black cloud mine final reclamation report

149
 6 V Black Cloud Reclamation Leadville Colorado Prepared fo r Resurrection Mining Company 6363 S Fiddlers Green Circle Greenwood Village CO 8 246 Prepared by Advanced Environmental Sciences In c 38 3 West 37 h Street Suite  4 Loveland CO 8 538 dvancied nvironmenlal iencies In c November 26 2 4

Upload: information-network-for-responsible-mining

Post on 02-Mar-2016

29 views

Category:

Documents


0 download

DESCRIPTION

Final report on reclamation activities at the Black Cloud Mine site near Leadville, Colorado. Newmont Mining Corporation and Resurrection Mining Company finished reclamation work under a consent decree agreement with the state to clean up the site in 2014. Report describes work, conditions, water quality, photographs.

TRANSCRIPT

Page 1: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 1/149

6

V

Black

Cloud Reclamation

Leadville

Colorado

Prepared

fo r

Resurrection

Mining

Company

6363

S Fiddlers Green Circle

Greenwood

Village

CO

8 246

Prepared by

Advanced

Environmental Sciences

Inc

383

West

37

h

Street Suite   4

Page 2: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 2/149

Resurrection Mining Company

6363

South Fiddlers Green Circle

Greenwood Village Colorado

8

3 3

863

74 4

November 26 2 4

Mr Allen

Sorenson

State

of Colorado

Division of

Reclamation Mining and Safety

 3 3

Sherman Street

Room 2 5

Denver

CO 8 2 3

Re

Black Cloud Mine 2 4 Annual

Report

Resurrection Mining Company

Dear

Mr Sorenson

 

Z

 

83

RECEIVED

NOV 28POi4

DIVISION OF

RECLAMATION

MINING

AND

SAFETY

Pursuant to Paragraph 22 of the

Final

Consent Decree

with Newmont

USA Limited

and

Resurrection

Mining

Company

Resurrection

which

was

entered

by

the

United

States

District

Court for the District of Colorado in Case

no

83

cv

 2388

WYD

the

enclosed

report describes

Resurrection Mining Company s

activities associated with

or at

the Black

Cloud

Mine in

Lake

County for calendar year 2 4

With

the

work

performed

in

2 4

Resurrection believes

that

it

has

completed

the

Black Cloud

mine reclamation As

required

in the Consent Decree over

the next

4

years Resurrection

will

perform

general

monitoring

maintenance

and

repair

activities as

necessary

If

you have

any questions or

require clarification on the

information

presented in this letter

please do not hesitate

to

contact

me at 3 3

837 5676

Page 3: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 3/149

Black Cloud

Reclamation

Leadville

Colorado

Prepared for

Resurrection

Mining

Company

6363 S

Fiddlers

Green

Circle

Greenwood Village CO 8 246

Prepared by

Advanced

Environmental

Sciences

Inc

383

West 37

h

Street Suite

  4

Loveland

CO 8 538

Page 4: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 4/149

TABLE

OF CONTENTS

 

INTRODUCTION

 

2

 

RECLAMATION

ACTIVITIES

3

2  

2 4

Activities

3

2

2

2 8

2 3

Reclamation

Activities

6

3

 

RECLAMATION

COSTS

9

3   2 4

Costs

9

4

 

WATER

QUALITY

 2

5

 

2 5

RECLAMATION

ACTIVITIES

2

LIST

OF

FIGURES

Figure

 

Overall

Black

Cloud Reclaimed

Contours

Figure 2

Typical Cross Sections of

Reclaimed

Tailing

LIST OF APPENDICES

Appendix

A

Reclamation

Activities

by

Year

Appendix

B

Site Photos

Appendix

C

Minor Modifications

Appendix D

Reclamation

Costs

Appendix

E

Water

Quality

Page 5: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 5/149

 

INTRODUCTION

Pursuant to Paragraph 22

of

the

Final

Consent Decree

with

Newmont USA Limited and

Resurrection

Mining

Company

Resurrection

which

was

entered by the

United

States

District

Court

fo r th e District

of Colorado

in

Case

no 83

cv

 2388 WYD

this

report describes

Resurrection

Mining

Company

s activities associated with

or

at the Black Cloud Mine in Lake

County

Under the Consent Decree and approved modifications 2 4 is

the

last year with unique

prescribed reclamation activities before

the onset

of the 4

year general

monitoring

maintenance

and

repair

activity

period

Because

this

is

the last

year with prescribed active reclamation

activities

this

report

summarizes

Resurrection

Mining

Company

s

Resurrection activities

associated with or at the Black

Cloud

Mine fo r the years 2 8 2 3

and

describes in detail the

activities

performed

fo r

2 4

Appendix A presents

a detailed breakdown

of

reclamation

activities

performed

from 2 8

through

2 3 Appendix B contains site

photos

of

reclamation

work for

the

years 2 8 through

2 3

One minor modification was

applied for

in

2 4 consisting of a

change in final topography

of

the

tailing surface

Seven other

minor

modifications s

were

applied for

and

approved from 2 8

Page 6: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 6/149

r

Black

Cloud

Mine

Facilities

2 4

Page 7: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 7/149

Julia

Fiske Road

2 4

2

 

RECLAMATION

ACTIVITIES

Pursuant

to Section

6

 

of

Appendix

E

to

the

Consent

Decree

Black Cloud Mine Reclamation

P lan and

Schedule

Leadville Colorado

the

schedule

for

reclamation activities were prescribed

Page 8: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 8/149

 

Mobilize

reclamation

equipment and

personnel

to the Black

Cloud

Mine

Compliance

Activities

and

Status

SLV

Earthmovers

of

Monte Vista

Colorado

mobilized to the

site

in mid

August Equ ipmen t

included

three excavators two loaders

two track

dozers

five

articulating haul

trucks

a

lube truck

a water

truck

a

parts

trailer a John Deere Tractor with a

tow behind

land planer and a fuel tank

and

containment

2

Complete removal from

site

and

properly

dispose

of all unneeded fuel lubricants

chemicals

and

any trash and

debris

unsuitable

for

onsite

burial

Compliance

Activities and Status

All

fuel

lubricants chemicals not necessary to

maintain th e site

emergency

generator or

front

end loader were

removed

in

2

Most

debris

and

t rash not suitable fo r

onsite

burial were removed and disposed in 2 3

A ll

remaining debris i

e

power poles was removed in 2 4

3

Continue removal and proper disposal or

resale

of infrastructure or equipment not

necessary to

support

operation of the Yak

Tunnel

blockage pumping and

tailing

impoundment dewatering systems Infrastructure includes

mill

PCB transformer other

unneeded

transformers above and below ground tanks mine and mill equipment

etc

Compliance Activities

and Status

All equipment

and infrastructure no t

necessary to

the

support the Yak

Tunnel

blockage pumping

tailing

impoundment dewatering Black

Cloud water

treatment plant site

snow removal and

maintenance operations

were

removed and

disposed

recycled and or sold in

2

4

Complete demolition of

all

remaining mine and

mill

structures at the Black

Cloud

surface

Page 9: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 9/149

be constructed as planned because the mill building will be preserved and

remain

then

debris will be properly disposed

of off site

Compliance

Activities

and

Status

The debris cell was

constructed

filled and graded

in

2

In

2 4 the cell

was

reopened fo r the media filter housings and

then

closed and

regraded

7

Grade Black

Cloud Mine

surface

plant area

Compliance

Activities

and

Status

The waste rock piles

were

excavated hauled

and

placed

on

th e

tailing

in

2

Approximately

2

feet

of

the

surface

at

the

Black Cloud

mine was

excavated hauled and

placed on

the tailing in 2 2 Final grading

of

the

Black

Cloud

mine

site was

completed

in 2 4

The mine site was surveyed prior

to

commencement ofwork in 2 4 and

after

completion of the 2 4 work

8

Prepare

roadways at Julia Fiske and Helena areas for placement

of

plant media

compacted roadways to be loosened through excavation

ripping and

grading

Compliance

Activities and Status

This

work

was completed

in

2 4

9

Excavate and transport off site borrow

materials to

the mine site for use as a growth

medium

Compliance

Activities

and

Status

Minor

Modification

S allowed

for

the use

of

on

site

instead ofoff

site

borrow materials

  Complete spreading

plant growth

media

in tailing impoundment

Black

Cloud and Helena

areas seed

fertilize and

mulch

Page 10: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 10/149

Quarterly

groundwater and surface water

samples

were collected on

January

2 April

22

July

 6 and October  5 2 4

The field parameter

and analytical

results

fo r the

quarterly samples are presented in

Table

 

Russell

Surveyors

Associates Russell su rveyed the 2 3 tailing

and borrow

area

surfaces on June  2 2 4 and Advanced

Environmental

Consultants

Inc

updated

the

tailing

cover work

to

be

completed

based

on th e

survey

data On November

  2 4

Russell

performed

a survey of the reclaimed tailing

and Black Cloud

mine area surfaces

fo r

incorporation

into the as built documentation

Obtained Class V

Injection

Well

Permitfrom

the United States Environmental Protection

Agency EPA for subsurface drainage of Fortuna

water

into

the

reclaimed tailing

storage facility

Finished installing aligning

and

reinforcing

stormwater channels

around the

Black

Cloud

mine

area

and tailing facility A permanent sediment pond and temporary

sediment

retention

structures

i

e

hay

bales were

installed

Page 11: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 11/149

2 9 Year  

Completed

Reclamation Activities

Site

equipment

materials chemicals solid and hazardous wastes fuels and

lubricants

were inventoried partially removed and properly disposed

Asbestos inspection and

removal

Demolition and cle an up of Black Cloud work areas yards and various

buildings foundations

including

safety

trailer dry

oil house welding shop assay

laboratory acid

house

Julia Fisk

storage

building and roadway IG  

monitoring

station

IG

2

monitoring

station

primer

magazine

powder

magazine

monitoring

shack and

Black Cloud Mine

propane storage tanks

The

I rene shaft

and east Black Cloud

shaft were

capped

Site equipment

and

materials inventory

Crusher and

mill pre

demolition inspections inventory and preliminary sale

negotiations

Partial construction

of

tailing

storage

facility

diversion

channels

Surveys of

existing

talus borrow

stockpiles

to determine available

quantity

Civil

survey of Fortuna adit to identify land ownership

Demolition

and

removal of

the

Irene electrical substation

transformers

roadway head

house

and head frame

siding

2

Year 2 Completed Reclamation Activities

Continued removal

disposal

or

recycling

of various materials

and

wastes

Continued asbestos

inspection

and removal

Page 12: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 12/149

Continued removal and

disposal

or resale of infrastructure no t necessary to support

Black

Cloud dewatering and pumping operations

Completion

of

removal

disposal

or recycling

of

various

wastes

Removal

and

proper

disposal of the Mill

PCB

transformer

Construction of new

office

at

the

water treatment

buildings

Completed

asbestos abatement

of the Mine Office and Truck Shop

Completed

demolition

of the

Black

Cloud Mill Crusher Scale House

Timber Shop

Machine Shop Warehouse Mine Office Water Head Tanks Truck Shop Shaft House

Hoist

House

and

Head Frame Foundations were

rubblized and material

was

removed or

buried

in the

debris cell

Completion of the

debris cell

Completed demolition

of

the

Helena Shaft House and Hoist House

Completed seeding and fertilizing of Eclipse waste rock dump

Transported screened rock

to stockpiles

along

the

northern

perimeter of the

tailings

storage facility and began

cover

placement

Completed excavation

haulage

and

placement

o f the

Black

Cloud

East and

West

waste

rock

dumps on

the

tailing storage facility

Placed Helena waste

rock

in tailings storage facility

Continued monitoring Fortuna Adit water

The

Helena

shaft

was capped

2 2 Year 4

Completed

Reclamation Activities

A new electrical system and larger dewatering pump were installed as part

of

the Iowa

Page 13: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 13/149

3  

RECLAMATION COSTS

Pursuant

to

Section

VIII

Performance

of

Work

at the

Black Cloud Mine

by

Settling

Defendants

Item 2 Reclamation Cap Final

Consent Decree

With Newmont USA

Limited

and

Resurrection

Mining Company

the

2 4

costs

are

presented

below

Appendix D presents

the

costs associated

with

reclamation

activities

from 2 8 through 2 4

3   2 4 Cos ts

Table

  Reclamation Costs

fo r

2 4

LEDGER

 

DATE

DESCRIPTION

F

COS

r

TOTAL

SALARY AND BURDEN

THRU

  3

NEWMONT

Site

Labor

Burden

F

9

964

 

Subtotal

69

964

FUEL EXPENSES

226 5 6  5  4

ACORN PETROLEUM

INC

 87 45

2 3  

9

 4

ACORN PETROLEUM

INC

7

28

2 55   23  4

ACORN PETROLEUM INC

259 52

2 325  2

 

4

ACORN PETROLEUM INC

25 59

2 566

 2 28  4

ACORN PETROLEUM INC

42 46

2 7 6  3

 

4

ACORN PETROLEUM

INC

 6

76

2 9 6

 3 2

4

ACORN PETROLEUM INC

296 62

22 5

4

 9

 4

ACORN PETROLEUM

INC

56

29

22 86

 4 24

 4

ACORN PETROLEUM INC

256 57

Page 14: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 14/149

Table   Reclamation

Costs

fo r 2 4

Cont

LEDGER

DATE DESCRIPTION COST

TOTAL

235 4

 8

 3  4

HREN S COMPLETE

SERVICE

25

HREN S

INSTALL

CULVERT

23664

 8

28  4

DURAN

LUCERO INC

9

4 2

5

DURAN FOUNTATION FLOOR

REHAB

2 242   3 4

JOHNSON

SEPTIC JOHNSON

TOILET  

SRVC BC

2 6 6  2

28

 4 JOHNSON

SEPTIC

 

JOHNSON PORTABLE

TOILET

BC

22 3

 4

 3

 4

JOHNSON SEPTIC JOHNSON TOILET  

22245

 4

3 4 JOHNSON SEPTIC

JOHNSON

BC

 

TOILET

2274

6

 2 4

JOHNSON SEPTIC

 

JOHNSON

PORTABLE

TOILET BC

23 56  7

 8

 4

JOHNSON SEPTIC

22

JOHNSON

PORTABLE TOILET SRVC

23585

 8  9 4

JOHNSON SEPTIC

 

JOHNSON

PORTABLE TOILET

24 5 2  4

JOHNSON

SEPTIC

 

JOHNSON

PORTABLE TOILET BC

23 9  7  8

 4

ADVANCED ENVIROMENTAL

5

889

8

SCIENCES AES

RECLAMATION

REIMBUSABLE EX

23

7

 8

 4

ADVANCED

ENVIROMENTAL

735 59

SCIENCES AES SITE COORDINATION

23 7

 8 4 ADVANCED ENVIROMENTAL

4

482

5

SCIENCES AES STORMWATER PLAN

23 9

 7  8 4

ADVANCED ENVIROMENTAL

659 24

Page 15: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 15/149

Table  

Reclamation Costs

fo r

2 4 Cont

LEDGER

DATE

DESCRIPTION COST TOTAL

2 6

9

 4 SLV

EARTH

MOVERS INC SLV

EARTH RIP

RAP

IOWA GULCH

4

5

THRU

9

 4

SLV EARTH

MOVERS INC

385 367

 

THRU

  4

SLV EARTH MOVERS INC 96

637

 

Subtotal

595 237

 5

PHONE LICENSES PERMITS POSTAGE

SUPPLIES

2262

6  5  4

BIGHORN

HARDWARE

BIGHORN

MISC SPLYS

 6 52

22947

 7  3

 4 BIGHORN HARDWARE

BIGHORN

MISC

SPLYS BC

 48 39

22945 7  3

 4

ALLEN LONG LONG

2

8 GATES

222

25

23426  8   4 DURAN

LUCERO

INC

DURAN

OXY

AC MC

87

53

23245  8   4

BIGHORN

HARDWARE

BIGHORN MISC SPLYS

 85 9

23743  9

 3  4

BIGHORN

HARDWARE

BIGHORN MISC

SPLYS

46 99

24 22

 

2

 4

BIGHORN HARDWARE

BIGHORN MISC SPLYS

  98

24474   5

 4

BIGHORN

HARDWARE

BIGHORN

MISC

SPLYS

77 53

2 582

 2 28  4

ALLEN LONG LONG SAMPLING

SPLYS

56 3

Page 16: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 16/149

LEDGER

DATE

DESCRIPTION

COST

TOTAL

22944

 7

 3

 4

ALLEN

LONG

LONG

BC P

O BOX

RENTAL

 4

23 58 7  9  4

SILVER

CITY

PRINTING SILVER

CITY CARTRIDGE

CARD

4 62

2335 8

  4

VERIZON WIRELESS VERIZON

87  5

236 7

 8

 9 4

VERIZON WIRELESS VERIZON

68

49

23734

 9

 3  4

ALLEN

LONG LONG

OFFICE SPLYS

44

 3

23986

 9

24

 4

VERIZON

WIRELESS VERIZON

67  3

2434 23

 4

VERIZON WIRELESS VERIZON

67  3

Subtotal 2 729

56

ELECTRICITY

GAS

2 8 9  4

XCEL ENERGY XCEL 748 CNTY RD

2A BLDG IOWA

5

632  8

2 32

2

 6

 4

XCEL

ENERGY

XCEL 748 CNTY RD

2A BLDG IOWA

3

245

34

2 783

 3  

4

XCEL

ENERGY

XCEL

748

CNTY RD

2A

BLDG IOWA

4 69 25

22 36  4

 3  4 XCEL

ENERGY

XCEL

748

CNTY

RD

2A BLDG IOWA

3

746

92

22284  4 3 4 XCEL

ENERGY XCEL 748 CNTY RD

2A

BLDG IOWA

4 4 3 56

22683

 6  5  4

XCEL ENERGY XCEL

748

CNTY RD

2Q BLDG IOWA

4 26

25

2299 7

 3

 4

XCEL

ENERGY

XCEL

748

CNTY

RD

2A BLDG IOWA

 

46 64

23375

 8

  4

XCEL

ENERGY

XCEL

748

CNTY

RD

2A BLDG IOWA

 

987

24

23789

 9

 3

 4

XCEL

ENERGY

XCEL 748 CNTY RD

3 65 92

Page 17: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 17/149

Table 2

Black

Cloud Surface and

Ground

Water Monitoring Results

SAMPLE LOCATION

Method

Detection

Limi t

MW  

MW   MW

 

MW

 

DATE  

2 2 4 4 22 2 4

7  6

2 4

 

5 2 4

PARAMETER UNITS Conc Lab

Qual

Conc Lab

Qual

Conc La b

Qual

Conc Lab Qual

Cadmium D

mg

L

 

6

 

7

 

5

 

5

Copper

D

mg

L

 

5

 

6 B

 

24 B

 

3

B

 

8 B

Lead D

mg L

 

U   B  

U

 

U

Manganese

D

mg

L

  5

  23

B

  9

B

 

5

U

  5

U

Mercury D

mg L

 

2

 

2 U   2 U   2

U

 

2 U

Zinc

D

mg L

  2

 

46

  6

39

 

42

Cyanide T

mg

L

 

3

 

3

U  

3

U  

3

U

 

3

U

Hardness

as

CaCO3

mg

L

  and

 

8 starting

7  6

2 4

  6

  2

89

  9

Nitrate

Nitrite as

N

mg

L

  2

 

26

 

22

 

38

Nitrogen

ammonia

mg L

  5

  5

U  

5

U

  5

U

 

5

U

TDS

mg

L

 

2

9

H

  6

Sulfate

mg

L

 

4

B 2 B

3 B

2

Total

Alkalinity

mgt 2

  4 82

82

 

8

Field Parameters

Units

  2 2 4

4

22

2 4 7

 6

2 4

  5 2 4

H std units

 

7 85 7 64 7 4

7

56

Temperature

C  

5

  9

5

 3 7 2 2

Conductivity

umhos cm

 

276 267

223 27

Depth to Water

Feet

  8

25

7 35

7 5 7

9

D

Dissolved

T Total

Laboratory

Qualifiers

B Analyte detected

at

value

between MDL and

PQL

U Ana ly te concentration less than MDL

H Analysis exceeded holding

time

Resurrection

Mining

Company  3

Advanced Environmental

Sciences

Inc

Novembe r 26 2 4

Page 18: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 18/149

Table 2

2 4 Black Cloud

Surface and

Ground Water Monitoring Results Cont

SAMPLE LOCAT ION

Method

Detection

Limi t

MW

2

MW

2

MW 2

MW 2

DATE

  2 2 4 4 22 2 4

7

 6

2 4

  5 2 4

PARAMETER

UNITS

Conc

La b Qual

Conc

La b

Qual

Conc Lab

Qual Conc

Lab Qual

Cadmium

D

mg

L

 

3

B

 

B

Copper

D

mg L

  5   3

5

B

Lead D

mg L

 

U

 

U

Manganese D

mg L

 

5

  8

B

 

5

B

Mercury

D

mg

L

 

2

  2

U

  2

U

Zinc D

mg

L

  2

  9

 

75

Cyanide T

mg L

  3

 

3

U

  3

U

Hardness

as

CaCO3

mg

L

 

and

 

8

starting

7 6 2 4

4 6

256

Nitrate Nitrite as N

mg L

  2

  9

 

Nitrogen

ammonia

mg L

  5

 

5

U

 

5

U

TDS

mg

L

 

5

H

332

Sulfate

mg L

 

34

2

Total Alkalinity

mg L

2

85  

94 3

Field

Parameters Units

  2 2 4 4 22 2 4

7  6

2 4

  5

2 4

H

st d

units

 

7

54

7

66

Temperature

C

 

5

  7

Conductivity

umhos cm

 

87 642

Dep th to Wa te r

Feet

 

5 5

6

D Dissolved

T

Total

Laboratory

Qualifiers

B

Analyte

detected

at

value between

MDL and

PQL

U Analyte concentration less than MDL

H

Analysis exceeded holding time

Resurrection

Mining

Company

 4

Advanced

Environmental

Sciences

Inc

November 26

2 4

Page 19: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 19/149

Table

2

2 4 Black

Cloud Surface and

Ground Water Monitoring

Results Cont

SAMPLE LOCAT ION

Method

Detection

Limi t

MW 3 MW 3

MW

3

MW

3

DATE

  2 2 4 4 22 2 4 7  6 2 4   5 2 4

PARAMETER UNITS

Cone

La b Qual

Cone

Lab Qual

Cone

Lab Qual

Cone

Lab Qua l

Cadmium D

mg

L

 

