONCRETE POURED INTO FORMWORK AND WELLPACKED AROUND REIFORCEMENTS.

    Provide and place concrete mi$ '8(8 in base slab accordance with thedrawing and as directed by the 3ngineer5s representative

    Provide and place concrete mi$ '8(8 in walls in accordance with thedrawing and as directed by the 3ngineer5s representative

    @igh yield tensile in straight and bent bars to >= including tying wire,spacers, distance blocks, etc. in slabs and walls

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    13/54

    S"NO DESCRIPTION QTY UNIT

    BILL 2A.1.2: CONCRETE WORK BROUGHT FORWARD:

    BILL 2A.1.2: CONCRETE WORK *C-/0,

    (A.'.(.) FORMWORK

    #awn @ardwood formwork to8

     A 3dges of **mm thick ground slab -*

    &

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    14/54

    S"NO DESCRIPTION QTY UNIT

    2A.2 BILL 2A.2: PLANT BUILDING *1&. X 1&.),

    (A.(.' BILL 2A.2.1: EXCAVATION AND EARTHWORK

    (A.(.'.' SITE CLEARANCE

     A ''-.**

    (A.(.'.(. EXCAVATION

     A /*.** m)

    (A.(.'.) DISPOSAL OF WATER

     A Allow for keeping surface of the site and e$cavation free of water '.** %tem

    (A.(.'. SOIL TREATMENT

     A *.(*

    & 0itto #ides of e$cavations '+.*

    (A.(.'.- FILLING

    1eturn, fill and well ram e$cavated material around e$ternal walls -.**

    (A.(.'. DISPOSAL OF EXCESS EXCAVATED MATERIAL

     A (.**

    & '-*mm thick well compacted rock hardcore filling '+.(- m)

    '').*

    lear site of bushes5 undergrowths5 hedges5 debris and rubbish,includingremoval of '-* mm top soil on building site then cart away as directed bythe 3ngineer5s representative on site m(

      . .5

    Treat the surface of filling under surface2bottom of escavations asdescribed with an approved ant4proofing poison m(

    m(

    m)

    Load e$cess e$cavated material and cart away from site to tip as 0irectedby 3ngineer 5s representateive m)

    '*** gauge polythene sheeting to beneath raft slab= laid to **mm lapsbothways m(

    TOTAL OF BILL NO.2: EXCAVATION AND EARTHWORK OF PLANTBUILDING TO MAIN SUMMARY

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    15/54

    S"NO DESCRIPTION QTY UNIT

    (A.(.( BILL 2A.2.2: CONCRETE WORK

    (A.(.(.'

     A '.** m)

    & ''-.** m(

    (A.(.(.(

     A   19.00  m)

    &   23.00  m)

    ''.** m)

    0   17.00  m)

    (A.(.(.) REINFORCEMENT

    & +.** Tons

    (A.(.(. FORMWORK

     A #awn @ardwood formwork to8

    & '+-

    ')-

    0 '('

    (A.(.(.- WATER PROOF MEMBRANE

    PLAIN IN SITU CONCRETE POURED AGAINST THE FACES OFEXCAVATION

    Provide and place concrete mi$ '8)8 in blinding layer base -*mm prior toconstruction of raft beams in accordance with the drawing and as directedby the the 3ngineer5s representative

    Provide and place concrete mi$ '8)8 in blinding layer base -*mm prior toconstruction of base slab in accordance with the drawing and as directedby the the 3ngineer5s representative

    REINFORCED CONCRETE POURED INTO FORMWORK AND WELLPACKED AROUND REIFORCEMENTS.

    Provide and place concrete mi$ '8(8 in raft beams in accordance with thedrawing and as directed by the the 3ngineer5s representative

    Provide and place concrete mi$ '8(8 in raft slab in accordance with thedrawing and as directed by the the 3ngineer5s representative

    Provide and place concrete mi$ '8(8 in superstructure columns and beamsin accordance with the drawing and as directed by the the 3ngineer5srepresentative

    Provide and place concrete mi$ '8(8 in roof slab in accordance with thedrawing and as directed by the the 3ngineer5s representative

     spacers, s ance oc s, e c. n s a s an eams

    Provide ,bend and fi$ @igh tensile steel reinforcement of all diameters in raftbeams, raft slab super structure columns, beams, roof slab and whereapplicable

    sides of concrete raft beam and slab in accordance with in accordance withthe drawing and as directed by the the 3ngineer5s representative

    m(

    sides of super structure concrete columns and beams in accordance within accordance with the drawing and as directed by the the 3ngineer5srepresentative m(

