black cloud mine final reclamation report
DESCRIPTION
Final report on reclamation activities at the Black Cloud Mine site near Leadville, Colorado. Newmont Mining Corporation and Resurrection Mining Company finished reclamation work under a consent decree agreement with the state to clean up the site in 2014. Report describes work, conditions, water quality, photographs.TRANSCRIPT
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 1/149
6
V
Black
Cloud Reclamation
Leadville
Colorado
Prepared
fo r
Resurrection
Mining
Company
6363
S Fiddlers Green Circle
Greenwood
Village
CO
8 246
Prepared by
Advanced
Environmental Sciences
Inc
383
West
37
h
Street Suite 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 2/149
Resurrection Mining Company
6363
South Fiddlers Green Circle
Greenwood Village Colorado
8
3 3
863
74 4
November 26 2 4
Mr Allen
Sorenson
State
of Colorado
Division of
Reclamation Mining and Safety
3 3
Sherman Street
Room 2 5
Denver
CO 8 2 3
Re
Black Cloud Mine 2 4 Annual
Report
Resurrection Mining Company
Dear
Mr Sorenson
Z
83
RECEIVED
NOV 28POi4
DIVISION OF
RECLAMATION
MINING
AND
SAFETY
Pursuant to Paragraph 22 of the
Final
Consent Decree
with Newmont
USA Limited
and
Resurrection
Mining
Company
Resurrection
which
was
entered
by
the
United
States
District
Court for the District of Colorado in Case
no
83
cv
2388
WYD
the
enclosed
report describes
Resurrection Mining Company s
activities associated with
or at
the Black
Cloud
Mine in
Lake
County for calendar year 2 4
With
the
work
performed
in
2 4
Resurrection believes
that
it
has
completed
the
Black Cloud
mine reclamation As
required
in the Consent Decree over
the next
4
years Resurrection
will
perform
general
monitoring
maintenance
and
repair
activities as
necessary
If
you have
any questions or
require clarification on the
information
presented in this letter
please do not hesitate
to
contact
me at 3 3
837 5676
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 3/149
Black Cloud
Reclamation
Leadville
Colorado
Prepared for
Resurrection
Mining
Company
6363 S
Fiddlers
Green
Circle
Greenwood Village CO 8 246
Prepared by
Advanced
Environmental
Sciences
Inc
383
West 37
h
Street Suite
4
Loveland
CO 8 538
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 4/149
TABLE
OF CONTENTS
INTRODUCTION
2
RECLAMATION
ACTIVITIES
3
2
2 4
Activities
3
2
2
2 8
2 3
Reclamation
Activities
6
3
RECLAMATION
COSTS
9
3 2 4
Costs
9
4
WATER
QUALITY
2
5
2 5
RECLAMATION
ACTIVITIES
2
LIST
OF
FIGURES
Figure
Overall
Black
Cloud Reclaimed
Contours
Figure 2
Typical Cross Sections of
Reclaimed
Tailing
LIST OF APPENDICES
Appendix
A
Reclamation
Activities
by
Year
Appendix
B
Site Photos
Appendix
C
Minor Modifications
Appendix D
Reclamation
Costs
Appendix
E
Water
Quality
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 5/149
INTRODUCTION
Pursuant to Paragraph 22
of
the
Final
Consent Decree
with
Newmont USA Limited and
Resurrection
Mining
Company
Resurrection
which
was
entered by the
United
States
District
Court
fo r th e District
of Colorado
in
Case
no 83
cv
2388 WYD
this
report describes
Resurrection
Mining
Company
s activities associated with
or
at the Black Cloud Mine in Lake
County
Under the Consent Decree and approved modifications 2 4 is
the
last year with unique
prescribed reclamation activities before
the onset
of the 4
year general
monitoring
maintenance
and
repair
activity
period
Because
this
is
the last
year with prescribed active reclamation
activities
this
report
summarizes
Resurrection
Mining
Company
s
Resurrection activities
associated with or at the Black
Cloud
Mine fo r the years 2 8 2 3
and
describes in detail the
activities
performed
fo r
2 4
Appendix A presents
a detailed breakdown
of
reclamation
activities
performed
from 2 8
through
2 3 Appendix B contains site
photos
of
reclamation
work for
the
years 2 8 through
2 3
One minor modification was
applied for
in
2 4 consisting of a
change in final topography
of
the
tailing surface
Seven other
minor
modifications s
were
applied for
and
approved from 2 8
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 6/149
r
Black
Cloud
Mine
Facilities
2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 7/149
Julia
Fiske Road
2 4
2
RECLAMATION
ACTIVITIES
Pursuant
to Section
6
of
Appendix
E
to
the
Consent
Decree
Black Cloud Mine Reclamation
P lan and
Schedule
Leadville Colorado
the
schedule
for
reclamation activities were prescribed
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 8/149
Mobilize
reclamation
equipment and
personnel
to the Black
Cloud
Mine
Compliance
Activities
and
Status
SLV
Earthmovers
of
Monte Vista
Colorado
mobilized to the
site
in mid
August Equ ipmen t
included
three excavators two loaders
two track
dozers
five
articulating haul
trucks
a
lube truck
a water
truck
a
parts
trailer a John Deere Tractor with a
tow behind
land planer and a fuel tank
and
containment
2
Complete removal from
site
and
properly
dispose
of all unneeded fuel lubricants
chemicals
and
any trash and
debris
unsuitable
for
onsite
burial
Compliance
Activities and Status
All
fuel
lubricants chemicals not necessary to
maintain th e site
emergency
generator or
front
end loader were
removed
in
2
Most
debris
and
t rash not suitable fo r
onsite
burial were removed and disposed in 2 3
A ll
remaining debris i
e
power poles was removed in 2 4
3
Continue removal and proper disposal or
resale
of infrastructure or equipment not
necessary to
support
operation of the Yak
Tunnel
blockage pumping and
tailing
impoundment dewatering systems Infrastructure includes
mill
PCB transformer other
unneeded
transformers above and below ground tanks mine and mill equipment
etc
Compliance Activities
and Status
All equipment
and infrastructure no t
necessary to
the
support the Yak
Tunnel
blockage pumping
tailing
impoundment dewatering Black
Cloud water
treatment plant site
snow removal and
maintenance operations
were
removed and
disposed
recycled and or sold in
2
4
Complete demolition of
all
remaining mine and
mill
structures at the Black
Cloud
surface
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 9/149
be constructed as planned because the mill building will be preserved and
remain
then
debris will be properly disposed
of off site
Compliance
Activities
and
Status
The debris cell was
constructed
filled and graded
in
2
In
2 4 the cell
was
reopened fo r the media filter housings and
then
closed and
regraded
7
Grade Black
Cloud Mine
surface
plant area
Compliance
Activities
and
Status
The waste rock piles
were
excavated hauled
and
placed
on
th e
tailing
in
2
Approximately
2
feet
of
the
surface
at
the
Black Cloud
mine was
excavated hauled and
placed on
the tailing in 2 2 Final grading
of
the
Black
Cloud
mine
site was
completed
in 2 4
The mine site was surveyed prior
to
commencement ofwork in 2 4 and
after
completion of the 2 4 work
8
Prepare
roadways at Julia Fiske and Helena areas for placement
of
plant media
compacted roadways to be loosened through excavation
ripping and
grading
Compliance
Activities and Status
This
work
was completed
in
2 4
9
Excavate and transport off site borrow
materials to
the mine site for use as a growth
medium
Compliance
Activities
and
Status
Minor
Modification
S allowed
for
the use
of
on
site
instead ofoff
site
borrow materials
Complete spreading
plant growth
media
in tailing impoundment
Black
Cloud and Helena
areas seed
fertilize and
mulch
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 10/149
Quarterly
groundwater and surface water
samples
were collected on
January
2 April
22
July
6 and October 5 2 4
The field parameter
and analytical
results
fo r the
quarterly samples are presented in
Table
Russell
Surveyors
Associates Russell su rveyed the 2 3 tailing
and borrow
area
surfaces on June 2 2 4 and Advanced
Environmental
Consultants
Inc
updated
the
tailing
cover work
to
be
completed
based
on th e
survey
data On November
2 4
Russell
performed
a survey of the reclaimed tailing
and Black Cloud
mine area surfaces
fo r
incorporation
into the as built documentation
Obtained Class V
Injection
Well
Permitfrom
the United States Environmental Protection
Agency EPA for subsurface drainage of Fortuna
water
into
the
reclaimed tailing
storage facility
Finished installing aligning
and
reinforcing
stormwater channels
around the
Black
Cloud
mine
area
and tailing facility A permanent sediment pond and temporary
sediment
retention
structures
i
e
hay
bales were
installed
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 11/149
2 9 Year
Completed
Reclamation Activities
Site
equipment
materials chemicals solid and hazardous wastes fuels and
lubricants
were inventoried partially removed and properly disposed
Asbestos inspection and
removal
Demolition and cle an up of Black Cloud work areas yards and various
buildings foundations
including
safety
trailer dry
oil house welding shop assay
laboratory acid
house
Julia Fisk
storage
building and roadway IG
monitoring
station
IG
2
monitoring
station
primer
magazine
powder
magazine
monitoring
shack and
Black Cloud Mine
propane storage tanks
The
I rene shaft
and east Black Cloud
shaft were
capped
Site equipment
and
materials inventory
Crusher and
mill pre
demolition inspections inventory and preliminary sale
negotiations
Partial construction
of
tailing
storage
facility
diversion
channels
Surveys of
existing
talus borrow
stockpiles
to determine available
quantity
Civil
survey of Fortuna adit to identify land ownership
Demolition
and
removal of
the
Irene electrical substation
transformers
roadway head
house
and head frame
siding
2
Year 2 Completed Reclamation Activities
Continued removal
disposal
or
recycling
of various materials
and
wastes
Continued asbestos
inspection
and removal
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 12/149
Continued removal and
disposal
or resale of infrastructure no t necessary to support
Black
Cloud dewatering and pumping operations
Completion
of
removal
disposal
or recycling
of
various
wastes
Removal
and
proper
disposal of the Mill
PCB
transformer
Construction of new
office
at
the
water treatment
buildings
Completed
asbestos abatement
of the Mine Office and Truck Shop
Completed
demolition
of the
Black
Cloud Mill Crusher Scale House
Timber Shop
Machine Shop Warehouse Mine Office Water Head Tanks Truck Shop Shaft House
Hoist
House
and
Head Frame Foundations were
rubblized and material
was
removed or
buried
in the
debris cell
Completion of the
debris cell
Completed demolition
of
the
Helena Shaft House and Hoist House
Completed seeding and fertilizing of Eclipse waste rock dump
Transported screened rock
to stockpiles
along
the
northern
perimeter of the
tailings
storage facility and began
cover
placement
Completed excavation
haulage
and
placement
o f the
Black
Cloud
East and
West
waste
rock
dumps on
the
tailing storage facility
Placed Helena waste
rock
in tailings storage facility
Continued monitoring Fortuna Adit water
The
Helena
shaft
was capped
2 2 Year 4
Completed
Reclamation Activities
A new electrical system and larger dewatering pump were installed as part
of
the Iowa
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 13/149
3
RECLAMATION COSTS
Pursuant
to
Section
VIII
Performance
of
Work
at the
Black Cloud Mine
by
Settling
Defendants
Item 2 Reclamation Cap Final
Consent Decree
With Newmont USA
Limited
and
Resurrection
Mining Company
the
2 4
costs
are
presented
below
Appendix D presents
the
costs associated
with
reclamation
activities
from 2 8 through 2 4
3 2 4 Cos ts
Table
Reclamation Costs
fo r
2 4
LEDGER
DATE
DESCRIPTION
F
COS
r
TOTAL
SALARY AND BURDEN
THRU
3
NEWMONT
Site
Labor
Burden
F
9
964
Subtotal
69
964
FUEL EXPENSES
226 5 6 5 4
ACORN PETROLEUM
INC
87 45
2 3
9
4
ACORN PETROLEUM
INC
7
28
2 55 23 4
ACORN PETROLEUM INC
259 52
2 325 2
4
ACORN PETROLEUM INC
25 59
2 566
2 28 4
ACORN PETROLEUM INC
42 46
2 7 6 3
4
ACORN PETROLEUM
INC
6
76
2 9 6
3 2
4
ACORN PETROLEUM INC
296 62
22 5
4
9
4
ACORN PETROLEUM
INC
56
29
22 86
4 24
4
ACORN PETROLEUM INC
256 57
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 14/149
Table Reclamation
Costs
fo r 2 4
Cont
LEDGER
DATE DESCRIPTION COST
TOTAL
235 4
8
3 4
HREN S COMPLETE
SERVICE
25
HREN S
INSTALL
CULVERT
23664
8
28 4
DURAN
LUCERO INC
9
4 2
5
DURAN FOUNTATION FLOOR
REHAB
2 242 3 4
JOHNSON
SEPTIC JOHNSON
TOILET
SRVC BC
2 6 6 2
28
4 JOHNSON
SEPTIC
JOHNSON PORTABLE
TOILET
BC
22 3
4
3
4
JOHNSON SEPTIC JOHNSON TOILET
22245
4
3 4 JOHNSON SEPTIC
JOHNSON
BC
TOILET
2274
6
2 4
JOHNSON SEPTIC
JOHNSON
PORTABLE
TOILET BC
23 56 7
8
4
JOHNSON SEPTIC
22
JOHNSON
PORTABLE TOILET SRVC
23585
8 9 4
JOHNSON SEPTIC
JOHNSON
PORTABLE TOILET
24 5 2 4
JOHNSON
SEPTIC
JOHNSON
PORTABLE TOILET BC
23 9 7 8
4
ADVANCED ENVIROMENTAL
5
889
8
SCIENCES AES
RECLAMATION
REIMBUSABLE EX
23
7
8
4
ADVANCED
ENVIROMENTAL
735 59
SCIENCES AES SITE COORDINATION
23 7
8 4 ADVANCED ENVIROMENTAL
4
482
5
SCIENCES AES STORMWATER PLAN
23 9
7 8 4
ADVANCED ENVIROMENTAL
659 24
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 15/149
Table
Reclamation Costs
fo r
2 4 Cont
LEDGER
DATE
DESCRIPTION COST TOTAL
2 6
9
4 SLV
EARTH
MOVERS INC SLV
EARTH RIP
RAP
IOWA GULCH
4
5
THRU
9
4
SLV EARTH
MOVERS INC
385 367
THRU
4
SLV EARTH MOVERS INC 96
637
Subtotal
595 237
5
PHONE LICENSES PERMITS POSTAGE
SUPPLIES
2262
6 5 4
BIGHORN
HARDWARE
BIGHORN
MISC SPLYS
6 52
22947
7 3
4 BIGHORN HARDWARE
BIGHORN
MISC
SPLYS BC
48 39
22945 7 3
4
ALLEN LONG LONG
2
8 GATES
222
25
23426 8 4 DURAN
LUCERO
INC
DURAN
OXY
AC MC
87
53
23245 8 4
BIGHORN
HARDWARE
BIGHORN MISC SPLYS
85 9
23743 9
3 4
BIGHORN
HARDWARE
BIGHORN MISC
SPLYS
46 99
24 22
2
4
BIGHORN HARDWARE
BIGHORN MISC SPLYS
98
24474 5
4
BIGHORN
HARDWARE
BIGHORN
MISC
SPLYS
77 53
2 582
2 28 4
ALLEN LONG LONG SAMPLING
SPLYS
56 3
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 16/149
LEDGER
DATE
DESCRIPTION
COST
TOTAL
22944
7
3
4
ALLEN
LONG
LONG
BC P
O BOX
RENTAL
4
23 58 7 9 4
SILVER
CITY
PRINTING SILVER
CITY CARTRIDGE
CARD
4 62
2335 8
4
VERIZON WIRELESS VERIZON
87 5
236 7
8
9 4
VERIZON WIRELESS VERIZON
68
49
23734
9
3 4
ALLEN
LONG LONG
OFFICE SPLYS
44
3
23986
9
24
4
VERIZON
WIRELESS VERIZON
67 3
2434 23
4
VERIZON WIRELESS VERIZON
67 3
Subtotal 2 729
56
ELECTRICITY
GAS
2 8 9 4
XCEL ENERGY XCEL 748 CNTY RD
2A BLDG IOWA
5
632 8
2 32
2
6
4
XCEL
ENERGY
XCEL 748 CNTY RD
2A BLDG IOWA
3
245
34
2 783
3
4
XCEL
ENERGY
XCEL
748
CNTY RD
2A
BLDG IOWA
4 69 25
22 36 4
3 4 XCEL
ENERGY
XCEL
748
CNTY
RD
2A BLDG IOWA
3
746
92
22284 4 3 4 XCEL
ENERGY XCEL 748 CNTY RD
2A
BLDG IOWA
4 4 3 56
22683
6 5 4
XCEL ENERGY XCEL
748
CNTY RD
2Q BLDG IOWA
4 26
25
2299 7
3
4
XCEL
ENERGY
XCEL
748
CNTY
RD
2A BLDG IOWA
46 64
23375
8
4
XCEL
ENERGY
XCEL
748
CNTY
RD
2A BLDG IOWA
987
24
23789
9
3
4
XCEL
ENERGY
XCEL 748 CNTY RD
3 65 92
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 17/149
Table 2
Black
Cloud Surface and
Ground
Water Monitoring Results
SAMPLE LOCATION
Method
Detection
Limi t
MW
MW MW
MW
DATE
2 2 4 4 22 2 4
7 6
2 4
5 2 4
PARAMETER UNITS Conc Lab
Qual
Conc Lab
Qual
Conc La b
Qual
Conc Lab Qual
Cadmium D
mg
L
6
7
5
5
Copper
D
mg
L
5
6 B
24 B
3
B
8 B
Lead D
mg L
U B
U
U
Manganese
D
mg
L
5
23
B
9
B
5
U
5
U
Mercury D
mg L
2
2 U 2 U 2
U
2 U
Zinc
D
mg L
2
46
6
39
42
Cyanide T
mg
L
3
3
U
3
U
3
U
3
U
Hardness
as
CaCO3
mg
L
and
8 starting
7 6
2 4
6
2
89
9
Nitrate
Nitrite as
N
mg
L
2
26
22
38
Nitrogen
ammonia
mg L
5
5
U
5
U
5
U
5
U
TDS
mg
L
2
9
H
6
Sulfate
mg
L
4
B 2 B
3 B
2
Total
Alkalinity
mgt 2
4 82
82
8
Field Parameters
Units
2 2 4
4
22
2 4 7
6
2 4
5 2 4
H std units
7 85 7 64 7 4
7
56
Temperature
C
5
9
5
3 7 2 2
Conductivity
umhos cm
276 267
223 27
Depth to Water
Feet
8
25
7 35
7 5 7
9
D
Dissolved
T Total
Laboratory
Qualifiers
B Analyte detected
at
value
between MDL and
PQL
U Ana ly te concentration less than MDL
H Analysis exceeded holding
time
Resurrection
Mining
Company 3
Advanced Environmental
Sciences
Inc
Novembe r 26 2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 18/149
Table 2
2 4 Black Cloud
Surface and
Ground Water Monitoring Results Cont
SAMPLE LOCAT ION
Method
Detection
Limi t
MW
2
MW
2
MW 2
MW 2
DATE
2 2 4 4 22 2 4
7
6
2 4
5 2 4
PARAMETER
UNITS
Conc
La b Qual
Conc
La b
Qual
Conc Lab
Qual Conc
Lab Qual
Cadmium