6

 

7

 

24

 

25

Copper D

mg L

 

5

 

5

U  

5

U

 

5

B

 

5 U

Lead D

mg

L

 

B

  B  

B

  U

Manganese

D

mg

L

  5

2 32

3

37 3 92

 

4

57

Mercury D

mg

L

 

2

 

2 U   2 U   2

U

  2 U

Zinc

D

mg L

 

2

  959

  762

 

735

  698

Cyanide T

mg L

 

3

 

3

U  

3

U

  3

U

  3

U

Hardness as CaCO3

mg

L

  and

  8

starting

7 6 2 4

763

759

876 8 9

Nitrate Nitrite as

N

mg

L

 

2

 

22

  7

 

2

 

36

Nitrogen ammonia

mg L

 

5

 

84

 

97

  55

 

37

TDS

mg L

 

6 3

2

H

  5

Sulfate

mg L

 

68

67

75

75

Total Alkalinity

mg

L

2

94 82

  6

 

Field

Parameters

Units

 

2 2 4 4

22

2 4 7

 6

2 4

  5

2 4

H std units   7 48 7

5

7 43 7 5

Temperature

C

 

4

9

5

4

 4  

9

8

Conductivity

umhos cm

 

492  5 2 789  727

Depth to

Water Feet   5 4

7

4 2

4 8

D

Dissolved

T Total

Laboratory Qualifiers

B

Analyte

detected

at value

between

MDL and

PQL

U

Analyte concentration less than

MDL

H Analysis exceeded holding time

Resurrection

Mining

Company

 5

Advanced Environmental

Sciences

Inc

November

26 2 4

Page 20: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 20/149

Table 2

2 4

Black

Cloud Surface and

Ground

Water Monitoring Results Cont

SAMPLE LOCATION

Method

Detection

Limit

MW 4

MW

4

MW 4 MW 4

DATE

  2 2 4

4

22

2 4

7  6 2 4

 

5 2 4

PARAMETER

UNITS

Conc

Lab

Qual Conc

Lab

Qual Conc

Lab

Qual

Conc Lab

Qual

Cadmium D

mg

L

 

9

 

4

 

2

Copper

D

mg L

  5

  7 B  

9 B

 

B

 

8 B

Lead

D

mg L

 

U

 

U

 

U

 

U

Manganese

D

mg L

  5

  6 B  

5 U

 

5

U

 

5 U

Mercury

D

mg L

  2

 

2

U

 

2

U   2

U

  2

U

Zinc

D

mg L

 

2

  2 8

  53

275

 

228

Cyanide T

mg

L

  3

 

3

U   3 U   3

U

  3

U

Hardness as CaCO3

mg L

 

and

  8 starting

7 6 2 4

242

2 5

2 6 229

Nitrate Nitrite as N

mg

L

 

2

  53

 

75

 

33

 

25

Nitrogen ammonia

mg L

 

5

 

5

U   5 U

 

5

U

 

5

U

TDS

mg L

 

29

28

26 H

28

Sulfate

mg

L

 

6

4

4

Total Alkalinity

mg L

2

  4 72

  7

  7

Field Parameters Units

  2 2 4 4 22 2 4

7  6 2 4   5

2 4

H

std units  

7

66 7

53

7 6 7

65

Temperature

C

  4 8 7  

3 7

8

Conductivity

umhos

cm

  527 555

5 9

534

Depth to

Water Feet

  6 4

 2  5

 2 92  5 8

D Dissolved

T Total

Laboratory

Qualifiers

B

Analyte detected at

value between

MDL and

PQL

U

Analyte concentration less

than

MDL

H Analysis exceeded holding time

Resurrection

Mining Company

 6

Advanced

Environmental

Sciences Inc

November

26 2 4

Page 21: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 21/149

Table

2

2 4 Black Cloud

Surface and

Ground Water Monitoring Results Cont

SAMPLE

LOCATION

Method

Detection

Limi t

MW 5 MW 5

MW 5 MW 5

DATE   2 2 4 4

22

2 4 7  6 2 4   5 2 4

PARAMETER UNITS Conc

Lab

Qual Conc

La b

Qual Conc

Lab Qual

Conc La b Qual

Cadm ium D

mg

L

 

2 B

 

3 B

 

2

B   B

Copper

D

mg L

  5

  5

U

  5 U

  5

U

 

5

U

Lead D

mg

L

 

2

B

 

2 B

 

5

  U

Manganese

D

mg L

 

5

  2

B

 

5

U   32 5 U

Mercury D

mg L

 

2

 

2 U

 

2 U   2

U

  2 U

Zinc

D

mg L

 

2

  34   48

  36

 

34

Cyanide T

mg

L

 

3

 

3 U

 

3 U  

3

U

  3 U

Hardness as CaCO3

mg L

 

and

  8 starting

7

 6

2 4

2

2 3 2 2

 95

Nitrate Nitrite as N

mg

L

 

2

  5

 

57

 

99

 

7

Nitrogen

ammonia

mg

L

 

5

  5 U

  5

U  

5

U

 

5

U

TDS

mg

L

 

24 25

25 H

242

Sulfate

mg

L

 

8

8

9

Total Alkalinity

mg

2

  9 22

 3

7

Field Parameters Units

 

2 2 4 4 22 2 4 7

 6

2 4

  5

2 4

H

std

units

  8

 2

7

84

7

99

7

98

Temperature

C

 

3

3

6 6

 2 4

5

9

Conductivi

umhos

cm

 

45 478 5 9 489

De th to W ater Feet  

4

4   7

 2

3

 2 9

D Dissolved

T Total

Laboratory

Qualifiers

B Analyte

detected

at value between

MDL

and PQL

U Ana ly te concentration

less

than

MDL

H Analysis

exceeded

holding time

Resurrection

Mining

Company

 7

Advanced Environmental

Sciences

Inc

November 26

2 4

Page 22: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 22/149

Table

2

2 4 Black Cloud

Surface and

Ground Water

Monitoring

Results

SAMPLE

LOCATION

Method

Detection

Limit

MW 6

MW

6 MW

6

MW

6

DATE   2 2 4 4 22 2 4 7  6 2 4   5 2 4

PARAMETER

UNITS

Cone

Lab

Qual

Cone La b

Qual

Cone

La b Qual Cone

La b Qual

Cadmium D

mg

L

 

U

 

U

 

U

 

U

Copper D

mg L

 

5

 

5 U

 

5 U

 

5 U

 

5

U

Lead D

mg

L

 

3

B

 

3

B  

U

 

U

Manganese

D

mg L

 

5

 

5

U

 

5

U

 

5

U

 

5

U

Mercury

D

mg L

 

2

  2

U

  2 U   2

U

  2 U

Zinc

D

mg

L

  2

 

6

 

23

 

26

 

6

Cyanide

T

mg L

  3

 

3 U   3 U   3

U

 

3

U

Hardness

as

CaCO3

mg L

  and

  8

starting

7 6 2 4

 77 82

 9 7

Nitrate Nitrite as N

mg L

 

2

  84

 

85

  87

  72

Nitrogen

ammonia

mg

L

 

5

  5 U   5

U  

7

B

  5

U

TDS

mg

L

 

2 22

23 H

2 4

Sulfate

mg

L

 

8 9

9

8

Total Alkalinity

mg

L

2

  8 89

 

9

Field Parameters Units

  2 2 4

4

22

2 4

7  6

2 4

  5 2 4

H

std units  

8

  7

99

8  

8  9

Temperature

C

 

4

7 8 8 9

5

8 3

Conductivity

umhos cm

 

484

4 8 479

434

Depth to Water

Feet   2

7  7

55

 8

5

 5 9

D Dissolved

T Total

Laboratory Qualifiers

B Analyte

detected

at value between MDL and PQL

U Ana ly te concentration

less

than

MDL

H Analysis exceeded holding

time

Resurrection

Mining

Company

 8

Advanced Environmental Sciences

Inc

November

26

2 4

Page 23: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 23/149

Table

2

2 4 Black

Cloud

Surface and Ground Water Monitoring Results

Cont

SAMPLE

LOCAT ION

Method

Detection

Limit

SW 5 SW 5

SW 5 SW

5

DATE

  2

2 4 4 22

2 4

7  6 2 4   5

2 4

PARAMETER

UNITS

Conc

Lab Qual

Conc

Lab

Qual

Conc

Lab

Qual

Conc

Lab

Qual

Cadmium D

mg

L

 

8

 

27

 

6

 

8

Copper

D

mg

L

  5

 

7 B

 

9 B

  2

B

 

2

B

Lead D

mg

L

 

2

B

  8

 

5

 

3 B

Manganese

D

mg

L

 

5

  2 392

  98   339

Mercury

D

mg L

  2

  2

U

 

2 U

 

2

U

 

2

U

Zinc D

mg

L

  2

 

2 9   658

 

36

 

226

Cyanide

T

mg

L

 

3

 

3

U   3 U

  3

U

  3

U

Hardness

as

CaCO3

mg L

 

and

 

8

starting

7 6

2 4

 66

 65 94  27

Nitrate

Nitrite

as

N

mg

L

  2

  34   43

 

3

  25

Nitrogen

ammonia

mg L

 

5

  5 U  

5

U  

5

U

  5 U

TDS

mg

L

 

8 2

8

38

Sulfate

mg L

 

8

9

3

B

5

Total Alkalinity

mg L

2

  4

7

82

 

Field Parameters

Units

  2 2 4 4 22 2 4 7  6 2 4   5 2 4

H st d

units  

8

 9

7

88

8 2 8 22

Temperature C

  2

4

5

  2 4

8

Conductivity

umhos cm

 

353

4 6 479

3 3

Depth

to

Water

Feet

 

NA NA

NA

NA

D Dissolved

T Total

Laboratory

Qualifiers

B Ana lyte

detected

at value between MDL and PQL

U Analyte concentration

less than MDL

H Analysis

exceeded

holding t ime

Resurrection

Mining

Company

 9 Advanced Environmental Sciences

Inc

November 26

2 4

Page 24: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 24/149

5

  2 5 RECLAMATION ACTIV IT IES

Pursuant

to Sect ion

6   Appendix E

to

the

Consent Decree

Black Cloud

Mine

Reclamation Plan

and Schedule Leadville

Colorado

the following

2 5 Year 7 reclamation activities will be

performed

Monitoring

maintenance and

repair

if

required

of

reclaimed

areas

Reclamation monitoring maintenance

and

repair

for the

2 5 field season will be communicated

to

and

coordinated

with

the Division s site

representative

Page 25: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 25/149

  955

  95

IN

Is m

WOVEN

GROWTH MEDIUM

GEOTEXTILE

M

milli

FABRIC

ME

M

TERRATEX HD

 2

CAPILLARY

wilms

ME

BARRIER

ELmmmmmm

 

Omni

IN

 

moll

 

I

imm

 

K4

l ima

lilolill

BE

 

i

mo

m

 

lmlM

  lilim

 

IN

Jim

M M sopp

 

so

OMNI

  olm

  2

IiiiiIII

Mill

Nil

  4

p

INI

P

 

I

 

IN

  95 5

  95

94 5

so so

  94 5

3 2

2

3

4

5 6

7

8 9

2 3 4 5 6 7 8 9 2

SECTION A

TAILING SURFACE

  96C

  955

  95

945

  94

Mill

Is m

WOVEN

GROWTH MEDIUM

GEOTEXTILE

M OEM

FABRIC

ME

M

TERRATEX HD

 2

CAPILLARY

ME

BARRIER

ELmmmmmm

 

IN

moll

 

mm

MEN

lien

E

K4

  96

95 5

  95

945

  94

3 2

2 3

4

SECTION B

TAILING SURFACE

NOTES

 

SECTION VERTICAL EXAGGERATION

SET AT 2 FT

IVA

SOIL COVER DETAIL TYP

NTS

SOIL COVER AT TSF OUTLET SWALE TYP

NTS

 8

WOVEN

GROWTH MEDIUM

GEOTEXTILE

FABRIC

TERRATEX HD

 2

CAPILLARY

BARRIER

TAILINGS

SOIL COVER AT TSF OUTLET SWALE TYP

NTS

Page 26: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 26/149

LEGEND

EXISTINGACCESS ROAD

IOWA GULCH FLOWLINE

AS BUILTELEVATION CONTOURS

FROM RUSSELLSURVEYORS

  23 4 SURVEY

EXISTING GROUND BACKGROUND

CONTOURS

L

7

ELECTRIC

BUILDING

2 4

DEBR IS CELL

TANK LDING

BLACK CLOUD

HELENASHAFT

LIMITS OF DISTURBANCE

J

c

DIVERSION CHANNEL

4

FORTUNA INJECTION

C

r

SYSTEM

Y

STORM

OUTLET

CULVERT

FINAL TOE

FIGURE  

DRAIN POND

OVERALL BLACK CLOUD

RECLAIMED CONTOURS

RESURRECTION MINING COMPANY

dvanced

TSF

STORMWATER

BLACK CLOUD MINE RECLAMMATION

nvironmental

OUTLET

CHANNEL

2 4

ANNUAL

REPORT

dences Inc

  2 2 4

Page 27: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 27/149

Work Completed as Listed

on

the CDRMS CIRCES

Cost

Estimate

YEAR ITEM WORK DESCRIPTION

2 9

Year   Mob Demob

Completed

Black Cloud

Reclamation

East

shaft

capped with steel plate as required by CDPHE

and

EPA to al low monitoring of ground water

levels

and blockage pumping

Propane tanks demolition removal completed

Dry demolition

completed

Oi l

House demolition completed

Oil

House concrete foundation demolition completed

Assay

Lab

demolition

completed

Assay Lab concrete foundation demolition

Used grease removal disposal completed

Used oil

and def

removal disposal

completed

Used

oil and def sludge

removal

disposal

completed

Used Antifreeze removal disposal completed

Used

heavy

oil

removal

disposal

completed

New xanthate removal disposal completed

New binder

removal disposal completed

Used oi l and water removal disposal completed

Partial head frame

to

be retained to

service Yak

blockage pump

Non Inert debris

hauled

to landfill

Tailing

Impoundment Reclamation

Survey

and

establish quantity of stock Piled 6 talus rock tailing impoundment cover material

Preliminary

channel des ign

excavate

approximately

75

linear

feet

of

diversion

channel

Helena Area Reclamation

No

Work Performed

Julia Fiske Area Reclamation

Structure

demolition

and

removal

completed

Roadway demolition

and

removal completed

Eclipse

Area Reclamation

No Work Performed

Resurrection

Mining

Company

A

 

Advanced Environmental Sciences Inc

November

26

2 4

Page 28: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 28/149

APPEND IX A

RECLAMATION

ACTIVIT IES

BY

YEAR

Page 29: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 29/149

Work Completed as

Listed on the CDRMS

CIRCES

Cost

Estimate

Cont

YEAR

ITEM

WORK DESCRIPTION

2 9

Cont

Irene

Area

Reclamation

Asphaltic pavement

removal

complete

Water tank removal complete

Substation

removal

complete

Transformers removal complete

Underground

tanks

removal complete

High voltage cable removal complete

Cable supports

and

connector removal complete

Water tank berm grading complete

Hoist

house

to be retained

Irene Mine head frame

tin

siding removal and head house demolition

completed

Irene

shafts

capped with

steel

plates as required by CDPHE

and

EPA to allow

monitoring

of ground

water

l evels and as an alternative

blockage

pumping location

Water Treatment

Collected

pumped

and

treated approximately

 3 8 million

gallons of

water from

the

Black Cloud

toe drain

Eclipse Soil

No

Work Performed

2

Year

2

Mob Demob

Completed

Black

Cloud Reclamation

Mil l

and

concentrator partial demolit ion

Electrical substation demolition and removal completed

Non Inert debris hauled to landfill

Tailing Impoundment Reclamation

Redesign channel to prevent disturbance to True Grit mill area and minimize cut and fill Excavate

approximatel 45 linear feet of diversion channel

Mobilize

Demobilize

screening

plant

Screen and

stockpile

a roximatel  3

35 tons

of

minus

6 tailing

impoundment

cover

material

Helena Area Reclamation

Electrical substation demolition

and

removal completed

Julia

Fiske Area

Reclamation

No

Work

Performed

Remaining

work consist of reve etation

Eclipse Area Reclamation

Concrete

foundations rubbilization and burial completed

Waste

tock

dump contoured to

3

  H

V

grade

Dolomite excavated and hauled from Irene Mine to Eclipse and   Foot cover constructed on waste

rock

dump

Resurrection

Mining

Company

A

2

Advanced EnvironmentalSciences Inc

November

26

2 4

Page 30: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 30/149

Work Completed as Listed

on the

CDRMS CIRCES

Cost

Estimate Cont

YEAR ITEM

WORK DESCRIPTION

2

Cont

Irene Area Reclamation

Head house concrete pad rubbilization

and

removal completed

Substation

concrete

pad rubbilization and

removal

completed

Propane tank concrete

pedestal

rubbilization

and

removal completed

Covering

of

rubblized concrete with Irene dolomite completed

Grading

of

Irene waste dump to promote drainage completed

Water

Treatment

Collected pumped and

treated

approximately

2

million gallons of water

from

the

Black

Cloud toe drain

Eclipse Soil

Kid s First soil excavated and hauled from Yak

WT to Eclipse and 6 Inch cover

constructed

on waste

rock

dump

2

9 cubic

yards of

Kid s First and stockpiled Eclipse soil was placed

for

the cover

2

Year 3 Mob Demob Completed

Black Cloud Reclamation

Mill

and

concentrator

demolition and

removal completed

Crusher

demolition

and removal

completed

Shaft

house

hoist

house

and partial

head

frame demolition and removal completed

Machine shop and

warehouse demolition and

removal completed

Mine

office demoli tion and removal

completed

truck

and

timber

shops

demolition

and

removal completed

Scale house

demolition

and removal completed

Al l remaining foundations and footings rubbization and removal completed

Debris

cell constructed

and

capped with approximately   foot

of

cover

PCB transformer removal and disposal complete and

in

accordance with

regulations

All remaining transformers removal and

disposal

complete

All

remaining

debr is chemicals

petroleum products removed and disposed of

in

accordance with

regulations

High voltage

cable removal

complete

Cable supports and

connector

removal

complete

East and

West

waste

rock

piles removed

and

placed

in tailing

impoundment

approximately

2 5

cubic

yards

Tailing

Impoundment Reclamation

Completed

diversion channel

as designed

by Del

Mont

Consultants

Haul 24   tons of minus

6

material from

talus borrow area

to

tailing

impoundment and stockpile

Approx

imatel 2 3 acres of tailing impoundment covered with

Black

Cloud waste rock

Resurrection

Mining

Company

A

3

Advanced

EnvironmentalSciences Inc

November

26

2 4

Page 31: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 31/149

Work

Completed as Listed on the CDRMS CIRCES Cost Estimate Cont

YEAR

ITEM

WORK

DESCRIPTION

2

Cont

Helena Area Reclamation

Hoist

house and

shaft

house

demolition

and removal complete

Helena

shaft

capped with steel plate as required by CDPHE and EPA to al low monitoring of ground water

levels

Waste rock

placed in tailing

impoundment

Julia Fiske Area Reclamation

No

Work

Performed Remaining

work

consist

of

reve etation

Eclipse

Area

Reclamation

Reve etation

and

fertilizing of waste rock

pile

completed

Irene Area Reclamation All

work

completed in 2

Water

Treatment

Collected pumped and treated approximately  2 3 million gallons of water from the

Black

Cloud toe drain

Eclipse Soil

A ll

work

completed in 2

2 2

Mob Demob Completed

Black

Cloud Reclamation

Approximately

2

feet

of fill material was removed from the surface of the Black Cloud Mine facility area and

laced in the tailing impoundment

Tailing

Impoundment Reclamation

Tailing impoundment cover was redesigned to

promote

drainage and reduce the

fill

volume

Approximately  

cy

of rock

fill material was excavated hauled

and

placed

on tailing

impoundment

Helena Area Reclamation

No

Work Performed Remaining work

consist

of

reve

etation

Julia Fiske Area Reclamation

No Work Performed

Remaining

work consist of

reve etation

Eclipse Area Reclamation

All

work

completed

in

2

Irene

Area Reclamation All work completed in

2

Water

Treatment

Collected

pumped and treated

approximately

 6 5

million

gallons of

water

from the Black

Cloud

toe

drain

Eclipse Soil

All

work

completed

in

2

2 3

Mob Demob

Mobilization completed

demobilization

anticipated

2nd

week

of

December

Black Cloud Reclamation

Approximately 2

feet

of

fill

material was

removed from the

surface of the Black

Cloud

Mine facility area and

laced in

the tailing impoundment in

2 2

Remaining work consists of reve etation

Tailing Impoundment Reclamation

Tailing

impoundment cover

design

was updated to reflect 2 2 work

Approximately

 85

 

cubic yards

of

rock fill material

and

growth media

was excavated

hauled

and

placed

on the tailing impoundment The spillway

and

drainage system were completed Remain ing

work

consists

of

reve etat ion

and filling of

a small

toe

dra in pump back area

Helena Area Reclamation

No

Work Performed

Remaining work

consist of

reve etation

Julia

Fiske

Area Reclamation

No

Work Performed

Remaining

work consist

of

revegetation

Resurrection

Mining

Company

A

4

Advanced Environmental

Sciences

Inc

November

26

2 4

Page 32: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 32/149

Work Completed as

Listed on the CDRMS CIRCES Cost

Estimate

Cont

YEAR

ITEM

WORK DESCRIPTION

2 3

Cont

Eclipse Area Reclamation

All

work

completed in 2

Irene Area Reclamation

All

work

completed

in 2

Water Treatment

Collected

pumped

and

treated approximately 2

million

gallons of water

from

the Black

Cloud

toe drain

Eclipse

Soil

All work completed in 2

2 4

Mob Demob

Completed

Al l work completed All mine and mill structures not necessary for Yak Tunnel blockage pumping tailing

impoundment dewatering

Black Cloud water treatment i e treatment plant

site

snow removal

and

maintenance operations were demolished and disposed

recycled

and or sold

in

2 In 2 4 the non

functional media filter

housings were

buried in

the

onsite debris cell and the media from

the

filters was

placed

Black Cloud Reclamation

in the tailing impoundment

The Black Cloud mine surface area was loosened fertilized and seeded in 2 4 Steep

slopes

were

hydromulched

and see ded and flatter slopes were

disked

mulched and crimped

The debris cell was constructed

filled

and graded in 2 In 2 4 the cell was reopened for the media

filter

housings

and then

closed

and

regraded

The spreading of plant growth media was completed in

October

2 4 The tailing was surveyed prior to

Tailing

Impoundment Reclamation

commencement

of seasonal

work

and

after completion

of

the

2 4

work The Black Cloud Julia

Fiske

and

Helena

areas were

seeded fertilized

and

mulched in October

and

November of 2 4

Helena Area Reclamation

Al l

work completed Compacted

roadways were loosened

seeded fertilized and mulched

in

2 4

Julia

Fiske

Area Reclamation

All work completed

Compacted roadways were loosened

seeded fertilized and mulched

in 2 4

Eclipse

Area

Reclamation

A ll

work

completed in

2

Irene

Area Reclamation

All

work

completed in 2

Water

Treatment

Collected pumped

and treated

approximately 42 3

million

gallons

of water

from the Black Cloud toe

drain

Eclipse Soil

A ll

work

completed

in

2

Resurrection

Mining

Company

A 5

Advanced Environmental

Sciences

Inc

November

26 2 4

Page 33: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 33/149

APPENDIX B

SITE

PHOTOS

Page 34: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 34/149

B lack C loud M ine Facilities

2 4

Page 35: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 35/149

Black

Cloud Mine Facilities Fall 2 2

Page 36: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 36/149

k

 

t t

K

Tailing

Storage

Facility

August 2

Page 37: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 37/149

Tailing

Storage

Facility

November 2 3

Page 38: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 38/149

Black

Cloud

Mine

Site

Bench

Fall

2 4

v

 