    #offit an sides of roof slab in accordance with in accordance with thedrawing and as directed by the the 3ngineer5s representative

    m(

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    16/54

    S"NO DESCRIPTION QTY UNIT

    (A.(.) BILL 2A.2.3: BLOCKWORK

     A ()*mm thick wall '(.*)

    & '-*mm thick wall *.**

    Protect all work in this section

    TOTAL OF BILL NO.2A.2.3: BLOCKWORK TO SUMMARY

     

    m(

    m(

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    17/54

    S"NO DESCRIPTION QTY UNIT

    (A.(. BILL 2A.2.4: METAL WORKS

    (A.(..' DOORS

     A ( 6o

    & Provide and instal roller shutter door7)***mm$)***mm high9 ' 6o.

    Allow a provisional sum for builders work in connection with this ) 6o

    (A.(..( WINDOWS

     A size )-**$'***high ' 6o

    & size '-**$'***high ' 6o

    size **$**high ' 6o

    3 %tem

    TOTAL OF BILL NO.2A.2.4: METAL WORKS TO SUMMARY

    Cale !ide @igh #ecurity door complete with frame= overall size '(** $('**mm high

     All works in this section to be of good quality Aluminium profile or approvedequal 6atural anodized Aluminium sections fabricated to achieve a rigidstructure complete with coupling devices, frames, locks, and otheraccessories

     Allow for the provision of stainless steel hand railings for the entire plant

    and galvanised steel plate as walk4way for the plant

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    18/54

    S"NO DESCRIPTION QTY UNIT

    (A.(.-

    (A.(.-.' PLUMBING AND SANITARY FITTINGS

     A ' 6o.

    & ' 6o.

    !all mounted toilet roll holder with chrome plate frame and plastic holder ( 6o.

    0 ' 6o.

    3 ' 6o.

    B #upply Toilet brush with holder set ' 6o.

    D %tem

    (A.(.-.( ELECTRICAL INSTALLATION

     A Allow the Provisional #um of ?6?(-*,***.** for 3lectrical %nstallation %tem

    & Allow a provisional sum for builders work in connection with this section %tem

    Protect all work in this section %tem

    BILL 2A.2.: BUILDING MECHANICAL AND ELECTRICALINSTALLATION WORKS

    #upply and fi$ the following sanitary fittings8 3ngland Twyford #4strap watercloset complete fle$ible drain pipe

     drain pipes

     clips and screw for mounting walls

    running tap

     Allow a provisional sum for builders work in connection with this section of

    work

    TOTAL OF BILL NO.2A.2.: MECHANICAL AND ELECTRICALINSTALLATION WORKS TO

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    19/54

    S"NO DESCRIPTION QTY UNIT

    (A.(. BILL 2A.2.!: FINISHES$ PAINTING AND DECORATION

    (A.(..' RENDERING

     A '-mm cement and sand rendering mi$ 7'89 on wall and soffit of ceiling '

    (A.(..( PAINTING

     A '

    m(

    Prepare and apply two under coats and one finishing coat of emulsion painton rendered wall and ceiling m(

    TOTAL OF BILL NO.2A.2.!:FINISHES$ PAINTING AND DECORATION TO

    SUMMARY

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    20/54

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    21/54

    ITEM SUMMARY

    BILL 2A.1: SBR AERATION TANK AND OTHER PROCESS UNITS

    &%LL (A.'.(8 3EA

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    22/54

     AMOUNT

    /-),-*.**

    ,>)>,*>+.)

    '*,)',(-*.**

    ),)**,***.**

    -*(,-**.**

    (/,**.**

    ','*,++-.**

    ',>>,/**.**

    23$!2$2'2.!3

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    23/54

     AMOUNT

    (,+>>,(-.)+

    '/,(',(>>.+*

    (),+/,+-./*

    '-,+-(,>/'.(-

    !&$)2$2&2.12

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    24/54

     AMOUNT

    !&$)2$2&2.12

    (',*.**

    >,->,+**.**

    (,'+/.*

    -,''/,+-*.**

    ',*(-,***.**

    (-*,***.**

    ''$11!$4%&.2

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    25/54

     AMOUNT

    +,+-*.**

    ''(,))(.**

    )(*,***.**

    (*,'**.**

    +),+**.**

    ',**.**

    (,**.**

    -'+,-**.**

    +)+,'**.**

    1$%43$4)2.&&

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    26/54

     AMOUNT

    -,/)/.'+

    (),->./

    ','*',+-.((

    ',))),).+

    )+,>.'/

    >/-,-)*.