D
mg
L
3
B
B
Copper
D
mg L
5 3
5
B
Lead D
mg L
U
U
Manganese D
mg L
5
8
B
5
B
Mercury
D
mg
L
2
2
U
2
U
Zinc D
mg
L
2
9
75
Cyanide T
mg L
3
3
U
3
U
Hardness
as
CaCO3
mg
L
and
8
starting
7 6 2 4
4 6
256
Nitrate Nitrite as N
mg L
2
9
Nitrogen
ammonia
mg L
5
5
U
5
U
TDS
mg
L
5
H
332
Sulfate
mg L
34
2
Total Alkalinity
mg L
2
85
94 3
Field
Parameters Units
2 2 4 4 22 2 4
7 6
2 4
5
2 4
H
st d
units
7
54
7
66
Temperature
C
5
7
Conductivity
umhos cm
87 642
Dep th to Wa te r
Feet
5 5
6
D Dissolved
T
Total
Laboratory
Qualifiers
B
Analyte
detected
at
value between
MDL and
PQL
U Analyte concentration less than MDL
H
Analysis exceeded holding time
Resurrection
Mining
Company
4
Advanced
Environmental
Sciences
Inc
November 26
2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 19/149
Table
2
2 4 Black
Cloud Surface and
Ground Water Monitoring
Results Cont
SAMPLE LOCAT ION
Method
Detection
Limi t
MW 3 MW 3
MW
3
MW
3
DATE
2 2 4 4 22 2 4 7 6 2 4 5 2 4
PARAMETER UNITS
Cone
La b Qual
Cone
Lab Qual
Cone
Lab Qual
Cone
Lab Qua l
Cadmium D
mg
L
6
7
24
25
Copper D
mg L
5
5
U
5
U
5
B
5 U
Lead D
mg
L
B
B
B
U
Manganese
D
mg
L
5
2 32
3
37 3 92
4
57
Mercury D
mg
L
2
2 U 2 U 2
U
2 U
Zinc
D
mg L
2
959
762
735
698
Cyanide T
mg L
3
3
U
3
U
3
U
3
U
Hardness as CaCO3
mg
L
and
8
starting
7 6 2 4
763
759
876 8 9
Nitrate Nitrite as
N
mg
L
2
22
7
2
36
Nitrogen ammonia
mg L
5
84
97
55
37
TDS
mg L
6 3
2
H
5
Sulfate
mg L
68
67
75
75
Total Alkalinity
mg
L
2
94 82
6
Field
Parameters
Units
2 2 4 4
22
2 4 7
6
2 4
5
2 4
H std units 7 48 7
5
7 43 7 5
Temperature
C
4
9
5
4
4
9
8
Conductivity
umhos cm
492 5 2 789 727
Depth to
Water Feet 5 4
7
4 2
4 8
D
Dissolved
T Total
Laboratory Qualifiers
B
Analyte
detected
at value
between
MDL and
PQL
U
Analyte concentration less than
MDL
H Analysis exceeded holding time
Resurrection
Mining
Company
5
Advanced Environmental
Sciences
Inc
November
26 2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 20/149
Table 2
2 4
Black
Cloud Surface and
Ground
Water Monitoring Results Cont
SAMPLE LOCATION
Method
Detection
Limit
MW 4
MW
4
MW 4 MW 4
DATE
2 2 4
4
22
2 4
7 6 2 4
5 2 4
PARAMETER
UNITS
Conc
Lab
Qual Conc
Lab
Qual Conc
Lab
Qual
Conc Lab
Qual
Cadmium D
mg
L
9
4
2
Copper
D
mg L
5
7 B
9 B
B
8 B
Lead
D
mg L
U
U
U
U
Manganese
D
mg L
5
6 B
5 U
5
U
5 U
Mercury
D
mg L
2
2
U
2
U 2
U
2
U
Zinc
D
mg L
2
2 8
53
275
228
Cyanide T
mg
L
3
3
U 3 U 3
U
3
U
Hardness as CaCO3
mg L
and
8 starting
7 6 2 4
242
2 5
2 6 229
Nitrate Nitrite as N
mg
L
2
53
75
33
25
Nitrogen ammonia
mg L
5
5
U 5 U
5
U
5
U
TDS
mg L
29
28
26 H
28
Sulfate
mg
L
6
4
4
Total Alkalinity
mg L
2
4 72
7
7
Field Parameters Units
2 2 4 4 22 2 4
7 6 2 4 5
2 4
H
std units
7
66 7
53
7 6 7
65
Temperature
C
4 8 7
3 7
8
Conductivity
umhos
cm
527 555
5 9
534
Depth to
Water Feet
6 4
2 5
2 92 5 8
D Dissolved
T Total
Laboratory
Qualifiers
B
Analyte detected at
value between
MDL and
PQL
U
Analyte concentration less
than
MDL
H Analysis exceeded holding time
Resurrection
Mining Company
6
Advanced
Environmental
Sciences Inc
November
26 2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 21/149
Table
2
2 4 Black Cloud
Surface and
Ground Water Monitoring Results Cont
SAMPLE
LOCATION
Method
Detection
Limi t
MW 5 MW 5
MW 5 MW 5
DATE 2 2 4 4
22
2 4 7 6 2 4 5 2 4
PARAMETER UNITS Conc
Lab
Qual Conc
La b
Qual Conc
Lab Qual
Conc La b Qual
Cadm ium D
mg
L
2 B
3 B
2
B B
Copper
D
mg L
5
5
U
5 U
5
U
5
U
Lead D
mg
L
2
B
2 B
5
U
Manganese
D
mg L
5
2
B
5
U 32 5 U
Mercury D
mg L
2
2 U
2 U 2
U
2 U
Zinc
D
mg L
2
34 48
36
34
Cyanide T
mg
L
3
3 U
3 U
3
U
3 U
Hardness as CaCO3
mg L
and
8 starting
7
6
2 4
2
2 3 2 2
95
Nitrate Nitrite as N
mg
L
2
5
57
99
7
Nitrogen
ammonia
mg
L
5
5 U
5
U
5
U
5
U
TDS
mg
L
24 25
25 H
242
Sulfate
mg
L
8
8
9
Total Alkalinity
mg
2
9 22
3
7
Field Parameters Units
2 2 4 4 22 2 4 7
6
2 4
5
2 4
H
std
units
8
2
7
84
7
99
7
98
Temperature
C
3
3
6 6
2 4
5
9
Conductivi
umhos
cm
45 478 5 9 489
De th to W ater Feet
4
4 7
2
3
2 9
D Dissolved
T Total
Laboratory
Qualifiers
B Analyte
detected
at value between
MDL
and PQL
U Ana ly te concentration
less
than
MDL
H Analysis
exceeded
holding time
Resurrection
Mining
Company
7
Advanced Environmental
Sciences
Inc
November 26
2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 22/149
Table
2
2 4 Black Cloud
Surface and
Ground Water
Monitoring
Results
SAMPLE
LOCATION
Method
Detection
Limit
MW 6
MW
6 MW
6
MW
6
DATE 2 2 4 4 22 2 4 7 6 2 4 5 2 4
PARAMETER
UNITS
Cone
Lab
Qual
Cone La b
Qual
Cone
La b Qual Cone
La b Qual
Cadmium D
mg
L
U
U
U
U
Copper D
mg L
5
5 U
5 U
5 U
5
U
Lead D
mg
L
3
B
3
B
U
U
Manganese
D
mg L
5
5
U
5
U
5
U
5
U
Mercury
D
mg L
2
2
U
2 U 2
U
2 U
Zinc
D
mg
L
2
6
23
26
6
Cyanide
T
mg L
3
3 U 3 U 3
U
3
U
Hardness
as
CaCO3
mg L
and
8
starting
7 6 2 4
77 82
9 7
Nitrate Nitrite as N
mg L
2
84
85
87
72
Nitrogen
ammonia
mg
L
5
5 U 5
U
7
B
5
U
TDS
mg
L
2 22
23 H
2 4
Sulfate
mg
L
8 9
9
8
Total Alkalinity
mg
L
2
8 89
9
Field Parameters Units
2 2 4
4
22
2 4
7 6
2 4
5 2 4
H
std units
8
7
99
8
8 9
Temperature
C
4
7 8 8 9
5
8 3
Conductivity
umhos cm
484
4 8 479
434
Depth to Water
Feet 2
7 7
55
8
5
5 9
D Dissolved
T Total
Laboratory Qualifiers
B Analyte
detected
at value between MDL and PQL
U Ana ly te concentration
less
than
MDL
H Analysis exceeded holding
time
Resurrection
Mining
Company
8
Advanced Environmental Sciences
Inc
November
26
2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 23/149
Table
2
2 4 Black
Cloud
Surface and Ground Water Monitoring Results
Cont
SAMPLE
LOCAT ION
Method
Detection
Limit
SW 5 SW 5
SW 5 SW
5
DATE
2
2 4 4 22
2 4
7 6 2 4 5
2 4
PARAMETER
UNITS
Conc
Lab Qual
Conc
Lab
Qual
Conc
Lab
Qual
Conc
Lab
Qual
Cadmium D
mg
L
8
27
6
8
Copper
D
mg
L
5
7 B
9 B
2
B
2
B
Lead D
mg
L
2
B
8
5
3 B
Manganese
D
mg
L
5
2 392
98 339
Mercury
D
mg L
2
2
U
2 U
2
U
2
U
Zinc D
mg
L
2
2 9 658
36
226
Cyanide
T
mg
L
3
3
U 3 U
3
U
3
U
Hardness
as
CaCO3
mg L
and
8
starting
7 6
2 4
66
65 94 27
Nitrate
Nitrite
as
N
mg
L
2
34 43
3
25
Nitrogen
ammonia
mg L
5
5 U
5
U
5
U
5 U
TDS
mg
L
8 2
8
38
Sulfate
mg L
8
9
3
B
5
Total Alkalinity
mg L
2
4
7
82
Field Parameters
Units
2 2 4 4 22 2 4 7 6 2 4 5 2 4
H st d
units
8
9
7
88
8 2 8 22
Temperature C
2
4
5
2 4
8
Conductivity
umhos cm
353
4 6 479
3 3
Depth
to
Water
Feet
NA NA
NA
NA
D Dissolved
T Total
Laboratory
Qualifiers
B Ana lyte
detected
at value between MDL and PQL
U Analyte concentration
less than MDL
H Analysis
exceeded
holding t ime
Resurrection
Mining
Company
9 Advanced Environmental Sciences
Inc
November 26
2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 24/149
5
2 5 RECLAMATION ACTIV IT IES
Pursuant
to Sect ion
6 Appendix E
to
the
Consent Decree
Black Cloud
Mine
Reclamation Plan
and Schedule Leadville
Colorado
the following
2 5 Year 7 reclamation activities will be
performed
Monitoring
maintenance and
repair
if
required
of
reclaimed
areas
Reclamation monitoring maintenance
and
repair
for the
2 5 field season will be communicated
to
and
coordinated
with
the Division s site
representative
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 25/149
955
95
IN
Is m
WOVEN
GROWTH MEDIUM
GEOTEXTILE
M
milli
FABRIC
ME
M
TERRATEX HD
2
CAPILLARY
wilms
ME
BARRIER
ELmmmmmm
Omni
IN
moll
I
imm
K4
l ima
lilolill
BE
i
mo
m
lmlM
lilim
IN
Jim
M M sopp
so
OMNI
olm
2
IiiiiIII
Mill
Nil
4
p
INI
P
I
IN
95 5
95
94 5
so so
94 5
3 2
2
3
4
5 6
7
8 9
2 3 4 5 6 7 8 9 2
SECTION A
TAILING SURFACE
96C
955
95
945
94
Mill
Is m
WOVEN
GROWTH MEDIUM
GEOTEXTILE
M OEM
FABRIC
ME
M
TERRATEX HD
2
CAPILLARY
ME
BARRIER
ELmmmmmm
IN
moll
mm
MEN
lien
E
K4
96
95 5
95
945
94
3 2
2 3
4
SECTION B
TAILING SURFACE
NOTES
SECTION VERTICAL EXAGGERATION
SET AT 2 FT
IVA
SOIL COVER DETAIL TYP
NTS
SOIL COVER AT TSF OUTLET SWALE TYP
NTS
8
WOVEN
GROWTH MEDIUM
GEOTEXTILE
FABRIC
TERRATEX HD
2
CAPILLARY
BARRIER
TAILINGS
SOIL COVER AT TSF OUTLET SWALE TYP
NTS
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 26/149
LEGEND
EXISTINGACCESS ROAD
IOWA GULCH FLOWLINE
AS BUILTELEVATION CONTOURS
FROM RUSSELLSURVEYORS
23 4 SURVEY
EXISTING GROUND BACKGROUND
CONTOURS
L
7
ELECTRIC
BUILDING
2 4
DEBR IS CELL
TANK LDING
BLACK CLOUD
HELENASHAFT
LIMITS OF DISTURBANCE
J
c
DIVERSION CHANNEL
4
FORTUNA INJECTION
C
r
SYSTEM
Y
STORM
OUTLET
CULVERT
FINAL TOE
FIGURE
DRAIN POND
OVERALL BLACK CLOUD
RECLAIMED CONTOURS
RESURRECTION MINING COMPANY
dvanced
TSF
STORMWATER
BLACK CLOUD MINE RECLAMMATION
nvironmental
OUTLET
CHANNEL
2 4
ANNUAL
REPORT
dences Inc
2 2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 27/149
Work Completed as Listed
on
the CDRMS CIRCES
Cost
Estimate
YEAR ITEM WORK DESCRIPTION
2 9
Year Mob Demob
Completed
Black Cloud
Reclamation
East
shaft
capped with steel plate as required by CDPHE
and
EPA to al low monitoring of ground water
levels
and blockage pumping
Propane tanks demolition removal completed
Dry demolition
completed
Oi l
House demolition completed
Oil
House concrete foundation demolition completed
Assay
Lab
demolition
completed
Assay Lab concrete foundation demolition
Used grease removal disposal completed
Used oil
and def
removal disposal
completed
Used
oil and def sludge
removal
disposal
completed
Used Antifreeze removal disposal completed
Used
heavy
oil
removal
disposal
completed
New xanthate removal disposal completed
New binder
removal disposal completed
Used oi l and water removal disposal completed
Partial head frame
to
be retained to
service Yak
blockage pump
Non Inert debris
hauled
to landfill
Tailing
Impoundment Reclamation
Survey
and
establish quantity of stock Piled 6 talus rock tailing impoundment cover material
Preliminary
channel des ign
excavate
approximately
75
linear
feet
of
diversion
channel
Helena Area Reclamation
No
Work Performed
Julia Fiske Area Reclamation
Structure
demolition
and
removal
completed
Roadway demolition
and
removal completed
Eclipse
Area Reclamation
No Work Performed
Resurrection
Mining
Company
A
Advanced Environmental Sciences Inc
November
26
2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 28/149
APPEND IX A
RECLAMATION
ACTIVIT IES
BY
YEAR
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 29/149
Work Completed as
Listed on the CDRMS
CIRCES
Cost
Estimate
Cont
YEAR
ITEM
WORK DESCRIPTION
2 9
Cont
Irene
Area
Reclamation
Asphaltic pavement
removal
complete
Water tank removal complete
Substation
removal
complete
Transformers removal complete
Underground
tanks
removal complete
High voltage cable removal complete
Cable supports
and
connector removal complete
Water tank berm grading complete
Hoist
house
to be retained
Irene Mine head frame
tin
siding removal and head house demolition
completed
Irene
shafts
capped with
steel
plates as required by CDPHE
and
EPA to allow
monitoring
of ground
water
l evels and as an alternative
blockage
pumping location
Water Treatment
Collected
pumped
and
treated approximately
3 8 million
gallons of
water from
the
Black Cloud
toe drain
Eclipse Soil
No
Work Performed
2
Year
2
Mob Demob
Completed
Black
Cloud Reclamation
Mil l
and
concentrator partial demolit ion
Electrical substation demolition and removal completed
Non Inert debris hauled to landfill
Tailing Impoundment Reclamation
Redesign channel to prevent disturbance to True Grit mill area and minimize cut and fill Excavate
approximatel 45 linear feet of diversion channel
Mobilize
Demobilize
screening
plant
Screen and
stockpile
a roximatel 3
35 tons
of
minus
6 tailing
impoundment
cover
material
Helena Area Reclamation
Electrical substation demolition
and
removal completed
Julia
Fiske Area
Reclamation
No
Work
Performed
Remaining
work consist of reve etation
Eclipse Area Reclamation
Concrete
foundations rubbilization and burial completed
Waste
tock
dump contoured to
3
H
V
grade
Dolomite excavated and hauled from Irene Mine to Eclipse and Foot cover constructed on waste
rock
dump
Resurrection
Mining
Company
A
2
Advanced EnvironmentalSciences Inc
November
26
2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 30/149
Work Completed as Listed
on the
CDRMS CIRCES
Cost
Estimate Cont
YEAR ITEM
WORK DESCRIPTION
2
Cont
Irene Area Reclamation
Head house concrete pad rubbilization
and
removal completed
Substation
concrete
pad rubbilization and
removal
completed
Propane tank concrete
pedestal
rubbilization
and
removal completed
Covering
of
rubblized concrete with Irene dolomite completed
Grading
of
Irene waste dump to promote drainage completed
Water
Treatment
Collected pumped and
treated
approximately
2
million gallons of water
from
the
Black
Cloud toe drain
Eclipse Soil
Kid s First soil excavated and hauled from Yak
WT to Eclipse and 6 Inch cover
constructed
on waste
rock
dump
2
9 cubic
yards of
Kid s First and stockpiled Eclipse soil was placed
for
the cover
2
Year 3 Mob Demob Completed
Black Cloud Reclamation
Mill
and
concentrator
demolition and
removal completed
Crusher
demolition
and removal
completed
Shaft
house
hoist
house
and partial
head
frame demolition and removal completed
Machine shop and
warehouse demolition and
removal completed
Mine
office demoli tion and removal
completed
truck
and
timber
shops
demolition
and
removal completed
Scale house
demolition
and removal completed
Al l remaining foundations and footings rubbization and removal completed
Debris
cell constructed
and
capped with approximately foot
of
cover
PCB transformer removal and disposal complete and
in
accordance with
regulations
All remaining transformers removal and
disposal
complete
All
remaining
debr is chemicals
petroleum products removed and disposed of
in
accordance with
regulations
High voltage
cable removal
complete
Cable supports and
connector
removal
complete
East and
West
waste
rock
piles removed
and
placed
in tailing
impoundment
approximately
2 5
cubic
yards
Tailing
Impoundment Reclamation
Completed
diversion channel
as designed
by Del
Mont
Consultants
Haul 24 tons of minus
6
material from
talus borrow area
to
tailing
impoundment and stockpile
Approx
imatel 2 3 acres of tailing impoundment covered with
Black
Cloud waste rock
Resurrection
Mining
Company
A
3
Advanced
EnvironmentalSciences Inc
November
26
2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 31/149
Work
Completed as Listed on the CDRMS CIRCES Cost Estimate Cont
YEAR
ITEM
WORK
DESCRIPTION
2
Cont
Helena Area Reclamation
Hoist
house and
shaft
house
demolition
and removal complete
Helena
shaft
capped with steel plate as required by CDPHE and EPA to al low monitoring of ground water
levels
Waste rock
placed in tailing
impoundment
Julia Fiske Area Reclamation
No
Work
Performed Remaining
work
consist
of
reve etation
Eclipse
Area
Reclamation
Reve etation
and
fertilizing of waste rock
pile
completed
Irene Area Reclamation All
work
completed in 2
Water
Treatment
Collected pumped and treated approximately 2 3 million gallons of water from the
Black
Cloud toe drain
Eclipse Soil
A ll
work
completed in 2
2 2
Mob Demob Completed
Black
Cloud Reclamation
Approximately
2
feet
of fill material was removed from the surface of the Black Cloud Mine facility area and
laced in the tailing impoundment
Tailing
Impoundment Reclamation
Tailing impoundment cover was redesigned to
promote
drainage and reduce the
fill
volume
Approximately
cy
of rock
fill material was excavated hauled
and
placed
on tailing
impoundment
Helena Area Reclamation
No
Work Performed Remaining work
consist
of
reve
etation
Julia Fiske Area Reclamation
No Work Performed
Remaining
work consist of
reve etation
Eclipse Area Reclamation
All
work
completed
in
2
Irene
Area Reclamation All work completed in
2
Water
Treatment
Collected
pumped and treated
approximately
6 5
million
gallons of
water
from the Black
Cloud
toe
drain
Eclipse Soil
All
work
completed
in
2
2 3
Mob Demob
Mobilization completed
demobilization
anticipated
2nd
week
of
December
Black Cloud Reclamation
Approximately 2
feet
of
fill
material was
removed from the
surface of the Black
Cloud
Mine facility area and
laced in
the tailing impoundment in
2 2
Remaining work consists of reve etation
Tailing Impoundment Reclamation
Tailing
impoundment cover
design
was updated to reflect 2 2 work
Approximately
85
cubic yards
of
rock fill material
and
growth media
was excavated
hauled
and
placed
on the tailing impoundment The spillway
and