4

Page 39: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 39/149

M

s

r

4

Y

7

y

Black

Cloud

Debris

Cell

Fall

2 4

r

Page 40: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 40/149

Tailing

Storage Facility Stormwater Outlet Fall

2 4

Page 41: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 41/149

Clear

Grit Mil l Fall 2 4

Page 42: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 42/149

IG  

Fall

2 2

Page 43: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 43/149

Page 44: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 44/149

IG

2 Fall 2 2

Page 45: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 45/149

Eclipse

Waste Rock

Dump

Spring

2

Page 46: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 46/149

MINOR MODIFICATION MD

 

Page 47: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 47/149

Resurrection Mining Company

6363

South Fiddlers

Green Circle

Greenwood

Village

CO 8

August

3

2 9

Mr Alan Sorenson

State

of

Colorado

Division of Reclamation

Mining

and

Safety

 3 3

Sherman Street Room

2 5

Denver CO 8 2 3

Re

Black Cloud Mine

Reclamation

Plan

Minor

Amendment

 

Resurrection

Mining

Company

Dear Mr Sorenson

Please

find

this request

and the

corresponding

bank dra ft in

the

amount

of  

for minor

amendment

 

to

the

Black

Cloud Reclamation

Plan

As

we discussed

during

your

recent

site

visit we propose this minor amendment to the Reclamation Plan

such

further

research can

be

conducted prior to making a connection with the Yak Water Treatment pipeline

as

proposed

in

the

Black Cloud Reclamation Plan

The

further

research determined

necessary primarily focuses on

flow

rates

local climatic

conditions

and alternate

management

technologies

As indicated

this

summer a young intern

did a preliminary characterization

of

the adit chemistry and

flows

The

water quality data

to

date

does

not

suggest

a

direct

discharge

of

this water but

the

flow

rates

measured

June

5

45 gpm

July

4

97

gpm August

5

36 gpm suggest alternative long

term

water management methods

might be

possible depending

upon further characterization of

flows

and

climatic conditions

In

Page 48: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 48/149

Black

Cloud

Reclamation

Plan

Minor

Amendment

 

August

3

2 9

Page

2

Cc

Tim Runnells

Rebecca Haldane

Page 49: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 49/149

DIVISION

OF RECLAMATION MINING AND SAFETY

Department of Natural Resources

 3 3 Sherman

St

Room 2 5

Denver Co lo rado 8 2 3

Phone 3 3 866 3567

FAX 3 3 832

8 6

STATE OF COLORADO

COLORADO

D I

V IS I

ON

O

F

RECLAMATION

MINING

SAFETY

Bil l Ri tter Jr

Governor

Har ris D Sherman

Executive Director

November

2

2 9

L5

Ronald W

Cattany

Division Director

Mr

William

Lyle

Natural Resource Trustee

Resurrection Mining

Company

6363 South

Fiddlers

Green

Circle

Greenwood

Village

CO

8

Re

Black

Cloud

Mine

File

No M 2 8  83 Modification Approval Revision No MD  

Dear Mr Lyle

On September 25 2 9

the Division

of Reclamation

Mining

and Safety approved

the

Modification application

submitted

to the Division on September 3

2 9

addressing the following

Provide

work

plan to research unnamed adit

by February  5 2 Execute

work plan

approved by the

Division during 2 and

provide final

reclamation plan for unnamed

adit

by February  5 2

The terms

of the

Modification No

  approved

by

the

Division

are

hereby

incorporated

into File

No

M

2 8

 83 All

other

conditions

and requirements

of

the Consent Decree

remain in full

force and

effect

Page 50: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 50/149

MINOR

MODIFICATION

MD 2

Page 51: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 51/149

N6

s

Resurrection

Mining

Company

6363 South Fiddlers Green

Circle

Greenwood Village Colorado

8

3 3 863 74 4

November

3 2

Mr

Allen Sorenson

State of

Colorado

Division

of

Reclamation

Mining

and

Safety

 3 3

Sherman

Street

Room

2 5

Denver CO 8 2 3

Re

Black

Cloud

Mine

Minor Amendment

2

Resurrection Mining Company

Dear Mr Sorenson

M

9 3

o83

Rwonm

DEC   2

tD

Division

at

k 4

Men

3

Mfning

an d

kiy

MA  

Please

find this

request

for

a

minor amendment to

the

Black Cloud

Mine

Reclamation

Schedule

and

the enclosed  

check

for

processing

this

request

Resurrection Mining

Company Resurrection

requests

that the Reclamation Schedule be amended for the

demolition

and

removal of

the

Black

Cloud

Mine scale house in 2 rather

than

2

allowing the scale house to

be

used during 2 for weighing

demolition

materials being

shipped

off

site

during

the

Black Cloud mill

crusher

and support buildings

demolition

With

this

request Resurrection

agrees the scale house will

be demolished

and

removed

in

2 prior to encumbering the

advancement

of the Black

Cloud

waste pile removals

In addition Resurrection request the Division considermodifying the

Reclamation

Page 52: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 52/149

Division

of

Reclamation Mining and Safety

Fee Receipt fo r M2 8 83

Resurrection

Mining

Company

Receipt  

9488

Date

 2  3 2

Permit

M2 8 83

 

Paymen t Me thod

Revenue

Amoun t

22398

mr

43

Minerals

Technical

Revision

M 2 8  83 fees

paid

by

Idarado

Mining Company

 

Receipt

Tota l

 

Page 53: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 53/149

DIVISION OF RECLAMATION MINING AND SAFETY

Department of Natural Resources

 3 3 Sherman St Room 2 5

Denver

Colorado

8 2 3

Phone

3 3

866 3567

FAX

3 3

832

8 6

STATE

OF

COLOMDO

COLORADO

D I VISION OF

RECLAMATION

MINING

SAFETY

Bill Ritter Jr

Governor

Harris D

Sherman

Executive

Director

November

2

2 9

tl

L 5

Ronald W Cattany

Division Director

Natural

Resource Trustee

Mr William

Lyle

Resurrection

Mining Company

6363

South

Fiddlers Green

Circle

Greenwood Village CO 8

Re

Black

Cloud

Mine

File

No

M

2 8 83 Modifcation Approval Revision

No

MD  

Dear

Mr

Lyle

On

September 25 2 9 the

Division

of Reclamation Mining

and

Safety approved

the

Modification application

submitted to the Division on September 3 2 9 addressing the following

Provide work plan to research unnamed

adit by

February  5 2 Execute

work plan

approved by

the

Division

during 2

and provide

final reclamation plan

for

unnamed

adit

by February

 5 2

The terms

of

the

Modification

No

 

approved

by

the

Division

are

hereby

incorporated

into

File

No

M

2 8

 83 All other conditions and requirements of the

Consent Decree

remain in full force and effect

Page 54: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 54/149

MINOR

MODIFICATION MD

3

Page 55: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 55/149

KS

u

b

 rv

t

4

I

Resurrection Mining Company

6363

South Fiddlers

Green

Circle

Greenwood Village

CO 8

August 9 2

Mr Alan

Sorenson

State of

Colorado

Division

of Reclamation Mining and Safety

 3 3 Sherman

Street

Room

2 5

Denver

CO 8 2 3

Re

Black Cloud

Mine

Reclamation

Plan

Helena

Black

Cloud Mine

Shaft

Minor Amendment

Resurrection

Mining

Company

rv i

zoo

  3

M D

3

RECEIVED

UG

 

9 2

Dear M r

Sorenson

Division of Reclamation

Mining

Safety

Per

our

recent

conversation concerning

the

Black Cloud Mine Reclamation

Plan

Resurrection

Mining Company Resurrection submits this minor amendment application for modifications to

the reclamation

plan pertaining to capping

the Helena

mine shaft and the

removal of

the Black

Cloud mine shaft

head

frame

and

hoist house

As

we discussed

Resurrection

is

proposing

to

modify the Helena Shaft

reclamation

cap

to allow

continued

access

to monitor

groundwater

elevations contained within the Black

Cloud

Mine

workings and the

Yak

Tunnel blockage As part

of

the

California

Gulch

Superfund

Yak

Tunnel

contingency

plan

there

is a

continued

need to

monitor

the

Helena Shaft

groundwater

elevations

Besides accommodating these

monitoring

activities the proposed cap

revision will

allow

Page 56: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 56/149

Black

Cloud

Mine

Reclamation

Plan

Helena

Black Cloud

Mine

Shaft Minor

Amendment

Resurrection Mining

Company

Page

2

Currently

to

the

remove

and or replace the pump and or

pump

casings from the shaft

a

snatch

block

assembly

has

been retro

fitted

on

the

head frame

above

the pump

motor

and a

drill truck

and

a

mine timber

hoist

are

required to move

the

pump

assemblies

to

and

from

the

shaft The

lifting cable

on the

drill truck cable drum is extended horizontally

out and

away

from the

drill

truck

to

the

snatch

block

such

that

the

pump

assemblies

can

be

either

l if ted or

lowered

into

place

while a second

cable

from

a mine timber

hoist

adjacent to the head frame

is

used to pull the

equipment away

from

the

head

frame

This process is

quite

cumbersome and exposes

personnel

to

multiple lifting

cables being stretched

and stressed in a

fairly confined

area

should

a cable

break or separate personnel

could

be

injured

Each of these pieces of equipment are designed to

lift vertically not horizontally

an d such uses as

described

above tends

to

stress

the

lifting

cables and doesn

t take

advantage

of

the equipment

s specific design

Should

the head

frame be removed

a

drill truck or

a

pump

service truck could be positioned

directly over

the

pump motor

with

the

truck

mast raised

into

place

and

the

pump equipment

used

as designed that is lifting vertically

from

the

shaft

in

the

same manner as any routine pump

removal

from

a well Being able

to

utilize the truck lifting

equipment

in

this

manner would make

the process more

productive

will take less time

to

service the

pump will result

in safer

maintenance with more open space and less equipment

cables

and will result in less expense any

time

the

pump

needs to serviced

Attached

please

find

a

bank

draft

in

the

amount

of

  for

the

administration

of

this

request

If you

have

any

questions please let me know at

3 3 837

5852

Sincerely

Page 57: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 57/149

Division of Reclamation Mining

and

Safety

Fee Receipt fo r M2 8 83

Resurrect ion

Mining

Company

Receipt

Date

Permit

 

55

 8   2

M2 8 83

Method

ayment

Revenue Cocle

23244

43

3

Minerals

Amendment

Fees

M

2 8 83 Paid By Idarado

Mining Company

 

I

Receipt

Total

i

  I

Page 58: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 58/149

August 26

2

Joh n W

Hickenlooper

Governor

Mike

King

Mr William

Lyle

Executive Director

Resurrection

Mining Company

Loretta E Pmeda

Director

6363 South Fiddlers Green Circle

Greenwood

Village CO 8

Re

Black Cloud

Mine File No

M

2 8 83

Modification

Approval Revision No MD 3

Dear Mr Lyle

On August 26 2 the

Division

of Reclamation Mining and Safety approved the

Modification

application submitted

to the

Division

on

August

9

2

addressing the

following

Mods Helena Shaft closure method Demolish and remove Black Cloud headframe and

hoist

house

The

terms

of

the Modification No 3 approved

by

the Division are hereby incorporated into Black

Cloud Reclamation Plan in accordance

with

the

terms

of the

Consent

Decree All other conditions

and

requirements

of

the Reclamation Plan remain in full force and effect

Page 59: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 59/149

Page 60: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 60/149

4MOl

Resurrection

Mining Company

6363 South

Fiddlers

Green

Circle

Greenwood

Village

CO

8

October

 

2 2

Mr Alan

Sorenson

State of

Colorado

Division

of Reclamation

Mining and Safety

 3 3

Sherman

Street

Room

2 5

Denver CO

8 2 3

Re

Black Cloud

Mine

Reclamation Plan

Iowa Gulch Tailing Minor Amendment

Dear Mr Sorenson

A

zoo

9

 83

RECENED

OCT  

S

2 2

Division

of

Reclamation

Mining

Safety

Per

our recent conversation concerning the Black Cloud Mine Reclamation

Plan

Resurrection

Mining

Company Resur rection submits th is minor

amendment

application

for

modifications to

the reclamation plan pertaining to changing the grading of the Iowa Gulch tailing reclamation

cap

Under the existing reclamation plan in

excess

of 6 yd of material will be

needed

for final

reclamation

Based

on current information there may no t be enough material

at

the

Black Cloud

Mine

site and scree hill

combined to meet

the

required fill volumes The Homer p lacer

can

provide

the

remaining fill but requires

a

haul

of

several

miles

using either

dirt

roads

or

paved

County roads

both

which

run along

portions of streams

In

addition the

existing

reclamation

Page 61: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 61/149

Mr Alan Sorenson

October

 

2 2

Page

2

The attached figures present details

of the proposed

plan

Attached please find

a

bank

draft in

the

amount

of   for the

administration

of this request

If you

have

any questions please le t me know at

3 3 863

74 4 or on

my

cell phone at

3 3

258 6539

Sincerely

Larry Fiske

Senior Manger Legacy

Sites

Closure

and

Reclamation

Cc

Al Long Resurrection Mining Company

Tim

Runne lls AES

Page 62: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 62/149

Division

of

Reclamation Mining and Safety

Fee Receipt

fo r M2 8 83

Resurrection Mining Company

 

Receipt

Date

Permit

 3839

  4 2 2

M2 8 83

Method

ayment

Revenue

Code

Fee Description Notes

Amount

2 96 jwd

43

3

Minerals

Amendment

Fees

M

2 8  83

Paid

By Advanced Environmental Sciences Inc

 

Receipt

Total

 

Page 63: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 63/149

Resurrection

Mining

Company

C

 4

Advanced Environmental

Sciences

November

26 2 4

t

a

ROSS SECTION

4

CROSS SECTION 3

CROSS

SECTION

2 CROSS

SECTION

 

rte

ACCESS ROAD

TO LEADVILLE

IOWA

GULCH

I

GULCH

I

GEUNE

 

n

Existing

EM

  944

947

93

Final dv   95 3

Final

EIv

  95

7

El

  9 4 7 5 4

Z

Z

J

  GE

Existing

Eh

  948 23

I

Fi 953 25

LOW

FLOW CHANNEL

ExfstMg

lE

  94253

  22

  23 24 25

ind

dv   947 54

Find Fl

  947

8

I

 

SLOPE

 9   RG

Existing

Elv

  942

6

 

6

 

7

 

8

ExlstingFfly

  9 47 2

ow

ow

Low

Flow

IstM

94639

Channel

Elv   953

 

At

fisting

El

  943

4

9

25 83

E ND O F LOW

FLOW

CHANNEL

WRH EXISTING CHANNEL

ELV   947  

d

Z

Channel

Elv   9456

Low F low

Fin 95

39

LU

Channel

dv  

48

2

7

EERED CHANN

4   SLOPE

Existin El

  934

68 x

45

7

9

I

82

Existi 945

46

Low

Flow

3

o

Fina953

65

Z

Channel Elv

  9 43 2

g

J

x

Existing

El   93455

 

BADE BRENC

Find

El

  942

32

i

7

B

g

6

 

7

 

i 7

U

m

ss

4l

 

3

AIAAAP

t

 

5  

I

 

LEGEND

 t

2

 

Existing Elv   939

33

x CULVERT

Find Elv   938 2

DRAINAGE DITCH

DO NOT DISTURB

EXISTING DITCH

L

DRAINAGE

CNANNEL

FLOW

DIRECTION

PROPOSED 38 CMP SUB SURFACE

SPILLWAY I NV E LV

  933  

SPOT

ELEVATION

I

i

p

SCALE

NORTH

3

TAIL INGS POND REGRADING PLAN

DRAWING

 

Resurrection

Mining

Company

C

 4

Advanced Environmental

Sciences

November 26 2 4

Page 64: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 64/149

Resurrection

Mining Company

C  5

Advanced

Environmental

Sciences

Novembe r 2 6 2 4

c

e

6

4

  97

97

W

  965

STA

3

4

 4

STA

3 6 7

EE

  943 4

E   94 88

CUT

VO

  965

Z

 

J

LL

  96

NAL

SURFACE

STA 24 78 73

ELEV   D5 32

  96

d

Tn

 

STA

3

8 9

STA 9 6667

  O

 955

STA

2

 9

29

E lE V 9 38 4 8

LL

VOWME

EIEV

  853  

955

Z

J

  95

E IF V 9 43 8 8

STA 3

84

45

STA 23 8 2

ELEW

  94

6

UJI

 

94 7

  95

Z

  945

ST

52  6

STA 5 526

945 Q

  94

946

99

ELEV   939  8

STA  W 99 37

STA 2

x923

EIEV

  947  

935

EIEV   937

58

TA

 9 8 8 8 7

ELEV

  947

2 32

 8

2

  94

U

Inlet o Culvert

45

  935

O

 

93 STA 2   83

CUT VOLUME

EXISTING SURFACE

STA

7 934

  83

Y

lJL

  925

EL EV   93595

V   93458

STA   7 7

  925

U

ENGINEERED

CHANNEL

E

  9 3 4 3 6

MERGE

wrrH

EXISTING

SWAIE

 

92

STA   8458

  92

m J

  9 5

ERCE

WfrM EXI ST ING GRADING

E lE V 9 34

55

  9 5

  9

9

2   3 4

 

5

 

6   7 8

9

  2

  3

 

4

  5  

6

 

7   8

  9   2

2 22

  23 24

25

  26

 

NOT TO

SCALE

LOW FLOW

CHANNEL PROFILE

9

DRAWING 2

r

Resurrection

Mining Company

C  5

Advanced

Environmental

Sciences

November26

2 4

Page 65: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 65/149

Resurrection

Mining

Company

C

 6

Advanced

Environmental Sciences

November 2 6 2 4

 

9

e

a

a7a

 

f

MERGE WITH

EXISTING

6AM

EDGE

EXISTING

SURFACE

Resurrection

Mining

Company

C

 6

Advanced

Environmental Sciences

November 2 6 2 4

a

a7a

 

f

r

2 6 2 4

Page 66: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 66/149

Resurrection

Mining

Company C  7

Advanced

EnWronmentnl3clences

Novembe r 2 6 2 4

  97

965

MERGE

  96

955

  95

945

  94

935

  93

925

  92

97

965

  96

955

  95

945

  94

935

  93

925

  92

8

 

NOT TO SCALE

a

MERGE WITH EXISTING GRADING

ITH EXISTING DAM

EDGE

F INAL SURFACE

O

n

N

Q UW

 

U

Y

U

g

m

DO NOT

CUT

RW9dlne

STA

3 24 72

ELEV

  95

Lor

Fbw

CnonnN

STA 7

STA

5

43  

947

48

E IF V 9 47

54

 8

84

STA 2 4 38

F EM   94927

2

STA

LEM

  9 4 3 7 4

 9 2

ELEAV  944

STA

5 43  

E IE V 9 42

53

STA 7

 8

 

E

  84

6

F ILL VOLUME

EXISTING SURFACE

d

 

2 3

4

 

5

6 7

3

CROSS

SECTION 2

DRAWING 4

4

Resurrection

Mining

Company C  7

Advanced

EnWronmentnl3clences

Novembe r 2 6 2 4

Page 67: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 67/149

Resurrection

Mining

Company

C

 8

AdvancedEnvironmental Sciences

November

2 6 2 4

  97 97

8

  965

EXISTING

STOCKPILES

MERGE

WITH

EXISTING

STA 3

 7 53

DAM

EDGE

  D3 B

DO NOT DISTURB

MERGE WITH EXISTING

GRADING

  965

  96

FINAL SURFACE

  96

8s

  955

Rid9eline

STA

3

7

25

ELEV   95 78

STA

  943

955

Q

ow F lo w

ELEV

OhpnMl

  95

STA

LEV 2 73

4

947

83

STA 8 4

am

  94232

  95

Z

a

  945

  94

STK 3 7827

ELEV   94

945

  94

Cl

Z

Z  

J U

TAIEN

84 4

z

2

5

846

STA 4  9 55

EL

EN   94 45

  935

  93

STA 8 3 9 9 8

ELEV   834 59

  935

STA

9

3238

ELEV

  93

Qj

N

O

p

Y

C  

STA 5 6 9 6 5

ELEW   934 62

STA

9  9 42

ELEY

  936

2

925

EXISTING

SURFACE

FILL VOLUME

 925

 

92 92

9 5

  9 5

  9

2   3

 

4

 