    ',-(*,>++.-*

    +-',)'*.**

    -+>,-/(.**

    -'>,++.(*

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    27/54

     AMOUNT

    +(+,/)/.+

    4

    '2'$)3).'!

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    28/54

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    29/54

     AMOUNT

    -,***.**

    )(,-**.**

    '+,***.**

    >,-**.**

    '(,-**.**

    ,-**.**

    ''),***.**

    (-*,***.**

    /*,***.**

    '-,***.**

    '31$&&&.&&

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    30/54

     AMOUNT

    />*,)**.**

    /),/>/.**

    1$'4$1%).&&

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    31/54

     AMOUNT

    /-/,***.**

    ',)(*,***.**

    ',>(*,***.**

    )>*,***.**

    ),)*,***.**

    )/,)**.**

    ,-**,***.**

    ',-**,***.**

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    32/54

    AMOUNT *+N+,

    (),(-,(+(.)

      ++,'',>*.-(

    ',>),/(.**

    -,///,-'.+-

    +(+,/)/.+

    '),-*,'/.)*

    +)',***.**

    ',+-,'>/.**

    ','>,)**.**

      13%$23$21'.%

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    33/54

    BILL 2B: ELECTROMECHANICAL EQUIPMENT FOR THE SBR WASTEWATER T

    S"NO DESCRIPTION QTY UNIT

    2B.1 BILL 2B.1: INFLOW PUMP

     A

    ' nos

    ACCESSORIES: nos

    & Power able '*m of +D',- @F+164B ' nos

    %nternal ream F oating 7 %mpeller and %nternal ' nos

    @ Bloat #witch !A - with -m cable Art. 6o. *)//> ( nos

    % 6on 1eturn

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    34/54

    S"NO DESCRIPTION QTY UNIT

    (&.(BILL 2B.2: MECHINCAL WASTEWATER PRE #TREATMENT SYSTEM

    (&.(.' HUBER PLANT

     A Plant omponents

    &@;&31 1FTA:AT F:PL3T3 PLA6T 1*-4@0 size (*, type 1o'2**

    * 6os

    %ntegrated #creenings washing system %1DA without 3$4protection * 6os

    0 Automatic press zone washing system without 3$4protection * nos

    3 over for the complete tank * nos

    B Fptional8 Pre4wiring up to terminal without 3$4protection * nos

    D :ore price for 2)**

    L Provision for

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    35/54

    S"NO DESCRIPTION QTY UNIT

    (&.) BILL 2B.3: BUFFER SBR TANK PUMPS

    (&.).'

    ( nos

    (&.).( A3##F1%3#8 nos

     A ontrol able '*m of + $ '.-mm( 6##@F; ( nos

    & Power able '*m of $ '.-mm( 6##@F; ( nos

    %nternal ream F oating 7 %mpeller and %nternal ( nos

    @ Bloat #witch !A - with -m cable Art. 6o. -*)('')>* ( nos

    % 6on 1eturn * 3lbow 06 '** Art. 6o. *)'+( ( nos

    L :ounting Accessories 06 '** Art. 6o. (*'+'+ ( nos

    : hain set P# 43 : Length, Dalv. #teel Art. 6o. *)'' ( nos

    6 Duide Pipe Dalv #teel Art. 6o. *)'-- nos

    TOTAL OF BILL NO.2B.3: BUFFER TANKS PUMPS TO SUMMARY

    apacity 8 '>*m)2hr I m !ilo #ubmersible #ewage pump :odel BA '*./(3J T (*.'42(( D43) Art. 6o8 G:AT ****' driven by a +.-kw, pole, **volt%P/ submersible. !eight8 ((-kg. %nstallattion Type8 #tationery !et !ell%nstallation.

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    36/54

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    37/54

    S"NO DESCRIPTION QTY UNIT

    (&.- BILL 2B.: MIXER " AGITATOR

    (&.-.'(

    (&.-.( A3##F1%3#8

     A 7*(***9 oating of mi$er and motor sharft material8 ceram co **u'

    & 7*-'+-9 3lectrode relay 6%-9 fi$ation set + 4 ($ :' concrete 4 A '

    B 7*'*>'9 Au$iliary lifting device 7@@

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    38/54

    S"NO DESCRIPTION QTY UNIT

    (&. BILL 2B.!: EQUALIATION TANK PUMPS

    (&..'