drainage system were completed Remain ing
work
consists
of
reve etat ion
and filling of
a small
toe
dra in pump back area
Helena Area Reclamation
No
Work Performed
Remaining work
consist of
reve etation
Julia
Fiske
Area Reclamation
No
Work Performed
Remaining
work consist
of
revegetation
Resurrection
Mining
Company
A
4
Advanced Environmental
Sciences
Inc
November
26
2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 32/149
Work Completed as
Listed on the CDRMS CIRCES Cost
Estimate
Cont
YEAR
ITEM
WORK DESCRIPTION
2 3
Cont
Eclipse Area Reclamation
All
work
completed in 2
Irene Area Reclamation
All
work
completed
in 2
Water Treatment
Collected
pumped
and
treated approximately 2
million
gallons of water
from
the Black
Cloud
toe drain
Eclipse
Soil
All work completed in 2
2 4
Mob Demob
Completed
Al l work completed All mine and mill structures not necessary for Yak Tunnel blockage pumping tailing
impoundment dewatering
Black Cloud water treatment i e treatment plant
site
snow removal
and
maintenance operations were demolished and disposed
recycled
and or sold
in
2 In 2 4 the non
functional media filter
housings were
buried in
the
onsite debris cell and the media from
the
filters was
placed
Black Cloud Reclamation
in the tailing impoundment
The Black Cloud mine surface area was loosened fertilized and seeded in 2 4 Steep
slopes
were
hydromulched
and see ded and flatter slopes were
disked
mulched and crimped
The debris cell was constructed
filled
and graded in 2 In 2 4 the cell was reopened for the media
filter
housings
and then
closed
and
regraded
The spreading of plant growth media was completed in
October
2 4 The tailing was surveyed prior to
Tailing
Impoundment Reclamation
commencement
of seasonal
work
and
after completion
of
the
2 4
work The Black Cloud Julia
Fiske
and
Helena
areas were
seeded fertilized
and
mulched in October
and
November of 2 4
Helena Area Reclamation
Al l
work completed Compacted
roadways were loosened
seeded fertilized and mulched
in
2 4
Julia
Fiske
Area Reclamation
All work completed
Compacted roadways were loosened
seeded fertilized and mulched
in 2 4
Eclipse
Area
Reclamation
A ll
work
completed in
2
Irene
Area Reclamation
All
work
completed in 2
Water
Treatment
Collected pumped
and treated
approximately 42 3
million
gallons
of water
from the Black Cloud toe
drain
Eclipse Soil
A ll
work
completed
in
2
Resurrection
Mining
Company
A 5
Advanced Environmental
Sciences
Inc
November
26 2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 33/149
APPENDIX B
SITE
PHOTOS
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 34/149
B lack C loud M ine Facilities
2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 35/149
Black
Cloud Mine Facilities Fall 2 2
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 36/149
k
t t
K
Tailing
Storage
Facility
August 2
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 37/149
Tailing
Storage
Facility
November 2 3
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 38/149
Black
Cloud
Mine
Site
Bench
Fall
2 4
v
4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 39/149
M
s
r
4
Y
7
y
Black
Cloud
Debris
Cell
Fall
2 4
r
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 40/149
Tailing
Storage Facility Stormwater Outlet Fall
2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 41/149
Clear
Grit Mil l Fall 2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 42/149
IG
Fall
2 2
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 43/149
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 44/149
IG
2 Fall 2 2
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 45/149
Eclipse
Waste Rock
Dump
Spring
2
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 46/149
MINOR MODIFICATION MD
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 47/149
Resurrection Mining Company
6363
South Fiddlers
Green Circle
Greenwood
Village
CO 8
August
3
2 9
Mr Alan Sorenson
State
of
Colorado
Division of Reclamation
Mining
and
Safety
3 3
Sherman Street Room
2 5
Denver CO 8 2 3
Re
Black Cloud Mine
Reclamation
Plan
Minor
Amendment
Resurrection
Mining
Company
Dear Mr Sorenson
Please
find
this request
and the
corresponding
bank dra ft in
the
amount
of
for minor
amendment
to
the
Black
Cloud Reclamation
Plan
As
we discussed
during
your
recent
site
visit we propose this minor amendment to the Reclamation Plan
such
further
research can
be
conducted prior to making a connection with the Yak Water Treatment pipeline
as
proposed
in
the
Black Cloud Reclamation Plan
The
further
research determined
necessary primarily focuses on
flow
rates
local climatic
conditions
and alternate
management
technologies
As indicated
this
summer a young intern
did a preliminary characterization
of
the adit chemistry and
flows
The
water quality data
to
date
does
not
suggest
a
direct
discharge
of
this water but
the
flow
rates
measured
June
5
45 gpm
July
4
97
gpm August
5
36 gpm suggest alternative long
term
water management methods
might be
possible depending
upon further characterization of
flows
and
climatic conditions
In
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 48/149
Black
Cloud
Reclamation
Plan
Minor
Amendment
August
3
2 9
Page
2
Cc
Tim Runnells
Rebecca Haldane
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 49/149
DIVISION
OF RECLAMATION MINING AND SAFETY
Department of Natural Resources
3 3 Sherman
St
Room 2 5
Denver Co lo rado 8 2 3
Phone 3 3 866 3567
FAX 3 3 832
8 6
STATE OF COLORADO
COLORADO
D I
V IS I
ON
O
F
RECLAMATION
MINING
SAFETY
Bil l Ri tter Jr
Governor
Har ris D Sherman
Executive Director
November
2
2 9
L5
Ronald W
Cattany
Division Director
Mr
William
Lyle
Natural Resource Trustee
Resurrection Mining
Company
6363 South
Fiddlers
Green
Circle
Greenwood
Village
CO
8
Re
Black
Cloud
Mine
File
No M 2 8 83 Modification Approval Revision No MD
Dear Mr Lyle
On September 25 2 9
the Division
of Reclamation
Mining
and Safety approved
the
Modification application
submitted
to the Division on September 3
2 9
addressing the following
Provide
work
plan to research unnamed adit
by February 5 2 Execute
work plan
approved by the
Division during 2 and
provide final
reclamation plan for unnamed
adit
by February 5 2
The terms
of the
Modification No
approved
by
the
Division
are
hereby
incorporated
into File
No
M
2 8
83 All
other
conditions
and requirements
of
the Consent Decree
remain in full
force and
effect
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 50/149
MINOR
MODIFICATION
MD 2
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 51/149
N6
s
Resurrection
Mining
Company
6363 South Fiddlers Green
Circle
Greenwood Village Colorado
8
3 3 863 74 4
November
3 2
Mr
Allen Sorenson
State of
Colorado
Division
of
Reclamation
Mining
and
Safety
3 3
Sherman
Street
Room
2 5
Denver CO 8 2 3
Re
Black
Cloud
Mine
Minor Amendment
2
Resurrection Mining Company
Dear Mr Sorenson
M
9 3
o83
Rwonm
DEC 2
tD
Division
at
k 4
Men
3
Mfning
an d
kiy
MA
Please
find this
request
for
a
minor amendment to
the
Black Cloud
Mine
Reclamation
Schedule
and
the enclosed
check
for
processing
this
request
Resurrection Mining
Company Resurrection
requests
that the Reclamation Schedule be amended for the
demolition
and
removal of
the
Black
Cloud
Mine scale house in 2 rather
than
2
allowing the scale house to
be
used during 2 for weighing
demolition
materials being
shipped
off
site
during
the
Black Cloud mill
crusher
and support buildings
demolition
With
this
request Resurrection
agrees the scale house will
be demolished
and
removed
in
2 prior to encumbering the
advancement
of the Black
Cloud
waste pile removals
In addition Resurrection request the Division considermodifying the
Reclamation
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 52/149
Division
of
Reclamation Mining and Safety
Fee Receipt fo r M2 8 83
Resurrection
Mining
Company
Receipt
9488
Date
2 3 2
Permit
M2 8 83
Paymen t Me thod
Revenue
Amoun t
22398
mr
43
Minerals
Technical
Revision
M 2 8 83 fees
paid
by
Idarado
Mining Company
Receipt
Tota l
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 53/149
DIVISION OF RECLAMATION MINING AND SAFETY
Department of Natural Resources
3 3 Sherman St Room 2 5
Denver
Colorado
8 2 3
Phone
3 3
866 3567
FAX
3 3
832
8 6
STATE
OF
COLOMDO
COLORADO
D I VISION OF
RECLAMATION
MINING
SAFETY
Bill Ritter Jr
Governor
Harris D
Sherman
Executive
Director
November
2
2 9
tl
L 5
Ronald W Cattany
Division Director
Natural
Resource Trustee
Mr William
Lyle
Resurrection
Mining Company
6363
South
Fiddlers Green
Circle
Greenwood Village CO 8
Re
Black
Cloud
Mine
File
No
M
2 8 83 Modifcation Approval Revision
No
MD
Dear
Mr
Lyle
On
September 25 2 9 the
Division
of Reclamation Mining
and
Safety approved
the
Modification application
submitted to the Division on September 3 2 9 addressing the following
Provide work plan to research unnamed
adit by
February 5 2 Execute
work plan
approved by
the
Division
during 2
and provide
final reclamation plan
for
unnamed
adit
by February
5 2
The terms
of
the
Modification
No
approved
by
the
Division
are
hereby
incorporated
into
File
No
M
2 8
83 All other conditions and requirements of the
Consent Decree
remain in full force and effect
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 54/149
MINOR
MODIFICATION MD
3
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 55/149
KS
u
b
rv
t
4
I
Resurrection Mining Company
6363
South Fiddlers
Green
Circle
Greenwood Village
CO 8
August 9 2
Mr Alan
Sorenson
State of
Colorado
Division
of Reclamation Mining and Safety
3 3 Sherman
Street
Room
2 5
Denver
CO 8 2 3
Re
Black Cloud
Mine
Reclamation
Plan
Helena
Black
Cloud Mine
Shaft
Minor Amendment
Resurrection
Mining
Company
rv i
zoo
3
M D
3
RECEIVED
UG
9 2
Dear M r
Sorenson
Division of Reclamation
Mining
Safety
Per
our
recent
conversation concerning
the
Black Cloud Mine Reclamation
Plan
Resurrection
Mining Company Resurrection submits this minor amendment application for modifications to
the reclamation
plan pertaining to capping
the Helena
mine shaft and the
removal of
the Black
Cloud mine shaft
head
frame
and
hoist house
As
we discussed
Resurrection
is
proposing
to
modify the Helena Shaft
reclamation
cap
to allow
continued
access
to monitor
groundwater
elevations contained within the Black
Cloud
Mine
workings and the
Yak
Tunnel blockage As part
of
the
California
Gulch
Superfund
Yak
Tunnel
contingency
plan
there
is a
continued
need to
monitor
the
Helena Shaft
groundwater
elevations
Besides accommodating these
monitoring
activities the proposed cap
revision will
allow
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 56/149
Black
Cloud
Mine
Reclamation
Plan
Helena
Black Cloud
Mine
Shaft Minor
Amendment
Resurrection Mining
Company
Page
2
Currently
to
the
remove
and or replace the pump and or
pump
casings from the shaft
a
snatch
block
assembly
has
been retro
fitted
on
the
head frame
above
the pump
motor
and a
drill truck
and
a
mine timber
hoist
are
required to move
the
pump
assemblies
to
and
from
the
shaft The
lifting cable
on the
drill truck cable drum is extended horizontally
out and
away
from the
drill
truck
to
the
snatch
block
such
that
the
pump
assemblies
can
be
either
l if ted or
lowered
into
place
while a second
cable
from
a mine timber
hoist
adjacent to the head frame
is
used to pull the
equipment away
from
the
head
frame
This process is
quite
cumbersome and exposes
personnel
to
multiple lifting
cables being stretched
and stressed in a
fairly confined
area
should
a cable
break or separate personnel
could
be
injured
Each of these pieces of equipment are designed to
lift vertically not horizontally
an d such uses as
described
above tends
to
stress
the
lifting
cables and doesn
t take
advantage
of
the equipment
s specific design
Should
the head
frame be removed
a
drill truck or
a
pump
service truck could be positioned
directly over
the
pump motor
with
the
truck
mast raised
into
place
and
the
pump equipment
used
as designed that is lifting vertically
from
the
shaft
in
the
same manner as any routine pump
removal
from
a well Being able
to
utilize the truck lifting
equipment
in
this
manner would make
the process more
productive
will take less time
to
service the
pump will result
in safer
maintenance with more open space and less equipment
cables
and will result in less expense any
time
the
pump
needs to serviced
Attached
please
find
a
bank
draft
in
the
amount
of
for
the
administration
of
this
request
If you
have
any
questions please let me know at
3 3 837
5852
Sincerely
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 57/149
Division of Reclamation Mining
and
Safety
Fee Receipt fo r M2 8 83
Resurrect ion
Mining
Company
Receipt
Date
Permit
55
8 2
M2 8 83
Method
ayment
Revenue Cocle
23244
43
3
Minerals
Amendment
Fees
M
2 8 83 Paid By Idarado
Mining Company
I
Receipt
Total
i
I
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 58/149
August 26
2
Joh n W
Hickenlooper
Governor
Mike
King
Mr William
Lyle
Executive Director
Resurrection
Mining Company
Loretta E Pmeda
Director
6363 South Fiddlers Green Circle
Greenwood
Village CO 8
Re
Black Cloud
Mine File No
M
2 8 83
Modification
Approval Revision No MD 3
Dear Mr Lyle
On August 26 2 the
Division
of Reclamation Mining and Safety approved the
Modification
application submitted
to the
Division
on
August
9
2
addressing the
following
Mods Helena Shaft closure method Demolish and remove Black Cloud headframe and
hoist
house
The
terms
of
the Modification No 3 approved
by
the Division are hereby incorporated into Black
Cloud Reclamation Plan in accordance
with
the
terms
of the
Consent
Decree All other conditions
and
requirements
of
the Reclamation Plan remain in full force and effect
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 59/149
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 60/149
4MOl
Resurrection
Mining Company
6363 South
Fiddlers
Green
Circle
Greenwood
Village
CO
8
October
2 2
Mr Alan
Sorenson
State of
Colorado
Division
of Reclamation
Mining and Safety
3 3
Sherman
Street
Room
2 5
Denver CO
8 2 3
Re
Black Cloud
Mine
Reclamation Plan
Iowa Gulch Tailing Minor Amendment
Dear Mr Sorenson
A
zoo
9
83
RECENED
OCT
S
2 2
Division
of
Reclamation
Mining
Safety
Per
our recent conversation concerning the Black Cloud Mine Reclamation
Plan
Resurrection
Mining
Company Resur rection submits th is minor
amendment
application
for
modifications to
the reclamation plan pertaining to changing the grading of the Iowa Gulch tailing reclamation
cap
Under the existing reclamation plan in
excess
of 6 yd of material will be
needed
for final
reclamation
Based
on current information there may no t be enough material
at
the
Black Cloud
Mine
site and scree hill
combined to meet
the
required fill volumes The Homer p lacer
can
provide
the
remaining fill but requires
a
haul
of
several
miles
using either
dirt
roads
or
paved
County roads
both
which
run along
portions of streams
In
addition the
existing
reclamation
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 61/149
Mr Alan Sorenson
October
2 2
Page
2
The attached figures present details
of the proposed
plan
Attached please find
a
bank
draft in
the
amount
of for the
administration
of this request
If you
have
any questions please le t me know at
3 3 863
74 4 or on
my
cell phone at
3 3
258 6539
Sincerely
Larry Fiske
Senior Manger Legacy
Sites
Closure
and
Reclamation
Cc
Al Long Resurrection Mining Company
Tim
Runne lls AES
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 62/149
Division
of
Reclamation Mining and Safety
Fee Receipt
fo r M2 8 83
Resurrection Mining Company
Receipt
Date
Permit
3839
4 2 2
M2 8 83
Method
ayment
Revenue
Code
Fee Description Notes
Amount
2 96 jwd
43
3
Minerals
Amendment
Fees
M
2 8 83
Paid
By Advanced Environmental Sciences Inc
Receipt
Total
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 63/149
Resurrection
Mining
Company
C
4
Advanced Environmental
Sciences
November
26 2 4
t
a
ROSS SECTION
4
CROSS SECTION 3
CROSS
SECTION
2 CROSS
SECTION
rte
ACCESS ROAD
TO LEADVILLE
IOWA
GULCH
I
GULCH
I
GEUNE
n
Existing
EM
944
947
93
Final dv 95 3
Final
EIv
95
7
El
9 4 7 5 4
Z
Z
J
GE
Existing
Eh
948 23
I
Fi 953 25
LOW
FLOW CHANNEL
ExfstMg
lE
94253