5   6   7   8

  9  

5

NOT TO SCALE

CROSS SECTION 3

DRAWING

5

5

Resurrection

Mining

Company

C

 8

AdvancedEnvironmental Sciences

November

26

2 4

Page 68: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 68/149

Resurrection

Mining Company

C  9

Advanced

Environmental Sciences

November26 2 4

s

3

Y

w v

  97

97

965

STA 3 57  

E LE V 9

67

srA 3   72

ELEV

  949 72

MERGE WITH EXISTING GRADING

  965

  96 F EXISTING

STOCKPILES

V

  sou

EXISTING SURFACE

  96

z

O

DO NOT

DISTURB

a

  955

F INAL SURFACE

  955

z  

95

STA 3 5 48

ELEV

  947

88

STA 4 4662

UL M

  947

8

STA 9 97

 

ELEV

  944

26

  95

J P

Q U

LLI

to

  945

  94

STA 3

2

8

F

EV

  9492

STA

3

948

ELEV   945 33

STA 8 9 87

ELEV 7 943

 

9

29

67

  945

  94

O

  6

CO

  935

DO NOT CUT

 9 35

ind surfco

RldgeMe

STA 4   9

EIEV

  947

98

 

4

fl

 9

93

925

MERGE

WITH

EXISTING DAM

EDGE

Cnonnel

saoi

  925

Low

now

  92

F ILL VOLUME

  92

9 5

  9 5

 

2

 

3

4

 

5

 

6   7

 

8

 

9  

NOT

TO SCALE

t

CROSS

SECTION 4

DRAWING 6

6

Resurrection

Mining Company

C  9

Advanced

Environmental Sciences

November 26

2 4

Page 69: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 69/149

STATE

OF

COLORADO

DIVISION OF RECLAMATION MINING

AND

SAFETY

Department of

Natural Resources

 3 3 Sherman

St

Roam 2 5

Denver

Colorado 8 2 3

COLORADO

Phone 3 3 86 6 3567

UI

V

ISION OF

RECLAMATION

FAX

3 3 832

8 6

MINING

SAFETY

John W

Hickentooper

Govemor

December

 7

2 2

Mike King

Executive

Director

Mr

Larry

Fiske

Loretta E Pifteda

Director

Resurrection Mining

Company

6363 South Fiddlers Green

Circle

Greenwood Village CO 8

Re

Black Cloud Mine File

No

M

2 8 83 Modification Approval Revision No MD 4

Dear

Mr Fiske

On November 2 2 2

the Division

of Reclamation

Mining

and

Safety DBMS

approved the

Modification application

submitted

to the Division on October 3 2 2

addressing

the following

Iowa

Gulch

tailing

impoundmentgrading

and drainageplan

The terms

of

the

Modification

No

4

approved

by

the

Division

are

hereby incorporated

into

the

Black Cloud

Mine

reclamation plan under the Consent

Decree DRMS

File No M 2 8

 83

All

Page 70: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 70/149

MINOR

MODIFICATION

MD 5

Page 71: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 71/149

Resurrection

Mining Company

6363 South

Fiddlers

Green

Circle

Greenwood

Village

CO

8

February   2 3

Mr Allen Sorenson

State of

Colorado

Division

of

Reclamation Mining and Safety

 3 3

Sherman Street Room

2 5

Denver CO

8 2 3

Re

Black Cloud Mine

Reclamation Plan

Amendment 5

Growth

medium source modification

Dear Mr

Sorenson

Please

find

this

request

and

the

corresponding bank

draft in

the amount

of  

for

minor

amendment

5

to

th e

Black

Cloud

Reclamation

Plan

Reclamation

Plan

For

this minor

amendment application to

the

Reclamation

Plan

Resurrection

Mining

Company Resurrection

p roposes to

obtain

a tailing

growth medium from

the area

where the Black Cloud

surface

facilities

were

located

which is approximately

Z

mile to the

north of

the tailing

impoundment

Resurrection

feels

that using the proposed

local growth medium

source would reduce the

impact

on county roads and

stormwater

quality

reduce

fugitive

dust reduce

costs

and still meet the

conditions for

growth medium

as

outlined

in

the Reclamation Plan

Under

the

current Reclamation

Plan the

soil cover

will

include material from

the

following

a

stockpile located to the east of the tailing pond imported grow th medium from

the

Page 72: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 72/149

Mr Allen Sorenson

February  

2 3

Page

2

The

current topography

of

the Black Cloud

shaft

area is shown on Figure

 

The existing

surface

topography

is

at an approximate 3

 

horizontal vertical

slope with a flat

portion surrounding

the

Black Cloud shaft

and debris

cell Under

the

proposed amendment

the

growth material

would be generated by removing material

from the

slope

and

flat areas

with the exception

of

buffers

around the

debris

cell

and

shaft

Essentially

the

hillside would

be

cut back

approximately 3 feet from its

current

location and

the

current 3

 

slope

would

be retained

The

final topography after

the

growth medium is removed is shown

on

Figure 2 The proposed cut

would

stop

at

the

limit

of

disturbance

shown

on

Figure

2

The

disturbed

source

material

area

would

be

re vegetated per the

Reclamation

Plan requirements

Six samples

were

collected from the proposed

tailing

cover material source and

analyzed

by the

Colorado State

University

Soil

Water

and Plant Testing Laboratory CSU

fo r

suitability as a

growth

medium

The results of the analysis are enclosed with

this

letter

The

Soil Water and

Plant Testing Laboratory

recommends that 4 pounds

of nitrogen per acre be added and for

one

of the

six

areas

4

lbs of

phosphorous

per

acre be

added to the proposed growth

medium

The

CSU results were reviewed by Mr Victor

Meyer a

restoration ecologist Based on Mr Meyer s

recommendations Resurrection plans to

amend the

growth medium

with

4

pounds per acre

of

nitrogen

phosphorus and potassium

which will be incorporated into

the top

6

inches of

material

Attached

please find

a bank draft in

the

amount of   for

the

administration of this

request

If you have any questions please

contact

me at your convenience at

3 3

837 5676 or on my cell

phone at

3 3

258 6539

Sincerely

i

Page 73: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 73/149

v

o

c H

n ry

v

v

O Z

c

N

V

E

ua

c

e

5

r

I

ELECTMCALUILDING

DEBRIS

CELL

BLACK CLW

SHAFT

IMIT

OF DISTURBANCE

C

Q

O

F

U

U

 

LEGEND

Existing

Contour

NORTH

SCALE

IN FEET

i

 

loo

2

v

o

c H

n ry

v

v

O Z

c

N

V

E

ua

c

e

i

d

Page 74: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 74/149

j

ELECTRICAL

f

BUILDING

l

DEBRIS CELL

f

BLACK CLOU

D

SHAFT

MIT

OF

DISTURBANCE

4 m o

som

 

6

6

  6

w

 

5 7

  5

4

4

4

 

V

  3

3

  2

2

M

  2

U

 

O

w

U

ySi

 

U a

99

98

O

  9

O

t

DIMENT

BASIN

LOCATION

TAILING IMPOUNDMENT LOCATED

APPROXIMATELY  6 FEET SOUTH

LEGEND

Existing

Contour

Proposed

Contour 2

Interval

  99

Proposed Contour

 

ft Interval

NORTH

SCALE

 

d

h ry

g

i v

  2

W

a

 

N

U

m

n

 

a

G

O

Jamie

Langer Advanced

Environmental

Sciences

Inc

Colorado State

University

383 West

37th St

 

PIN

nt

V4

Soil

Water

and

Plant Testing

Laboratory

Loveland

CO

8 538

Q

 

Natural

Environmental Sciences Bldg

A3 9

Fort Collins CO 8 523   2

Page 75: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 75/149

DATE

RECEIVED  7

27

2 2

2 8

97 49

5 6

FA X

49 293

DATE REPORTED  7

 8

2 2

BILLING

RESEARCH

SOIL ANALYSIS

A B D TP A

LabSample paste ppm

ID

pH EC

CaCO3

OM

NO3

N P

K

Zn

Fe

Mn

Cu CEC

mmhos

cm

equiv

meq g

R42

BC

AGR W

7  

2

 

3 86  

7

7 36

27

36

7 4 3 9

5

9 9

R42 BC AG R W2 7

4

 

4

3

6 2 2 7

8

5  46  63

3 6

9   5 6 8 5

R422 BC AGR W3

7

5

 

3

  7

5

 

8

  32 99

3

23 4

 2 3 3 5 8 3

R423

BC

AGR

E

6 9

2 2 2 63  

7

  4

8

5

 43 287

7 6  7

7

28 4

 

6

R424 BC AGR E2

7 2 2 2

2 6  

8

2

3

  5

 53

 73 4 5 26 6

32 9

 3 8

R425 BC

AGR E3

6 8 2

  6

  7 2 5

 

5  43 23 38 8 78 3 26 6 9 5

Total

La b

Sample

S A B

ID Sand Silt

Clay

Texture

potential

R42 BC AGR W

44

23 33

Clay

Loam

  59

33 6

R42 BC

AGR W2 45

2 34

Clay Loam

  94

33  

R422

BC AGR

W3 48

2

32

Sandy Clay Loam

 

45  5 6

R423 BC AGR

E

52 2 28

Sandy Clay Loam

 

5

2 6

R424

BC

AGR

E2

44

22 24

Clay Loam

  37  7 3

R425

BC

AGR E3 48  9 33

Sandy Clay

Loam

  8 7 23

Crop

La b

Sample to be Ferti l izer Suggestions

ID

grown

irrigation

N

P2 5

K2

lb A

R42 BC

AGR

W

  native grasses

dryland 4

4

R42 BC

AGR W2 native grasses

dryland

4

Actd Base

potential

based

on

 

x

CaCO3

equiv

3

25

x

Total S

R422

BC AGR

W3

native grasses dryland 4

Acid

Base

potential

based on  

x

CaCO3

equry

3

25

x

pyritic

S

R423

BC AGR E

 

native grasses dryland

4

A

B potential calculated as Tons of CaCO3 per   tons of material

R424

BC AGR E2 native grasses dryland 4

R425

BC

AGR E3

native grasses

dryland

4

Page   of  

Resurrection

Mining

Company

C 25

Advanced Environmental Sciences

November

26

2 4

Page 76: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 76/149

STATE OF COLORADO

f

DIVISION

OF

RECLAMATION

MINING

AND SAFETY

Department of Natural Resources

 3 3 Sherman

St

Room 2 5

Denver

Colorado

8 2 3

COLORADO

Phone

3 3

866

3567

4

v

irall

L

i

RECLSAMATION

FAX

3 3

8 32 8 6

MINING

SAFETY

t

Jo hn W Hickenlooper

March

2 2 3

C

S

Governor

Mike King

Executive Director

Mr

Larry

Fiske

Loretta

E

Pmeda

 

Resurrection

Mining

Company

d

Director

6363 South Fiddlers Green

Circle

Greenwood

Village

CO

8

Re

Black

Cloud Mine

File

No M

2 8 83

Modification

Approval

Revision No Mn 5

Dear

Mr

Fiske

On March

 5 2 3

the

Division

of

Reclamation Mining

an d

Safety

DRMS

approved

the Modification

application submitted to th e Division on

February

 3

2 3

addressing the following

Growth Medium

Source Modification

The

terms

of the

Modification

No 5

approved

by the Division are

hereby incorporated

into the Black Cloud

Mine

reclamation

plan

under the

Consent

Decree

DRMS File

No M 2 8  83 All other conditions and

requirements

of

the

reclamation

plan

remain

in

full

force

and

effect

Page 77: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 77/149

M INOR MOD IF ICAT ION MD

6

Resurrection Mining Company

6363 South

Fiddlers

Green Circle

Page 78: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 78/149

Greenwood

Village CO

8

May  

2 3

Mr

Allen

Sorenson

State of Colorado

Division

of

Reclamation

Mining and Safety

 3 3 Sherman

Street

Room

2 5

Denver

CO

8 2 3

Re Black Cloud Reclamation

Plan

Tailing Facility

Minor

Amendment

6

Proposed

Modification of Required Geotextile Covered Area

Dear Mr Sorenson

This

is

a

request

fo r

a

Minor

Amendment

6

of the 2 8

Black Cloud

Reclamation

Plan

Reclamation Plan

Enclosed

please find an accompanying

bank

draft in the amount of

 

to

cover

the

administrative

cost

of this

request

The Reclamation Plan states Section

4

 

p

 

that the

surface

of

the

Black Cloud tailing

facility in Iowa Gulch will be covered by

waste

rock

other natural

fill

material

and

vegetated

growth medium

Thin lifts of the subgrade

fill will be compacted

to reduce the permeability and

the surface will be graded for drainage

The fill

will then

be

covered

by

a geotextile The

geotextile

will

be

overlain

by

6

inches

of natural

borrow

material

and

 8

inches of

revegetated

growth medium

The

purpose

of

the

geotextile

is to maintain separation and prevent

Mr

Allen

Sorenson

Page

2

May

  2 3

Page 79: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 79/149

Resurrection

therefore requests

approval to

reduce the area to be covered

by geotextile to

those

portions

of the

tailing surface that are not covered by at least

4

feet of compacted fill

and

revegetated growth med ium or area s of the tailing that have

not

had to time to consolidate from

previous placement of subgrade materia l This

would

represent a reduction

in

the area to be

covered by geotextile from approximately 29 acres

to

approximately 4 acres In

addition

to

improved

root growth Resurrection believes that

reduction

of

the

area

of geotextile

will simplify

final reclamation minimize impacts to

the

existing tailing

facility

grading and schedule and

reduce the cost of

reclamation while still

fully meeting all of the goals

listed

in the

Reclamation

Plan for the surface

of

the Black Cloud tailing

facility

The approximate

area

to

be

covered by geotextile

is

shown in

enclosed

Figure

 

Final selection

of

the area

involved will

be

determined

in

the

field

by the

Colorado

Division of

Reclamation

Mining

and

Safety

Project Manager

If you

have

any questions

please

let me know at 3 3 837 5676 or on my cell phone at 3 3

258 6539

Sincerely

Lawrence E

Fiske

Senior Manager Legacy Sites Closure and

Reclamation

Cc

Al

Long

Resurrection

Mining

Company

Julio Madrid Newmont Mining Company

Page 80: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 80/149

STATE OF COLORADO

DIVISION

OF RECLAMATION MINING AND SAFETY

Department of Natural Resources

 3 3

Sherman

St

Room

2 5

C O

L O

R

A

D O

Denver Co lo rado 8 2 3

D

t

v

t

s

t o N o

IF

Phone 3 3 866 3567

RECLAMATION

FAX

3 3 832

8 6

MINING

St

SAFETY

John

W Hicken loope r

May

29 2 3

Governor

Mike K ing

Executive Director

Mr

Larry

Fiske

Loretta E Pmeda

Resurrection

Mining Company

Director

6363

South

Fiddlers

Green Circle

Greenwood Village CO 8

Re

Black

Cloud

Mine File No M 2 8 83 Modification Approval Revision No

MD 6

Dear Mr Fiske

On May

29

2 3 the

Division of Reclamation Mining

and Safety DBMS approved

the Modification

application submitted to the

Division on May

8

2 3 addressing

the

following

Modification of

geotextile

covered area in Iowa

Gulch

Tailing

Impoundment

The terms of

the Modification

No 6 approved by the

Division are

hereby incorporated

into the Black

Cloud

Mine

reclamation plan under

the

Consent Decree DRMS File No M

2 8

 83 All other conditions

and

requirements

of

the

reclamation

plan

remain

in

full

force

and

effect

Page 81: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 81/149

MINOR

MODIF ICAT ION MD 7

Page 82: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 82/149

Resurrection

Mining

Company

6363 South

Fiddlers

Green Circle

Greenwood

Village

CO 8

October 28 2 3

Mr Allen

Sorenson

State

of

Colorado

Division

of Reclamation

Mining

and Safety

 3 3 Sherman Street Room

2 5

Denver CO

8 2 3

Re Black

Cloud

Reclamation

Plan

Tailing Facility

Minor

Amendment

7

Proposed

Modification

of

Reclamation

Schedule

Dear Mr

Sorenson

This is

a

request

for a

Minor

Amendment

7 of the 2 8 Black Cloud

Reclamation Plan

Reclamation

Plan

as discussed

during

your

site visit

of October

2

2 3

This proposed

amendment is for an

extension

of the reclamation

schedule

from

2 3

to the end of 2 4 for

reasons as described below

Enclosed

please find an accompanying bank draft in the amount

of

 

to

cover the administrative

cost

of

this

request

Page 83: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 83/149

Mr

Allen

Sorenson

October

28

2 3

Page

3

5

Sort

demolition

debris

and

properly

dispose of debris unsuitable

for

onsite

disposal

Transport

off site

debris unsuitable for onsite disposal

and

salvage materials

6

Construct

and prepare debris

cell

place debris and

reclaim

the onsite debris

cell

if Mill

facilities

are not determined to

be

appropriate

for

preservation

If

the debris cell cannot

be constructed as

planned

because

the

mill

building

will

be

preserved

an d remain

then

debris will

be properly disposed

off site

7

Grade Black

Cloud

Mine surface plant

area

8

Prepare

roadways at Julia F iske

and

Helena areas for placement of p lant med ia

compacted roadways to be

loosened

through excavation

ripping and

grading

9

Excavated and transport off site borrow materials to the mine site for use as growth

medium

  Complete spreading

plant growth

media in ta il ing impoundment

Black Cloud

and

Helena

a re as se ed fertilize

and

mulch

 

Demobilize the

site

 2

The

Iowa

Gulch

Water Treatment building

and associated

pipelines will be demolished

an d

removed

if

the operator

has

demonstrated that the

Yak

or any new

water

treatment

plant

has adequate capacity to treat wa te rs from the Iowa

Gulch tailings facility through

at least one

spring summer

fall season and DRMS

provides

demolition

approval

Resurrection

Mining

Company Resurrection has

completed

Year 5 items

  6 and 9

through

Minor

Amendment 5 and is

currently

working on completion of items 7 8   and  

Due

to

the

above average

precipitation in

2 3 and

the

resulting

issues

of

access

necessary

for

i tems and

Mr A lle n Sorenson

Page 3

Page 84: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 84/149

October

28

2 3

was also

extremely

muddy and inaccessible

Starting

in August 2 3 additional

flow

to

the

toe

drain

occurred from

precipitation

on th e

tailing

facility Beginning in

Sep tember the

Black

Cloud

shaft

pumping

rate was

reduced to provide

additional

pipeline capacity and additional

toe

drain

water was sent to the Yak water

treatment

plant to assist in

dewatering

the tailing facility

pond By

the end

of

September

the tailing pond had

been

significantly

reduced

For

the reasons stated above

Resurrection

is

requesting an

extension in time for reclamation

If

the

extension is

granted Resurrection

will

complete all reclamation

work

by the

end

of

2 4

If

you

have

any questions

please don

t

hesitate

to call me at 3 3 837 5676 or on my cell phone

at

3 3 258

6539

Resp

fully

Lawrence

E

Fiske

Director Legacy Sites Closure and Reclamation

Cc

Al Long Resurrection Mining Company e

Julio Madrid Newmont Mining Company e

Tim

Runnells

AES

STATE

OF COLORADO

Page 85: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 85/149

J

DIVISION OF RECLAMATION

MINING

AND SAFETY

Department of Natural Resources

 3 3

Sherman

St Room

2 5

Denver Colorado

8 2 3

Phone 3 3 866 3567

FAX

3 3 832

8 6

eCS

COLORADO

D I

V I S

I O N O F

RECLAMATION

MINING

SAFETY

John

W

Hickenlooper

Govemor

November  5

2 3

Mike

King

Executive Director

Mr Larry Fiske

4

Resurrection

Mining

Company

Loretta

E

Pineda

6363 South Fiddlers

Green

Circle

Director

Greenwood Village CO 8

Re

Black

Cloud Mine

File No

M

2 8

 83 Modification

Approval

Revision No MD 7

Dear

Mr

Fiske

On

November

 5

2 3

the

Division

of

Reclamation

Mining

and

Safety

DRMS

approved the

Modification

application

submitted to the Division on

October

27 2 3 addressing the

following

Extend reclamation

schedule

through

the end of2 4

The terms

of

the

Modification No

7

approved

by

the

Division

ar e

hereby incorporated

into

the

Black

Cloud

Page 86: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 86/149

MINOR

MODIFICATION

MD

8

Page 87: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 87/149

Resurrection

Mining

Company

6363

South Fiddlers

Green Circle

Greenwood Village

CO

8

November 2

2 4

Mr Allen

Sorenson

State of

Colorado

Division

of Reclamation Mining

and

Safety

 3 3

Sherman Street Room 2 5

Denver CO

8 2 3

Re

Black

Cloud

Reclamation

Plan

Tailing

Facility

Minor Amendment

8

Proposed

Modification of

Final

Reclaimed Tailing Surface

Dear

Mr Sorenson

This

is

a

request

fo r a

Minor

Amendment

8 of the

2 8

Black Cloud Reclamation

Plan

Reclamation

Plan Enclosed please find

an accompanying bank draft in

the

amount

of

  to

cover

the administrative cost of

this

request

Historically the tailing

pond

was used

as

a

holding

pond

for pump back water

from

the

toe drain

seep collection

system With final

reclamation this will

no

longer be an

option as the

reclaimed

tailing

surface has

a

constant

slope

to

promote

surface

runoff

of

precipitation Currently

the

toe

drain water

is

sen t via

pipeline

to

th e

Yak

Water

Treatment

Plant

Yak

Resurrection Mining

Mr

Allen

Sorenson

Page 88: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 88/149

November 2

2 4

Page 2

If

you

have any questions please let

me

know at 3 3

837

5676

or

on my cell

phone

at 3 3

258 6539

Sincerely

RESURRECTIO

ING COMPANY

77

Lawrence E Fiske

Director Legacy Sites

Closure

and

Reclamation

Cc

Al

Long Resurrection

Mining Company

Julio

Madrid

Newmont Mining

Company

Tim Runnells AES

AVCOLORADO

Division of

Reclamation

Page 89: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 89/149

Mining and Safety

Department

of Natural Resources

 3 3

Sherman Street

Room

2 5

Denver CO

8 2 3

November

25

2 4

Mr

Larry

Fiske

Resurrection

Mining

Company

6363

South

Fiddlers

Green

Circle

Greenwood

Village CO 8

Re

Black

Cloud Mine

File No M

2 8

 83 Modification Approval Revision

No MD

8

Dear Mr Fiske

On

November

25 2 4 the

Division

of

Reclamation

Mining

and

Safety

DRMS approved the

Modification

application

submitted

to the

Division

on

November

25

2 4

addressing the

following

Maintain

as a backup water management system

the capability

to

pump toe drain

and tailing

seepage water

to a depression

at

the

south edge of the reclaimed tailing storage facility

The terms

of the Modification No 8

approved by the

Division are

hereby incorporated into

the Black

Cloud

Mine

reclamation plan under the

Consent

Decree

DRMS File

No M

2 8

 83

All other

conditions and requirements of

the

reclamation plan remain in full force and effect

If you

have any questions

please contact me

Page 90: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 90/149

APPENDIX

D

RECLAMATION

COSTS

APPENDIX

D

2 8

2 3

BLACK CLOUD

RECLAMATION

COSTS

LEDGER

DATE

VENDOR SERVICE

AMOUNT

2 8

Page 91: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 91/149

966 6 2 8

Haldane

Rebecca

Labor 2  

966 95

  6

2 8 Haldane

Rebecca

Burden

38

966

29

2 8 Haldane Rebecca

Labor

2

7 8 33

966 95

 

