CONTENTS
PAKISTAN BITUMEN MARKET
MAJOR PLAYERS
GRADES AND SPECIFICATIONS
BITUMEN DEMAND SUPPLY SCENARIO
ROAD NETWORK OF PAKISTAN
CHALLENGES & OPPORTUNITIES
CONCLUSION
7th Middle East Bitumen/Asphalt 2016 2
Bitumen in Pakistan
History of bitumen use in Pakistan is much older than history of Pakistan itself
In the Indus Valley, there is a particularly well-preserved water tank which dates back to around 3,000 BC. The stone blocks in the tank's walls are bonded with natural bitumen and there is a vertical bituminous core in the center of the wall . The same principle is used today in modern dam design.
Source: http://www.bitumenuk.com/bitumen.asp
7th Middle East Bitumen/Asphalt 2016 3
PAKISTAN BITUMEN MARKET
7th Middle East Bitumen/Asphalt 2016 4
Pakistan Bitumen Market
7th Middle East Bitumen/Asphalt 2016 5
Source: http://www.factfish.com/
Bitumen Production:
o Pakistan has a world share of 0.2%. o Pakistan is #52 in the world ranking.
Pakistan Bitumen Market
7th Middle East Bitumen/Asphalt 2016 6
Bitumen Consumption:
o Pakistan has a world share of 0.2%. o Pakistan is #52 in the world ranking.
Source: http://www.factfish.com/
MAJOR PLAYERS
7th Middle East Bitumen/Asphalt 2016
7
Major Players - Refineries
o Attock Refinery Limited (ARL)
o The only refinery in Pakistan producing bitumen till mid sixties.
o 150,000 Tons per annum bitumen production capacity.
o Processing indigenous heavy crudes for asphalt production.
o National Refinery Limited (NRL)
o The second refinery with asphalt production unit (Commissioned in 1966).
o 240,000 Tons per annum bitumen production capacity.
o Pak-Arab Refinery Limited (PARCO)
o The third refinery in Pakistan to have asphalt production capability.
o Commissioned bitumen production unit in 2012.
o 175,000* Tons per annum bitumen production capacity.
7th Middle East Bitumen/Asphalt 2016 8
*Based on 500 ton/day & 350 stream days.
Major Players – Oil Marketing Companies
o Attock Petroleum Limited
o Member of Attock Group of Companies.
o ARL and NRL also members of Attock Group.
o Enjoys group synergy and had 81.5% of bitumen market share during 2014-15.
o PARCO (Pearl) and (TPPL) TOTAL PARCO Pakistan
o PEARL; the brand name of PARCO’s marketing company.
o TPPL is a Joint venture of TOTAL S.A. and PARCO refinery
o Combined market share of both companies was 18.5 % during 2014-15.
7th Middle East Bitumen/Asphalt 2016
9
GRADES AND SPECIFICATIONS
7th Middle East Bitumen/Asphalt 2016
10
Grades and Specifications
Attock Refinery Limited offers following bitumen grades:
Paving Bitumen
PEN Grade (60/70)
PEN Grade (80/100)
Cut back Bitumen
RC-70
RC-250
MC-70
Performance Grade Bitumen
PMB (Polymer Modified Bitumen)
7th Middle East Bitumen/Asphalt 2016 11
Grades and Specifications
National Refinery Limited offers following bitumen grades:
Paving Bitumen
PEN Grade (40/50)
PEN Grade (60/70)
PEN Grade (70/80)
PEN Grade (80/100)
7th Middle East Bitumen/Asphalt 2016 12
Grades and Specifications
Pak-Arab Refinery Limited (PARCO) offers following bitumen grades:
PEN Grade Bitumen (60/70, 80/100)
Multi grade Bitumen (30/40, 40/50)
Industrial Bitumen (10/20)
7th Middle East Bitumen/Asphalt 2016 13
BITUMEN DEMAND SUPPLY SCENARIO
7th Middle East Bitumen/Asphalt 2016
14
Bitumen Demand Supply Scenario
7th Middle East Bitumen/Asphalt 2016 15 Source: Pakistan Oil Report by OCAC
-
50
100
150
200
250
300
350
400
450
500
Bitumen Production and Consumption Trend (Thousand Tons)
Bitumen Production Bitumen Consumption
Bitumen Demand Supply Scenario
7th Middle East Bitumen/Asphalt 2016 16
Source: Pakistan Oil Report by OCAC
-
50
100
150
200
250
300
350
Bitumen Refineries Production (Thousand Tons)
ARL NRL PARCO Refineries Total
ROAD NETWORK OF PAKISTAN
7th Middle East Bitumen/Asphalt 2016
17
Road Network of Pakistan
Steadily increasing; current road network length in Pakistan is around 264,000 kilometers
7th Middle East Bitumen/Asphalt 2016 18 Source: Economic Survey of Pakistan 2014-15.
200,000
210,000
220,000
230,000
240,000
250,000
260,000
270,000
280,000
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Road network (Kilometers)
Motorways 1,930 Highways 9,555 District/Rural Roads 252,457
Total 263,942
Road Network of Pakistan
7th Middle East Bitumen/Asphalt 2016 19
Road Network of Pakistan (Roads Paved)
Quality of roads being improved. Currently around 70% of network consists of paved roads.
7th Middle East Bitumen/Asphalt 2016
20
50
55
60
65
70
75
80
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Roads Paved (% of Total Roads)
Source: Economic Survey of Pakistan 2014-15.
7th Middle East Bitumen/Asphalt 2016 21
o Current road density stands at 33 km/100 sq. km .
o Road density projected to raise up the level of 45 km/100 sq. km by 2018
o Existing road network will increase from around 264,000 km to 358,000 km.