22
23 24 25
ind
dv 947 54
Find Fl
947
8
I
SLOPE
9 RG
Existing
Elv
942
6
6
7
8
ExlstingFfly
9 47 2
ow
ow
Low
Flow
IstM
94639
Channel
Elv 953
At
fisting
El
943
4
9
25 83
E ND O F LOW
FLOW
CHANNEL
WRH EXISTING CHANNEL
ELV 947
d
Z
Channel
Elv 9456
Low F low
Fin 95
39
LU
Channel
dv
48
2
7
EERED CHANN
4 SLOPE
Existin El
934
68 x
45
7
9
I
82
Existi 945
46
Low
Flow
3
o
Fina953
65
Z
Channel Elv
9 43 2
g
J
x
Existing
El 93455
BADE BRENC
Find
El
942
32
i
7
B
g
6
7
i 7
U
m
ss
4l
3
AIAAAP
t
5
I
LEGEND
t
2
Existing Elv 939
33
x CULVERT
Find Elv 938 2
DRAINAGE DITCH
DO NOT DISTURB
EXISTING DITCH
L
DRAINAGE
CNANNEL
FLOW
DIRECTION
PROPOSED 38 CMP SUB SURFACE
SPILLWAY I NV E LV
933
SPOT
ELEVATION
I
i
p
SCALE
NORTH
3
TAIL INGS POND REGRADING PLAN
DRAWING
Resurrection
Mining
Company
C
4
Advanced Environmental
Sciences
November 26 2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 64/149
Resurrection
Mining Company
C 5
Advanced
Environmental
Sciences
Novembe r 2 6 2 4
c
e
6
4
97
97
W
965
STA
3
4
4
STA
3 6 7
EE
943 4
E 94 88
CUT
VO
965
Z
J
LL
96
NAL
SURFACE
STA 24 78 73
ELEV D5 32
96
d
Tn
STA
3
8 9
STA 9 6667
O
955
STA
2
9
29
E lE V 9 38 4 8
LL
VOWME
EIEV
853
955
Z
J
95
E IF V 9 43 8 8
STA 3
84
45
STA 23 8 2
ELEW
94
6
UJI
94 7
95
Z
945
ST
52 6
STA 5 526
945 Q
94
946
99
ELEV 939 8
STA W 99 37
STA 2
x923
EIEV
947
935
EIEV 937
58
TA
9 8 8 8 7
ELEV
947
2 32
8
2
94
U
Inlet o Culvert
45
935
O
93 STA 2 83
CUT VOLUME
EXISTING SURFACE
STA
7 934
83
Y
lJL
925
EL EV 93595
V 93458
STA 7 7
925
U
ENGINEERED
CHANNEL
E
9 3 4 3 6
MERGE
wrrH
EXISTING
SWAIE
92
STA 8458
92
m J
9 5
ERCE
WfrM EXI ST ING GRADING
E lE V 9 34
55
9 5
9
9
2 3 4
5
6 7 8
9
2
3
4
5
6
7 8
9 2
2 22
23 24
25
26
NOT TO
SCALE
LOW FLOW
CHANNEL PROFILE
9
DRAWING 2
r
Resurrection
Mining Company
C 5
Advanced
Environmental
Sciences
November26
2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 65/149
Resurrection
Mining
Company
C
6
Advanced
Environmental Sciences
November 2 6 2 4
9
e
a
a7a
f
MERGE WITH
EXISTING
6AM
EDGE
EXISTING
SURFACE
Resurrection
Mining
Company
C
6
Advanced
Environmental Sciences
November 2 6 2 4
a
a7a
f
r
2 6 2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 66/149
Resurrection
Mining
Company C 7
Advanced
EnWronmentnl3clences
Novembe r 2 6 2 4
97
965
MERGE
96
955
95
945
94
935
93
925
92
97
965
96
955
95
945
94
935
93
925
92
8
NOT TO SCALE
a
MERGE WITH EXISTING GRADING
ITH EXISTING DAM
EDGE
F INAL SURFACE
O
n
N
Q UW
U
Y
U
g
m
DO NOT
CUT
RW9dlne
STA
3 24 72
ELEV
95
Lor
Fbw
CnonnN
STA 7
STA
5
43
947
48
E IF V 9 47
54
8
84
STA 2 4 38
F EM 94927
2
STA
LEM
9 4 3 7 4
9 2
ELEAV 944
STA
5 43
E IE V 9 42
53
STA 7
8
E
84
6
F ILL VOLUME
EXISTING SURFACE
d
2 3
4
5
6 7
3
CROSS
SECTION 2
DRAWING 4
4
Resurrection
Mining
Company C 7
Advanced
EnWronmentnl3clences
Novembe r 2 6 2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 67/149
Resurrection
Mining
Company
C
8
AdvancedEnvironmental Sciences
November
2 6 2 4
97 97
8
965
EXISTING
STOCKPILES
MERGE
WITH
EXISTING
STA 3
7 53
DAM
EDGE
D3 B
DO NOT DISTURB
MERGE WITH EXISTING
GRADING
965
96
FINAL SURFACE
96
8s
955
Rid9eline
STA
3
7
25
ELEV 95 78
STA
943
955
Q
ow F lo w
ELEV
OhpnMl
95
STA
LEV 2 73
4
947
83
STA 8 4
am
94232
95
Z
a
945
94
STK 3 7827
ELEV 94
945
94
Cl
Z
Z
J U
TAIEN
84 4
z
2
5
846
STA 4 9 55
EL
EN 94 45
935
93
STA 8 3 9 9 8
ELEV 834 59
935
STA
9
3238
ELEV
93
Qj
N
O
p
Y
C
STA 5 6 9 6 5
ELEW 934 62
STA
9 9 42
ELEY
936
2
925
EXISTING
SURFACE
FILL VOLUME
925
92 92
9 5
9 5
9
2 3
4
5 6 7 8
9
5
NOT TO SCALE
CROSS SECTION 3
DRAWING
5
5
Resurrection
Mining
Company
C
8
AdvancedEnvironmental Sciences
November
26
2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 68/149
Resurrection
Mining Company
C 9
Advanced
Environmental Sciences
November26 2 4
s
3
Y
w v
97
97
965
STA 3 57
E LE V 9
67
srA 3 72
ELEV
949 72
MERGE WITH EXISTING GRADING
965
96 F EXISTING
STOCKPILES
V
sou
EXISTING SURFACE
96
z
O
DO NOT
DISTURB
a
955
F INAL SURFACE
955
z
95
STA 3 5 48
ELEV
947
88
STA 4 4662
UL M
947
8
STA 9 97
ELEV
944
26
95
J P
Q U
LLI
to
945
94
STA 3
2
8
F
EV
9492
STA
3
948
ELEV 945 33
STA 8 9 87
ELEV 7 943
9
29
67
945
94
O
6
CO
935
DO NOT CUT
9 35
ind surfco
RldgeMe
STA 4 9
EIEV
947
98
4
fl
9
93
925
MERGE
WITH
EXISTING DAM
EDGE
Cnonnel
saoi
925
Low
now
92
F ILL VOLUME
92
9 5
9 5
2
3
4
5
6 7
8
9
NOT
TO SCALE
t
CROSS
SECTION 4
DRAWING 6
6
Resurrection
Mining Company
C 9
Advanced
Environmental Sciences
November 26
2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 69/149
STATE
OF
COLORADO
DIVISION OF RECLAMATION MINING
AND
SAFETY
Department of
Natural Resources
3 3 Sherman
St
Roam 2 5
Denver
Colorado 8 2 3
COLORADO
Phone 3 3 86 6 3567
UI
V
ISION OF
RECLAMATION
FAX
3 3 832
8 6
MINING
SAFETY
John W
Hickentooper
Govemor
December
7
2 2
Mike King
Executive
Director
Mr
Larry
Fiske
Loretta E Pifteda
Director
Resurrection Mining
Company
6363 South Fiddlers Green
Circle
Greenwood Village CO 8
Re
Black Cloud Mine File
No
M
2 8 83 Modification Approval Revision No MD 4
Dear
Mr Fiske
On November 2 2 2
the Division
of Reclamation
Mining
and
Safety DBMS
approved the
Modification application
submitted
to the Division on October 3 2 2
addressing
the following
Iowa
Gulch
tailing
impoundmentgrading
and drainageplan
The terms
of
the
Modification
No
4
approved
by
the
Division
are
hereby incorporated
into
the
Black Cloud
Mine
reclamation plan under the Consent
Decree DRMS
File No M 2 8
83
All
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 70/149
MINOR
MODIFICATION
MD 5
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 71/149
Resurrection
Mining Company
6363 South
Fiddlers
Green
Circle
Greenwood
Village
CO
8
February 2 3
Mr Allen Sorenson
State of
Colorado
Division
of
Reclamation Mining and Safety
3 3
Sherman Street Room
2 5
Denver CO
8 2 3
Re
Black Cloud Mine
Reclamation Plan
Amendment 5
Growth
medium source modification
Dear Mr
Sorenson
Please
find
this
request
and
the
corresponding bank
draft in
the amount
of
for
minor
amendment
5
to
th e
Black
Cloud
Reclamation
Plan
Reclamation
Plan
For
this minor
amendment application to
the
Reclamation
Plan
Resurrection
Mining
Company Resurrection
p roposes to
obtain
a tailing
growth medium from
the area
where the Black Cloud
surface
facilities
were
located
which is approximately
Z
mile to the
north of
the tailing
impoundment
Resurrection
feels
that using the proposed
local growth medium
source would reduce the
impact
on county roads and
stormwater
quality
reduce
fugitive
dust reduce
costs
and still meet the
conditions for
growth medium
as
outlined
in
the Reclamation Plan
Under
the
current Reclamation
Plan the
soil cover
will
include material from
the
following
a
stockpile located to the east of the tailing pond imported grow th medium from
the
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 72/149
Mr Allen Sorenson
February
2 3
Page
2
The
current topography
of
the Black Cloud
shaft
area is shown on Figure
The existing
surface
topography
is
at an approximate 3
horizontal vertical
slope with a flat
portion surrounding
the
Black Cloud shaft
and debris
cell Under
the
proposed amendment
the
growth material
would be generated by removing material
from the
slope
and
flat areas
with the exception
of
buffers
around the
debris
cell
and
shaft
Essentially
the
hillside would
be
cut back
approximately 3 feet from its
current
location and
the
current 3
slope
would
be retained
The
final topography after
the
growth medium is removed is shown
on
Figure 2 The proposed cut
would
stop
at
the
limit
of
disturbance
shown
on
Figure
2
The
disturbed
source
material
area
would
be
re vegetated per the
Reclamation
Plan requirements
Six samples
were
collected from the proposed
tailing
cover material source and
analyzed
by the
Colorado State
University
Soil
Water
and Plant Testing Laboratory CSU
fo r
suitability as a
growth
medium
The results of the analysis are enclosed with
this
letter
The
Soil Water and
Plant Testing Laboratory
recommends that 4 pounds
of nitrogen per acre be added and for
one
of the
six
areas
4
lbs of
phosphorous
per
acre be
added to the proposed growth
medium
The
CSU results were reviewed by Mr Victor
Meyer a
restoration ecologist Based on Mr Meyer s
recommendations Resurrection plans to
amend the
growth medium
with
4
pounds per acre
of
nitrogen
phosphorus and potassium
which will be incorporated into
the top
6
inches of
material
Attached
please find
a bank draft in
the
amount of for
the
administration of this
request
If you have any questions please
contact
me at your convenience at
3 3
837 5676 or on my cell
phone at
3 3
258 6539
Sincerely
i
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 73/149
v
o
c H
n ry
v
v
O Z
c
N
V
E
ua
c
e
5
r
I
ELECTMCALUILDING
DEBRIS
CELL
BLACK CLW
SHAFT
IMIT
OF DISTURBANCE
C
Q
O
F
U
U
LEGEND
Existing
Contour
NORTH
SCALE
IN FEET
i
loo
2
v
o
c H
n ry
v
v
O Z
c
N
V
E
ua
c
e
i
d
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 74/149
j
ELECTRICAL
f
BUILDING
l
DEBRIS CELL
f
BLACK CLOU
D
SHAFT
MIT
OF
DISTURBANCE
4 m o
som
6
6
6
w
5 7
5
4
4
4
V
3
3
2
2
M
2
U
O
w
U
ySi
U a
99
98
O
9
O
t
DIMENT
BASIN
LOCATION
TAILING IMPOUNDMENT LOCATED
APPROXIMATELY 6 FEET SOUTH
LEGEND
Existing
Contour
Proposed
Contour 2
Interval
99
Proposed Contour
ft Interval
NORTH
SCALE
d
h ry
g
i v
2
W
a
N
U
m
n
a
G
O
Jamie
Langer Advanced
Environmental
Sciences
Inc
Colorado State
University
383 West
37th St
PIN
nt
V4
Soil
Water
and
Plant Testing
Laboratory
Loveland
CO
8 538
Q
Natural
Environmental Sciences Bldg
A3 9
Fort Collins CO 8 523 2
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 75/149
DATE
RECEIVED 7
27
2 2
2 8
97 49
5 6
FA X
49 293
DATE REPORTED 7
8
2 2
BILLING
RESEARCH
SOIL ANALYSIS
A B D TP A
LabSample paste ppm
ID
pH EC
CaCO3
OM
NO3
N P
K
Zn
Fe
Mn
Cu CEC
mmhos
cm
equiv
meq g
R42
BC
AGR W
7
2
3 86
7
7 36
27
36
7 4 3 9
5
9 9
R42 BC AG R W2 7
4
4
3
6 2 2 7
8
5 46 63
3 6
9 5 6 8 5
R422 BC AGR W3
7
5
3
7
5
8
32 99
3
23 4
2 3 3 5 8 3
R423
BC
AGR
E
6 9
2 2 2 63
7
4
8
5
43 287
7 6 7
7
28 4
6
R424 BC AGR E2
7 2 2 2
2 6
8
2
3
5
53
73 4 5 26 6
32 9
3 8
R425 BC
AGR E3
6 8 2
6
7 2 5
5 43 23 38 8 78 3 26 6 9 5
Total
La b
Sample
S A B
ID Sand Silt
Clay
Texture
potential
R42 BC AGR W
44
23 33
Clay
Loam
59
33 6
R42 BC
AGR W2 45
2 34
Clay Loam
94
33
R422
BC AGR
W3 48
2
32
Sandy Clay Loam
45 5 6
R423 BC AGR
E
52 2 28
Sandy Clay Loam
5
2 6
R424
BC
AGR
E2
44
22 24
Clay Loam
37 7 3
R425
BC
AGR E3 48 9 33
Sandy Clay
Loam
8 7 23
Crop
La b
Sample to be Ferti l izer Suggestions
ID
grown
irrigation
N
P2 5
K2
lb A
R42 BC
AGR
W
native grasses
dryland 4
4
R42 BC
AGR W2 native grasses
dryland
4
Actd Base
potential
based
on
x
CaCO3
equiv
3
25
x
Total S
R422
BC AGR
W3
native grasses dryland 4
Acid
Base
potential
based on
x
CaCO3
equry
3
25
x
pyritic
S
R423
BC AGR E
native grasses dryland
4
A
B potential calculated as Tons of CaCO3 per tons of material
R424
BC AGR E2 native grasses dryland 4
R425
BC
AGR E3
native grasses
dryland
4
Page of
Resurrection
Mining
Company
C 25
Advanced Environmental Sciences
November
26
2 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 76/149
STATE OF COLORADO
f
DIVISION
OF
RECLAMATION
MINING
AND SAFETY
Department of Natural Resources
3 3 Sherman
St
Room 2 5
Denver
Colorado
8 2 3
COLORADO
Phone
3 3
866
3567
4
v
irall
L
i
RECLSAMATION
FAX
3 3
8 32 8 6
MINING
SAFETY
t
Jo hn W Hickenlooper
March
2 2 3
C
S
Governor
Mike King
Executive Director
Mr
Larry
Fiske
Loretta
E
Pmeda
Resurrection
Mining
Company
d
Director
6363 South Fiddlers Green
Circle
Greenwood
Village
CO
8
Re
Black
Cloud Mine
File
No M
2 8 83
Modification
Approval
Revision No Mn 5
Dear
Mr
Fiske
On March
5 2 3
the
Division
of
Reclamation Mining
an d
Safety
DRMS
approved
the Modification
application submitted to th e Division on
February
3
2 3
addressing the following
Growth Medium
Source Modification
The
terms
of the
Modification
No 5
approved
by the Division are
hereby incorporated
into the Black Cloud
Mine
reclamation
plan
under the
Consent
Decree
DRMS File
No M 2 8 83 All other conditions and
requirements
of
the
reclamation
plan
remain
in
full
force
and
effect
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 77/149
M INOR MOD IF ICAT ION MD
6
Resurrection Mining Company
6363 South
Fiddlers
Green Circle
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 78/149
Greenwood
Village CO
8
May
2 3
Mr
Allen
Sorenson
State of Colorado
Division
of
Reclamation
Mining and Safety
3 3 Sherman
Street
Room
2 5
Denver
CO
8 2 3
Re Black Cloud Reclamation
Plan
Tailing Facility
Minor
Amendment
6
Proposed
Modification of Required Geotextile Covered Area
Dear Mr Sorenson
This
is
a
request
fo r
a
Minor
Amendment
6
of the 2 8
Black Cloud
Reclamation
Plan
Reclamation Plan
Enclosed
please find an accompanying
bank
draft in the amount of
to
cover
the
administrative
cost
of this
request
The Reclamation Plan states Section
4
p
that the
surface
of
the
Black Cloud tailing
facility in Iowa Gulch will be covered by
waste
rock
other natural
fill
material
and
vegetated
growth medium
Thin lifts of the subgrade
fill will be compacted
to reduce the permeability and
the surface will be graded for drainage
The fill
will then
be
covered
by
a geotextile The
geotextile
will
be
overlain
by
6
inches
of natural
borrow
material
and
8
inches of
revegetated
growth medium
The
purpose
of
the
geotextile
is to maintain separation and prevent
Mr
Allen
Sorenson
Page
2
May
2 3
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 79/149
Resurrection
therefore requests
approval to
reduce the area to be covered
by geotextile to
those
portions
of the
tailing surface that are not covered by at least
4
feet of compacted fill
and
revegetated growth med ium or area s of the tailing that have
not
had to time to consolidate from
previous placement of subgrade materia l This
would
represent a reduction
in
the area to be
covered by geotextile from approximately 29 acres
to
approximately 4 acres In
addition
to
improved
root growth Resurrection believes that
reduction
of
the
area
of geotextile
will simplify
final reclamation minimize impacts to
the
existing tailing
facility
grading and schedule and
reduce the cost of
reclamation while still
fully meeting all of the goals
listed
in the
Reclamation
Plan for the surface
of
the Black Cloud tailing
facility
The approximate
area
to
be
covered by geotextile
is
shown in
enclosed
Figure
Final selection
of
the area
involved will
be
determined
in
the
field
by the
Colorado
Division of
Reclamation
Mining
and
Safety
Project Manager
If you
have
any questions
please
let me know at 3 3 837 5676 or on my cell phone at 3 3
258 6539
Sincerely
Lawrence E
Fiske
Senior Manager Legacy Sites Closure and
Reclamation
Cc
Al
Long
Resurrection
Mining
Company
Julio Madrid Newmont Mining Company
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 80/149
STATE OF COLORADO
DIVISION
OF RECLAMATION MINING AND SAFETY
Department of Natural Resources
3 3
Sherman
St
Room
2 5
C O
L O
R
A
D O
Denver Co lo rado 8 2 3
D
t
v
t
s
t o N o
IF
Phone 3 3 866 3567
RECLAMATION
FAX
3 3 832
8 6
MINING
St
SAFETY
John
W Hicken loope r
May
29 2 3
Governor
Mike K ing
Executive Director
Mr
Larry
Fiske
Loretta E Pmeda
Resurrection
Mining Company
Director
6363
South
Fiddlers
Green Circle
Greenwood Village CO 8
Re
Black
Cloud
Mine File No M 2 8 83 Modification Approval Revision No
MD 6
Dear Mr Fiske
On May
29
2 3 the
Division of Reclamation Mining
and Safety DBMS approved
the Modification
application submitted to the
Division on May
8
2 3 addressing
the
following
Modification of
geotextile
covered area in Iowa
Gulch
Tailing
Impoundment
The terms of
the Modification
No 6 approved by the
Division are
hereby incorporated
into the Black
Cloud
Mine
reclamation plan under
the
Consent Decree DRMS File No M
2 8
83 All other conditions
and
requirements
of
the
reclamation
plan
remain
in
full
force
and
effect
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 81/149
MINOR
MODIF ICAT ION MD 7
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 82/149
Resurrection
Mining
Company
6363 South
Fiddlers
Green Circle
Greenwood
Village
CO 8
October 28 2 3
Mr Allen
Sorenson
State
of
Colorado
Division
of Reclamation
Mining
and Safety
3 3 Sherman Street Room