29

2 8

Haldane Rebecca Burden

5 4 58

966

7 2 8 Haldane

Rebecca

Labor

2 7 8 33

966

25 2 8 Haldane Rebecca

Labor

2

7 8 33

966 2

 6

2 8 Haldane

Rebecca Labor

2

7 8 33

966 2 28

2 8

Haldane Rebecca

Labor

2

7 8 33

37 7

 2

23 2 8

MFG Inc

Contract

Labor

Maintenance Supplies

 2

5 47

37 9  2 23 2 8

SLV Earthmovers Inc Contract

Services

5 4 7

Subtotal

34 353 7

2 8

Total

34 353 7

2 9

966 2 2 9

Haldane

Rebecca Labor

2 7 8

33

966 95   2 2 9 Haldane Rebecca

Burden

568 75

966 27

2 9 Haldane Rebecca

Labor

2 7 8

33

966 95

 

27

2 9 Haldane

Rebecca Burden

568

75

966

2  6 2 9 Haldane Rebecca

Labor

2 7 8 33

966 95

2  6 2 9 Haldane Rebecca

Burden

568

75

APPENDIX D

2 8 2 3 BLACK CLOUD RECLAMATION COSTS

966

6 25

2 9 Haldane Rebecca Labor 2

77

63

966 95

6 25

2 9

Haldane Rebecca

Burden 8 3 48

Page 92: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 92/149

966 7  6

2 9 Haldane

Rebecca Labor 2 77 63

966 95

7

 6

2 9

Haldane

Rebecca

Burden

858

9

966 7 28 2 9 Haldane Rebecca Labor

2 77

63

966 95 7 28 2 9 Haldane Rebecca Burden 858 9

966

8  7

2 9

Haldane

Rebecca

Labor

2 77 63

966 95

8 7

2 9 Haldane Rebecca Burden

858 9

966

8

25

2 9

Haldane

Rebecca

Labor

2 77 63

966 95 8 25

2 9

Haldane

Rebecca

Burden

858 9

966

9

25

2 9

Haldane

Rebecca

Labor

2

77

63

966 95

9

25

2 9 Haldane

Rebecca

Burden 858 9

966

6

2 9

Haldane Rebecca Labor

2 77 63

966 95

 

6 2 9

Haldane Rebecca

Burden

858 9

966 27 2 9 Haldane

Rebecca

Labor

2 77 63

966 95  

27

2 9

Haldane Rebecca Burden

858

9

966 6 2 9 Haldane

Rebecca Labor 2

77 63

966 95

  6

2 9

Haldane

Rebecca Burden 858 9

966

23

2 9 Haldane Rebecca

Labor

2

77

63

966 95

  23

2 9

Haldane Rebecca Burden

858 9

966 2 6 2 9 Haldane

Rebecca

Labor

5 3

75

966

2  6

2 9

Haldane

Rebecca

Labor 5 3 75

966 2

 6 2 9

Haldane

Rebecca

Labor

755 63

966 95  2 6 2 9

Haldane Rebecca Burden 2

58

966 95  2

 6

2 9

Haldane Rebecca

Burden

2 58

APPENDIX

D

2 8 2 3

BLACK CLOUD

RECLAMATION

COSTS

  7 4 3 2 9 MFG Inc

Contract Labor

32 94 97

Maintenance

Supplies

Page 93: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 93/149

 5

6

3

2 9

MFG Inc Contract

Labor

7 57

59

Maintenance

Supplies

 5 2 6 3 2 9

MFG Inc

Contract

Labor

2

6

2

Maintenance Supplies

 684 6 25 2 9 MFG Inc Contract Labor 7 49

Maintenance

Supplies

2334 8

 9

2 9 MFG

Inc Contract

Labor

 7

  6

5

Maintenance Supplies

264

9 7

2 9

MFG

Inc

Contract

Labor

2

57

5

Maintenance

Supplies

2727  

2 9

MFG Inc

Contract

Labor

37 999

43

Maintenance Supplies

2973

  2 2 9

MFG

Inc Contract

Labor

8

9 8 76

Maintenance Supplies

3255   2 2 9 MFG

Inc Contract

Labor

 7

366

92

Maintenance

Supplies

3556

 2

8 2 9 MFG Inc Contract

Labor

27 952 4

Maintenance Supplies

Subtotal 3 3 72 5

 6 2 6

 

2 9 Wells

Fargo Business

Credit  3

87

Material

Disposal REGGS

 66

6

 8

2 9 Wells

Fargo Business

Credit

7

848 54

APPENDIX

D

2 8 2 3 BLACK CLOUD RECLAMATION COSTS

2879   7 2 9

Wells

Fargo Business Credit

Material Disposal REGGS

3

 45  

Page 94: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 94/149

33 2

  9 2 9

Wells

Fargo

Business Credit

Material

Disposal

REGGS

  592 5

3327

  23

2 9

Wells Fargo Business Credit

Material Disposal REGGS

332 5

3699

 2

29

2 9

Wells Fargo Business Credit

Material Disposal REGGS

3

847 4

Subtotal

43   9 4

856

7

8

2 9

Alpine

Locates

and

Utilities

Utility Locates

2 5

 

2682

9 24

2 9

Alpine Locates

and Utilities

Utility Locates

2 5

 

3 24

  4 2 9

Alpine Locates and Utilities

Utility

Locates

365 5

Subtotal

775 5

2329

8

 9 2 9

Power

Equipment

Trackhoe

Rental

  244

49

288

7 2 9

Power

Equipment Trackhoe

Rental

 8

74

 692

6 25 2 9

Power Equipment

Trackhoe

Rental

 4  6 5

87

7

9

2 9

Power

Equipment

Trackhoe

 5

 76

5

APPENDIX

D

2 8 2 3

BLACK

CLOUD

RECLAMATION

COSTS

Subtotal

 6 937

5

3 6

Page 95: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 95/149

 

4 2 9

Del

Mont

Consultants

Inc

Surveyor Engineering Services

 4  38  2

3334

 2 2

2 9

Del

Mont

Consultants Inc

Surveyor Engineering Services

8  92 97

Subtotal

22 33 9

2636

9 7

2 9

Verizon Wireless Haldane

phone

charges

96

87

2968

 

2 2 9

Verizon Wireless

Haldane

phone charges

3 2

87

3326

  23

2 9

Verizon

Wireless Haldane

phone charges

662 46

3678

 2

22

2 9

Verizon Wireless

Haldane

phone

charges

352

96

Subtotal

 

4 5 6

3 22

  4 2 9

Phillips

66

Conoco Fuel

98

98

3427

 2

 

2 9

Fuel

Pipeline

  9

Subtotal

2 7 98

2328

8  9 2 9

Rebecca

Haldane Supplies

23 56

2582

9 9

2 9

Rebecca Haldane Supplies

44

4

2582

 

2 9

Office Depot

Supplies

236

 8

2884

 

APPENDIX

D 2 8

2 3 BLACK CLOUD

RECLAMATION COSTS

966 95

 

26

2

Haldane

Rebecca

Burden

453

38

966

2

 6 2

Haldane Rebecca Labor

2 77 63

Page 96: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 96/149

966 95

2

 6 2

Haldane

Rebecca

Burden

83

9

966 2

23

2 Haldane

Rebecca

Labor

2

77 63

966 95

2 23 2

Haldane

Rebecca

Burden

83

9

966

3

 6 2

Haldane

Rebecca Labor

2

875 92

966 95

3  6 2

Haldane Rebecca Burden

862 78

966

3

25 2

Haldane Rebecca Labor

  597

73

966 95

3 26 2

Haldane

Rebecca

Burden

479 32

966

4  6

2

Haldane Rebecca Labor

2 875 92

966 95

4 6

2

Haldane

Rebecca

Burden

862 78

966 4 27

2

Haldane Rebecca Labor 2

875 92

966 95 4 27 2 Haldane Rebecca Burden 862 78

966 5  7 2

Haldane

Rebecca

Labor

2 875 92

966 95

5

 7 2

Haldane

Rebecca Burden

862 78

966 5 25 2

Haldane Rebecca Labor 2

875

92

966 95

5

25

2 Haldane Rebecca Burden

862 78

966 6

 6 2

Haldane Rebecca Labor 22 22

966 6  6 2 Haldane Rebecca Labor 2 433 47

966 95

6

 6

2

Haldane Rebecca Burden

66 37

966 95 6  6

2 Haldane Rebecca Burden

73

4

966

6 25

2

Haldane Rebecca Labor

2 875 92

966 95 6 25 2 Haldane Rebecca Burden 862 78

966

7  6

2 Haldane Rebecca

Labor

2 875 92

966 95

7  6 2

Haldane Rebecca

Burden

862 78

APPENDIX

D

2 8 2 3 BLACK CLOUD

RECLAMATION

COSTS

876 9

 6 2

Marvin Long Labor

2 825

 

876

9

27

2

Marvin Long Labor

2 825

Page 97: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 97/149

876 95 7 27 2

Marvin Long Burden

847 5

876 95

7

27

2

Marvin

Long

Burden

 56 46

876 95

8 6 2

Marvin

Long

Burden

847 5

876 95

8

26 2

Marvin Long

Burden

847 5

876 95

9

 6

2

Marvin Long Burden

847

5

876 95 9 27 2

Marvin Long Burden

847 5

Subtotal  9

 4

5

3

 

3

2 Johnson

Excavating

Septic

Porta Potty Set Up

 3

65   28 2 Johnson

Excavating

Septic

Porta Potty

Monthly Rental

 

5 4

3

 7

2 Johnson

Excavating

Septic

Porta Potty Monthly Rental

 

738 4 29

2

Johnson

Excavating

Septic

Porta

Potty

Monthly

Rental

 

942

5

27 2 Johnson

Excavating

Septic

Porta Potty Monthly

Rental

 

2 7 7 8 2 Johnson

Excavating

Septic

Porta Potty Monthly

Rental

 

3 74 8 25

2 Johnson

Excavating

Septic

Porta

Potty Monthly

Rental

 

3628

9

29

2 Johnson

Excavating

Septic

 

APPENDIX D 2 8 2 3 BLACK

CLOUD

RECLAMATION COSTS

466 3 8

2

Tetra Tech

Property

32 658 37

Labor

Maintenance

Supplies

Page 98: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 98/149

87 5

 3 2

Tetra

Tech

Property

7 228 69

Labor

Maintenance

Supplies

  32 6   2

Tetra Tech Property

  28 38

Labor

Maintenance

Supplies

 3 9

7

 5 2

Tetra

Tech

Property

 2 668

 5

Labor Maintenance Supplies

3 2

8 7 2

Tetra Tech

Property

8   8

74

Labor Maintenance Supplies

3556

9

 6

2 Tetra

Tech

Vehicle

Transfer

9

28

3959   8

2

Tetra

Tech Seep Management

  25

4323

 

2

Tetra Tech

Asbestos

Inspection   937 35

4278

  2

Tetra

Tech

Truck Refund 3

 

25

Subtotal   7

5 5 56

354 2 24 2

SLV Earthmovers Inc  6 2 3 45

Contractor Services

394

3 3

2

SLV Earthmovers

Inc

9

425

Contractor Services

2855

7

3

2

SLV

Earthmovers

Inc

7

35

APPENDIX

D

2 8 2 3 BLACK CLOUD RECLAMATION

COSTS

Subtotal 3

956  3

Page 99: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 99/149

  9 6   2

Advanced

Environmental

Sciences Inc

Technical

Services

437 5

2965

8

7

2

Advanced Environmental

Sciences

Inc Technical

Services

 

5 3

3529

9

 6 2

Advanced

Environmental

Sciences

Inc Tailing Pump

Maintenance

6

585 49

3867

  3

2

Advanced Environmental

Sciences Inc

Demo

Permit

Applications

9

 33 36

4369   5 2 Advanced Environmental

Sciences Inc

Reclamation

Services

2 899 85

Subtotal

39 469 2

48

6 22 2 Wells

Fargo

Business Credit

Material

Disposal

REGGS

  9

Subtotal

  9

APPENDIX

D

2 8

2 3

BLACK CLOUD RECLAMATION COSTS

3593

9 23

2

Molleur

Construction 67 768  

Irene

Eclipse Mine

Site

Page 100: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 100/149

Reclamation

Scree Stockpile

3889

 

3

2

Molleur

Construction

58

32

Irene Eclipse Mine Site

Reclamation

Scree

Stockpile

389

3 2

Mol leur

Construction 4 3

 3

Irene Eclipse Mine

Site

Reclamation Scree

Stockpile

389

3 2

Mol leur Construction

9

 

Irene Eclipse

Mine

Site

Reclamation

Scree Stockpile

4 55  

3 2

Mol leur Construction

67  

Irene Eclipse

Mine

Site

Reclamation

Scree

Stockpile

Subtotal

2 2

5 3

36 5

9 29 2

De l Mont Consultants Inc

6

  2

99

Eclipse Irene

Scree

Surveying

Engineering

36 6

9 29 2 Del

Mont

Consultants Inc

 6 797 83

Eclipse

Irene Scree

Surveying

APPENDIX

D

2 8 2 3 BLACK CLOUD RECLAMATION

COSTS

3437

9 8

2

Acorn Petroleum Inc Fuel

42

44

3577

9 23 2 Acorn

Petroleum

Inc

Fuel

7 88

Page 101: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 101/149

3635

9 29

2

Phillips 66 Conoco 76

Fuel

49

 9

3787

 

7

2 Acorn Petroleum

Inc Fuel 65 2

3933   8 2

Acorn Petroleum Inc Fuel

63 7

3987

  28 2

Phillips

66 Conoco 76

Fuel 5

85

4 3 2

Acorn

Petroleum Inc Fuel

  6 24

Subtotal  

2 6

43

43 2

  2

Impact Contractors Demo

Contractor

36

728

86

Direct

Payment from

AM

King

to

Impact

Contractor

Impact

Contractors

Demo

Contractor

55

 

Direct

Payment

from

AM

King to

Impact

Contractor

Impact

Contractors

Demo

Contractor

9  

Subtotal

  728 86

3

 

3

2

Farm

Plan

Supplies

Materials  

8 9  4

APPENDIX D

2 8 2 3 BLACK CLOUD

RECLAMATION

COSTS

3982

  28

2

Office Depot Ink Copy Paper

 95 45

399

28

2

PSC

Environmental Services

Disposal

46 3

Page 102: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 102/149

Transformer Oil

4 29

 

3

2

Critter

Gritter

Beaver

Management

  5

Subtotal

 4

95

22

3 29

8 7

2

Excel Energy 748 County Road

2A

  2 4 28

3338

9

 

2

Excel

Energy 748

County

Road

2A

  5 8

69

3853   7 2

Excel Energy 748 County Road

2A

 

278

96

4 92   3 2

Excel Energy

748

County Road

2A

 

32

7

4 98  

3

2

Excel Energy 748

County Road

2A

6

62

96

Subtotal

  646 59

2977 8

7 2

Diedrich Construction

Co

2 yd

Rolloff

464

 

2978

8

7 2

Diedrich Construction

Co

Trash

Pickup

4

3 22

8

 9

2

Diedrich Construction

Co

2

yd

Rolloff

458

APPENDIX D

2 8 2 3

BLACK

CLOUD RECLAMATION COSTS

4 36  

3

2

FedEx

25 35

Subtotal

4 25

Page 103: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 103/149

  9

  2

2

Verizon Wireless Rebecca

Haldane

2 6 29

347 2 24 2

Verizon Wireless Rebecca

Haldane

 52 54

56

3

24 2

Verizon

Wireless

Rebecca

Haldane

 35 35

7 6

4 2

2

Verizon

Wireless

Rebecca

Haldane

 39 56

94

5

27 2

Verizon Wireless Rebecca

Haldane

 95

53

6 22

2

Verizon Wireless Rebecca

Haldane

67

2859 7 22 2

Verizon Wireless Rebecca

Haldane

 68 54

3 49 8 9 2

Verizon

Wireless

Rebecca

Haldane

238

37

36 9

23

2

Verizon

Wireless

Rebecca

Haldane

84

 

4 4   28 2

Verizon Wireless

Rebecca

Haldane

8 43

Subtotal

 

478

 

APPENDIX

D

2 8

2 3

BLACK

CLOUD

RECLAMATION COSTS

966 95 3

3

2

Haldane

Rebecca

Burden

862 78

966

4

 5 2

Haldane

Rebecca Labor

2 875 92

966 95

4  5 2

Haldane Rebecca

Burden 862

78

Page 104: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 104/149

966

4

3

2

Haldane

Rebecca

Labor

2

875

92

966 95

4

3 2

Haldane Rebecca Burden

862 78

966

5

 5 2

Haldane

Rebecca

Labor

2 875 92

966 95 5  5

2

Haldane

Rebecca

Burden

862

78

966 5 3 2 Haldane Rebecca Labor 2 875 92

966 95 5 3 2

Haldane

Rebecca Burden

862 78

966

6

 5 2 Haldane

Rebecca

Labor

2

875 92

966 95

6 5

2

Haldane

Rebecca

Burden 862

78

966 6 3 2

Haldane

Rebecca

Labor

2 875

92

966

6

3 2

Haldane

Rebecca Labor 862 78

966 95

7  5

2

Haldane Rebecca Burden

2 875

92

966 95 7

 5 2 Haldane Rebecca Burden

862

78

966

7

3

2

Haldane

Rebecca Labor

2

875 92

966 95

7 3

2

Haldane

Rebecca

Burden 862 78

966

8

 5

2

Haldane

Rebecca

Labor

2

875 92

966 95

8

 5 2

Haldane Rebecca Burden 862 78

966 8

3 2

Haldane Rebecca Labor 2 875 92

966 95 8

3 2

Haldane

Rebecca Burden

862

78

Subtotal

63 557 9

876

2

3

2

Marvin Long

Labor

2 825

876

2

3

2

Marvin

Long

Burden

52 54

APPENDIX

D

2 8 2 3

BLACK

CLOUD

RECLAMATION

COSTS

876 95

5

 5 2

Marvin Long

Labor

2

825

 

876

5  5 2

Marvin

Long Burden

52 54

876

5

3

2

Page 105: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 105/149

Marvin

Long Labor

2

825

 

876

5

3

2

Marvin

Long

Burden

52

54

876

6

 5 2

Marvin

Long

Labor

2

825  

876

6  5

2

Marvin Long Burden

52 54

876

6

3

2

Marvin Long Labor

2

825

 

876

6 3 2

Marvin Long Burden

52 54

876 95

7  5 2

Marvin Long Labor

2

825

 

876 95

7  5 2

Marvin Long Burden

52 54

876 95

7

3

2

Marvin

Long

Labor

2

825

 

876 95

7 3

2

Marvin Long Burden

52 54

876 95

8  5 2

Marvin Long

Labor

2

825  

876 95

8

 5 2

Marvin Long Burden

52 54

876

8 3 2

Marvin Long

Labor

2

825  

876

8 3

2

Marvin

Long Burden

52

54

876

9

 5

2

Marvin Long

Labor

2 825

876 95

9  5

2

Marvin

Long

Burden

52 54

876 95

9 3 2

Marvin

Long Labor

2

825  

876 95

9

3 2

Marvin Long Burden

52

54

876 95

 

5 2

Marvin Long Labor

2 825

 

876 95

 

5 2

Marvin

Long Burden

52 84

876 95

  3

2

Marvin

Long

Labor

2

825  

876

3

2

Marvin Long Burden

52 54

876

5

2

Marvin

Long Labor

2

825  

APPENDIX D

2 8 2 3

BLACK CLOUD RECLAMATION COSTS

6683 4 2 2

Acorn Petroleum Inc

59

74

6769 4 26 2 Phillips

66

Conoco 76 63  8

Page 106: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 106/149

6967 5   2 Acorn

Petroleum Inc

67 32

7 29

5

25

2 Phillips

66

Conoco

76 33 7

7337 6 8 2

Acorn Petroleum Inc

58 86

75 6

2

2 Acorn

Petroleum Inc

2 8 57

7599

6 3 2

Phillips

66 Conoco 76

25 2

7774

7 6

2 Acorn

Petroleum Inc

75 52

7946

7 2 2

Acorn Petroleum Inc

32

 

8 6 7 27 2 Phillips

66

Conoco

76

29 66

82

8

 

2

Acorn

Petroleum

Inc

62 24

8322

8

25

2

Acorn

Petroleum Inc

 26

 9

86 9 8 2

Acorn Petroleum Inc

54 8

8739 9 22 2

Acorn

Petroleum Inc

58

29

9 27

 

6 2

Acorn

Petroleum

Inc

 68 24

9 85   2

2

Acorn Petroleum Inc

83  7

953

3 2 Acorn Petroleum Inc

58 92

9667

  22 2

Acorn

Petroleum

Inc

 26 35

Subtotal

2 872 55

2 Supplies

5586

 

25

2

Eldorado

Homes

Office

8 8

5993

2

28

2

Haldane

Snowshoes

386

6696 4 2 2

Long Measuring

Tape

  54

7992

7 27

2

John

Deere

Transfer

999

 2

APPENDIX D

2 8 2 3 BLACK CLOUD

RECLAMATION

COSTS

6245 3 8 2

Excel Energy

  535

33

6296 3 8 2

Excel

Energy

 

535 33

66 7 4

7 2

Excel Energy

  4 7

89

Page 107: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 107/149

6888

5

2

2

Excel

Energy

 

74

7426

6 8

2

Excel Energy

698

 

7825 7 6 2

Excel Energy

  25

87

8669 9 8

2

Excel Energy

  285 69

9 5

  6

2

Excel Energy

 