Road Network of Pakistan (Road Density)
Road Network of Pakistan (Roads, Passengers Carried)
Road passengers carried; increasing at an average annual rate of 7%
7th Middle East Bitumen/Asphalt 2016 22
0
50
100
150
200
250
300
350
1999 2001 2003 2005 2007 2009 2011
Roads, Passengers Carried (Million Passenger-km)
Road Network of Pakistan (Roads, Goods Transported)
Roads, goods transported; increasing at an average annual rate of 11%
7th Middle East Bitumen/Asphalt 2016 23
0
20
40
60
80
100
120
140
160
180
200
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
Roads, Goods Transported (Million Ton-km)
Road Network of Pakistan (Vehicles per kilometer of road)
Vehicles per kilometer of road; increasing at an average annual rate of 6.5%
7th Middle East Bitumen/Asphalt 2016
24
-
2
4
6
8
10
12
14
16
18
2000 2002 2004 2006 2008 2010 2012 2014
Vehicles per km of Road
Source: Pakistan Bureau of Statistics
CHALLENGES & OPPORTUNITIES
7th Middle East Bitumen/Asphalt 2016 25
Challenges & Opportunities (Extreme weather conditions)
7th Middle East Bitumen/Asphalt 2016
26
Challenges & Opportunities (Extreme weather conditions)
7th Middle East Bitumen/Asphalt 2016
27
Challenges & Opportunities (Selection of Bitumen Grades)
Paving Grade Bitumen
– 40/50 Grade
– 60/70 Grade
– 80/100 Grade
Performance Grade (PG) Bitumen
7th Middle East Bitumen/Asphalt 2016 28
Challenges & Opportunities (Selection of Bitumen Grade)
Pakistan is divided into six temperatures zones
PG 70-10 covers more than 70 % of the area
Not produced by refineries.
The closest available grade is PG 76-16 (PMB) from ARL.
Bitumen produced by refineries correspond to PG 58-22 , PG 64-16 and PG 64-22.
In future, NHA to consume PG Bitumen for the development/ rehabilitation of main highways and motorways in the country.
7th Middle East Bitumen/Asphalt 2016 29 Source: Pak. J. Engg. & Appl. Sci. Vol. 8, Jan., 2011
Challenges & Opportunities (Selection of Bitumen Grade)
7th Middle East Bitumen/Asphalt 2016 30
Source: Pak. J. Engg. & Appl. Sci. Vol. 8, Jan., 2011
Source Penetration Grade
Equivalent PG grade
ARL 60-70 PG 58-22
ARL PMB PG 76-16
ARL 80-100 PG 58-22
NRL 40-50 PG 64-16
NRL 60-70 PG 64-22
NRL 80-100 PG 58-22
Summary of Bitumen PG Grading in Pakistan
Challenges & Opportunities (Selection of Bitumen Grade)
7th Middle East Bitumen/Asphalt 2016 31 Source: Pak. J. Engg. & Appl. Sci. Vol. 8, Jan., 2011
Required PG Grade
Available Exact Grade
Possible Grade
Availability
Equivalent Penetration
Grade
Remarks
PG 70-10
No
PG 76-16
ARL–PMB
PMB, Polymer Modified may be too hard for PG 70-10 and
may result in cracking
PG 64-10 No PG 64-16 NRL–40/50 Acceptable
PG 64-16
Yes PG 64-16
PG 64-22
NRL–40/50
NRL–60/70
Acceptable
PG 58-16
No
PG 58-22 NRL–80/100
ARL–80/100
ARL–60/70
Acceptable
PG 76-10 No PG 76-16 ARL–PMB Acceptable
PG 58-22
Yes
PG 58-22 NRL–80/100
ARL–80/100
ARL–60/70
Acceptable
Challenges & Opportunities Bitumen and HSFO price de-regulated
HSFO being deficit product; price linked with Arab Gulf market
Asphalt price dependent on demand/supply situation
7th Middle East Bitumen/Asphalt 2016 32
0
100
200
300
400
500
600
700
800
900
1,000
Jul-10 Dec-10 Jul-11 Jan-12 Jul-12 Jan-13 Jul-13 Jan-14 Jul-14 Jan-15 Jul-15 Jan-16
Ex-Refinery Price Trend (US $/Ton)
HSFO ASPHALT
Challenges & Opportunities (Improved roads network)
Improved roads network is the top most priority of the present government
Road density projected to raise to the level of 0.45 km/sq. km by 2018 against the existing 0.33 km/sq. km
The existing road network to increase from around 264,000 km to 358,000 km.
PG Bitumen to be used for future development/ rehabilitation projects of main highways and motorways in the country.
7th Middle East Bitumen/Asphalt 2016 33
Challenges & Opportunities China-Pakistan Economic Corridor
2,395 km long China-Pak Economic Corridor (CPEC) connecting Gwadar to Kashghar (China).
Karachi-Lahore Motorway (KLM) 6-lane controlled access.
KLM is part of the CPEC Phase-I.
KLM to serve initially the Economic Corridor to ensure optimal utilization of existing network.
7th Middle East Bitumen/Asphalt 2016 34
CONCLUSION
7th Middle East Bitumen/Asphalt 2016
35
7th Middle East Bitumen/Asphalt 2016
36
Conclusion
Future demand outlook of bitumen is upbeat.
Fast growing vehicle population and freight services; call for improved and long-lasting roads.
Performance grade bitumen- solution to road problems.
Opportunity for foreign investment o PG Bitumen export to Pakistan
o Polymer/alternate chemicals for modifying paving grades to required PG bitumen
Thanks