2 5
Denver CO
8 2 3
Re Black
Cloud
Reclamation
Plan
Tailing Facility
Minor
Amendment
7
Proposed
Modification
of
Reclamation
Schedule
Dear Mr
Sorenson
This is
a
request
for a
Minor
Amendment
7 of the 2 8 Black Cloud
Reclamation Plan
Reclamation
Plan
as discussed
during
your
site visit
of October
2
2 3
This proposed
amendment is for an
extension
of the reclamation
schedule
from
2 3
to the end of 2 4 for
reasons as described below
Enclosed
please find an accompanying bank draft in the amount
of
to
cover the administrative
cost
of
this
request
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 83/149
Mr
Allen
Sorenson
October
28
2 3
Page
3
5
Sort
demolition
debris
and
properly
dispose of debris unsuitable
for
onsite
disposal
Transport
off site
debris unsuitable for onsite disposal
and
salvage materials
6
Construct
and prepare debris
cell
place debris and
reclaim
the onsite debris
cell
if Mill
facilities
are not determined to
be
appropriate
for
preservation
If
the debris cell cannot
be constructed as
planned
because
the
mill
building
will
be
preserved
an d remain
then
debris will
be properly disposed
off site
7
Grade Black
Cloud
Mine surface plant
area
8
Prepare
roadways at Julia F iske
and
Helena areas for placement of p lant med ia
compacted roadways to be
loosened
through excavation
ripping and
grading
9
Excavated and transport off site borrow materials to the mine site for use as growth
medium
Complete spreading
plant growth
media in ta il ing impoundment
Black Cloud
and
Helena
a re as se ed fertilize
and
mulch
Demobilize the
site
2
The
Iowa
Gulch
Water Treatment building
and associated
pipelines will be demolished
an d
removed
if
the operator
has
demonstrated that the
Yak
or any new
water
treatment
plant
has adequate capacity to treat wa te rs from the Iowa
Gulch tailings facility through
at least one
spring summer
fall season and DRMS
provides
demolition
approval
Resurrection
Mining
Company Resurrection has
completed
Year 5 items
6 and 9
through
Minor
Amendment 5 and is
currently
working on completion of items 7 8 and
Due
to
the
above average
precipitation in
2 3 and
the
resulting
issues
of
access
necessary
for
i tems and
Mr A lle n Sorenson
Page 3
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 84/149
October
28
2 3
was also
extremely
muddy and inaccessible
Starting
in August 2 3 additional
flow
to
the
toe
drain
occurred from
precipitation
on th e
tailing
facility Beginning in
Sep tember the
Black
Cloud
shaft
pumping
rate was
reduced to provide
additional
pipeline capacity and additional
toe
drain
water was sent to the Yak water
treatment
plant to assist in
dewatering
the tailing facility
pond By
the end
of
September
the tailing pond had
been
significantly
reduced
For
the reasons stated above
Resurrection
is
requesting an
extension in time for reclamation
If
the
extension is
granted Resurrection
will
complete all reclamation
work
by the
end
of
2 4
If
you
have
any questions
please don
t
hesitate
to call me at 3 3 837 5676 or on my cell phone
at
3 3 258
6539
Resp
fully
Lawrence
E
Fiske
Director Legacy Sites Closure and Reclamation
Cc
Al Long Resurrection Mining Company e
Julio Madrid Newmont Mining Company e
Tim
Runnells
AES
STATE
OF COLORADO
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 85/149
J
DIVISION OF RECLAMATION
MINING
AND SAFETY
Department of Natural Resources
3 3
Sherman
St Room
2 5
Denver Colorado
8 2 3
Phone 3 3 866 3567
FAX
3 3 832
8 6
eCS
COLORADO
D I
V I S
I O N O F
RECLAMATION
MINING
SAFETY
John
W
Hickenlooper
Govemor
November 5
2 3
Mike
King
Executive Director
Mr Larry Fiske
4
Resurrection
Mining
Company
Loretta
E
Pineda
6363 South Fiddlers
Green
Circle
Director
Greenwood Village CO 8
Re
Black
Cloud Mine
File No
M
2 8
83 Modification
Approval
Revision No MD 7
Dear
Mr
Fiske
On
November
5
2 3
the
Division
of
Reclamation
Mining
and
Safety
DRMS
approved the
Modification
application
submitted to the Division on
October
27 2 3 addressing the
following
Extend reclamation
schedule
through
the end of2 4
The terms
of
the
Modification No
7
approved
by
the
Division
ar e
hereby incorporated
into
the
Black
Cloud
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 86/149
MINOR
MODIFICATION
MD
8
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 87/149
Resurrection
Mining
Company
6363
South Fiddlers
Green Circle
Greenwood Village
CO
8
November 2
2 4
Mr Allen
Sorenson
State of
Colorado
Division
of Reclamation Mining
and
Safety
3 3
Sherman Street Room 2 5
Denver CO
8 2 3
Re
Black
Cloud
Reclamation
Plan
Tailing
Facility
Minor Amendment
8
Proposed
Modification of
Final
Reclaimed Tailing Surface
Dear
Mr Sorenson
This
is
a
request
fo r a
Minor
Amendment
8 of the
2 8
Black Cloud Reclamation
Plan
Reclamation
Plan Enclosed please find
an accompanying bank draft in
the
amount
of
to
cover
the administrative cost of
this
request
Historically the tailing
pond
was used
as
a
holding
pond
for pump back water
from
the
toe drain
seep collection
system With final
reclamation this will
no
longer be an
option as the
reclaimed
tailing
surface has
a
constant
slope
to
promote
surface
runoff
of
precipitation Currently
the
toe
drain water
is
sen t via
pipeline
to
th e
Yak
Water
Treatment
Plant
Yak
Resurrection Mining
Mr
Allen
Sorenson
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 88/149
November 2
2 4
Page 2
If
you
have any questions please let
me
know at 3 3
837
5676
or
on my cell
phone
at 3 3
258 6539
Sincerely
RESURRECTIO
ING COMPANY
77
Lawrence E Fiske
Director Legacy Sites
Closure
and
Reclamation
Cc
Al
Long Resurrection
Mining Company
Julio
Madrid
Newmont Mining
Company
Tim Runnells AES
AVCOLORADO
Division of
Reclamation
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 89/149
Mining and Safety
Department
of Natural Resources
3 3
Sherman Street
Room
2 5
Denver CO
8 2 3
November
25
2 4
Mr
Larry
Fiske
Resurrection
Mining
Company
6363
South
Fiddlers
Green
Circle
Greenwood
Village CO 8
Re
Black
Cloud Mine
File No M
2 8
83 Modification Approval Revision
No MD
8
Dear Mr Fiske
On
November
25 2 4 the
Division
of
Reclamation
Mining
and
Safety
DRMS approved the
Modification
application
submitted
to the
Division
on
November
25
2 4
addressing the
following
Maintain
as a backup water management system
the capability
to
pump toe drain
and tailing
seepage water
to a depression
at
the
south edge of the reclaimed tailing storage facility
The terms
of the Modification No 8
approved by the
Division are
hereby incorporated into
the Black
Cloud
Mine
reclamation plan under the
Consent
Decree
DRMS File
No M
2 8
83
All other
conditions and requirements of
the
reclamation plan remain in full force and effect
If you
have any questions
please contact me
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 90/149
APPENDIX
D
RECLAMATION
COSTS
APPENDIX
D
2 8
2 3
BLACK CLOUD
RECLAMATION
COSTS
LEDGER
DATE
VENDOR SERVICE
AMOUNT
2 8
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 91/149
966 6 2 8
Haldane
Rebecca
Labor 2
966 95
6
2 8 Haldane
Rebecca
Burden
38
966
29
2 8 Haldane Rebecca
Labor
2
7 8 33
966 95
29
2 8
Haldane Rebecca Burden
5 4 58
966
7 2 8 Haldane
Rebecca
Labor
2 7 8 33
966
25 2 8 Haldane Rebecca
Labor
2
7 8 33
966 2
6
2 8 Haldane
Rebecca Labor
2
7 8 33
966 2 28
2 8
Haldane Rebecca
Labor
2
7 8 33
37 7
2
23 2 8
MFG Inc
Contract
Labor
Maintenance Supplies
2
5 47
37 9 2 23 2 8
SLV Earthmovers Inc Contract
Services
5 4 7
Subtotal
34 353 7
2 8
Total
34 353 7
2 9
966 2 2 9
Haldane
Rebecca Labor
2 7 8
33
966 95 2 2 9 Haldane Rebecca
Burden
568 75
966 27
2 9 Haldane Rebecca
Labor
2 7 8
33
966 95
27
2 9 Haldane
Rebecca Burden
568
75
966
2 6 2 9 Haldane Rebecca
Labor
2 7 8 33
966 95
2 6 2 9 Haldane Rebecca
Burden
568
75
APPENDIX D
2 8 2 3 BLACK CLOUD RECLAMATION COSTS
966
6 25
2 9 Haldane Rebecca Labor 2
77
63
966 95
6 25
2 9
Haldane Rebecca
Burden 8 3 48
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 92/149
966 7 6
2 9 Haldane
Rebecca Labor 2 77 63
966 95
7
6
2 9
Haldane
Rebecca
Burden
858
9
966 7 28 2 9 Haldane Rebecca Labor
2 77
63
966 95 7 28 2 9 Haldane Rebecca Burden 858 9
966
8 7
2 9
Haldane
Rebecca
Labor
2 77 63
966 95
8 7
2 9 Haldane Rebecca Burden
858 9
966
8
25
2 9
Haldane
Rebecca
Labor
2 77 63
966 95 8 25
2 9
Haldane
Rebecca
Burden
858 9
966
9
25
2 9
Haldane
Rebecca
Labor
2
77
63
966 95
9
25
2 9 Haldane
Rebecca
Burden 858 9
966
6
2 9
Haldane Rebecca Labor
2 77 63
966 95
6 2 9
Haldane Rebecca
Burden
858 9
966 27 2 9 Haldane
Rebecca
Labor
2 77 63
966 95
27
2 9
Haldane Rebecca Burden
858
9
966 6 2 9 Haldane
Rebecca Labor 2
77 63
966 95
6
2 9
Haldane
Rebecca Burden 858 9
966
23
2 9 Haldane Rebecca
Labor
2
77
63
966 95
23
2 9
Haldane Rebecca Burden
858 9
966 2 6 2 9 Haldane
Rebecca
Labor
5 3
75
966
2 6
2 9
Haldane
Rebecca
Labor 5 3 75
966 2
6 2 9
Haldane
Rebecca
Labor
755 63
966 95 2 6 2 9
Haldane Rebecca Burden 2
58
966 95 2
6
2 9
Haldane Rebecca
Burden
2 58
APPENDIX
D
2 8 2 3
BLACK CLOUD
RECLAMATION
COSTS
7 4 3 2 9 MFG Inc
Contract Labor
32 94 97
Maintenance
Supplies
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 93/149
5
6
3
2 9
MFG Inc Contract
Labor
7 57
59
Maintenance
Supplies
5 2 6 3 2 9
MFG Inc
Contract
Labor
2
6
2
Maintenance Supplies
684 6 25 2 9 MFG Inc Contract Labor 7 49
Maintenance
Supplies
2334 8
9
2 9 MFG
Inc Contract
Labor
7
6
5
Maintenance Supplies
264
9 7
2 9
MFG
Inc
Contract
Labor
2
57
5
Maintenance
Supplies
2727
2 9
MFG Inc
Contract
Labor
37 999
43
Maintenance Supplies
2973
2 2 9
MFG
Inc Contract
Labor
8
9 8 76
Maintenance Supplies
3255 2 2 9 MFG
Inc Contract
Labor
7
366
92
Maintenance
Supplies
3556
2
8 2 9 MFG Inc Contract
Labor
27 952 4
Maintenance Supplies
Subtotal 3 3 72 5
6 2 6
2 9 Wells
Fargo Business
Credit 3
87
Material
Disposal REGGS
66
6
8
2 9 Wells
Fargo Business
Credit
7
848 54
APPENDIX
D
2 8 2 3 BLACK CLOUD RECLAMATION COSTS
2879 7 2 9
Wells
Fargo Business Credit
Material Disposal REGGS
3
45
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 94/149
33 2
9 2 9
Wells
Fargo
Business Credit
Material
Disposal
REGGS
592 5
3327
23
2 9
Wells Fargo Business Credit
Material Disposal REGGS
332 5
3699
2
29
2 9
Wells Fargo Business Credit
Material Disposal REGGS
3
847 4
Subtotal
43 9 4
856
7
8
2 9
Alpine
Locates
and
Utilities
Utility Locates
2 5
2682
9 24
2 9
Alpine Locates
and Utilities
Utility Locates
2 5
3 24
4 2 9
Alpine Locates and Utilities
Utility
Locates
365 5
Subtotal
775 5
2329
8
9 2 9
Power
Equipment
Trackhoe
Rental
244
49
288
7 2 9
Power
Equipment Trackhoe
Rental
8
74
692
6 25 2 9
Power Equipment
Trackhoe
Rental
4 6 5
87
7
9
2 9
Power
Equipment
Trackhoe
5
76
5
APPENDIX
D
2 8 2 3
BLACK
CLOUD
RECLAMATION
COSTS
Subtotal
6 937
5
3 6
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 95/149
4 2 9
Del
Mont
Consultants
Inc
Surveyor Engineering Services
4 38 2
3334
2 2
2 9
Del
Mont
Consultants Inc
Surveyor Engineering Services
8 92 97
Subtotal
22 33 9
2636
9 7
2 9
Verizon Wireless Haldane
phone
charges
96
87
2968
2 2 9
Verizon Wireless
Haldane
phone charges
3 2
87
3326
23
2 9
Verizon
Wireless Haldane
phone charges
662 46
3678
2
22
2 9
Verizon Wireless
Haldane
phone
charges
352
96
Subtotal
4 5 6
3 22
4 2 9
Phillips
66
Conoco Fuel
98
98
3427
2
2 9
Fuel
Pipeline
9
Subtotal
2 7 98
2328
8 9 2 9
Rebecca
Haldane Supplies
23 56
2582
9 9
2 9
Rebecca Haldane Supplies
44
4
2582
2 9
Office Depot
Supplies
236
8
2884
APPENDIX
D 2 8
2 3 BLACK CLOUD
RECLAMATION COSTS
966 95
26
2
Haldane
Rebecca
Burden
453
38
966
2
6 2
Haldane Rebecca Labor
2 77 63
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 96/149
966 95
2
6 2
Haldane
Rebecca
Burden
83
9
966 2
23
2 Haldane
Rebecca
Labor
2
77 63
966 95
2 23 2
Haldane
Rebecca
Burden
83
9
966
3
6 2
Haldane
Rebecca Labor
2
875 92
966 95
3 6 2
Haldane Rebecca Burden
862 78
966
3
25 2
Haldane Rebecca Labor
597
73
966 95
3 26 2
Haldane
Rebecca
Burden
479 32
966
4 6
2
Haldane Rebecca Labor
2 875 92
966 95
4 6
2
Haldane
Rebecca
Burden
862 78
966 4 27
2
Haldane Rebecca Labor 2
875 92
966 95 4 27 2 Haldane Rebecca Burden 862 78
966 5 7 2
Haldane
Rebecca
Labor
2 875 92
966 95
5
7 2
Haldane
Rebecca Burden
862 78
966 5 25 2
Haldane Rebecca Labor 2
875
92
966 95
5
25
2 Haldane Rebecca Burden
862 78
966 6
6 2
Haldane Rebecca Labor 22 22
966 6 6 2 Haldane Rebecca Labor 2 433 47
966 95
6
6
2
Haldane Rebecca Burden
66 37
966 95 6 6
2 Haldane Rebecca Burden
73
4
966
6 25
2
Haldane Rebecca Labor
2 875 92
966 95 6 25 2 Haldane Rebecca Burden 862 78
966
7 6
2 Haldane Rebecca
Labor
2 875 92
966 95
7 6 2
Haldane Rebecca
Burden
862 78
APPENDIX
D
2 8 2 3 BLACK CLOUD
RECLAMATION
COSTS
876 9
6 2
Marvin Long Labor
2 825
876
9
27
2
Marvin Long Labor
2 825
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 97/149
876 95 7 27 2
Marvin Long Burden
847 5
876 95
7
27
2
Marvin
Long
Burden
56 46
876 95
8 6 2
Marvin
Long
Burden
847 5
876 95
8
26 2
Marvin Long
Burden
847 5
876 95
9
6
2
Marvin Long Burden
847
5
876 95 9 27 2
Marvin Long Burden
847 5
Subtotal 9
4
5
3
3
2 Johnson
Excavating
Septic
Porta Potty Set Up
3
65 28 2 Johnson
Excavating
Septic
Porta Potty
Monthly Rental
5 4
3
7
2 Johnson
Excavating
Septic
Porta Potty Monthly Rental
738 4 29
2
Johnson
Excavating
Septic
Porta
Potty
Monthly
Rental
942
5
27 2 Johnson
Excavating
Septic
Porta Potty Monthly
Rental
2 7 7 8 2 Johnson
Excavating
Septic
Porta Potty Monthly
Rental
3 74 8 25
2 Johnson
Excavating
Septic
Porta
Potty Monthly
Rental
3628
9
29
2 Johnson
Excavating
Septic
APPENDIX D 2 8 2 3 BLACK
CLOUD
RECLAMATION COSTS
466 3 8
2
Tetra Tech
Property
32 658 37
Labor
Maintenance
Supplies
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 98/149
87 5
3 2
Tetra
Tech
Property
7 228 69
Labor
Maintenance
Supplies
32 6 2
Tetra Tech Property
28 38
Labor
Maintenance
Supplies
3 9
7
5 2
Tetra
Tech
Property
2 668
5
Labor Maintenance Supplies
3 2
8 7 2
Tetra Tech
Property
8 8
74
Labor Maintenance Supplies
3556
9
6
2 Tetra
Tech
Vehicle
Transfer
9
28
3959 8
2
Tetra
Tech Seep Management
25
4323
2
Tetra Tech
Asbestos
Inspection 937 35
4278
2
Tetra
Tech
Truck Refund 3
25
Subtotal 7
5 5 56
354 2 24 2
SLV Earthmovers Inc 6 2 3 45
Contractor Services
394
3 3
2
SLV Earthmovers
Inc
9
425
Contractor Services
2855
7
3
2
SLV
Earthmovers
Inc
7
35
APPENDIX
D
2 8 2 3 BLACK CLOUD RECLAMATION
COSTS
Subtotal 3
956 3
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 99/149
9 6 2
Advanced
Environmental
Sciences Inc
Technical
Services
437 5
2965
8
7
2
Advanced Environmental
Sciences
Inc Technical
Services
5 3
3529
9
6 2
Advanced
Environmental
Sciences
Inc Tailing Pump
Maintenance
6
585 49
3867
3
2
Advanced Environmental
Sciences Inc
Demo
Permit
Applications
9
33 36
4369 5 2 Advanced Environmental
Sciences Inc
Reclamation
Services
2 899 85
Subtotal
39 469 2
48
6 22 2 Wells
Fargo
Business Credit
Material
Disposal
REGGS
9
Subtotal
9
APPENDIX
D
2 8
2 3
BLACK CLOUD RECLAMATION COSTS
3593
9 23
2
Molleur
Construction 67 768
Irene
Eclipse Mine
Site
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 100/149
Reclamation
Scree Stockpile
3889
3
2
Molleur
Construction
58
32
Irene Eclipse Mine Site
Reclamation
Scree
Stockpile
389
3 2
Mol leur
Construction 4 3
3
Irene Eclipse Mine
Site
Reclamation Scree
Stockpile
389
3 2
Mol leur Construction
9
Irene Eclipse
Mine
Site
Reclamation
Scree Stockpile
4 55
3 2
Mol leur Construction
67
Irene Eclipse
Mine
Site
Reclamation
Scree
Stockpile
Subtotal
2 2
5 3
36 5
9 29 2
De l Mont Consultants Inc
6
2
99
Eclipse Irene
Scree
Surveying
Engineering
36 6
9 29 2 Del
Mont
Consultants Inc
6 797 83
Eclipse
Irene Scree
Surveying
APPENDIX
D
2 8 2 3 BLACK CLOUD RECLAMATION
COSTS
3437
9 8
2
Acorn Petroleum Inc Fuel
42
44
3577
9 23 2 Acorn
Petroleum
Inc
Fuel
7 88
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 101/149
3635
9 29
2
Phillips 66 Conoco 76
Fuel
49
9
3787
7
2 Acorn Petroleum
Inc Fuel 65 2
3933 8 2
Acorn Petroleum Inc Fuel
63 7
3987
28 2
Phillips
66 Conoco 76
Fuel 5
85
4 3 2
Acorn
Petroleum Inc Fuel
6 24
Subtotal
2 6
43
43 2
2
Impact Contractors Demo
Contractor
36
728
86
Direct
Payment from
AM
King
to
Impact
Contractor
Impact
Contractors
Demo
Contractor
55
Direct
Payment
from
AM
King to
Impact
Contractor
Impact
Contractors
Demo
Contractor
9
Subtotal
728 86
3