78 25

9385

 

2

2

Excel Energy

 

33

4

Subtotal  9

388 34

2

Other

Utilities

Debris Removal

5 92

 

6 2 Diedrich Construction 4

5842

2

8 2 Diedrich

Construction

4

6 87 3 8 2 Diedrich

Construction

4

6564 4

7 2

Diedrich

Construction 4

6996

5

2

Diedrich

Construction

55

7 87

5

 8 2

Diedrich Construction

9 6

 

736

6 8

2

Diedrich

Construction

5 4  

736

6 8

2

Diedrich

Construction

9

7792

7 6 2

Diedrich Construction

558

 

7793 7 6 2 Diedrich

Construction

55

7975

7

27

2

Diedrich Construction

 

66

APPENDIX

D

2 8 2 3 BLACK CLOUD RECLAMATION COSTS

Contractor

Consultant

Services

5449

 

3 2

AES

2

592

7

Page 108: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 108/149

5526   9 2 TetraTech

 

56 89

557 25 2

Johnson

Excavating

22

594 2  6 2

TetraTech

57  8

6 98 3

8

2

Johnson Excavating

22

6 66

3 8

2

ACZ

Labratories  

7 8 28

63 3

 7 2

AES

4 6 2

6333 3  7 2

TetraTech

 4 75

635

3

28 2

Johnson Excavating

 

669 4 2 2

AES

582

 7

6857

5 2

2

Johnson

Excavating

22

7 72 5   2 Clear Creek Consultants 75

6978

5   2

AES

2 3 2

5

7 8

5

 8

2

ACZ

Labratories   9 6

28

7475

6

 5

2 AES

5

398 45

748

6

 5

2

Johnson Excavating

 

7567

6

3

2

Clean Harbors

3

796 48

7892

7 2 2

AES 43  76

56

795

7

2 2

Johnson

Excavating

 

79 3 7 2 2

Mobile

Record

Shredders

75

82 7

8

2

AES

 2

  5

6

APPENDIX

D

2 8

2 3 BLACK

CLOUD RECLAMATION

COSTS

Subtotal

8 6

878 24

2 Postage

Page 109: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 109/149

758 6 3 2 FedEx 33

75

8 48

8

2 2

FedEx 3 5 93

Subtotal 349 68

2 Permits

7978 7 27 2

CDRMS Helena Shaft Mod

 

8298

8 7

2

CDPHE

Stormwater

 25

 

Subtotal   25

 

2

Training

6776

4 26 2

OHSA Haldane

45

 

6694

4 2

2

OSHA

Long

45

 

Subtotal

9

2

Phone

56 3   25 2 Verizon Wireless Haldane 76 67

6 4

2

28 2 Verizon

Wireless

Haldane

69

9

6383

3

28 2

Verizon Wireless Haldane 2 7 7

67 8 4 2 2 Ver izon Wire less Haldane

2 9 82

7 49

5 25 2

Verizon Wireless Haldane

9 3

7537

6

2

2 Verizon Wireless Haldane

74 52

APPENDIX

D

2 8 2 3 BLACK CLOUD

RECLAMATION

COSTS

  998 2 4

2 2

Acorn

Petroleum

Inc

3 7

25

  5 6

3 6 2 2

Acorn

Petroleum

Inc  

8

  69

3

2

2 2

Acorn Petroleum Inc

95 24

Page 110: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 110/149

  977 4

5

2 2

Acorn

Petroleum

Inc 97 33

 2 46

4 2 2 2

Acorn

Petroleum Inc 69

6

2459 5 9 2 2

Acorn Petroleum Inc 57  8

 29 5

6 7 2 2

Acorn

Petroleum

Inc

 

66

 3 77 6

28 2 2

Acorn

Petroleum

Inc

 88 94

 3494

7  2

2 2

Acorn Petroleum Inc  87  5

 3643

7 26 2 2

Acorn

Petroleum Inc 97 74

 394

8

8 2 2

Acorn

Petroleum

Inc 284 65

 4 79 8

23

2 2 Acorn

Petroleum

Inc

  3

93

 4594 9 26 2 2

Acorn

Petroleum

Inc 79 76

 477 3

2 2

Acorn Petro leum Inc

  6  9

 493

9 2 2 Acorn Petroleum Inc 96 24

Subtotal

2

 86 32

2 2 Supplies

9467

 2

  2

Turner Auto Pickup

Truck

38 4 79

  88  2

29

2

County Clerk Registration

7 6 4

Subtotal 39

  6

83

2 2 Electrical

APPENDIX

D

2 8

2 3

BLACK

CLOUD RECLAMATION COSTS

2A

 4364

9 6 2 2

Excel Energy 748 County Road

5 5 2

Page 111: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 111/149

2A

4535

9   2 2

Excel

Energy 748 County Road

2A

854 74

 4865

  3

2 2

Excel Energy

748 County Road

2A

782  8

 5 9

2 2

Excel Energy

748

County Road

2A

93 27

Subtotal

 3 498

4

2 2 Debris

and

Trash

Removal

996

2

7 2

Diedrich Construction

55  

54

 2 4 2

Diedrich Construction

3   2

 

67

2 2

Diedrich

Construction

9

863

 

26

2 2

Diedrich

Construction

552

6

2 4 2 2

Diedrich Construction

55  

Subtotal

3

854  

2 2 Contractor and

Consultant Services

96 8

  7 2

Johnson

Excavating

Septic

 

9566

  7 2

ACZ

Labratories Inc

  922 4

9726

 2

  2

3 35 33

APPENDIX D

2 8 2 3 BLACK CLOUD RECLAMATION COSTS

 2222

4 26 2 2

Del Mont Surveying

836 88

 2383

5 2 2 2

Johnson

Excavating

Septic

 

Page 112: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 112/149

2466

5 9 2 2

Advanced Environmental

Sciences Inc

4

 36 25

 2476

5

9 2 2

Advanced Environmental

Sciences Inc

8

27 64

 2569

5  5 2 2

ACZ

Labratories Inc

 

662

 2

 3 44

6  4 2 2

Advanced Environmental

Sciences Inc

69 964 86

 3 34

6 2

2 2 Johnson

Excavating

Septic  

3444

7 5 2 2 SLV

Earthmovers Inc

2 7 7 59

 35 9

7

 2

2 2

Browns Hill

Engineering

2 97

3625

7

 9 2 2

Johnson

Excavating

Septic  

3658

7 26 2 2

Advanced

Environmental

Sciences

Inc

39

 84 43

 3946

8 8 2 2

ACZ

Labratories Inc

 

855 98

 4 84

8 23 2 2

Advanced Environmental

Sciences

Inc

2

962

5

4565

9  3 2 2

Salida Fire Extinguisher 8

4534

9 26 2 2

Johnson

Excavating

Septic

22

49 7

  8

2 2

Advanced Environmental

45

722 6

APPENDIX D

2 8 2 3

BLACK CLOUD

RECLAMATION COSTS

Subtotal

248

 5

Page 113: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 113/149

2 2 Travel

9682

  22 2

Columbine Suites

LTD

636 48

9683

  22 2

Columbine Suites

LTD

282 88

9684

  22 2

Columbine

Suites

LTD

 4 44

9685

  22 2

Columbine

Suites LTD

 4 44

  834

4   2 2

Columbine Suites LTD

484  6

Subtotal

  686 4

2 2 Meals

  3

 2 2 2

Aaron Taylor

  4 99

  277

2  3 2 2

Aaron

Taylor

  7

75

 3 38

6 2

2 2

Larry Fiske

  9 56

Subtotal

322 3

2 2

Total

457 693

69

2 3

Salary

Burden

 2

  2 2

  3 2 3

Newmont Site

Labor Burden

  9  24

 

Subtotal

  9  24

 

APPENDIX

D

2 8

2 3

BLACK

CLOUD RECLAMATION COSTS

 8943

7

22

2 3

Acorn Petroleum

Inc

99 5

9 72

8

6

2 3

Acorn

Petroleum Inc

9 74

 9438

9 7 2 3

Acorn

Petroleum

Inc

  2 8

 9634

9 26

2 3

Acorn

Petroleum Inc

Page 114: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 114/149

75

87

 9794

 

8 2 3

Acorn

Petroleum Inc

  3

2 236

  4

2 3

Acorn

Petroleum

Inc

 84

 9

Subtotal

2 542 3

2 3

Contractor

and

Consultant Services

  2 2

 2

3

2 2

SLV

Earthmovers Inc

427 748

66

 

2 3

 2

3

2 3

SLV Earthmovers Inc

777

42

2 8 2 2

Advanced Environmental

Sciences

Inc

35 89 44

 6557

 

8 2 3

Clear Creek Consultants Inc  57 5

6698

  6

2 3

Advanced Environmental

Sciences

Inc

52 357 32

 672

6

2 3

Johnson

Excavating

Septic 22

6829

  28

2 3

Browns Hill

Engineering

3 673

 

6987

2

6

2 3

ACZ

Labratories Inc

 

7 8 38

 7 37

2  2 2 3

Advanced

Environmental

Sciences Inc

27 659 84

 7 57

2

 2 2 3

APPENDIX

D

2 8

2 3 BLACK CLOUD RECLAMATION COSTS

2 3

Phone

Licenses

Permits

Postage

 6 35

 2 27

2 2

Verizon

Wireless

Cell

Phone

6 35

Page 115: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 115/149

 68

22

2 3

Verizon

Wireless

Cell Phone 55 62

 7222

2

22

2 3

Verizon Wireless Cell Phone

29 62

 7 85

2

22

2 3

Allen

Long License

Renewal

85  

7584

3 27 2 3

Verizon Wireless Cell Phone 4 8

 7896

4 25 2 3 Verizon

Wireless

Cell Phone

64 34

 8 6

5  6

2 3

Allen

Long

Postage

 2 35

 82

5 23

2 3

Verizon

Wireless

Cell

Phone

4

8534

6

2 2 3 Verizon

Wireless

Cell

Phone

4

8964

7

22 2 3

Verizon

Wireless

Cell

Phone 4

9266

8

 8 2 3

Silver City

Printing

 4

85

 924

8 8

2 3

Allen Long Office

Supplies

25

 2

 934

8

24 2 3

Verizon

Wireless

Cell Phone 4 5

 9683

9 26 2 3

Verizon Wireless Cell Phone 4 5

 98

8

2 3

Colorado

Dept

of

Public Health

Permit

75  

APPENDIX D

2 8 2 3 BLACK CLOUD RECLAMATION

COSTS

 664

8 2 3

Excel

Energy 748

County Road

  246 76

2A

 7 85

2

6 2 3

Excel

Energy

748

County

Road

29 46

2A

Page 116: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 116/149

 7 9

2

6

2 3

Excel

Energy

748

County

Road

6

 7

78

2A

 7 89

2 6 2 3

Excel Energy 748

County

Road

  4 28

2A

 7323

3

 

2 3

Excel Energy 748 County

Road

26

8

2A

 7385

3

6 2 3

Excel Energy 748 County

Road

7 8 68

2A

 7732

4

5 2 3

Excel Energy 748 County

Road

26

 3

2A

 7734

4 5 2 3

Excel Energy 748 County Road

8 334 59

2A

 8 27

5 2 3

Excel Energy 748 County Road

26 29

2A

 8 34

5

9

2 3

Excel

Energy 748

County

Road

9

 47

77

2A

 83 7

5 3 2 3

Excel Energy 748 County

Road

26

36

2A

 83 8

5 3 2 3

Excel

Energy

748

County

Road

9 897  2

2A

 87

7 3 2 3

Excel Energy 748 County Road

27 48

2A

APPENDIX

D

2 8

2 3

BLACK

CLOUD

RECLAMATION COSTS

2A

Subtotal

 

89

 22 9

2 3

Total

 

6 2 4

85

 

Page 117: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 117/149

2 8 2 3 Totals

2 8

Total

34

353

7

2 9

Total 557

4 4 88

2 Total

672 773

4

2 Total   7 647

69

2 2 Total 457 693

69

2 3

Total  

6 2 4

85

2 4 Total 7 2 269 58

Total

5  54 554 79

Page 118: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 118/149

APPENDIX E

WATER

QUALITY

2 8

Black

Cloud

Surface

and Ground Water Monitoring Results

SAMPLE

LOCATION

DATE

Method

Detect

Limit

MW  

9 29 2 8

MW  

7 2 8

MW 2

9

29 2 8

MW 2

  7

2 8

MW 3

9

29

2 8

MW

3

 

7

2 8

MW

4

9 29 2 8

MW 4

  7 2 8

PARAMETER

Cadmium

D

mg  

9

 

6  

2

 

44

 

43

  7

 

9

Copper

D

mg

 

5

  9   22   8   32  

33

 

32

  4

Lead D

 

2  

Page 119: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 119/149

mg

Manganese

D

mg  

5

  27   55   384

 

376 3

95

2 58

 

23

Mercury

D

mg  

2

 

2   2

 

2

  2   2   2   2   2

Zinc

D

mg

 

2

 

72   76  

48

 

39

  55

 

37

 

374

 

363

Cyanide

T

mg  

5

 

5   5

 

5

  5  

5

 

5

 

5

  5

Total Disso lved Soli ds mg  

2 2

6 55

4 37 43

43

Alkalinity

T

mg  

2

  98

7

74

 24 4

9

9

Hardness

mg  

4

4 6

4 3

9 4

n a 32 328

Sulfate mg  

2

37 33

88

89

22 23

Nitrogen Ammonia

mg

 

5

  4

  5   54   35

 

2

 

44

  7

5

Nitrate Nitrite as N mg

 

2

  5

 

4

 

36  

53

 

29

  4

  5   63

Field Parameters

9

29 2 8   7 2 8 9 29 2 8

 

7

2 8 9

29

2 8

  7 2 8 9

29

2 8

  7

2 8

Fie ld pH S

U

7 93 9

7

96

8 8

7

78

8

3

7 89 9 4

Field

Temperature C

6

69

7 67 6

99

6

94

Field

Conductivity mhos

 75

2

 82

5

478

499

689

786 387

428

Depth t o Wa te r Feet 7 8 7 9

5 8

5

55 3 9 4 5  2

 2

4

D

Dissolved

T

Total

Laboratory

Qualifiers

B Analyte detected

at

value between MDL

and

PQL

U

Analyte concentration

less

than

MDL

H Analysis exceeded holding

time

Resurrection Mining Company

E

 

AdvancedEnvi ronmenta l Sciences

November

26

2 4

2 8

Black Cloud Surface and Ground Water Monitoring Results Cont

SAMPLE LOCATION

DATE

Method

Detect

Limi t

MW 6

9

28

2 8

MW

6

  7

2 8

SW

5

9

28

2 8

SW

5

 

7

2 8

MW

5

9

28

2 8

MW 5

  7 2 8

MW 5

Numeric

Limi t

PARAMETER

Dissolved Cadmium

mg

 

9

 

4

 

2

 

2

  5

Disso lved Coppe r mg  

5

 

4

 

5

 

7

  2   32   5

 

5

Dissolved

Lead mg

 

2

  3   5

 

5

 

2

 

2

  6

Page 120: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 120/149

Dissolved

Manganese

mg  

5

  26

 

4   33

486

 

3

4 4

Dissolved

Mercury mg

 

2

  2

 

2  

2

  2   2

 

2

 

Dissolved

Zinc mg  

2

 

38

 

3

235  

355

 

47  

33

  5

Total Cyanide mg  

5

  5   5

 

5

  5   5

  5

 

2

Total Dissolved Solid

mg

 

9 2

2

27

22

2

4

Total Alkalinity mg  

2

 

97

99

 

Report

Hardness mg  

74  72

 62

22

73

 7

Report

Sulfate

mg

 

7

7

7 2

6 6

3

Nitrogen Ammonia mg  

5

  2

 

5

 

27  

5

  52

  5

Report

Nitrate

Nitrite as N

mg  

2

  5

 

96

 

5

  32

 

5

 

43

Report

Field

Parameters

9

28

2 8

  7

2 8

9 28

2 8

  7 2 8 9

28

2 8

  7

2 8

F ie ld pH S

U

8 58

 

4

8

35

8 8

8  6

  3

Report

Field

Temperature

C

6 84 6 85

6 76

Report

Field

Conductivity

mhos

245 25 244

3 7

25

267

Report

Depth to Water

Feet

2

3 6

 2 2 3

Report

D D is so lv ed

T Total

Laboratory Qualifiers

B

Analyte

detected

at

value

between

MDL

and

PQL

U

Analyte

concentration

less

than

MDL

H Analysis exceeded holding time

Resurrect ion

Mining Company

E

2

Advanced

Environmental

Sciences

November26

2 4

2 9

Black

Cloud

Surface and Ground Water

Monitoring

Results

SAMPLE

Method

LOCATION

Detect

MW  

MW

 

MW   MW   MW   MW

2

MW 2

MW

2

MW 2 MW 2

DATE Limit

3 6 2 9

4

22 2 9

7 5

2 9

  2

2 9  

8

2 9

3  6

2 9

4 22 2 9

7

 5 2 9

  2 2 9

 

8 2 9

PARAMETER

Cadmium D

mg  

Varies  

3   3

  8

 

3

 

5

 

4

 

6

Copper

D

mg  

Varies  

3

 

28

  5   5  

5

  3

  2

 

2

 

5

 

5

Lead

D mg

 

Varies

 

6   7

6  

4

 

4

 

Page 121: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 121/149

Manganese D

Varies  

95

 

5 8

  75

33

297

 

286

  22 299

 

7

mg  

Mercury

D

  2

  2   2

  2   2

  2   2

  2

 

2

  2   2

m

 

Zinc D mg

 

Varies

  58

 

7

 

88

 

7

 

56

 

282

  89   37

 

8

  2

Cyanide T mg  

Varies

 

5

  5

 

3

 

3

 

3

  5

 

2

 

3

 

3   3

Total Dissolved

Solids

m  

2

3

64 57

48 6

33

Alkalinity T

mg  

Varies   2

99 8 2 2

 

75

75 7 7

95

Hardness mg

 

6   6

85

 

469 43

335 473

258

Sulfate

mg  

3

3

2 2 3 39 34 27 37

7

Nitrogen

Ammonia mg

 

Varies

 

5   5

  5

  5

 

5 3

  5

 

2

  29

 

5

Nitrate Nitrite as N

mg

 

2

 

25

  25

 

7

  24

  95 92

 

48 5 7

Field Parameters

3 6 2 9 4 22 2 9

7

 5

2 9

  2

2 9  

8

2 9

3 6

2 9 4

22

2 9 7

 5 2 9  

2

2 9

  8

2 9

Field pH S U

8 33

7

48 7

79

8 48 8 4 8 49

7 56

7

24

8 28 8

3

Field Temperature

C 4  

3   7

3 5 3

2

4

2

6 4

8

8

4

2 3 8

Field Conductivity

mhos

 32

6

 89

 

335

 6 2

2 8

L 285

276 335 4 4

49

L

Depth to Water Feet 8 3

7 95

6

8 7 5 5 8

6 25

6

 

5

45

5 9

5 8

D Disso lved

T

Total

Laboratory

Qualifiers

B Analyte

detected

at value between MDL and PQL

U Analyte concentration less

than

MDL

H

Analysis exceeded holding time

Resurrection

Mining Company

E 3

Advanced Envi ronmenta lSciences

November

26 2 4

2 9

Black

Cloud Surface

and Ground Water Monitoring Results

Cont

SAMPLE

Method

LOCATION

Detect

MW 3

MW 3

MW 3 MW 3

MW

3

MW 4

MW4

MW 4

MW

4

MW 4

DATE

Limi t

3 6 2 9

4 22 2 9

7

 5 2 9

  2 2 9

 

8 2 9

3 6 2 9 4 22 2 9

7  5 2 9

  2

2 9  

8

2 9

PARAMETER

Cadmium

D

mg  

Varies

  43

 

45

  43

 

3

  39

 

8

  4

  9

 

2

  5

Copper

D mg  

Varies

  2

2

  3

 

5

  34

  3

  8

 

9

 

5

  36

 

Varies   2

 

3

 

2

Page 122: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 122/149

Lead

D

mg

 

2

  3

 

Manganese D

mg

 

Varies

72

9

3

88 4

53 4 22

4 46

 

2 5

  32

 

54

  5

  4

Mercury

D mg

 

2

  2

 

2

  2

 

2

  2

 

2

  2

 

2

  2

  2

Zinc

D mg  

Varies

 

7

  25

  8

  22

  3 5

 

254

  35

28

 

278

Cyanide T mg

 

Varies

  5

 

5 4

 

5

  6

  5

  2

  3

  3

 

3

Total Dissolved

Solids

mg

 

36

38

44

2

23

45

37

38

39

39

Alkalinity T

mg

 

Varies

7

63

7

72

83 87

93 94

93

94

Hardness

mg

 

92

983

95

9

876 332

293

288

296

3 2

Sul fa te mg

 

88 89 93

78 79

25 2

9

2 22

Nitrogen

Ammonia mg  

Varies

2

 

5 2 22

2

 7

2 7

 

3

  5

 

5

5

  5

Nitrate Nitrite as N

mg

 

2

  9

  4

  3

  2

 

3

  8

8

54

 

55

  6

Field Parameters

3 6 2 9

4 22 2 9

7  5

2 9

 

2 2 9

 

8

2 9

3

 6

2 9

4

22 2 9

7  5

2 9

  2

2 9

  8 2 9

Field

pH S

U

7

96

7 28 7 76 7 28

8  7

8

3

7

62

7

74

7

9

8

 6

Field

Temperature

C 6 7

7 2 7 2

7 2

4  

4 4

6

6

7

4 7

6

Field

Conductivity

mhos

37 4

686

4

47 L

24

234 3

342

569 L

Depth to Water

Feet

4 55 4 5

3

65

4

5

4 4

 4

2

3

  9

 3

35

 3 65

D Dissolved

T

Total

Laboratory Qualifiers

B Analyte

detected

at value between MDL and PQL

U Ana ly te concentration

less than MDL

H Ana ly sis

exceeded

holding

time

Resurrection

Mining Company

E 4

Advanced Environmental

Sciences

Novembe r 2 6 2 4

2 9

Black

Cloud Surface

and Ground Water Monitoring Results

Cont

SAMPLE

Method

LOCATION

Detect

MW

6 MW 6 MW 6

MW 6

MW

6 SW

5

SW 5

SW

5

SW

5 SW 5

DATE

L imi t

3  6 2 9 4 22 2 9

7

 5

2 9

  2

2 9

  8

2 9

3

 6

2 9

4

22 2 9

7 5

2 9  

2 2 9

  8 2 9

PARAMETER

Cadmium D

m

I

Varies  

3

 