    ' nos

    (&..( A3##F1%3#8

     A 0ouble Pump ontrol Panel :odel #4L4($ A4T40FL4!: Art. 6o8 (-)/>'+ * nos

    & #uspension 0evice ;nit 06 '**2(1G Art. 6o. *)/// ( nos

    Bloat #witch !A - with -m cable Art. 6o. -*)('')>* ) nos

    0 6on 1eturn

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    39/54

    S"NO DESCRIPTION QTY UNIT

    (&.+ BILL 2B.': CHLORINATION UNIT AND SLUDGE PUMPS

    (&.+.' @LF1%6AT%F6 ;6%T P;:P#

     A ' L#

    (&.+.( #L;0D3 P;:P#

     A

    ' nos

    (&.+.) A3##F1%3#8

     A #ingle Pump ontrol panel model #4L4'EA4T40FL4!:Art. 6o8 (-)/>' ' nos

    & #uspension 0evice ;nit 06 /*2(1G Art. 6o. *)/// ' nos

    Bloat #witch !A - with -m cable Art. 6o. -*)('')>* ) nos

    0 6on 1eturn *M 3lbow 06 - Art. 6o. (*'(* ' 6os

    D :ounting Accessories 06/* Art. 6o. (*'(*+ ' nos

    hain set P#4 3 : Length, Dalv. #teel Art. 6o. *)''' nos

    @ Duide Pipe Dalv #teel Art. 6o. *)'' ' nos

    % '*m :otor onnection able +D', @*+164+ ' nos

    Provide for the supply and installation of stainless dosing pump of 3bara make,stirrer, dosing tank and house

    apacity8 *m)2hr I m !ilo submersible

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    40/54

    S"NO DESCRIPTION QTY UNIT

    (&./ BILL 2B.): MISCELLANEOUS AND OTHER WORKS

    (&./.' nos

    (&./.( Provide for general piping works of the treatment plant ' L#

    (&./.) 3BBL;36T L%63

     A onnection of effluent line to the nearest storm water outfall ' L#

    (&./. :%#3LLA6F;# %T3:#

     A ' L#

    &Provide for perimeter lighting to include galvanised steel pole and lamp holder ' L#

    ' L#

    0' L#

    3 #upply and install '**G

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    41/54

    ITEM SUMMARY

    &%LL (&.'8 %6BLF! P;:P

    &%LL (&.(8 :3@%6AL !A#T3!AT31 P13 4T13AT:36T #C#T3:

    &%LL (&.)8 &;BB31 N #&1 TA6G P;:P#

    &%LL (&.8 A31AT%F6 #C#T3: KF63

    &%LL (&.-8 :%E31 2 AD%TATF1

    &%LL (&.8 3;AL%KAT%F6 TA6G P;:P#

    &%LL (&.+8 @LF1%6AT%F6 ;6%T A60 #L;0D3 P;:P#

    &%LL (&./8 :%#3LLA63F;# A60 FT@31 !F1G#

    TOTAL OF BILL 2B: TO MAIN SUMMARY

    BILL 2B: ELECTROMECHANICAL EQUIPMENT FOR THE SBRWASTEWATER TREATMENT PLANT

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    42/54

     

    BILL NO 2: BEME FOR SBR WASTEWATER TREATMENT PLANT

    BILL

    N( 

    (A&%LL (A8 %

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    43/54

      EATMENT PLANT

     RATE AMOUNT

    ',->,***.** ',->,***.**

    -,***.** -,***.**

    )),***.** )),***.**

    '*),**.** '*),**.**

    '',/**.** '',/**.**

    ',***.** 4

    '+),**.** '+),**.**

    )),**.** +,(**.**

    ''+,**.** ''+,**.**

    '**,/**.** '**,/**.**

    '*,**.** '*,**.**

    ',***.** ',***.**

    +(,/**.** +(,/**.**

    >(,**.** '/,/**.**

    3$&43$!&&.&&

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    44/54

     RATE AMOUNT

    (-,-/>,+*.** 4

    (',**.** 4

    (*,*.** 4

    -/,***.** 4

    ','((,(*.** 4

    4 4

    //*,)(*.** 4

    ,'*>,/*.** 4

    (,-(*,***.** 4

    ?