3
2
Farm
Plan
Supplies
Materials
8 9 4
APPENDIX D
2 8 2 3 BLACK CLOUD
RECLAMATION
COSTS
3982
28
2
Office Depot Ink Copy Paper
95 45
399
28
2
PSC
Environmental Services
Disposal
46 3
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 102/149
Transformer Oil
4 29
3
2
Critter
Gritter
Beaver
Management
5
Subtotal
4
95
22
3 29
8 7
2
Excel Energy 748 County Road
2A
2 4 28
3338
9
2
Excel
Energy 748
County
Road
2A
5 8
69
3853 7 2
Excel Energy 748 County Road
2A
278
96
4 92 3 2
Excel Energy
748
County Road
2A
32
7
4 98
3
2
Excel Energy 748
County Road
2A
6
62
96
Subtotal
646 59
2977 8
7 2
Diedrich Construction
Co
2 yd
Rolloff
464
2978
8
7 2
Diedrich Construction
Co
Trash
Pickup
4
3 22
8
9
2
Diedrich Construction
Co
2
yd
Rolloff
458
APPENDIX D
2 8 2 3
BLACK
CLOUD RECLAMATION COSTS
4 36
3
2
FedEx
25 35
Subtotal
4 25
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 103/149
9
2
2
Verizon Wireless Rebecca
Haldane
2 6 29
347 2 24 2
Verizon Wireless Rebecca
Haldane
52 54
56
3
24 2
Verizon
Wireless
Rebecca
Haldane
35 35
7 6
4 2
2
Verizon
Wireless
Rebecca
Haldane
39 56
94
5
27 2
Verizon Wireless Rebecca
Haldane
95
53
6 22
2
Verizon Wireless Rebecca
Haldane
67
2859 7 22 2
Verizon Wireless Rebecca
Haldane
68 54
3 49 8 9 2
Verizon
Wireless
Rebecca
Haldane
238
37
36 9
23
2
Verizon
Wireless
Rebecca
Haldane
84
4 4 28 2
Verizon Wireless
Rebecca
Haldane
8 43
Subtotal
478
APPENDIX
D
2 8
2 3
BLACK
CLOUD
RECLAMATION COSTS
966 95 3
3
2
Haldane
Rebecca
Burden
862 78
966
4
5 2
Haldane
Rebecca Labor
2 875 92
966 95
4 5 2
Haldane Rebecca
Burden 862
78
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 104/149
966
4
3
2
Haldane
Rebecca
Labor
2
875
92
966 95
4
3 2
Haldane Rebecca Burden
862 78
966
5
5 2
Haldane
Rebecca
Labor
2 875 92
966 95 5 5
2
Haldane
Rebecca
Burden
862
78
966 5 3 2 Haldane Rebecca Labor 2 875 92
966 95 5 3 2
Haldane
Rebecca Burden
862 78
966
6
5 2 Haldane
Rebecca
Labor
2
875 92
966 95
6 5
2
Haldane
Rebecca
Burden 862
78
966 6 3 2
Haldane
Rebecca
Labor
2 875
92
966
6
3 2
Haldane
Rebecca Labor 862 78
966 95
7 5
2
Haldane Rebecca Burden
2 875
92
966 95 7
5 2 Haldane Rebecca Burden
862
78
966
7
3
2
Haldane
Rebecca Labor
2
875 92
966 95
7 3
2
Haldane
Rebecca
Burden 862 78
966
8
5
2
Haldane
Rebecca
Labor
2
875 92
966 95
8
5 2
Haldane Rebecca Burden 862 78
966 8
3 2
Haldane Rebecca Labor 2 875 92
966 95 8
3 2
Haldane
Rebecca Burden
862
78
Subtotal
63 557 9
876
2
3
2
Marvin Long
Labor
2 825
876
2
3
2
Marvin
Long
Burden
52 54
APPENDIX
D
2 8 2 3
BLACK
CLOUD
RECLAMATION
COSTS
876 95
5
5 2
Marvin Long
Labor
2
825
876
5 5 2
Marvin
Long Burden
52 54
876
5
3
2
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 105/149
Marvin
Long Labor
2
825
876
5
3
2
Marvin
Long
Burden
52
54
876
6
5 2
Marvin
Long
Labor
2
825
876
6 5
2
Marvin Long Burden
52 54
876
6
3
2
Marvin Long Labor
2
825
876
6 3 2
Marvin Long Burden
52 54
876 95
7 5 2
Marvin Long Labor
2
825
876 95
7 5 2
Marvin Long Burden
52 54
876 95
7
3
2
Marvin
Long
Labor
2
825
876 95
7 3
2
Marvin Long Burden
52 54
876 95
8 5 2
Marvin Long
Labor
2
825
876 95
8
5 2
Marvin Long Burden
52 54
876
8 3 2
Marvin Long
Labor
2
825
876
8 3
2
Marvin
Long Burden
52
54
876
9
5
2
Marvin Long
Labor
2 825
876 95
9 5
2
Marvin
Long
Burden
52 54
876 95
9 3 2
Marvin
Long Labor
2
825
876 95
9
3 2
Marvin Long Burden
52
54
876 95
5 2
Marvin Long Labor
2 825
876 95
5 2
Marvin
Long Burden
52 84
876 95
3
2
Marvin
Long
Labor
2
825
876
3
2
Marvin Long Burden
52 54
876
5
2
Marvin
Long Labor
2
825
APPENDIX D
2 8 2 3
BLACK CLOUD RECLAMATION COSTS
6683 4 2 2
Acorn Petroleum Inc
59
74
6769 4 26 2 Phillips
66
Conoco 76 63 8
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 106/149
6967 5 2 Acorn
Petroleum Inc
67 32
7 29
5
25
2 Phillips
66
Conoco
76 33 7
7337 6 8 2
Acorn Petroleum Inc
58 86
75 6
2
2 Acorn
Petroleum Inc
2 8 57
7599
6 3 2
Phillips
66 Conoco 76
25 2
7774
7 6
2 Acorn
Petroleum Inc
75 52
7946
7 2 2
Acorn Petroleum Inc
32
8 6 7 27 2 Phillips
66
Conoco
76
29 66
82
8
2
Acorn
Petroleum
Inc
62 24
8322
8
25
2
Acorn
Petroleum Inc
26
9
86 9 8 2
Acorn Petroleum Inc
54 8
8739 9 22 2
Acorn
Petroleum Inc
58
29
9 27
6 2
Acorn
Petroleum
Inc
68 24
9 85 2
2
Acorn Petroleum Inc
83 7
953
3 2 Acorn Petroleum Inc
58 92
9667
22 2
Acorn
Petroleum
Inc
26 35
Subtotal
2 872 55
2 Supplies
5586
25
2
Eldorado
Homes
Office
8 8
5993
2
28
2
Haldane
Snowshoes
386
6696 4 2 2
Long Measuring
Tape
54
7992
7 27
2
John
Deere
Transfer
999
2
APPENDIX D
2 8 2 3 BLACK CLOUD
RECLAMATION
COSTS
6245 3 8 2
Excel Energy
535
33
6296 3 8 2
Excel
Energy
535 33
66 7 4
7 2
Excel Energy
4 7
89
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 107/149
6888
5
2
2
Excel
Energy
74
7426
6 8
2
Excel Energy
698
7825 7 6 2
Excel Energy
25
87
8669 9 8
2
Excel Energy
285 69
9 5
6
2
Excel Energy
78 25
9385
2
2
Excel Energy
33
4
Subtotal 9
388 34
2
Other
Utilities
Debris Removal
5 92
6 2 Diedrich Construction 4
5842
2
8 2 Diedrich
Construction
4
6 87 3 8 2 Diedrich
Construction
4
6564 4
7 2
Diedrich
Construction 4
6996
5
2
Diedrich
Construction
55
7 87
5
8 2
Diedrich Construction
9 6
736
6 8
2
Diedrich
Construction
5 4
736
6 8
2
Diedrich
Construction
9
7792
7 6 2
Diedrich Construction
558
7793 7 6 2 Diedrich
Construction
55
7975
7
27
2
Diedrich Construction
66
APPENDIX
D
2 8 2 3 BLACK CLOUD RECLAMATION COSTS
Contractor
Consultant
Services
5449
3 2
AES
2
592
7
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 108/149
5526 9 2 TetraTech
56 89
557 25 2
Johnson
Excavating
22
594 2 6 2
TetraTech
57 8
6 98 3
8
2
Johnson Excavating
22
6 66
3 8
2
ACZ
Labratories
7 8 28
63 3
7 2
AES
4 6 2
6333 3 7 2
TetraTech
4 75
635
3
28 2
Johnson Excavating
669 4 2 2
AES
582
7
6857
5 2
2
Johnson
Excavating
22
7 72 5 2 Clear Creek Consultants 75
6978
5 2
AES
2 3 2
5
7 8
5
8
2
ACZ
Labratories 9 6
28
7475
6
5
2 AES
5
398 45
748
6
5
2
Johnson Excavating
7567
6
3
2
Clean Harbors
3
796 48
7892
7 2 2
AES 43 76
56
795
7
2 2
Johnson
Excavating
79 3 7 2 2
Mobile
Record
Shredders
75
82 7
8
2
AES
2
5
6
APPENDIX
D
2 8
2 3 BLACK
CLOUD RECLAMATION
COSTS
Subtotal
8 6
878 24
2 Postage
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 109/149
758 6 3 2 FedEx 33
75
8 48
8
2 2
FedEx 3 5 93
Subtotal 349 68
2 Permits
7978 7 27 2
CDRMS Helena Shaft Mod
8298
8 7
2
CDPHE
Stormwater
25
Subtotal 25
2
Training
6776
4 26 2
OHSA Haldane
45
6694
4 2
2
OSHA
Long
45
Subtotal
9
2
Phone
56 3 25 2 Verizon Wireless Haldane 76 67
6 4
2
28 2 Verizon
Wireless
Haldane
69
9
6383
3
28 2
Verizon Wireless Haldane 2 7 7
67 8 4 2 2 Ver izon Wire less Haldane
2 9 82
7 49
5 25 2
Verizon Wireless Haldane
9 3
7537
6
2
2 Verizon Wireless Haldane
74 52
APPENDIX
D
2 8 2 3 BLACK CLOUD
RECLAMATION
COSTS
998 2 4
2 2
Acorn
Petroleum
Inc
3 7
25
5 6
3 6 2 2
Acorn
Petroleum
Inc
8
69
3
2
2 2
Acorn Petroleum Inc
95 24
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 110/149
977 4
5
2 2
Acorn
Petroleum
Inc 97 33
2 46
4 2 2 2
Acorn
Petroleum Inc 69
6
2459 5 9 2 2
Acorn Petroleum Inc 57 8
29 5
6 7 2 2
Acorn
Petroleum
Inc
66
3 77 6
28 2 2
Acorn
Petroleum
Inc
88 94
3494
7 2
2 2
Acorn Petroleum Inc 87 5
3643
7 26 2 2
Acorn
Petroleum Inc 97 74
394
8
8 2 2
Acorn
Petroleum
Inc 284 65
4 79 8
23
2 2 Acorn
Petroleum
Inc
3
93
4594 9 26 2 2
Acorn
Petroleum
Inc 79 76
477 3
2 2
Acorn Petro leum Inc
6 9
493
9 2 2 Acorn Petroleum Inc 96 24
Subtotal
2
86 32
2 2 Supplies
9467
2
2
Turner Auto Pickup
Truck
38 4 79
88 2
29
2
County Clerk Registration
7 6 4
Subtotal 39
6
83
2 2 Electrical
APPENDIX
D
2 8
2 3
BLACK
CLOUD RECLAMATION COSTS
2A
4364
9 6 2 2
Excel Energy 748 County Road
5 5 2
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 111/149
2A
4535
9 2 2
Excel
Energy 748 County Road
2A
854 74
4865
3
2 2
Excel Energy
748 County Road
2A
782 8
5 9
2 2
Excel Energy
748
County Road
2A
93 27
Subtotal
3 498
4
2 2 Debris
and
Trash
Removal
996
2
7 2
Diedrich Construction
55
54
2 4 2
Diedrich Construction
3 2
67
2 2
Diedrich
Construction
9
863
26
2 2
Diedrich
Construction
552
6
2 4 2 2
Diedrich Construction
55
Subtotal
3
854
2 2 Contractor and
Consultant Services
96 8
7 2
Johnson
Excavating
Septic
9566
7 2
ACZ
Labratories Inc
922 4
9726
2
2
3 35 33
APPENDIX D
2 8 2 3 BLACK CLOUD RECLAMATION COSTS
2222
4 26 2 2
Del Mont Surveying
836 88
2383
5 2 2 2
Johnson
Excavating
Septic
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 112/149
2466
5 9 2 2
Advanced Environmental
Sciences Inc
4
36 25
2476
5
9 2 2
Advanced Environmental
Sciences Inc
8
27 64
2569
5 5 2 2
ACZ
Labratories Inc
662
2
3 44
6 4 2 2
Advanced Environmental
Sciences Inc
69 964 86
3 34
6 2
2 2 Johnson
Excavating
Septic
3444
7 5 2 2 SLV
Earthmovers Inc
2 7 7 59
35 9
7
2
2 2
Browns Hill
Engineering
2 97
3625
7
9 2 2
Johnson
Excavating
Septic
3658
7 26 2 2
Advanced
Environmental
Sciences
Inc
39
84 43
3946
8 8 2 2
ACZ
Labratories Inc
855 98
4 84
8 23 2 2
Advanced Environmental
Sciences
Inc
2
962
5
4565
9 3 2 2
Salida Fire Extinguisher 8
4534
9 26 2 2
Johnson
Excavating
Septic
22
49 7
8
2 2
Advanced Environmental
45
722 6
APPENDIX D
2 8 2 3
BLACK CLOUD
RECLAMATION COSTS
Subtotal
248
5
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 113/149
2 2 Travel
9682
22 2
Columbine Suites
LTD
636 48
9683
22 2
Columbine Suites
LTD
282 88
9684
22 2
Columbine
Suites
LTD
4 44
9685
22 2
Columbine
Suites LTD
4 44
834
4 2 2
Columbine Suites LTD
484 6
Subtotal
686 4
2 2 Meals
3
2 2 2
Aaron Taylor
4 99
277
2 3 2 2
Aaron
Taylor
7
75
3 38
6 2
2 2
Larry Fiske
9 56
Subtotal
322 3
2 2
Total
457 693
69
2 3
Salary
Burden
2
2 2
3 2 3
Newmont Site
Labor Burden
9 24
Subtotal
9 24
APPENDIX
D
2 8
2 3
BLACK
CLOUD RECLAMATION COSTS
8943
7
22
2 3
Acorn Petroleum
Inc
99 5
9 72
8
6
2 3
Acorn
Petroleum Inc
9 74
9438
9 7 2 3
Acorn
Petroleum
Inc
2 8
9634
9 26
2 3
Acorn
Petroleum Inc
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 114/149
75
87
9794
8 2 3
Acorn
Petroleum Inc
3
2 236
4
2 3
Acorn
Petroleum
Inc
84
9
Subtotal
2 542 3
2 3
Contractor
and
Consultant Services
2 2
2
3
2 2
SLV
Earthmovers Inc
427 748
66
2 3
2
3
2 3
SLV Earthmovers Inc
777
42
2 8 2 2
Advanced Environmental
Sciences
Inc
35 89 44
6557
8 2 3
Clear Creek Consultants Inc 57 5
6698
6
2 3
Advanced Environmental
Sciences
Inc
52 357 32
672
6
2 3
Johnson
Excavating
Septic 22
6829
28
2 3
Browns Hill
Engineering
3 673
6987
2
6
2 3
ACZ
Labratories Inc
7 8 38
7 37
2 2 2 3
Advanced
Environmental
Sciences Inc
27 659 84
7 57
2
2 2 3
APPENDIX
D
2 8
2 3 BLACK CLOUD RECLAMATION COSTS
2 3
Phone
Licenses
Permits
Postage
6 35
2 27
2 2
Verizon
Wireless
Cell
Phone
6 35
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 115/149
68
22
2 3
Verizon
Wireless
Cell Phone 55 62
7222
2
22
2 3
Verizon Wireless Cell Phone
29 62
7 85
2
22
2 3
Allen
Long License
Renewal
85
7584
3 27 2 3
Verizon Wireless Cell Phone 4 8
7896
4 25 2 3 Verizon
Wireless
Cell Phone
64 34
8 6
5 6
2 3
Allen
Long
Postage
2 35
82
5 23
2 3
Verizon
Wireless
Cell
Phone
4
8534
6
2 2 3 Verizon
Wireless
Cell
Phone
4
8964
7
22 2 3
Verizon
Wireless
Cell
Phone 4
9266
8
8 2 3
Silver City
Printing
4
85
924
8 8
2 3
Allen Long Office
Supplies
25
2
934
8
24 2 3
Verizon
Wireless
Cell Phone 4 5
9683
9 26 2 3
Verizon Wireless Cell Phone 4 5
98
8
2 3
Colorado
Dept
of
Public Health
Permit
75
APPENDIX D
2 8 2 3 BLACK CLOUD RECLAMATION
COSTS
664
8 2 3
Excel
Energy 748
County Road
246 76
2A
7 85
2
6 2 3
Excel
Energy
748
County
Road
29 46
2A
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 116/149
7 9
2
6
2 3
Excel
Energy
748
County
Road
6
7
78
2A
7 89
2 6 2 3
Excel Energy 748
County
Road
4 28
2A
7323
3
2 3
Excel Energy 748 County
Road
26
8
2A
7385
3
6 2 3
Excel Energy 748 County
Road
7 8 68
2A
7732
4
5 2 3
Excel Energy 748 County
Road
26
3
2A
7734
4 5 2 3
Excel Energy 748 County Road
8 334 59
2A
8 27
5 2 3
Excel Energy 748 County Road
26 29
2A
8 34
5
9
2 3
Excel
Energy 748
County
Road
9
47
77
2A
83 7
5 3 2 3
Excel Energy 748 County
Road
26
36
2A
83 8
5 3 2 3
Excel
Energy
748
County
Road
9 897 2
2A
87
7 3 2 3
Excel Energy 748 County Road
27 48
2A
APPENDIX
D
2 8
2 3
BLACK
CLOUD
RECLAMATION COSTS
2A
Subtotal
89
22 9
2 3
Total
6 2 4
85
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 117/149
2 8 2 3 Totals
2 8
Total
34
353
7
2 9
Total 557
4 4 88
2 Total
672 773
4
2 Total 7 647
69
2 2 Total 457 693
69
2 3
Total
6 2 4
85
2 4 Total 7 2 269 58
Total
5 54 554 79
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 118/149
APPENDIX E
WATER
QUALITY
2 8
Black
Cloud
Surface
and Ground Water Monitoring Results
SAMPLE
LOCATION
DATE
Method
Detect
Limit
MW
9 29 2 8
MW
7 2 8
MW 2
9
29 2 8
MW 2
7
2 8
MW 3
9
29
2 8
MW
3
7
2 8
MW
4
9 29 2 8
MW 4
7 2 8
PARAMETER
Cadmium
D
mg
9
6
2
44
43
7
9
Copper
D
mg
5
9 22 8 32
33
32
4
Lead D
2
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 119/149
mg
Manganese
D
mg
5
27 55 384
376 3
95
2 58
23
Mercury
D
mg
2
2 2
2
2 2 2 2 2
Zinc
D
mg
2
72 76
48
39
55
37
374
363
Cyanide
T
mg
5
5 5
5
5
5
5
5
5
Total Disso lved Soli ds mg
2 2
6 55
4 37 43
43
Alkalinity
T
mg
2
98
7
74
24 4
9
9
Hardness
mg
4
4 6
4 3
9 4
n a 32 328
Sulfate mg
2
37 33
88
89
22 23
Nitrogen Ammonia
mg
5
4
5 54 35
2
44
7
5
Nitrate Nitrite as N mg
2
5
4
36
53
29
4
5 63
Field Parameters
9
29 2 8 7 2 8 9 29 2 8
7
2 8 9
29
2 8
7 2 8 9
29
2 8
7
2 8
Fie ld pH S
U
7 93 9
7
96
8 8
7
78
8
3
7 89 9 4
Field
Temperature C
6
69
7 67 6
99
6
94
Field
Conductivity mhos
75
2
82
5
478
499
689
786 387
428
Depth t o Wa te r Feet 7 8 7 9
5 8
5
55 3 9 4 5 2
2
4
D
Dissolved
T
Total
Laboratory
Qualifiers
B Analyte detected
at
value between MDL
and
PQL
U
Analyte concentration
less
than
MDL
H Analysis exceeded holding
time
Resurrection Mining Company
E
AdvancedEnvi ronmenta l Sciences
November
26
2 4
2 8
Black Cloud Surface and Ground Water Monitoring Results Cont
SAMPLE LOCATION
DATE
Method
Detect
Limi t
MW 6
9
28
2 8
MW
6
7
2 8
SW
5
9
28
2 8
SW
5
7
2 8
MW
5
9
28
2 8
MW 5
7 2 8
MW 5
Numeric
Limi t
PARAMETER
Dissolved Cadmium
mg
9
4
2
2
5
Disso lved Coppe r mg
5
4
5
7
2 32 5
5
Dissolved
Lead mg
2
3 5
5
2
2
6
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 120/149
Dissolved
Manganese
mg
5
26
4 33
486
3
4 4
Dissolved
Mercury mg
2
2
2
2
2 2
2
Dissolved
Zinc mg
2
38
3
235
355
47
33
5
Total Cyanide mg
5
5 5
5
5 5
5
2
Total Dissolved Solid
mg
9 2
2
27
22
2
4
Total Alkalinity mg
2
97
99
Report
Hardness mg
74 72
62
22
73
7
Report
Sulfate
mg
7
7
7 2
6 6
3
Nitrogen Ammonia mg
5
2
5
27
5
52
5
Report
Nitrate
Nitrite as N
mg
2
5
96
5
32
5
43
Report
Field
Parameters
9
28
2 8
7
2 8
9 28
2 8
7 2 8 9
28
2 8
7
2 8
F ie ld pH S
U
8 58
4
8
35
8 8
8 6
3
Report
Field
Temperature
C
6 84 6 85
6 76
Report
Field
Conductivity
mhos
245 25 244
3 7
25
267
Report
Depth to Water
Feet
2
3 6
2 2 3
Report
D D is so lv ed
T Total
Laboratory Qualifiers
B
Analyte
detected
at
value
between
MDL
and
PQL
U
Analyte
concentration
less
than
MDL
H Analysis exceeded holding time
Resurrect ion
Mining Company
E
2
Advanced
Environmental
Sciences
November26
2 4
2 9
Black
Cloud
Surface and Ground Water
Monitoring
Results
SAMPLE
Method
LOCATION
Detect
MW
MW
MW MW MW MW
2
MW 2
MW
2
MW 2 MW 2
DATE Limit
3 6 2 9
4
22 2 9
7 5
2 9
2
2 9
8
2 9
3 6
2 9
4 22 2 9
7
5 2 9
2 2 9
8 2 9
PARAMETER
Cadmium D
mg
Varies
3 3
8
3
5
4
6
Copper
D
mg
Varies
3
28
5 5
5
3
2
2
5
5
Lead
D mg
Varies
6 7
6
4
4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 121/149
Manganese D
Varies
95
5 8
75
33
297
286
22 299
7
mg
Mercury
D
2
2 2
2 2
2 2
2
2
2 2
m
Zinc D mg
Varies
58
7
88
7
56
282
89 37
8
2
Cyanide T mg
Varies
5
5
3
3
3
5
2
3
3 3
Total Dissolved
Solids
m
2
3
64 57
48 6
33
Alkalinity T
mg
Varies 2
99 8 2 2
75
75 7 7
95
Hardness mg
6 6
85
469 43
335 473
258
Sulfate
mg
3
3
2 2 3 39 34 27 37
7
Nitrogen
Ammonia mg
Varies
5 5
5
5
5 3
5
2
29
5
Nitrate Nitrite as N
mg
2
25
25
7
24
95 92
48 5 7
Field Parameters
3 6 2 9 4 22 2 9
7
5
2 9
2
2 9
8
2 9
3 6
2 9 4
22
2 9 7
5 2 9
2
2 9
8
2 9
Field pH S U
8 33
7
48 7
79
8 48 8 4 8 49
7 56
7
24
8 28 8
3
Field Temperature
C 4
3 7
3 5 3
2
4
2
6 4
8
8
4
2 3 8
Field Conductivity
mhos
32
6
89
335
6 2
2 8
L 285
276 335 4 4
49
L
Depth to Water Feet 8 3
7 95
6
8 7 5 5 8
6 25
6
5
45
5 9
5 8
D Disso lved
T
Total
Laboratory
Qualifiers
B Analyte
detected
at value between MDL and PQL
U Analyte concentration less
than
MDL
H
Analysis exceeded holding time
Resurrection