29   7

  7

Copper D mg l

Varies

  7

 

5

  2

  5   5

 

3

 

29

  6   5 5

 

Varies   5

  5

  7

5

2   8

Page 123: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 123/149

Lead

D mg

 

 

6

 

4

Manganese D

Varies  

27

  2   8

 

5

 

2

  43   365

 

24

  9

mg  

Mercury D mg  

2   2

  2

 

2

  2

  2   2

  2  

2

  2

  2

Zinc D mg  

Varies

  27   37

  37

 

3

  23   37

  754 37

  7

 

2 4

Cyanide

T

mg

 

Varies

 

5

 

2

  4

 

3

  3   5

 

2

 

3

 

3

 

3

Total Dissolved

Solid s mg  

9 2 9

7 9 3

25

2

9

Alkalinity

T

m

 

Varies  

8  

2

  9

77

98   3

Hardness

mg

 

66  69  63

 59 67

24

94

98

 45  67

Sulfate mg

 

6

8 7

6

5 4

3

4

7

Nitrogen

Ammonia

mg

 

MDL

diff

based

Varies   5

 

5

  5

 

5

  5 5

  5 5

 

5

  5

on lab

dilution

Nitrate

Nitrite

as N

  2

 

84

 

8

87 47

 

4 2

 

25

33

mg  

Field Parameters

3  6 2 9

4

22

2 9  

7

 5 2 9

  2

2 9

  8

2 9 3  6 2 9

4 22 2 9 7

 5 2 9

 

2 2 9

 

8 2 9

Field

pH

S U 8

46

8 24

78

28

7

24

8 57 8 42

8

 

8 23

8  3

8

5

Field

Temperature

C

7

 

6 2 6 9

4 7

5  

4

9 2

 

6 2   7

  9

Field Conductivity

mhos

 65 3  85 6

 7 3 24

3 9

L

 49

6

 8

7  32 2

256

3 8 L

Depth

to

Water

Feet 22 5

22 3 2

5 23  

2

5

N

A

N

A

N

A

N

A

N

A

D D is so lv ed

T Total

Laboratory Qualifiers

B Analyte detected at

value

between MDL and

PQL

U

Analyte

concentration

less

than MDL

H

Analysis

exceeded

holding

time

Resurrection Mining Company

E

5

Advanced Environmental

Sciences

November

26

2 4

2 9

Black Cloud Surface and Ground Water

Monitoring

Results Cont

SAMPLE Method

MW 5

LOCATION

Detect

MW 5 MW 5 MW 5 MW 5 MW

5

Numeric

3

 6 2 9 4

22

2 9

7

 5 2 9

  2

2 9  

8

2 9

DATE L im it L im it

PARAMETER

Cadmium

D

Varies   2

 

2

  3

  2

 

5

m

 

Copper D mg  

Varies

 

6   9   2

5

  7

 

5

Lead D m

g

 

Varies   9

  2

29  

7

  6

Manganese

D

Page 124: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 124/149

Varies

 

4

  3

  34

 

5  

6

4

4

mg  

Mercury

D

m  

2  

2   2   2

  2

 

2

 

Zinc D m g  

Varies

  42  

4 45

 

4

  46

 

5

Cyanide T mg  

Varies  

5

 

2

  3

3

  3

 

2

Total Dissolved

Solids

m  

9 9 22 9

9

4

Alkalinity T

Varies

  8

  6

9

  2

Report

m

 

H ardness mg  

63

 68

 78

 64

 68

Report

Sulfa te mg  

5 6 7 7

6

3

Nitrogen

Ammonia m

 

Varies   5

 

5 5

 

5

 

5 Report

Nitrate

Nitrite as N

 

2   64   55  

25

  34   4

Report

mg  

Field Parameters 3  6 2 9 4 22 2 9 7  5 2 9   2 2 9

  8 2 9

F ie ld pH S U 8 43 8

 7

8 3 8

 8

8 42

Report

Field

Temperature

UC 3

2

4 7

6

  5 7 4 2 Report

Field

Conductivity

mhos

2 8

 59 3

3 4 237 326

L

Report

Depth

to

Water Feet  3

2

 2 5

7

 2 4

 2

6

Report

D Dissolved

T

Total

Laboratory Qualifiers

B Ana ly te

detected at

value

between

MDL

and

PQ L

U Ana ly te

concentration

less

than

MDL

H Analysis

exceeded

holding time

Resurrection Mining Company

E 6

Advanced Environmental Sciences

November 26

2 4

2

Black

Cloud Surface and

Ground Water

Monitoring

Results

SAMPLE LOCATION

DATE

Method

Detect

Limi t

MW

 

2

2

MW  

4 27 2

MW

 

7 27 2

MW  

2

2

MW 2

 

2

2

MW 2

4

27

2

MW 2

7 27 2

MW 2

 

2 2

PARAMETER

Dissolved Cadmium

mg  

6

 

5

  6  

2  

2

 

5

 

3

Dissolved Copper m g  

5   8   5

  2

 

5   8

  22

  2

  5

2  

6

 

Page 125: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 125/149

Dissolved

Lead mg  

Dissolved

Manganese

mg

 

5   5

  4   276

  432   7 8

  365

 

36

Dissolved Mercury

mg  

2  

2

  2

  2

  2

  2   2   2

 

2

Dissolved Zinc mg  

2   45 4

 

57

  42

 

6 23

47  

6

Total

Cyanide mg  

3

 

3

 

3

  3   3

  3   3

 

3  

3

Total Dissolved Solid

mg  

2

77

84

4 45

Total Alkalinity

mg  

2

 

94

87 96

73

7

78

83

Hardness

mg  

4

98   8 636

636 293 33

Sulfate

mg

 

2 2

3

3 48 5

9

26

Nitrogen Ammonia

mg

 

5

 

5

 

5

  5

  5   23  

8

2

 

24

Nitrate

Nitrite

as N

mg  

2

  26

  23   3

  7  

53

 

55

  48

  4

Field

Parameters

 

2

2 4

27

2

7 27 2

2

2

2

2 4

27

2 7

27

2

2

2

F ie ld pH

S

U 7 4

7

74

7 52

7 55 7  8 7 64

7

66

7 73

Field Temperature C

7 4 7 8

 

4  

3

7

2

 2 2  2 2

 

5

Field

Conductivity

mhos

228

 73

 66

9

278  

873 374

792

Depth to Water

Feet

 

8 6

 

8  

7 3

 

7

75

 

7

25

 

7

25

 

6

6 2

D D is so lv ed

T

Total

Laboratory Qualifiers

B Analyte

detected

at value

between

MDL and PQL

U

Analyte

concentration

less

than

MDL

H Analysis exceeded holding time

Resurrection

Mining

Company

E 7

Advanced

Environmental Sciences

November

26 2 4

2

Black

Cloud Surface

and Ground Water

Monitoring

Results

Cont

SAMPLE LOCATION

DATE

Method

Detect

Limi t

MW 3

 

2 2

MW

3

4

27 2

MW 3

7

27

MW 3

  2

2

MW 4

  2 2

MW 4

4 27

2

MW 4

7

27

2

MW 4

  2

2

PARAMETER

Disso lved Cadmium mg  

35  

3

  23   7

 

25   5

  5

Dissolved

Copper

mg

 

5

  7

  2 2  

5

 

7

 

5

Dissolved

Lead mg

 

2  

2

Page 126: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 126/149

Dissolved Manganese

mg  

5

4 9 5 92

5

 4

4  

6

 

5  

5

 

6

Dissolved Mercury mg

 

2   2

 

2

  2   2

 

2   2   2

 

2

Dissolved Zinc mg  

2

 

945   2

  2

  927

  2 7

 573

 

29

278

Total

Cyanide mg  

3

 

3

  5   3

 

3   3

  3   3

  3

Tota l D isso lved So lid

mg

 

23

6 33

9

3

39

4 39

Total Alkalinity

mg  

2

65

87

85 85

98 78

9 97

Hardness

mg

 

884

853

9 5 8 2

234

3

274

292

Sulfa te mg  

82

73

78

7

4

9 7

2

Nitrogen Ammonia

mg

 

5

2

 

4

 

8

 

53  

5

 

5

 

5  

5

Nitrate

Nitrite as

N mg  

2

 

2

  4

  2

 

2

  58   87

  5

5

Field Parameters

 

2 2 4

27

2

7 27

 

2

2

2

2

4 27 2

7 27

2

2

2

Field

pH

S U

7 4

7

33

7 55 7 52

7

42 7

45

7

76

7 72

Field

Temperature C

7 8

 2  

3 3

  7

6 8

9 9 9 4

9 3

Field Conductivity mhos

 476

 2

3 7

 7 4

449 46

429

 

749

Depth to Water

Feet 5

 5

4 35 4

 

4 4

 4

6

55

 

3

3

 

5 6

D Disso lved

T

Total

Laboratory Qualifiers

B Analyte detected at

value between

MDL and

PQL

U Ana ly te

concentration

less

than

MDL

H Analysis exceeded holding time

Resurrection Mining Company

Am

Advanced Environmental

Sciences

November

26

2 4

2

Black

Cloud Surface and

Ground Water

Monitoring

Results

Cont

SAMPLE LOCATION

DATE

Method

Detect

Limit

MW

6

 

2 2

MW

6

4 27

2

MW 6

7

27

MW 6

  22 2

SW

5

  2 2

SW

5

4 27

2

SW

5

7 27

2

SW

5

 

22 2

PARAMETER

Disso lved Cadm ium mg

 

2

  2  

28

 

5

  7

Dissolved

Coppe r m g

 

5 5   5   5   5   27  

Dissolved Lead mg  

4  

5

 

5

 

5

  9  

8

  6

Dissolved

Manganese 5

 

7

 

7

 

5

 

5

  7  

395

 

44

 

25

Page 127: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 127/149

mg  

Dissolved

Mercury mg

 

2   2   2   2   2   2   2   2   2

Dissolved

Zinc mg  

2 2   22   27   24   445   759  

25

  2

Total Cyanid e mg  

3

 

3

 

3  

3

 

3

 

3

 

3

 

3

 

3

Tota l D isso lved So lid

mg

 

2 9

22 8

59

28 3 4

Total Alkalinity mg  

2   2 8 6 8 96

9

Hardness

mg  

6 68 7 62

439

223 7

 43

Sulfa te mg  

9 6

7

6

35

3 3 5

Nitrogen Ammonia

mg

 

5   5   5   5   5 5   5 5   5

Nitrate Nitrite as N

mg

 

2 82

 

93

 

89

  8 6

39

  9

26

Field

Parameters   2

2

4 27

2

7 27 22 2 2 2

4 27 2

7 27

2

22

2

Field pH S

U

7

95

8  2 8  2 8  2 7

76

8  5 8 47 8

54

Field

Temperature

C

6 9 9 6

7

9 4

7

5

8

9

2 8

6 4 3

Field

Conductivity

mhos

3 3

266

285 458 747

372

2 286

Dep th to Wa te r

Feet 24

 5

22 4

22

8

23

6 N

A

N A

N

A N A

D Disso lved

T

Total

Laboratory

Qualifiers

B

Analyte

detected

at value

between

MDL and

PQL

U

Analyte concentration less

than

MDL

H Analysis exceeded holding

time

Resurrection

Mining

Company

E

9 Advanced EnvironmentalSciences

November 26 2 4

2

Black

Cloud

Surface and Ground Water Monitoring Results Cont

SAMPLE LOCATION

DATE

Method

Detect

Limi t

MW 5

  2 2

MW 5

4

27

2

MW

5

7 27 2

MW 5

  2

2

MW

5

Numeric

Limi t

PARAMETER

Dissolved Cadmium

mg  

2

  2

  2

  2

 

5

Dissolved Copper

mg  

5   5

  5

 

5

  5

 

5

Dissolved

Lead mg

 

3

  2

 

2

 

3

  6

Page 128: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 128/149

Dissolved Manganese

mg

 

5

  5   5

 

5

  7

4 4

Dissolved Mercury mg  

2   2

  2

  2

 

2

 

Dissolved Zinc mg  

2

 

3  

36

  35

  35

  5

Total Cyanide

mg

 

3

 

3

  3

  3

 

3

  2

Tota l D issolved So lid

mg  

2

22

26

9

4

Total

Alkalinity

mg  

2

  3

 2 3

  4

Report

Hardness mg  

69

 92

 9 74

Report

Sulfate

mg  

6

6 8

6

3

Nitrogen

Ammonia mg

 

5

 

5

  5

 

5

  5

Repor t

Nitrate

Nitrite

as N mg  

2

 

29

 

2

  3

8

Repor t

Field Parameters

  2 2

4 27

2

7

27

2

2

2

Field

pH S

U

7

78 7

97

8 65

8 27

Repor t

Field

Temperature

C

8 8

  7

 

6

3

Report

Field Conductivity mhos

327

3 4

33

335

Report

Depth to

Water

Feet

 4

55

 2 85  2

8  3

  Report

D Visso lved

T T otal

Laboratory

Qualifiers

B Analyte

detected

at value

between

MDL and PQL

U Analyte

concentration less

than

MDL

H Analysis exceeded

holding

time

Resurrection Mining

Company

E  

Advanced

Environmental

Sciences

November

26 2 4

2

Black Cloud Surface and Ground

Water

Monitoring Results

SAMPLE LOCATION

Method

Detection

Limit

MW

 

MW

 

MW  

MW   MW  

DATE

2

 6 2

4 2 2 7

2

2

8 28 2

24

2

PARAMETER

UNITS

Conc

Conc

Conc

Conc

Conc

Cadmium D

mg L

 

3

 

5

  2

  6

Copper D

mg

L

  5

 

7  

3

 

7

Lead

D

mg

L

 

3  

Manganese

D

mg

L

 

5

 

56

 

5

 

3

 

6

Page 129: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 129/149

Mercury D

mg L

 

2

  2

 

2

  2

 

2

Zinc D

mg

L

  2

 

4   42   42

 

42

Cyanide T

mg L

  3

  3

  3 H

 

3

  3

Hardness

as

CaCO3

mg

L

 

7

8 2

Nitrate Nitrite as N

mg L

  2

 

24   9

  9

  2

Nitrogen ammonia

mg

L

 

5

  5

  5   5

 

5

TDS

mg L

 

4

2

9

3

Sulfate

mg

L

 

2

2

3

Total Alkalinity

mg L

2

  4

  2

 53

92

Field Parameters

Units

2

 6 2

4

2 2

7 2 2

8 28 2 24 2

H

st d units

8

 5

8 9

7

43

7 43

7 7

Temperature

C

 

7

4

 7 6

 7

6

8 2

Conductivity

umhos cm

264

 98  9

4  9 4

2

De

th to Water

Feet

 

7 98

7

5

6

45

7

 

7 35

D Dissolved

T

Total

Laboratory

Qualifiers

B

Analyte

detected

at

value

between

MDL

and

PQL

U

Analyte

concentration less

than

MDL

H Analysis

exceeded

holding time

Resurrection Mining Company

E

 

Advanced Environmental Sciences

November

26

2 4

2

Black Cloud Surface and Ground

Water

Monitoring Results Cont

SAMPLE LOCAT ION

Method

Detection

Limi t

MW 2 MW 2 MW 2

MW 2 MW 2

DATE

2

 6 2

4

2 2

7 2 2 8 28 2 24 2

PARAMETER

UNITS

Conc Conc

Conc Conc

Conc

Cadmium D

mg L

 

2

 

8

Copper

D

mg L

 

5

  9

  8   2

 

Lead

D

mg

L

 

Manganese

D

mg

L

 

5

 

375

 

64

 

8

Page 130: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 130/149

Mercury

D

mg

L

  2

  2

  2   2

  2

Zinc D

mg L

 

2

  42

 

46

  73

 

5

Cyanide

T

mg L

  3

 

3

 

3

H

  3   3

Hardness

as

CaCO3

mg L

 

37

 53

332

5 6

Nitrate Nitr ite as N

mg

L

 

2

 

68

  57

 

4

46

Ni trogen ammonia

mg L

 

5

 

5

  5   5

  22

TDS

mg

L

 

3

8

54

73

Sulfate

mg

L

 

33

6 28

45

Total Alkalinity

mg

L

2

98

94 75 76

Field

Parameters

Units

2

 6 2

4

2 2 7

2 2

8

28 2

24 2

H

std units

8  

8

 5

7

58

7

58

7

69

Tem

erature

C

2

6 6  

4

3  4 3

  2

Conductivity

umhos cm

346

234

697

697

69

Depth

to

Water Feet

6 7

6   5 35

3 55

4

 

D Dissolved

T

Total

Laboratory Qualifiers

B

Analyte

detected at value between

MDL

and

PQL

U Analyte

concentration

less

than

MDL

H Analysis exceeded

holding

time

Resurrection

Mining

Company

E  2

Advanced Environmental Sciences

November

26 2 4

2

Black Cloud Surface

and Ground Water

Monitoring Results Cont

SAMPLE LOCATION

Method

Detection

Limit

MW 3 MW 3

MW 3

MW

3

MW 3

DATE

2  6 2 4 2 2

7

2

2

8 28 2 24 2

PARAMETER

UNITS Cone Conc Conc

Conc Conc

Cadmium

D

mg L

 

2 2

  26

 

2

Copper D

mg

L

  5

  3  

27  

5

  5

Lead D

mg

L

 

2  

Manganese

D

mg

L

 

5

3

8

3

58

4

63

3

8

Page 131: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 131/149

Mercury D

mg

L

  2

 

2   2

 

2  

2

Zinc

D

mg

L

  2

  9 4   96

 

855

  7 8

Cyanide T

mg

L

  3

 

3

 

3

H

 

3

  3

Hardness

as

CaCO3

mg

L

 

8 9

787 895

833

Nitrate Nitrite as

N

mg L

  2

 

2

 

7

  2

  2

Nitrogen ammonia

mg L

 

5

 

74

  52

  97

2  7

TDS

mg L

 

3 7 32

4

Sulfate

mg L

 

66 67

8

74

Total Alkalinity

mg

L

2

74

72 66 79

Fie ld Parameters

Units

2

 6

2 4 2

2 7

2 2 8 28 2

24

2

H

std units

7 79 7 8

7 49

7

49

7

45

Tem

erature C

4 2

7

8

 6 7

 6 7 8

8

Conductivity

umhos cm

 747 269

 5

5

29

Depth

to

Water

Feet

4 7 4

5 3

4

3 55 4

D

Dissolved

T Total

Laboratory Qualifiers

B

Analyte

detected at

value between

MDL

and

PQL

U Ana ly te concentration less

than

MDL

H Analysis exceeded holding time

Resurrection

Mining

Company

E

 3

Advanced Environmental Sciences

November

26 2 4

2

Black

Cloud Surface and

Ground Water

Monitoring Results Cont

SAMPLE LOCATION

Method

Detection

Limi t

MW

4

MW 4 MW 4 MW 4 MW 4

DATE

2  6 2 4 2 2

7

2 2 8 28 2 24 2

PARAMETER

UNITS Conc Conc Conc Conc Conc

Cadm ium D

mg

L

 

2  

2

 

22

 

8

Copper D

mg L

  5

  7   8   8

Lead D

mg

L

 

Manganese

D

mg

L

 

5

 

56

 

6

 

5

 

5

Page 132: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 132/149

Mercury D

mg

L

 

2

 

2

 

2  

2  

2

Zinc D

mg

L

 

2

  242   227   5 2   3 4

Cyanide T

mg L

  3

  3   3

H

  3   3

Hardness as CaCO3

mg L

 

278 247 22 333

Nitrate Nitrite

as N

mg L

  2

  6  

63

  48  

56

Nitrogen ammonia

mg

L

  5

 

5

  5   5   5

TDS

mg

L

 

32 3

35

43

Sulfate

mg

L

 

62

 5 4 23

Total Alkalinity

mg

L

2

94

9

83

88

Field Parameters

Units 2

 6

2 4 2 2

7

2 2

8 28 2 24

2

H

st d

units

7

84

7

9

7 6

7

59

7

53

Tem

erature C

3

4

9 6

 

4

 4

9 2

Conductivity

umhos cm

67 429

447

594 588

Depth

to

Water Feet

 

85 6  

5

 2

  3

85

D Dissolved

T

Total

Laboratory Qualifiers

B

Analyte

detected at

value

between

MDL

and

PQL

U Ana ly te concentration less than MDL

H

Analysis

exceeded holding time

Resurrect ion

Mining

Company

E

 4

Advanced Environmental

Sciences

November

26

2 4

2

Black Cloud Surface and Ground Water Monitoring Results Cont

SAMPLE LOCATION

Method

Detection

Limit

MW 5 MW 5

MW

5

MW 5 MW 5

DATE

2 6 2

4 2 2 7

2 2

8

28 2

24

2

PARAMETER

UNITS

Conc

Conc Conc

Conc Conc

Cadmium

D

mg L

 

2

 

2

  2

 

2

Copper D

mg L

 

5

 

5

 

4  

8

Lead D

mg

L

 

3  

2

 

Manganese

D

mg

L

 

5

 

27

 

6

 

5

 

5

Page 133: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 133/149

Mercury D

mg

L

  2

 

2

 

2   2

 

2

Zinc D

mg

L

  2

  33

  45   35

  33

Cyanide T

mg L

  3

  3

  3

H

  3

 

3

Hardness

as

CaCO3

mg L

 

72

2 3 92

 86

Nitrate Nitrite

as

N

mg

L

  2

 

37  

8

 

7

  23

Nitrogen ammonia

mg L

 

5

 

5

  5

 

5

  5

TDS

mg L

 

8

25

26

22

Sulfate

mg

L

 

59 9

7

7

Total

Alkalinity

mg

L

2

  6

  3

  9

  3

Field

Parameters Units

2  6 2

4

2 2 7

2 2

8 28 2

24

2

H

st d

units

8 26   4

 3 4

7

95

8  

Tem erature

C

4

6

8

 2

8

 

2 4

 

3

Conductivity

umhos cm

457

372 866

34

337

Depth to Water

Feet

 4

6

 3 5

 