    #

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    45/54

     RATE AMOUNT

    ',//,***.** ),>,***.**

    -,***.** ''(,***.**

    )>,(**.** +/,**.**

    )),***.** +(,***.**

    '*),**.** (*+,(**.**

    '',/**.** ((>,**.**

    +(/,***.** 4

    '+),**.** )+,(**.**

    )),**.** +,(**.**

    ''+,**.** ()-,(**.**

    '**,/**.** (*',**.**

    '*,**.** ('(,/**.**

    ',***.** (/,***.**

    +(,/**.** '-,**.**

    >(,**.** )>,**.**

    !$!&2$4&&.&&

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    46/54

     RATE AMOUNT

    -),>'.+

    '),*),/**.**

    (,***,***.**

    -,>*','**./* '',/*(,(*'.*

    2!$)4!$&&1.!&

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    47/54

     RATE AMOUNT

    ',-(,***.** ),)*,***.**

    '/,/**.** '/,/**.**

    ),**.** ),**.**

    )+(,**.** )+(,**.**

    +,(/*.** +,(/*.**

    '),*.** '),*.**

    +*,**.** +*,**.**

    (-,(**.** -*,**.**

    '+),**.** )+,(**.**

    -',-(*.** '*),**.**

    4$))%$3!&.&&

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    48/54

     RATE AMOUNT

    ,***.** ,***.**

    ->>,(**.** 4

    ''+,**.** ()-,(**.**

    )),**.** '**,/**.**

    '*,**.** ('(,/**.**

    >-,(**.** '>*,**.**

    >-,(**.** '>*,**.**

    ',***.** (/,***.**

    +,(**.** '),**.**

    +/,**.** )'),**.**

    -,***.** ''(,***.**

    2$1!1$!&&.&&

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    49/54

     RATE AMOUNT

    (,(*,***.** (,(*,***.**

    ,***.** ,***.**

    +,***.** +,***.**

    ''+,**.** ''+,**.**

    )),**.** '**,/**.**

    '*,**.** '*,**.**

    >-,(**.** >-,(**.**

    >-,(**.** >-,(**.**

    ',***.** ',***.**

    +,(**.** +,(**.**

    +/,**.** +/,**.**

    -,***.** -,***.**

    4$&%&$)&&.&&

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    50/54

     RATE AMOUNT

    ',*,***.** ,(-,***.**

    ),+((,//*.** ),+((,//*.**

    ,->(,***.** ,->(,***.**

    (,(*,***.** (,(*,***.**

    ),>(*,***.** ),>(*,***.**

    '(,)(*,***.** '(,)(*,***.**

    (,(*,***.** (,(*,***.**

    -,>-(,'.* -,>-(,'.*

    ),*+,>(*.** ),*+,>(*.**

    -,**,***.** -,**,***.**

    '',(**,***.** '',(**,***.**

    ,++,***.** ,++,***.**

    (,'/,***.** 4

    !$)%!$241.!&

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    51/54

    AMOUNT *+N+,

      ),*),**.**

    *.**

      ,*(,**.**

    (,/,**'.*

    ,//>,)*.**

    (,'',**.**

    ,*>*,/**.**

    -,/>,('.*

      113$3&$&&3.2&

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    52/54

     AMOUNT

    ')>,-(),('+.>-

    ''),-)*,**).(*

    (-),*-),(('.'-

    23$&3$221.1

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    53/54

     

    BILL FOR SBR WASTEWATER TREATMENT SYSTEM

    BILL

    N( 

    ' &%LL 6F '8 &3:3 BF1 F6#T1;T%F6 FB #3!31 63T!F1G

    ( &%LL 6F (8 &3:3 BF1 #&1 !A#T3!AT31 T13AT:36T PLA6T

    #;& TFTALADD

     Allowance for operation and maintenance for ( years at 'O per annum

    0esign of treatment system

    Bor insurance and other obligations as follows8

     7a9 insurance bond

    VAT 0 56/7-8069 /*1&;,

    TOTAL CARRIED TO FORM OF TENDER

    #ignature of contractor .

    Bor and on behalf .. 

     Address................................................................................................................................................................................................................................................

  • 8/17/2019 Bill for Gravity Sewer and WWTP j

    54/54

     AMOUNT

    Err:502

      253,053,221.15

    Err:502

    Err:502

    Err:502

    Err:502

    Err:502

    Err:502