Mining Company
E 3
Advanced Envi ronmenta lSciences
November
26 2 4
2 9
Black
Cloud Surface
and Ground Water Monitoring Results
Cont
SAMPLE
Method
LOCATION
Detect
MW 3
MW 3
MW 3 MW 3
MW
3
MW 4
MW4
MW 4
MW
4
MW 4
DATE
Limi t
3 6 2 9
4 22 2 9
7
5 2 9
2 2 9
8 2 9
3 6 2 9 4 22 2 9
7 5 2 9
2
2 9
8
2 9
PARAMETER
Cadmium
D
mg
Varies
43
45
43
3
39
8
4
9
2
5
Copper
D mg
Varies
2
2
3
5
34
3
8
9
5
36
Varies 2
3
2
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 122/149
Lead
D
mg
2
3
Manganese D
mg
Varies
72
9
3
88 4
53 4 22
4 46
2 5
32
54
5
4
Mercury
D mg
2
2
2
2
2
2
2
2
2
2
2
Zinc
D mg
Varies
7
25
8
22
3 5
254
35
28
278
Cyanide T mg
Varies
5
5 4
5
6
5
2
3
3
3
Total Dissolved
Solids
mg
36
38
44
2
23
45
37
38
39
39
Alkalinity T
mg
Varies
7
63
7
72
83 87
93 94
93
94
Hardness
mg
92
983
95
9
876 332
293
288
296
3 2
Sul fa te mg
88 89 93
78 79
25 2
9
2 22
Nitrogen
Ammonia mg
Varies
2
5 2 22
2
7
2 7
3
5
5
5
5
Nitrate Nitrite as N
mg
2
9
4
3
2
3
8
8
54
55
6
Field Parameters
3 6 2 9
4 22 2 9
7 5
2 9
2 2 9
8
2 9
3
6
2 9
4
22 2 9
7 5
2 9
2
2 9
8 2 9
Field
pH S
U
7
96
7 28 7 76 7 28
8 7
8
3
7
62
7
74
7
9
8
6
Field
Temperature
C 6 7
7 2 7 2
7 2
4
4 4
6
6
7
4 7
6
Field
Conductivity
mhos
37 4
686
4
47 L
24
234 3
342
569 L
Depth to Water
Feet
4 55 4 5
3
65
4
5
4 4
4
2
3
9
3
35
3 65
D Dissolved
T
Total
Laboratory Qualifiers
B Analyte
detected
at value between MDL and PQL
U Ana ly te concentration
less than MDL
H Ana ly sis
exceeded
holding
time
Resurrection
Mining Company
E 4
Advanced Environmental
Sciences
Novembe r 2 6 2 4
2 9
Black
Cloud Surface
and Ground Water Monitoring Results
Cont
SAMPLE
Method
LOCATION
Detect
MW
6 MW 6 MW 6
MW 6
MW
6 SW
5
SW 5
SW
5
SW
5 SW 5
DATE
L imi t
3 6 2 9 4 22 2 9
7
5
2 9
2
2 9
8
2 9
3
6
2 9
4
22 2 9
7 5
2 9
2 2 9
8 2 9
PARAMETER
Cadmium D
m
I
Varies
3
29 7
7
Copper D mg l
Varies
7
5
2
5 5
3
29
6 5 5
Varies 5
5
7
5
2 8
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 123/149
Lead
D mg
6
4
Manganese D
Varies
27
2 8
5
2
43 365
24
9
mg
Mercury D mg
2 2
2
2
2
2 2
2
2
2
2
Zinc D mg
Varies
27 37
37
3
23 37
754 37
7
2 4
Cyanide
T
mg
Varies
5
2
4
3
3 5
2
3
3
3
Total Dissolved
Solid s mg
9 2 9
7 9 3
25
2
9
Alkalinity
T
m
Varies
8
2
9
77
98 3
Hardness
mg
66 69 63
59 67
24
94
98
45 67
Sulfate mg
6
8 7
6
5 4
3
4
7
Nitrogen
Ammonia
mg
MDL
diff
based
Varies 5
5
5
5
5 5
5 5
5
5
on lab
dilution
Nitrate
Nitrite
as N
2
84
8
87 47
4 2
25
33
mg
Field Parameters
3 6 2 9
4
22
2 9
7
5 2 9
2
2 9
8
2 9 3 6 2 9
4 22 2 9 7
5 2 9
2 2 9
8 2 9
Field
pH
S U 8
46
8 24
78
28
7
24
8 57 8 42
8
8 23
8 3
8
5
Field
Temperature
C
7
6 2 6 9
4 7
5
4
9 2
6 2 7
9
Field Conductivity
mhos
65 3 85 6
7 3 24
3 9
L
49
6
8
7 32 2
256
3 8 L
Depth
to
Water
Feet 22 5
22 3 2
5 23
2
5
N
A
N
A
N
A
N
A
N
A
D D is so lv ed
T Total
Laboratory Qualifiers
B Analyte detected at
value
between MDL and
PQL
U
Analyte
concentration
less
than MDL
H
Analysis
exceeded
holding
time
Resurrection Mining Company
E
5
Advanced Environmental
Sciences
November
26
2 4
2 9
Black Cloud Surface and Ground Water
Monitoring
Results Cont
SAMPLE Method
MW 5
LOCATION
Detect
MW 5 MW 5 MW 5 MW 5 MW
5
Numeric
3
6 2 9 4
22
2 9
7
5 2 9
2
2 9
8
2 9
DATE L im it L im it
PARAMETER
Cadmium
D
Varies 2
2
3
2
5
m
Copper D mg
Varies
6 9 2
5
7
5
Lead D m
g
Varies 9
2
29
7
6
Manganese
D
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 124/149
Varies
4
3
34
5
6
4
4
mg
Mercury
D
m
2
2 2 2
2
2
Zinc D m g
Varies
42
4 45
4
46
5
Cyanide T mg
Varies
5
2
3
3
3
2
Total Dissolved
Solids
m
9 9 22 9
9
4
Alkalinity T
Varies
8
6
9
2
Report
m
H ardness mg
63
68
78
64
68
Report
Sulfa te mg
5 6 7 7
6
3
Nitrogen
Ammonia m
Varies 5
5 5
5
5 Report
Nitrate
Nitrite as N
2 64 55
25
34 4
Report
mg
Field Parameters 3 6 2 9 4 22 2 9 7 5 2 9 2 2 9
8 2 9
F ie ld pH S U 8 43 8
7
8 3 8
8
8 42
Report
Field
Temperature
UC 3
2
4 7
6
5 7 4 2 Report
Field
Conductivity
mhos
2 8
59 3
3 4 237 326
L
Report
Depth
to
Water Feet 3
2
2 5
7
2 4
2
6
Report
D Dissolved
T
Total
Laboratory Qualifiers
B Ana ly te
detected at
value
between
MDL
and
PQ L
U Ana ly te
concentration
less
than
MDL
H Analysis
exceeded
holding time
Resurrection Mining Company
E 6
Advanced Environmental Sciences
November 26
2 4
2
Black
Cloud Surface and
Ground Water
Monitoring
Results
SAMPLE LOCATION
DATE
Method
Detect
Limi t
MW
2
2
MW
4 27 2
MW
7 27 2
MW
2
2
MW 2
2
2
MW 2
4
27
2
MW 2
7 27 2
MW 2
2 2
PARAMETER
Dissolved Cadmium
mg
6
5
6
2
2
5
3
Dissolved Copper m g
5 8 5
2
5 8
22
2
5
2
6
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 125/149
Dissolved
Lead mg
Dissolved
Manganese
mg
5 5
4 276
432 7 8
365
36
Dissolved Mercury
mg
2
2
2
2
2
2 2 2
2
Dissolved Zinc mg
2 45 4
57
42
6 23
47
6
Total
Cyanide mg
3
3
3
3 3
3 3
3
3
Total Dissolved Solid
mg
2
77
84
4 45
Total Alkalinity
mg
2
94
87 96
73
7
78
83
Hardness
mg
4
98 8 636
636 293 33
Sulfate
mg
2 2
3
3 48 5
9
26
Nitrogen Ammonia
mg
5
5
5
5
5 23
8
2
24
Nitrate
Nitrite
as N
mg
2
26
23 3
7
53
55
48
4
Field
Parameters
2
2 4
27
2
7 27 2
2
2
2
2 4
27
2 7
27
2
2
2
F ie ld pH
S
U 7 4
7
74
7 52
7 55 7 8 7 64
7
66
7 73
Field Temperature C
7 4 7 8
4
3
7
2
2 2 2 2
5
Field
Conductivity
mhos
228
73
66
9
278
873 374
792
Depth to Water
Feet
8 6
8
7 3
7
75
7
25
7
25
6
6 2
D D is so lv ed
T
Total
Laboratory Qualifiers
B Analyte
detected
at value
between
MDL and PQL
U
Analyte
concentration
less
than
MDL
H Analysis exceeded holding time
Resurrection
Mining
Company
E 7
Advanced
Environmental Sciences
November
26 2 4
2
Black
Cloud Surface
and Ground Water
Monitoring
Results
Cont
SAMPLE LOCATION
DATE
Method
Detect
Limi t
MW 3
2 2
MW
3
4
27 2
MW 3
7
27
MW 3
2
2
MW 4
2 2
MW 4
4 27
2
MW 4
7
27
2
MW 4
2
2
PARAMETER
Disso lved Cadmium mg
35
3
23 7
25 5
5
Dissolved
Copper
mg
5
7
2 2
5
7
5
Dissolved
Lead mg
2
2
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 126/149
Dissolved Manganese
mg
5
4 9 5 92
5
4
4
6
5
5
6
Dissolved Mercury mg
2 2
2
2 2
2 2 2
2
Dissolved Zinc mg
2
945 2
2
927
2 7
573
29
278
Total
Cyanide mg
3
3
5 3
3 3
3 3
3
Tota l D isso lved So lid
mg
23
6 33
9
3
39
4 39
Total Alkalinity
mg
2
65
87
85 85
98 78
9 97
Hardness
mg
884
853
9 5 8 2
234
3
274
292
Sulfa te mg
82
73
78
7
4
9 7
2
Nitrogen Ammonia
mg
5
2
4
8
53
5
5
5
5
Nitrate
Nitrite as
N mg
2
2
4
2
2
58 87
5
5
Field Parameters
2 2 4
27
2
7 27
2
2
2
2
4 27 2
7 27
2
2
2
Field
pH
S U
7 4
7
33
7 55 7 52
7
42 7
45
7
76
7 72
Field
Temperature C
7 8
2
3 3
7
6 8
9 9 9 4
9 3
Field Conductivity mhos
476
2
3 7
7 4
449 46
429
749
Depth to Water
Feet 5
5
4 35 4
4 4
4
6
55
3
3
5 6
D Disso lved
T
Total
Laboratory Qualifiers
B Analyte detected at
value between
MDL and
PQL
U Ana ly te
concentration
less
than
MDL
H Analysis exceeded holding time
Resurrection Mining Company
Am
Advanced Environmental
Sciences
November
26
2 4
2
Black
Cloud Surface and
Ground Water
Monitoring
Results
Cont
SAMPLE LOCATION
DATE
Method
Detect
Limit
MW
6
2 2
MW
6
4 27
2
MW 6
7
27
MW 6
22 2
SW
5
2 2
SW
5
4 27
2
SW
5
7 27
2
SW
5
22 2
PARAMETER
Disso lved Cadm ium mg
2
2
28
5
7
Dissolved
Coppe r m g
5 5 5 5 5 27
Dissolved Lead mg
4
5
5
5
9
8
6
Dissolved
Manganese 5
7
7
5
5
7
395
44
25
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 127/149
mg
Dissolved
Mercury mg
2 2 2 2 2 2 2 2 2
Dissolved
Zinc mg
2 2 22 27 24 445 759
25
2
Total Cyanid e mg
3
3
3
3
3
3
3
3
3
Tota l D isso lved So lid
mg
2 9
22 8
59
28 3 4
Total Alkalinity mg
2 2 8 6 8 96
9
Hardness
mg
6 68 7 62
439
223 7
43
Sulfa te mg
9 6
7
6
35
3 3 5
Nitrogen Ammonia
mg
5 5 5 5 5 5 5 5 5
Nitrate Nitrite as N
mg
2 82
93
89
8 6
39
9
26
Field
Parameters 2
2
4 27
2
7 27 22 2 2 2
4 27 2
7 27
2
22
2
Field pH S
U
7
95
8 2 8 2 8 2 7
76
8 5 8 47 8
54
Field
Temperature
C
6 9 9 6
7
9 4
7
5
8
9
2 8
6 4 3
Field
Conductivity
mhos
3 3
266
285 458 747
372
2 286
Dep th to Wa te r
Feet 24
5
22 4
22
8
23
6 N
A
N A
N
A N A
D Disso lved
T
Total
Laboratory
Qualifiers
B
Analyte
detected
at value
between
MDL and
PQL
U
Analyte concentration less
than
MDL
H Analysis exceeded holding
time
Resurrection
Mining
Company
E
9 Advanced EnvironmentalSciences
November 26 2 4
2
Black
Cloud
Surface and Ground Water Monitoring Results Cont
SAMPLE LOCATION
DATE
Method
Detect
Limi t
MW 5
2 2
MW 5
4
27
2
MW
5
7 27 2
MW 5
2
2
MW
5
Numeric
Limi t
PARAMETER
Dissolved Cadmium
mg
2
2
2
2
5
Dissolved Copper
mg
5 5
5
5
5
5
Dissolved
Lead mg
3
2
2
3
6
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 128/149
Dissolved Manganese
mg
5
5 5
5
7
4 4
Dissolved Mercury mg
2 2
2
2
2
Dissolved Zinc mg
2
3
36
35
35
5
Total Cyanide
mg
3
3
3
3
3
2
Tota l D issolved So lid
mg
2
22
26
9
4
Total
Alkalinity
mg
2
3
2 3
4
Report
Hardness mg
69
92
9 74
Report
Sulfate
mg
6
6 8
6
3
Nitrogen
Ammonia mg
5
5
5
5
5
Repor t
Nitrate
Nitrite
as N mg
2
29
2
3
8
Repor t
Field Parameters
2 2
4 27
2
7
27
2
2
2
Field
pH S
U
7
78 7
97
8 65
8 27
Repor t
Field
Temperature
C
8 8
7
6
3
Report
Field Conductivity mhos
327
3 4
33
335
Report
Depth to
Water
Feet
4
55
2 85 2
8 3
Report
D Visso lved
T T otal
Laboratory
Qualifiers
B Analyte
detected
at value
between
MDL and PQL
U Analyte
concentration less
than
MDL
H Analysis exceeded
holding
time
Resurrection Mining
Company
E
Advanced
Environmental
Sciences
November
26 2 4
2
Black Cloud Surface and Ground
Water
Monitoring Results
SAMPLE LOCATION
Method
Detection
Limit
MW
MW
MW
MW MW
DATE
2
6 2
4 2 2 7
2
2
8 28 2
24
2
PARAMETER
UNITS
Conc
Conc
Conc
Conc
Conc
Cadmium D
mg L
3
5
2
6
Copper D
mg
L
5
7
3
7
Lead
D
mg
L
3
Manganese
D
mg
L
5
56
5
3
6
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 129/149
Mercury D
mg L
2
2
2
2
2
Zinc D
mg
L
2
4 42 42
42
Cyanide T
mg L
3
3
3 H
3
3
Hardness
as
CaCO3
mg
L
7
8 2
Nitrate Nitrite as N
mg L
2
24 9
9
2
Nitrogen ammonia
mg
L
5
5
5 5
5
TDS
mg L
4
2
9
3
Sulfate
mg
L
2
2
3
Total Alkalinity
mg L
2
4
2
53
92
Field Parameters
Units
2
6 2
4
2 2
7 2 2
8 28 2 24 2
H
st d units
8
5
8 9
7
43
7 43
7 7
Temperature
C
7
4
7 6
7
6
8 2
Conductivity
umhos cm
264
98 9
4 9 4
2
De
th to Water
Feet
7 98
7
5
6
45
7
7 35
D Dissolved
T
Total
Laboratory
Qualifiers
B
Analyte
detected
at
value
between
MDL
and
PQL
U
Analyte
concentration less
than
MDL
H Analysis
exceeded
holding time
Resurrection Mining Company
E
Advanced Environmental Sciences
November
26
2 4
2
Black Cloud Surface and Ground
Water
Monitoring Results Cont
SAMPLE LOCAT ION
Method
Detection
Limi t
MW 2 MW 2 MW 2
MW 2 MW 2
DATE
2
6 2
4
2 2
7 2 2 8 28 2 24 2
PARAMETER
UNITS
Conc Conc
Conc Conc
Conc
Cadmium D
mg L
2
8
Copper
D
mg L
5
9
8 2
Lead
D
mg
L
Manganese
D
mg
L
5
375
64
8
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 130/149
Mercury
D
mg
L
2
2
2 2
2
Zinc D
mg L
2
42
46
73
5
Cyanide
T
mg L
3
3
3
H
3 3
Hardness
as
CaCO3
mg L
37
53
332
5 6
Nitrate Nitr ite as N
mg
L
2
68
57
4
46
Ni trogen ammonia
mg L
5
5
5 5
22
TDS
mg
L
3
8
54
73
Sulfate
mg
L
33
6 28
45
Total Alkalinity
mg
L
2
98
94 75 76
Field
Parameters
Units
2
6 2
4
2 2 7
2 2
8
28 2
24 2
H
std units
8
8
5
7
58
7
58
7
69
Tem
erature
C
2
6 6
4
3 4 3
2
Conductivity
umhos cm
346
234
697
697
69
Depth
to
Water Feet
6 7
6 5 35
3 55
4
D Dissolved
T
Total
Laboratory Qualifiers
B
Analyte
detected at value between
MDL
and
PQL
U Analyte
concentration
less
than
MDL
H Analysis exceeded
holding
time
Resurrection
Mining
Company
E 2
Advanced Environmental Sciences
November
26 2 4
2
Black Cloud Surface
and Ground Water
Monitoring Results Cont
SAMPLE LOCATION
Method
Detection
Limit
MW 3 MW 3
MW 3
MW
3
MW 3
DATE
2 6 2 4 2 2
7
2
2
8 28 2 24 2
PARAMETER
UNITS Cone Conc Conc
Conc Conc
Cadmium
D
mg L
2 2
26
2
Copper D
mg
L
5
3
27
5
5
Lead D
mg
L
2
Manganese
D
mg
L
5
3
8
3
58
4
63
3
8
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 131/149
Mercury D
mg
L
2
2 2
2
2
Zinc
D
mg
L
2
9 4 96
855
7 8
Cyanide T
mg
L
3
3
3
H
3
3
Hardness
as
CaCO3
mg
L
8 9
787 895
833
Nitrate Nitrite as
N
mg L
2
2
7
2
2
Nitrogen ammonia
mg L
5
74
52
97
2 7
TDS
mg L
3 7 32
4
Sulfate
mg L
66 67
8
74
Total Alkalinity
mg
L
2
74
72 66 79
Fie ld Parameters
Units
2
6
2 4 2
2 7
2 2 8 28 2
24
2
H
std units
7 79 7 8
7 49
7
49
7
45
Tem
erature C
4 2
7
8
6 7
6 7 8
8
Conductivity
umhos cm
747 269
5
5
29
Depth
to
Water
Feet
4 7 4
5 3
4
3 55 4
D
Dissolved
T Total
Laboratory Qualifiers
B
Analyte
detected at
value between
MDL
and
PQL
U Ana ly te concentration less
than
MDL
H Analysis exceeded holding time
Resurrection
Mining
Company
E
3
Advanced Environmental Sciences
November
26 2 4
2
Black
Cloud Surface and
Ground Water
Monitoring Results Cont
SAMPLE LOCATION
Method
Detection
Limi t
MW
4
MW 4 MW 4 MW 4 MW 4
DATE
2 6 2 4 2 2
7
2 2 8 28 2 24 2
PARAMETER
UNITS Conc Conc Conc Conc Conc
Cadm ium D
mg
L
2
2
22
8
Copper D
mg L
5
7 8 8
Lead D
mg
L
Manganese
D
mg
L
5
56
6
5
5
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 132/149
Mercury D
mg
L
2
2
2
2
2
Zinc D
mg
L
2
242 227 5 2 3 4
Cyanide T
mg L
3
3 3
H
3 3
Hardness as CaCO3
mg L
278 247 22 333
Nitrate Nitrite
as N
mg L
2
6
63
48
56
Nitrogen ammonia
mg
L
5
5
5 5 5
TDS
mg
L
32 3
35
43
Sulfate
mg
L
62
5 4 23
Total Alkalinity
mg
L
2
94
9
83
88
Field Parameters
Units 2
6
2 4 2 2
7
2 2
8 28 2 24
2
H
st d
units
7
84
7
9
7 6
7
59
7
53
Tem
erature C
3
4
9 6
4
4
9 2
Conductivity
umhos cm
67 429
447
594 588
Depth
to
Water Feet
85 6
5
2
3
85
D Dissolved
T
Total
Laboratory Qualifiers
B
Analyte
detected at
value
between
MDL
and
PQL
U Ana ly te concentration less than MDL
H
Analysis
exceeded holding time
Resurrect ion
Mining
Company
E
4
Advanced Environmental
Sciences
November
26
2 4
2
Black Cloud Surface and Ground Water Monitoring Results Cont
SAMPLE LOCATION
Method
Detection
Limit
MW 5 MW 5
MW
5
MW 5 MW 5
DATE
2 6 2
4 2 2 7
2 2
8
28 2
24
2
PARAMETER
UNITS
Conc
Conc Conc
Conc Conc
Cadmium
D
mg L
2
2
2
2
Copper D
mg L
5
5
4
8
Lead D
mg
L
3
2
Manganese
D
mg
L
5
27
6
5
5
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 133/149
Mercury D
mg
L
2
2
2 2
2
Zinc D
mg
L
2
33
45 35
33
Cyanide T
mg L
3
3
3
H
3
3
Hardness
as
CaCO3
mg L
72
2 3 92
86
Nitrate Nitrite
as
N
mg
L
2
37
8
7
23
Nitrogen ammonia
mg L
5
5
5
5
5
TDS
mg L
8
25
26
22
Sulfate
mg
L
59 9
7
7
Total
Alkalinity
mg
L
2
6
3
9
3
Field
Parameters Units
2 6 2
4
2 2 7
2 2
8 28 2
24
2
H
st d
units
8 26 4
3 4
7
95
8
Tem erature
C
4
6
8
2
8
2 4
3
Conductivity
umhos cm
457
372 866
34
337
Depth to Water
Feet
4
6
3 5
65 2
5
2 4
D Dissolved
T Total
Laboratory
Qualifiers
B
Analyte
detected at
value
between
MDL
and
PQL
U
Analyte concentration
less
than MDL
H Analysis exceeded holding time
Resurrection
Mining Company
E
5
Advanced Envi ronmental Sciences
November 2 6 2 4
2
Black Cloud Surface and Ground Water Monitoring Results Cont
SAMPLE LOCATION
Method
Detection
Limi t
MW
6
MW 6
MW
6
MW 6
DATE
2 6
2 4
2 2
8
28 2
24 2
PARAMETER
UNITS Conc
Conc
Conc Conc
Cadmium D
mg L
Copper D
mg
L
5
5 5
5
5
Lead D
mg L
4
5 4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 134/149
Manganese
D
mg L
5
35 7
9
5
Mercury
D
mg
L
2
2
2
2
2
Zinc
D
mg L
2
27
22 3
2
Cyanide T
mg L
3
3
3
3 3
Hardness as CaCO3
mg L
65
67 69
68
Nitrate Nitrite as N
mg
L
2
76
85
83
85
Nitrogen
ammonia
mg L
5
5
5
5
5
TDS
mg
L
2 9
2 2
Sulfate
mg
L
56 6
6 6
Total Alkalinity
mg
L
2
4
3 3
Field
Parameters
Units
2 6 2
4 2 2 8 28 2
24
2
H
st d
units
8 3
8
25 8
6
8
5
Tem era tu re
C
5 5
8 8 2
4
7
Conductivi
umhos cm
4 3
328 3 3
Depth to Water
Feet
4
7
8
23 8 5
D
Dissolved
T Total
Laboratory Qualifiers
B Analyte detected
at
value between MDL
and
PQL
U Analy te concentration less
than
MDL
H Analysis
exceeded
holding time
Resurrection
Mining Company
E
6
Advanced Environmental Sciences
November26 2 4
2 Black
Cloud Surface
and Ground
Water
Monitoring
Results Cont
SAMPLE
LOCATION
Method
Detection
Limi t
SW 5
SW
5 SW 5 SW 5
SW 5
DATE 2
6
2
4
2
2 7
2
2 8
28 2 24
2
PARAMETER
UNITS Conc Conc Conc
Conc
Conc
Cadmium D
mg L
8
9 6
5
Copper D
mg
L
5
4 9
Lead D
mg
L
4
2
5
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 135/149
Manganese
D
mg L
5
99 2 8
653
Mercury
D
mg L
2
2
2
2
2
Zinc
D
mg
L
2
2 8 58
4 492
Cyanide
T
mg
L
3
3 3 H 3
3
Hardness as CaCO3
mg L
77
226
89
9
Nitrate
Nitrite as
N
mg
L
2
34
37 6
27
Nitrogen
ammonia
mg L
5
5
5 5
5
TDS
mg
L
24
28 23
Sulfate
mg
L
9
2 2
Total
Alkalinity
mg L
2
94
97
69
99
Field
Parameters
Units 2
6
2 4
2 2
7
2 2
8
28 2
24 2
H std units
8 26
8
33
8
45
8 33 8 34
Temperature
C
4 6 9 7 2
8
4 4
