BIOSOLIDS ENHANCEMENTS AT THE DOS RIOS WRC SLUDGE BLEND TANKS AND CENTRIFUGESGarrett Kehoe, P.E.
September 21, 2018
Arcadis 2017
Agenda
Background
Issues
Phased Solution Approach
o Phase I Sludge Blend Tank Improvements
o Phase II Thickening Centrifuges
Lessons Learned and Implemented
Arcadis 2017
1984/85 Dissolved Air Flotation Thickening
2006- Gravity Belt Thickeners 1 & 2
2009 Gravity Belt Thickeners 3 & 4
Dos Rios WRC Sludge consists of:
o Excess Activated Sludge (WAS)
o Dos Rios Primary Sludge
o Leon Creek Sludge (Primary + WAS)
Background
Arcadis 2017
The issues
(Prior to Upgrades)
Inconsistent Feed Rate
Inconsistent Thickness
Lack of Automation
Lack of Redundancy
Capacity Limitations
Arcadis 2017
Existing SystemPrimary Sludge
DIGESTERS
DIGESTERS
DIGESTERS
EAS
EAS
EAS
Leon
Primary
Sludge
Leon
Blended
Thickened
Arcadis 2017
The IssuesPrimary Sludge
DIGESTERS
DIGESTERS
DIGESTERS
EAS
EAS
EAS
Leon
Primary
Sludge
Leon
Blended
Thickened
Centrifugal Pumps
(Inconsistent Flow)
Not Being Thickened
In Pipe Sludge Blending
(Inconsistent Thickness)
Arcadis 2017
Phase I Sludge Blending Tank
Fix consistency of flow and thickness
Increase operational flexibility
Phase II Centrifuges
Add redundancy
Add capacity
Automation
Reduce Operational Costs
Phased Approach
Arcadis 2017
New Gravity Belt Thickeners Feed Pump Station
New Recirculation Pump Station
New Blending Tank
Overflow Protection
Bypasses for Operational Flexibility
Phase I Sludge Blend Tank
Arcadis 2017
Primary Sludge
DIGESTERS
DIGESTERS
DIGESTERS
EAS
EAS
EASLeon
Primary
Sludge
Leon
Blended
Thickened
Proposed System
New Feed Pump Station
(Improved Flow Rate Control)
New Blending Tank
(Improved Consistency)
Arcadis 2017
Completion Pictures
Arcadis 2017
Two new Centrifuges
New Polymer System
New Centrate Pump Stations
Automation
Facilities for Future Centrifuges
Phase II
Arcadis 2017
Solids Loading Capacity vs Flow Capacity
Thickening equipment needs to be evaluated for both
Capacity Evaluation
Arcadis 2017
Phase II Sludge Flows
GBTs @ 750 gpm each
0
500
1000
1500
2000
2500
3000
3500
2014 2016 2018 2020 2022 2024 2026 2028 2030 2032
Slu
dge F
low
(gpm
)
Year
2% Growth Sludge Flow
Average Flow (gpm) 3 Operating GBT 4 Operating GBT
Arcadis 2017
Phase II - Solids Thickening Needs
GBTs @ 3750 lb/hr | Centrifuge @ 6500 lb/hr
0
100000
200000
300000
400000
500000
600000
700000
800000
2014 2016 2018 2020 2022 2024 2026 2028 2030 2032
Dry
Solid
s (
ppd)
Year
2% Growth Solids Handling Capabilities
Average Flow Loading Rate (ppd) 3 Operating GBT 4 Operating GBT One Additional Centrifuge Two Additional Centrifuge
Arcadis 2017
Phase II
New Feed Pumps
New Polymer Building
New Electrical Building
New Centrate Pumps
New Centrifuges Future Centrifuges
Arcadis 2017
Ongoing Construction
Arcadis 2017
Ongoing Construction
Arcadis 2017
Scoping/Procurement Differences
General Contractor
Centrifuge
Backwash Pump
Thickened Sludge Pump
Polymer System
TYPICAL
Centrifuge
General Contractor
Backwash Pump
Thickened Sludge Pump
Polymer System
DOS RIOS THICKENING
Lessons Learned
Arcadis 2017
Available underground space extremely limited
Exposed piping can be your friend
Lessons Learned
Arcadis 2017
I&C Workshops, I&C Workshops, I&C Workshops
3 Instrumentation and controls workshops during design
1 Network workshop during construction
1 Control panel workshop during construction
1 Graphics workshop during construction
Lessons Learned
Record drawings are not always right!
Arcadis 2017
Thickened sludge pumping is an art.
Non Newtonian fluid.
Highly recommend viscosity testing sludge for >5% solids.
Lessons Learned
Arcadis 2017
Lessons Learned Control Maps
Arcadis 2017
Housekeeping and Safety By Design
Confined Space, no access provided
Tapered edge to prevent storm water entry
Grating above entire centrifuge area to clear spilled sludge easily
Arcadis 2017
Questions?