6 9
Conductivity
umhos cm
457 385
7 6
242
272
Depth to Water
Feet
NA
NA
NA
NA
NA
D
Dissolved
T Total
Laboratory Qualifiers
B Analyte detected
at
value between
MDL and
PQL
U
Analyte concentration less than
MDL
H Analysis
exceeded
holding t ime
Resurrection
Mining
Company
E 7
Advanced
Environmental Sciences
November
26
2 4
2 2
Black Cloud Surface and Ground Water Monitoring Results
SAMPLE LOCAT ION
Method
Detection
Limi t
MW
MW MW
MW
DATE
8
2 2 4 23 2 2
7 8 2 2 5 2 2
PARAMETER
UNITS
Cone
La b Qual Cone La b
Qual
Cone
Lab Qua l Cone La b Qual
C adm ium D
mg
L
6
5
7
7
Copper D
mg L
5
6
B
3
B
B
9 B
Lead
D
mg
L
U
U
U U
Manganese
D
L
5
5 U
27
B
5
U
5
U
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 136/149
mg
Mercury D
mg
L
2
2 U
2
U
2
U
2 U
Zinc
D
mg
L
2
39
44
52
47
Cyanide T
mg L
3
3
U
3
U
3
U
3
U
Hardness
as CaCO3
mg L
5
4
8
23
Nitrate Nitrite
as
N
mg
L
2
33
2
6
35
Nitrogen
ammonia
mg
L
5
5
U
5
U
5
U
5 U
TDS
mg L
H
2
4
Sulfate
mg
L
3
B
2
B
2 B
3 B
Total
Alkalinity
mg
L
2
98
94
9
94
Field
Parameters
Units
8
2 2
4
23
2 2 7
8
2 2
5 2 2
H
st d units 7
75
7
95 7 42
7 7
Temperature
C
6
7 2
3
9
Conductivity
umhos
cm
2 6
2 2
75 3 4
Depth to Water
Feet
7
4
7
6 9 7
3
D D is so lv ed
T Total
Laboratory
Qualifiers
B Analyte
detected
at value between MDL and PQL
U
Analyte
concentration
less
than
MDL
H Analysis
exceeded
holding
time
Resurrection
Mining
Company
E
8
Advanced Envi ronmental Sciences
November
26 2 4
2 2
Black
Cloud Surface
and Ground
Water
Monitoring Results Cont
SAMPLE LOCATION
Method
Detection
Limi t
MW 2
MW
2
MW 2 MW
2
DATE
8 2 2
4
23 2 2
7 8 2 2 5 2 2
PARAMETER
UNITS
Conc
Lab
Qual
Conc
Lab Qual Conc
La b
Qual Conc
La b
Qual
Cadmium D
mg
L
4
B
2 B
Copper
D
mg
L
5
B
8
B
Lead D
mg
L
U
U
Manganese
D
mg
L
5
85
22
Mercury D
mg L
2
2
U
2
B
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 137/149
FROZEN
FROZEN
Zinc D
mg L
2
7
53
Cyanide T
mg
L
3
3
U
3 U
Hardness as CaCO3
mg L
247
5
Nitrate
Nitrite as N
mg L
2
39
79
Nitrogen ammonia
mg L
5
5 B
5
U
TDS
mg L
39
2
Sulfate
mg L
2
7
Total
Alkalinity
mg
L
2
85
89
Field Parameters Units
8 2 2
4 23 2 2
7 8
2 2
5 2 2
H
std units
FROZEN
FROZEN
7
55
7 76
Tem
erature C
8
5
3
Conductivity
umhos cm
373
375
Depth
to Water
Feet
5 65
5 9
D Dissolved
T Total
Laboratory
Qualifiers
B
Analyte
detected
at
value
between
MDL
and
PQL
U Ana lyte concentration less than MDL
H Ana ly sis
exceeded holding
time
Resurrection
Mining
Company
E 9
Advanced
Environmental
Sciences
Novembe r 2 6 2 4
2 2
Black
Cloud Surface and
Ground Water Monitoring Results
Cont
SAMPLE LOCATION
Method
Detection
Limi t
MW 3 MW 3
MW 3 MW 3
DATE
8 2 2
4
23 2 2
7 8
2 2
5
2 2
PARAMETER UNITS
Conc
La b
Qual Conc
La b Qual Conc
Lab
Qual
Conc Lab
Qual
Cadm ium D
mg L
9
2
B 2
2
Copper
D
mg
L
5
5 U 5
U
5
U
5
U
Lead
D
mg L
2
B
U
2 B
B
Manganese D
mg
L
5
2
4
2
5
2
93
4
mg L
2
2
U 2
U
2
U
2 U
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 138/149
Mercury
D
Zinc D
mg
L
2
2
2 37
87
25
Cya nid e T
mg L
3
3
U
3
U
3
U
3 U
Hardness
as
CaCO3
mg L
859
852
887
866
Nitrate Nitrite
as
N
mg L
2
3 B
5
B
2
U
2
U
Nitrogen ammonia
mg L
5
2
42
48
64
TDS
mg
L
3 H
2
25
23
Sulfate
mg
L
76
76 75
76
Total
Alkalinity
mg L
2
8
8
8
78
Field Parameters Units 8 2 2 4
23
2 2
7 8 2 2
5 2 2
H
st d units 7 58
7 48
7
33 7 56
Tem erature
C
6 9
7 4
2
2
Conductivity
umhos cm 429 47
64
775
Depth
to Water
Feet
4 3 4 3
4
25
4
6
D Disso lved
T Total
Laboratory Qualifiers
B
Analyte
detected
at
value between
MDL
and
PQ L
U Analyte
concentration
less
than
MDL
H
Analysis
exceeded holding time
Resurrect ion
Mining Company
E 2
Advanced Environmental Sciences
Novembe r 2 6 2 4
2 2
Black
Cloud Surface and
Ground
Water
Monitoring
Results
Cont
SAMPLE LOCAT ION
Method
Detection
Limit
MW 4
MW
4 MW 4 MW 4
DATE
8 2 2
4
23
2 2 7 8 2 2 5 2 2
PARAMETER UNITS Conc L ab Q ua l Conc
La b
Qual
Conc La b Qual Conc La b Qual
Cadmium D
mg L
2
2
Copper
D
mg L
5
7
B
7 B 4
B
9
B
Lead D
mg L
U
U
U
U
Manganese
D
mg
L
5
5
U
5
U
5
U
5
U
Mercury D
mg
L
2
2
U 2
U
2
U
2 U
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 139/149
Zinc
D
mg
L
2
233
248
2 5
96
Cyanide T
mg L
3
3 U 3
U
3
U
3
U
Hardness as
CaCO3
mg
L
245
252
24
245
Nitrate
Nitrite
as N
mg
L
2
54
56
42
6
Nitrogen ammonia
mg L
5
5
U
5
U
5
U
5 U
TDS
mg
L
28 H
34 33
33
Sulfate
mg
L
5
7 5
4
Total Alkalinity
mg L
2
97
94
9
97
Fie ld Parameters
Units 8 2 2 4 23
2 2 7 8 2 2
5 2 2
pH
std units
7 8
7 75 7
49
7 66
Temperature
C 3
3 4 9
9
6
Conductivity
umhos
cm
494 47
366 6 2
Depth
to Water
Feet
4 6
4 75 3
95
6
4
D Dissolved
T Total
Laboratory Qualifiers
B
Analyte detected
at value between MDL and PQL
U Analyte concentration less than MDL
H Analysis
exceeded
holding t ime
Resurrection Mining Company
E 2 Advanced Envi ronmenta l Sciences
Novembe r 2 6 2 4
2 2
Black
Cloud
Surface and Ground Water Monitoring
Results
Cont
SAMPLE LOCATION
Method
Detection
Limi t
MW
5
Numeric
Protection
Limits
MW
5
MW
5
MW
5
MW
5
DATE
8 2 2
4 23
2 2 7
8
2 2
5 2 2
PARAMETER
UNITS
Cone
La b
Qual
Cone
Lab
Qual
Cone
Lab
Qual Cone
Lab
Qual
Cadmium D
m
5 2 B 2
B 2 B 2
B
Copper D
mg L
5
5
B
3
5
5
U
5
U
Lead D
m
6
3
B
2
B
B 2
B
Manganese
D
mg
L
5
4
4 7
B
5
U 5
U 5
U
Mercury
D
mg L
2
2
U
2
U
2 U
2
U
Zinc D
mg L
2 5
35 46
38
4
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 140/149
Cyanide
T
mg
L
3 2
3
U
3 U
3
U
3
U
Hardness
as
CaCO3
mg L
Report
85
8 75
79
Nitrate Nitrite
as N
mg L
2
Report
4
8
6
9
Nitrogen
ammonia
mg
L
5
Report 5 U
5
U
5
U
5
U
TDS
m 4
2
H 2
2 22
Sulfate
m
3 7
6
7
7
Total Alkalinity mg
L
2
Report
2
9 8
2
Field
Parameters
Units
8 2 2
4
23
2 2 7 8 2 2
5 2 2
H
std units
Report 8
8
8
7
89
8 2
Temperature
C
Report
8
9 6 4 3
8 3
Conductivity
umhos cm
l Report
364 354
28
44
Depth to Water
Feet
Report
2 93
2 5 2 55
2 75
D
Dissolved
T Total
Laboratory
Qualifiers
B
Analyte
detected
at
value between
MDL
and
PQL
U Ana ly te concentration
less
than
MDL
H
Analysis
exceeded
holding
time
Resurrection
Mining
Company
E 22
Advanced Environmental
Sciences
Novembe r 2 6 2 4
2 2
Black Cloud Surface and Ground
Water Monitoring Results
Cont
SAMPLE LOCATION
Method
Detection
Limi t
MW
6
MW 6
MW
6 MW 6
DATE
8 2 2 4 23 2 2
7 8 2 2
5
2 2
PARAMETER
UNITS
Cone Lab Qua l Conc
La b
Qual
Conc
Lab Qua l
Cone
Lab Qua l
Cadmium D
mg
L
U
B
I
U
U
Copper D
mg L
5
5 U
33
9
B
5
U
Lead
D
mg
L
6
7
3
B
3
B
Manganese
D
mg
L
5
B
5
U
5
U
6
B
Mercury D
mg L
2
2
U
2
U
2
U
2 U
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 141/149
Zinc D
mg
L
2
23
37
2
22
Cyanide T
mg
L
3
3 U
3
U
3
U
3 U
Hardness
as
CaCO3
mg L
64
6
6
65
Nitrate Nitrite as N
mg L
2
74
93
85
89
Nitrogen
ammonia
mg
L
5
5
U 5
U
5
U
5
U
TDS
mg L
7 H
9 2
2
Sulfate
mg L
6
5
7
6
Total
Alkalinity
mg
L
2
6
8 3
23
Field Parameters Units
8 2 2 4 23 2 2
7
8 2 2 5 2 2
H
std units 8
24
8
9 8
27 8
35
Temperature
C
6
4
2 3 7 6
Conductivity
umhos cm
328
265 285 372
Depth to Water Feet
2 9 9
6
2 2
9
D Dissolved
T Total
Laboratory Qualifiers
B Analyte
detected
at
value
between MDL and PQL
U Analyte concentration
less
than MDL
H Analysis exceeded holding time
Resurrection
Mining Company
E
23
Advanced Envi ronmenta lSciences
November
26 2 4
2 2
Black
Cloud Surface
and Ground
Water
Monitoring Results Cont
SAMPLE
LOCATION
Method
Detection
Limit
SW
5
SW
5
SW
5
SW 5
DATE
8
2 2 4 23 2 2
7 8
2 2 5 2 2
PARAMETER
UNITS
Cone
La b Qual Cone La b
Qual Cone
Lab
Qual Cone
Lab Qual
C adm ium D
mg L
4
2 6
6
Copper D
mg
L
5
B
57 2
B
6 B
Lead
D
mg
L
3 B
22
5 B
3
B
Manganese
D
mg
L
5
497
22
5
74
Mercury D
mg L
2
2
U
2
U
2
U
2 U
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 142/149
Zinc D
mg L
2
4 2
325
3
46
Cyanide
T
mg L
3
3 U 3
U
3
U
3
U
Hardness as CaCO3
mg
L
335
29
22
4
Nitrate Nitrite
as
N
mg
L
2
48
26
23
45
Nitrogen
ammonia
mg
L
5
5 U 5
U
5
U
5
U
TDS
mg L
4
H
6 3
8
Sulfate
mg
L
22
5
B
4
B
5
B
Total
Alkalinity
mg
L
2
3
88 89
97
Field Parameters
Units
8 2 2 4
23
2 2 7 8 2 2 5 2 2
H
std units
8 5 8
26
8
36
8
47
Temperature C
7
3
5
Conductivity
umhos cm
64 263 2 6 327
Depth to
Water Feet
NA
NA
NA
NA
D
Dissolved
T Total
Laboratory Qualifiers
B Ana ly te
detected
at
value between
MDL and PQL
U
Analyte concentration
less
than
MDL
H Analysis
exceeded
holding
time
Resurrect ion
Mining Company
E 24
Advanced Environmental
Sciences
Novembe r 2 6 2 4
2 3
Black Cloud
Surface
and Ground Water Monitoring Results
SAMPLE LOCATION
Method
Detection
Limit
MW
MW
MW
MW
DATE
6 2 3
5 4 2 3
7
7
2 3
23 2 3
PARAMETER
UNITS
Cone
La b
Qual
Cone
Lab Qual
Cone Lab Qua l
Cone
La b
Qual
Cadmium
D
mg
L
6
5
6
5
Copper
D
mg
L
5
33
9
B
8
B
5
U
Lead D
mg L
B
U
U
U
Manganese
D
mg
L
5 5 B
5 U
6
B
34
U
Mercury D
mg
L
2
2 U
2 U
2
U
2 U
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 143/149
Zinc
D
mg L
2
5
4
47
49
Cyanide
T
mg
L
3
3
U 3
U
3
U
3
U
Hardness as CaCO3
mg L
6 2
92
7
Nitrate Nitrite
as
N
mg
L
2
29 7
6
28
Nitrogen
ammonia
mg L
5
5 U
5 U
5
U
5
U
TDS
mg L
2
2
Sulfate
mg L
3 3
B
2
B
2
B
Total
Alkalinity
mg
L
2
87 88 92
Field
Parameters
Units
6 2 3
5 4 2 3
7
7
2 3
23 2 3
H
st d units
7 94
7 86 7
58 7
67
Temperature C
9 9
9
6
7
Conductivity
umhos cm
362
94
22
26
Depth to Water
Feet
7 6
6 6
7 3
8
D
Dissolved
T Total
Laboratory Qualifiers
B Analyte
detected
at value between MDL and PQL
U
Analyte
concentration less than MDL
H Analysis exceeded
holding
time
Resurrection Mining Company
E 25
Advanced Envi ronmental Sciences
November 26 2 4
2 3
Black Cloud
Surface and
Ground
Water Monitoring Results Cont
SAMPLE
LOCATION
Method
Detection
Limi t
MW
2
MW 2
MW 2 MW 2
DATE
6 2 3
5 4 2 3 7
7
2 3
23 2 3
PARAMETER
UNITS
Cone
Lab Qual
Conc
Lab
Qual
Conc Lab Qual Conc
La b
Qual
Cadmium
D
mg L
U
FROZEN
6
2
B
Copper
D
mg L
5
48
7 B
5 U
Lead D
mg L
U
U
U
Manganese
D
mg
L
5
462
2
268
Mercury D
mg
L
2
2 U
2
U
2
U
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 144/149
Zinc
D
mg
L
2
54
26
43
Cyanide
T
mg
L
3
3 U
3
U
3 U
Hardness
as
CaCO3
mg
L
7
369
392
Nitrate Nitr ite as N
mg
L
2
8
34
45
Nitrogen
ammonia
mg
L
5
5 U
2
B
6 B
TDS
mg
L
23
48
46
Sulfate
mg
L
9
29
29
Total
Alkalinity
mg
L
2
78
8
Field
Parameters
Units 6 2 3
5
4
2 3
7 7 2 3 23 2 3
H
st d units 7 9
FROZEN
7 54
7
75
Temperature
C 9 9
2
9
9
Conductivity
umhos cm 362
725 793
Depth
to Water
Feet
6 9
6 3
5
7
D
Dissolved
T Total
Laboratory Qualifiers
B
Analyte
detected at value between MDL and PQL
U
Analyte concentration
less than
MDL
H
Analysis exceeded holding time
Resurrection Mining Company
E 26
Advanced Environmental
Sciences
November
26
2 4
2 3
Black Cloud Surface and Ground WaterMonitoring Results Cont
SAMPLE
LOCATION
MDL
MW 3
MDL
MW 3
MW 3
MDL
MW 3
DATE
6
2 3
5 4 2 3
7
7 2 3
23 2 3
PARAMETER
UNITS
Cone
Lab
Qual
Cone La b
Qual
Cone La b
Qual
Cone
La b
Qual
Cadmium D
mg
L
2
6
26 8
Copper D
mg L
5
5
U
5 6 B 5 U
2
5
U
Lead
D
mg L
2 B
U U
U
Manganese
D
mg
L
3 42
3
5 32
6
6
5 4
77
Mercury
D
mg L
2 2 U
2
2
U 2
U
2
2
U
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 145/149
Zinc D
mg L
5 65
3
3
89
Cyanide
T mg L
3
3
U 3
3 U
3 U 3 U
Hardness as CaCO3 mg L
833
642
829
2
8 8
Nitrate
Nitrite as N
mg
L
2
6 B
2 9 B
5 B
2
8 B
Nitrogen ammonia mg L
5 55 5 58 U
8 5
28
TDS
mg L
9
89 H
27
Sulfate
mg
L
75 54
75 72
Total
Alkalinity
mg L
2
8 2
4
Field
Parameters
Units 6
2 3
5 4 2 3
7 7
2 3
23
2 3
pH
st d
units
7 66 7 5
7 9
7
49
Temperature
C
8 9 5
4
8 7
Conductivity
umhos
cm
35
75
543
54
Depth to Wa te r Feet 5
4 5 4
4 7
D Disso lved
T Total
Laboratory
Qualifiers
B Analyte detected at value between
MDL and
PQL
U Ana ly te concentration less than MDL
H Analysis
exceeded
holding
time
Resurrection Mining
Company
E 27
Advanced Environmental
Sciences
November
26
2 4
2 3
Black
Cloud
Surface and
Ground
Water Monitoring Results
Cont
SAMPLE LOCATION
Method
Detection
Limi t
MW 4
MW
4 MW 4 MW 4
DATE
6 2 3
5
4 2 3 7 7 2 3 23 2 3
PARAMETER UNITS Conc
Lab Qual Conc La b
Qual
Conc La b
Qual
Conc Lab Qua l
Cadmium D
mg
L
3
2
2
Copper
D
mg
L
5
B
9 B
6 B
5 U
Lead D
mg L
B
U
U
U
Manganese D
mg L
5
5 U 5
U
5
U
5
U
Mercury D
mg
L
2
2
U
2
U 2
U
2 U
Zinc
D
mg
L
2
93
265
254
227
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 146/149
Cyanide
T
mg
L
3
3 U 3
U
3
U
3
U
Hardness
as
CaCO3
mg
L
238 222
93
257
Nitrate Nitri te as N
mg
L
2
54
73
35
45
Nitrogen
ammonia
mg
L
5
5
U
5
U
5
U
5
U
TDS
mg L
3
27
H
28
3
Sulfate
mg L
5 3
5
Total
Alkaline
mg
L
2
84
97
98
Field
Parameters Units 6 2 3
5 4 2 3 7
7 2 3
23
2 3
H
st d
units
7
76 7 77 7
6
7 8
Tem
erature
C
9 4 8 3
2
3
9
Conductive umhos cm
473 423
443
5 2
Depth
to Water
Feet
6 6
3 2 7 5 8
D D is so lv ed
T Total
Laboratory Qualifiers
B
Analyte
detected at
value
between
MDL
and
PQL
U
Analyte
concentration less than
MDL
H
Analysis
exceeded
holding t ime
Resurrect ion
Mining
Company
E
28
Advanced Environmental Sciences
November26 2 4
2 3
Black Cloud Surface and Ground
Water Monitoring
Results Cont
SAMPLE LOCATION
Method
Detection
Limit
MW 5
Numeric
Protection
Limits
MW 5 MW 5
MW
5
MW 5
DATE
6 2 3 5 4 2 3 7
7
2 3
23
2 3
PARAMETER UNITS
Conc Lab
Qual
Conc Lab
Qual
Conc La b
Qual
Conc
Lab
Qual
Cadmium D
mg L
5 2
B
3
B
3
B 2
B
Copper D
mg L
5
5
6 B B
5
U 5 U
Lead D
mg
L
6 2
B
2
B
B
U
Manganese
D
mg
L
5 4 4 5
U
5
U
2
B
6
B
Mercury
D
mg
L
2
2
U
2
U
2
U
2
U
Zinc D
m
2
5 44 54 4
4
Cyanide T
3
2 3
U 3
U
3
U 3
U
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 147/149
mg L
Hardness
as
CaCO3
mg
L
Report
95
2 3
92
2 4
Nitrate Nitri te as
N
mg
L
2
Re
or t 26
83
89
Nitrogen
ammonia
mg L
5
Report
5
U
5
U 5
U
5
U
TDS m 4
25 24 2
24
Sulfate m 3
9 7 8
9
Total Alkalinity
m 2 Report
4
23 8
Field
Parameters Units
6 2 3 5 4 2 3
7
7 2 3 23
2 3
H std
units
Report
8
7
88
7
78
7
93
Temperature C
Report
2 3 8
9
2 2
4
7
Conductivity
umhos cm Report
4 3
4 7
435
39
Depth to Water Feet
Report
3
7
5 2 3
3
3
D Disso lved
T Total
Laboratory
Qualifiers
B
Analyte
detected at
value
between
MDL
and
PQL
U Ana lyte concentration less than MDL
H
Analysis exceeded holding time
Resurrection
Mining
Company
E 29 Advanced Environmental
Sciences
Novembe r 2 6 2 4
2 3
Black
Cloud
Surface and
Ground Water Monitoring
Results
Cont
SAMPLE LOCATION Method
Detection
Limi t
MW 6
MW 6 MW 6 MW 6
DATE
6
2 3 5
4
2 3 7
7
2 3
23
2 3
PARAMETER
UNITS Conc Lab Qual
Conc
Lab Qual
Conc
La b Qual
Conc
Lab Qual
Cadmium
D
mg
L
U
U
U
U
Copper
D
mg
L
5
5
U
24
B
5
U
5
U
Lead D
mg L
5 B 3 B
3
B
2
B
Manganese
D
mg L
5
B
9
B
5
U
5 U
Mercury D
mg L
2
2
U
2
U
2
U
2
U
Zinc
D
mg L
2
22
37
24
8
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 148/149
Cyanide T
mg L
3
3
U
3
U
3
U
3
U
Hardness as
CaCO3
mg L
62
77
77
82
Nitrate
Nitrite
as N
mg
L
2
87 75
84
76
Nitrogen
ammonia
mg
L
5
5
U 5
U
5
U
5
U
TDS
mg L
9
22
25
22
Sulfate
mg
L
6
7
7
7
Total
Alkalinity
mg
L
2
4
2
2
3
Field
Parameters Units 6 2 3
5
4 2 3
7
7 2 3 23 2 3
H std
units
8
4
8 5 8 4 8 2
Tem erature
C 8
9 8
9
7
5 9
Conductivity
umhos cm
333 363 394 355
Depth to Water Feet
8 3
9 5
5 4
7 3
D Dissolved
T Total
Laboratory Qualifiers
B Analyte detected at value between
MDL and
PQL
U Ana ly te concentration
less
than
MDL
H Analysis
exceeded
holding
time
Resurrection Mining Company
E
3
Advanced Environmental
Sciences
November
26
2 4
2 3
Black Cloud Surface
and
Ground Water Monitoring
Results
Cont
SAMPLE LOCAT ION Method
Detection
Limi t
SW
5
SW
5
SW 5 SW
5
DATE 6 2 3 5 4 2 3 7 7 2 3
23
2 3
PARAMETER
UNITS
Cone La b Qual Cone Lab Qual Cone La b Qual Cone Lab Qua l
Cadmium D
mg
L
3
25
8
9
Copper
D
mg
L
5
47
69
9 B
9 B
Lead D
mg
L
U
2
4
B
Manganese
D
mg
L
5
574
246
4
96
Mercury
D
mg L
2
2 U
2
U
2
U
2
U
Zinc
D
mg L
2
349
543
2 5
94
7/18/2019 Black Cloud Mine Final Reclamation Report
http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 149/149
Cyanide T
mg
L
3
3
U
3
U
3
U
3
U
Hardness
as
CaCO3
mg
L
355
39 99
48
Nitrate Nitrite as N
mg L
2
5
35 22
34
Nitrogen
ammonia
mg L
5
5
U
5
U
5
U
5
U
TDS
mg L
45
7 2
7
Sulfate
mg L
24
8 3 B
5 B
Total Alkalinity
mg L
2
4
74 82
97
Field
Parameters Units 6 2 3
5
4 2 3 7
7
2 3 23 2 3
H
std units 8 7
8 6 8 26
8 29
Temperature
C
6 8
7 7
4 4
7
Conducti ity
umhos cm
642
236
227
279
Depth to
Water
Feet NA NA NA
NA
D D is so lv ed
T Total
Laboratory Qualifiers
B
Analyte
detected at value between MDL and PQL
U
Analyte
concentration
less
than
MDL
H
Analysis
exceeded holding time
Resurrection Mining Company
E 3
Advanced
Environmental Sciences
November
26 2 4