65  2

 5

 2 4

D Dissolved

T Total

Laboratory

Qualifiers

B

Analyte

detected at

value

between

MDL

and

PQL

U

Analyte concentration

less

than MDL

H Analysis exceeded holding time

Resurrection

Mining Company

E

 5

Advanced Envi ronmental Sciences

November 2 6 2 4

2

Black Cloud Surface and Ground Water Monitoring Results Cont

SAMPLE LOCATION

Method

Detection

Limi t

MW

6

MW 6

MW

6

MW 6

DATE

2 6

2 4

2 2

8

28 2

24 2

PARAMETER

UNITS Conc

Conc

Conc Conc

Cadmium D

mg L

 

Copper D

mg

L

  5

 

5   5

 

5

 

5

Lead D

mg L

 

4

  5   4

Page 134: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 134/149

Manganese

D

mg L

  5

  35   7

  9

  5

Mercury

D

mg

L

  2

  2  

2  

2

 

2

Zinc

D

mg L

 

2

  27

  22   3

2

Cyanide T

mg L

 

3

  3

 

3

  3   3

Hardness as CaCO3

mg L

 

65

 67 69

 68

Nitrate Nitrite as N

mg

L

 

2

 

76

  85

 

83  

85

Nitrogen

ammonia

mg L

  5

  5

 

5

 

5  

5

TDS

mg

L

 

2 9

2 2

Sulfate

mg

L

 

56 6

6 6

Total Alkalinity

mg

L

2

  4  

3 3

Field

Parameters

Units

2  6 2

4 2 2 8 28 2

24

2

H

st d

units

8 3

8

25 8

 6

8

 5

Tem era tu re

C

5 5

8 8  2

4

7

Conductivi

umhos cm

4 3

328 3 3

Depth to Water

Feet

 4

 

7

8

23   8 5

D

Dissolved

T Total

Laboratory Qualifiers

B Analyte detected

at

value between MDL

and

PQL

U Analy te concentration less

than

MDL

H Analysis

exceeded

holding time

Resurrection

Mining Company

E

 6

Advanced Environmental Sciences

November26 2 4

2 Black

Cloud Surface

and Ground

Water

Monitoring

Results Cont

SAMPLE

LOCATION

Method

Detection

Limi t

SW 5

SW

5 SW 5 SW 5

SW 5

DATE 2

 6

2

4

2

2 7

2

2 8

28 2 24

2

PARAMETER

UNITS Conc Conc Conc

Conc

Conc

Cadmium D

mg L

 

8

 

9   6

 

5

Copper D

mg

L

  5

 

4   9  

Lead D

mg

L

 

4  

2

 

5

Page 135: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 135/149

Manganese

D

mg L

  5

  99   2 8  

653

Mercury

D

mg L

  2

 

2  

2

 

2

  2

Zinc

D

mg

L

 

2

 

2 8   58

4 492

Cyanide

T

mg

L

 

3

  3 3 H   3

  3

Hardness as CaCO3

mg L

 

77

226

89

 9

Nitrate

Nitrite as

N

mg

L

 

2

  34

  37   6

27

Nitrogen

ammonia

mg L

  5

  5

 

5   5

  5

TDS

mg

L

 

24

28 23

Sulfate

mg

L

 

9

2 2

Total

Alkalinity

mg L

2

94

97

69

99

Field

Parameters

Units 2

 6

2 4

2 2

7

2 2

8

28 2

24 2

H std units

8 26

8

33

8

45

8 33 8 34

Temperature

C

 

4 6 9 7  2

8

 4 4

6 9

Conductivity

umhos cm

457 385

 7 6

242

272

Depth to Water

Feet

 

NA

NA

NA

NA

NA

D

Dissolved

T Total

Laboratory Qualifiers

B Analyte detected

at

value between

MDL and

PQL

U

Analyte concentration less than

MDL

H Analysis

exceeded

holding t ime

Resurrection

Mining

Company

E  7

Advanced

Environmental Sciences

November

26

2 4

2 2

Black Cloud Surface and Ground Water Monitoring Results

SAMPLE LOCAT ION

Method

Detection

Limi t

MW  

MW   MW  

MW

 

DATE

 

8

2 2 4 23 2 2

7  8 2 2   5 2 2

PARAMETER

UNITS

Cone

La b Qual Cone La b

Qual

Cone

Lab Qua l Cone La b Qual

C adm ium D

mg

L

 

6

  5

  7

  7

Copper D

mg L

 

5

  6

B

 

3

B

  B

  9 B

Lead

D

mg

L

 

U

 

U

 

U   U

Manganese

D

L

  5

 

5 U

  27

B

  5

U

 

5

U

Page 136: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 136/149

mg

Mercury D

mg

L

  2

 

2 U  

2

U

  2

U

  2 U

Zinc

D

mg

L

  2

  39

 

44

 

52

  47

Cyanide T

mg L

  3

 

3

U  

3

U

  3

U

  3

U

Hardness

as CaCO3

mg L

 

5

  4

  8

 23

Nitrate Nitrite

as

N

mg

L

  2

  33

  2

  6

  35

Nitrogen

ammonia

mg

L

  5

 

5

U  

5

U

 

5

U

 

5 U

TDS

mg L

 

H

 2

4

Sulfate

mg

L

 

3

B

2

B

2 B

3 B

Total

Alkalinity

mg

L

2

98

94

9

94

Field

Parameters

Units

  8

2 2

4

23

2 2 7

 8

2 2

  5 2 2

H

st d units   7

75

7

95 7 42

7 7

Temperature

C

 

6  

7 2

 3

9

Conductivity

umhos

cm

  2 6

2 2

 75 3 4

Depth to Water

Feet  

7

4

7

6 9 7

3

D D is so lv ed

T Total

Laboratory

Qualifiers

B Analyte

detected

at value between MDL and PQL

U

Analyte

concentration

less

than

MDL

H Analysis

exceeded

holding

time

Resurrection

Mining

Company

E

 8

Advanced Envi ronmental Sciences

November

26 2 4

2 2

Black

Cloud Surface

and Ground

Water

Monitoring Results Cont

SAMPLE LOCATION

Method

Detection

Limi t

MW 2

MW

2

MW 2 MW

2

DATE

  8 2 2

4

23 2 2

7  8 2 2   5 2 2

PARAMETER

UNITS

Conc  

Lab

Qual

Conc

 

Lab Qual Conc

La b

Qual Conc

La b

Qual

Cadmium D

mg

L

 

 

4

B

 

2 B

Copper

D

mg

L

 

5

 

B

 

8

B

Lead D

mg

L

 

U

  U

Manganese

D

mg

L

 

5

 

85

  22

Mercury D

mg L

  2

  2

U

 

2

B

Page 137: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 137/149

FROZEN

FROZEN

Zinc D

mg L

 

2

  7

  53

Cyanide T

mg

L

  3

  3

U

  3 U

Hardness as CaCO3

mg L

 

247

 5

Nitrate

Nitrite as N

mg L

 

2

  39

  79

Nitrogen ammonia

mg L

 

5

  5 B

 

5

U

TDS

mg L

 

39

2

Sulfate

mg L

 

2

7

Total

Alkalinity

mg

L

2

85

89

Field Parameters Units

  8 2 2

4 23 2 2

7  8

2 2

  5 2 2

H

std units

 

FROZEN

FROZEN

7

55

7 76

Tem

erature C

 

8

5

 3  

Conductivity

umhos cm  

373

375

Depth

to Water

Feet

 

5 65

5 9

D Dissolved

T Total

Laboratory

Qualifiers

B

Analyte

detected

at

value

between

MDL

and

PQL

U Ana lyte concentration less than MDL

H Ana ly sis

exceeded holding

time

Resurrection

Mining

Company

E  9

Advanced

Environmental

Sciences

Novembe r 2 6 2 4

2 2

Black

Cloud Surface and

Ground Water Monitoring Results

Cont

SAMPLE LOCATION

Method

Detection

Limi t

MW 3 MW 3

MW 3 MW 3

DATE

  8 2 2

4

23 2 2

7  8

2 2

 

5

2 2

PARAMETER UNITS

Conc

La b

Qual Conc

La b Qual Conc

Lab

Qual

Conc Lab

Qual

Cadm ium D

mg L

 

9

  2

B   2

  2

Copper

D

mg

L

 

5

  5 U   5

U

  5

U

 

5

U

Lead

D

mg L

 

2

B

 

U  

2 B

  B

Manganese D

mg

L

 

5

2

 4

2

5

2

93

4

mg L

  2

 

2

U   2

U

 

2

U

  2 U

Page 138: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 138/149

Mercury

D

Zinc D

mg

L

 

2

2

2 37

  87

  25

Cya nid e T

mg L

  3

 

3

U

  3

U

 

3

U

  3 U

Hardness

as

CaCO3

mg L

 

859

852

887

866

Nitrate Nitrite

as

N

mg L

 

2

 

3 B

  5

B

 

2

U

 

2

U

Nitrogen ammonia

mg L

  5

 

2

42

 

48

 

64

TDS

mg

L

 

3 H

 2

25

23

Sulfate

mg

L

 

76

76 75

76

Total

Alkalinity

mg L

2

8

8

8

78

Field Parameters Units   8 2 2 4

23

2 2

7  8 2 2

  5 2 2

H

st d units   7 58

7 48

7

33 7 56

Tem erature

C

 

6 9

  7 4

 2

2

Conductivity

umhos cm   429  47

64

 775

Depth

to Water

Feet

  4 3 4 3

4

25

4

6

D Disso lved

T Total

Laboratory Qualifiers

B

Analyte

detected

at

value between

MDL

and

PQ L

U Analyte

concentration

less

than

MDL

H

Analysis

exceeded holding time

Resurrect ion

Mining Company

E 2

Advanced Environmental Sciences

Novembe r 2 6 2 4

2 2

Black

Cloud Surface and

Ground

Water

Monitoring

Results

Cont

SAMPLE LOCAT ION

Method

Detection

Limit

MW 4

MW

4 MW 4 MW 4

DATE

  8 2 2

4

23

2 2 7  8 2 2   5 2 2

PARAMETER UNITS Conc L ab Q ua l Conc

La b

Qual

Conc La b Qual Conc La b Qual

Cadmium D

mg L

 

2

 

2

 

Copper

D

mg L

 

5

 

7

B

 

7 B   4

B

  9

B

Lead D

mg L

 

U  

U

 

U

  U

Manganese

D

mg

L

 

5

 

5

U

 

5

U

 

5

U

 

5

U

Mercury D

mg

L

  2

 

2

U   2

U

  2

U

  2 U

Page 139: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 139/149

Zinc

D

mg

L

  2

  233

 

248

 

2 5

  96

Cyanide T

mg L

  3

  3 U   3

U

  3

U

  3

U

Hardness as

CaCO3

mg

L

 

245

252

24

245

Nitrate

Nitrite

as N

mg

L

  2

  54

  56  

42

  6

Nitrogen ammonia

mg L

 

5

  5

U

  5

U

  5

U

  5 U

TDS

mg

L

 

28 H

34 33

33

Sulfate

mg

L

 

5

7 5

4

Total Alkalinity

mg L

2

97

94

9

97

Fie ld Parameters

Units   8 2 2 4 23

2 2 7 8 2 2

  5 2 2

pH

std units

  7 8

7 75 7

49

7 66

Temperature

C   3

 

3  4 9

9

6

Conductivity

umhos

cm

 

494 47

366 6 2

Depth

to Water

Feet  

4 6

 4 75  3

95

 6

4

D Dissolved

T Total

Laboratory Qualifiers

B

Analyte detected

at value between MDL and PQL

U Analyte concentration less than MDL

H Analysis

exceeded

holding t ime

Resurrection Mining Company

E 2 Advanced Envi ronmenta l Sciences

Novembe r 2 6 2 4

2 2

Black

Cloud

Surface and Ground Water Monitoring

Results

Cont

SAMPLE LOCATION

Method

Detection

Limi t

MW

5

Numeric

Protection

Limits

MW

5

MW

5

MW

5

MW

5

DATE

 

8 2 2

4 23

2 2 7

 8

2 2

  5 2 2

PARAMETER

UNITS

Cone

La b

Qual

Cone

Lab

 

Qual

Cone

Lab

Qual Cone

Lab

Qual

Cadmium D

m

 

5 2 B   2

B   2 B   2

B

Copper D

mg L

 

5  

5

  B  

3

5

 

5

U

 

5

U

Lead D

m

 

6

  3

B

  2

B  

B   2

B

Manganese

D

mg

L

 

5

4

4 7

B  

5

U   5

U   5

U

Mercury

D

mg L

  2  

2

U

  2

U  

2 U

  2

U

Zinc D

mg L

 

2   5

 

35   46

  38

 

4

Page 140: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 140/149

Cyanide

T

mg

L

  3   2

  3

U

  3 U

  3

U  

3

U

Hardness

as

CaCO3

mg L

 

Report

 85

 8 75

 79

Nitrate Nitrite

as N

mg L

 

2

Report

  4

  8

  6

 

9

Nitrogen

ammonia

mg

L

  5

Report   5 U

  5

U

 

5

U

 

5

U

TDS

m   4

2

H 2

2 22

Sulfate

m  

3 7

6

7

7

Total Alkalinity mg

L

2

Report

  2

  9 8

  2

Field

Parameters

Units

  8 2 2

4

23

2 2 7 8 2 2

  5 2 2

H

std units

 

Report 8

 

8

 8

7

89

8  2

Temperature

C  

Report

  8

9 6  4 3

8 3

Conductivity

umhos cm

l Report

364 354

28

44

Depth to Water

Feet

 

Report

 

2 93

 2 5  2 55

 

2 75

D

Dissolved

T Total

Laboratory

Qualifiers

B

Analyte

detected

at

value between

MDL

and

PQL

U Ana ly te concentration

less

than

MDL

H

Analysis

exceeded

holding

time

Resurrection

Mining

Company

E 22

Advanced Environmental

Sciences

Novembe r 2 6 2 4

2 2

Black Cloud Surface and Ground

Water Monitoring Results

Cont

SAMPLE LOCATION

Method

Detection

Limi t

MW

6

MW 6

MW

6 MW 6

DATE

  8 2 2 4 23 2 2

7  8 2 2  

5

2 2

PARAMETER

UNITS

Cone Lab Qua l Conc

La b

Qual

Conc

Lab Qua l

Cone

Lab Qua l

Cadmium D

mg

L

 

U

 

B

 

I

U

  U

Copper D

mg L

 

5

  5 U

 

33

 

9

B

  5

U

Lead

D

mg

L

 

6

 

7

  3

B

  3

B

Manganese

D

mg

L

 

5

 

B

  5

U

 

5

U

 

6

B

Mercury D

mg L

  2

  2

U

  2

U

  2

U

  2 U

Page 141: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 141/149

Zinc D

mg

L

 

2

  23

  37

 

2

22

Cyanide T

mg

L

 

3

  3 U

  3

U

  3

U

 

3 U

Hardness

as

CaCO3

mg L

 

64

 6

6

65

Nitrate Nitrite as N

mg L

  2

 

74

  93

  85

  89

Nitrogen

ammonia

mg

L

  5

 

5

U   5

U

 

5

U

  5

U

TDS

mg L

 

7 H

 9 2

2

Sulfate

mg L

 

6

5

7

6

Total

Alkalinity

mg

L

2

  6

  8   3

 23

Field Parameters Units

 

8 2 2 4 23 2 2

7

 8 2 2   5 2 2

H

std units   8

24

8

 9 8

27 8

35

Temperature

C

  6

 

4

 2 3 7 6

Conductivity

umhos cm

 

328

265 285 372

Depth to Water Feet

  2 9  9

6

2 2

 9

D Dissolved

T Total

Laboratory Qualifiers

B Analyte

detected

at

value

between MDL and PQL

U Analyte concentration

less

than MDL

H Analysis exceeded holding time

Resurrection

Mining Company

E

23

Advanced Envi ronmenta lSciences

November

26 2 4

2 2

Black

Cloud Surface

and Ground

Water

Monitoring Results Cont

SAMPLE

LOCATION

Method

Detection

Limit

SW

5

SW

5

SW

5

SW 5

DATE

 

8

2 2 4 23 2 2

7  8

2 2   5 2 2

PARAMETER

UNITS

Cone

La b Qual Cone La b

Qual Cone

Lab

Qual Cone

Lab Qual

C adm ium D

mg L

 

4

  2   6

  6

Copper D

mg

L

 

5

 

B

  57   2

B

  6 B

Lead

D

mg

L

 

3 B

 

22

  5 B

 

3

B

Manganese

D

mg

L

 

5

 

497

  22  

5

 

74

Mercury D

mg L

  2

 

2

U  

2

U

 

2

U

 

2 U

Page 142: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 142/149

Zinc D

mg L

  2

 

4 2

  325

  3

  46

Cyanide

T

mg L

  3

  3 U   3

U

  3

U

  3

U

Hardness as CaCO3

mg

L

 

335

 29

 22

 4

Nitrate Nitrite

as

N

mg

L

 

2

 

48

 

26

  23

 

45

Nitrogen

ammonia

mg

L

  5

 

5 U   5

U

  5

U

  5

U

TDS

mg L

 

4

H

 6 3

8

Sulfate

mg

L

 

22

5

B

4

B

5

B

Total

Alkalinity

mg

L

2

  3

88 89

97

Field Parameters

Units

  8 2 2 4

23

2 2 7  8 2 2   5 2 2

H

std units  

8  5 8

26

8

36

8

47

Temperature C

 

7  

3

5

Conductivity

umhos cm

 

64 263 2 6 327

Depth to

Water Feet

 

NA

NA

NA

NA

D

Dissolved

T Total

Laboratory Qualifiers

B Ana ly te

detected

at

value between

MDL and PQL

U

Analyte concentration

less

than

MDL

H Analysis

exceeded

holding

time

Resurrect ion

Mining Company

E 24

Advanced Environmental

Sciences

Novembe r 2 6 2 4

2 3

Black Cloud

Surface

and Ground Water Monitoring Results

SAMPLE LOCATION

Method

Detection

Limit

MW

 

MW  

MW  

MW  

DATE

  6 2 3

5  4 2 3

7

 7

2 3

  23 2 3

PARAMETER

UNITS

Cone

La b

Qual

Cone

Lab Qual

Cone Lab Qua l

Cone

La b

Qual

Cadmium

D

mg

L

 

6

  5

  6

 

5

Copper

D

mg

L

 

5

  33

  9

B

 

8

B

 

5

U

Lead D

mg L

 

B

 

U  

U

  U

Manganese

D

mg

L

 

5   5 B

 

5 U

 

6

B

 

34

U

Mercury D

mg

L

  2

 

2 U

 

2 U

  2

U

  2 U

Page 143: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 143/149

Zinc

D

mg L

 

2

 

5

4

47

  49

Cyanide

T

mg

L

 

3

  3

U   3

U

  3

U

  3

U

Hardness as CaCO3

mg L

 

6 2

92

  7

Nitrate Nitrite

as

N

mg

L

  2

  29   7

  6

 

28

Nitrogen

ammonia

mg L

  5

  5 U

 

5 U

 

5

U

 

5

U

TDS

mg L

 

2

2

Sulfate

mg L

 

3 3

B

2

B

2

B

Total

Alkalinity

mg

L

2  

87 88 92

Field

Parameters

Units

  6 2 3

5 4 2 3

7

 7

2 3

  23 2 3

H

st d units  

7 94

7 86 7

58 7

67

Temperature C

 

9 9

9

 

6

7

Conductivity

umhos cm  

362

 94

22

26

Depth to Water

Feet  

7 6

6 6

7 3

8  

D

Dissolved

T Total

Laboratory Qualifiers

B Analyte

detected

at value between MDL and PQL

U

Analyte

concentration less than MDL

H Analysis exceeded

holding

time

Resurrection Mining Company

E 25

Advanced Envi ronmental Sciences

November 26 2 4

2 3

Black Cloud

Surface and

Ground

Water Monitoring Results Cont

SAMPLE

LOCATION

Method

Detection

Limi t

MW

2

MW 2

MW 2 MW 2

DATE

  6 2 3

5 4 2 3 7

 7

2 3

  23 2 3

PARAMETER

UNITS

Cone

 

Lab Qual

Conc

 

Lab

Qual

Conc Lab Qual Conc

La b

Qual

Cadmium

D

mg L

 

U

FROZEN

 

6

  2

B

Copper

D

mg L

  5

  48

  7 B

 

5 U

Lead D

mg L

 

U

 

U

 

U

Manganese

D

mg

L

 

5

 

462

 

2

 

268

Mercury D

mg

L

  2

 

2 U

  2

U

  2

U

Page 144: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 144/149

Zinc

D

mg

L

  2

  54

  26

 

43

Cyanide

T

mg

L

  3

  3 U

  3

U

  3 U

Hardness

as

CaCO3

mg

L

 

7

369

392

Nitrate Nitr ite as N

mg

L

  2

  8

34

 

45

Nitrogen

ammonia

mg

L

 

5

 

5 U

  2

B

  6 B

TDS

mg

L

 

23

48

46

Sulfate

mg

L

 

9

29

29

Total

Alkalinity

mg

L

2

 

78

8

Field

Parameters

Units   6 2 3

5

 4

2 3

7  7 2 3   23 2 3

H

st d units   7 9

FROZEN

7 54

7

75

Temperature

C 9 9

 2

9

9

Conductivity

umhos cm   362

725 793

Depth

to Water

Feet

  6 9

6 3

5

7

D

Dissolved

T Total

Laboratory Qualifiers

B

Analyte

detected at value between MDL and PQL

U

Analyte concentration

less than

MDL

H

Analysis exceeded holding time

Resurrection Mining Company

E 26

Advanced Environmental

Sciences

November

26

2 4

2 3

Black Cloud Surface and Ground WaterMonitoring Results Cont

SAMPLE

LOCATION

MDL

MW 3

MDL

MW 3

MW 3

MDL

MW 3

DATE

  6

2 3

5 4 2 3

7

 7 2 3

  23 2 3

PARAMETER

UNITS

Cone

Lab

Qual

Cone La b

Qual

Cone La b

Qual

Cone

La b

Qual

Cadmium D

mg

L

 

2

6

  26   8

Copper D

mg L

  5  

5

U

  5   6 B   5 U

 

2

  5

U

Lead

D

mg L

 

2 B

 

U   U

  U

Manganese

D

mg

L

 

3 42

 

3

5 32

6

 6

5 4

77

Mercury

D

mg L

  2   2 U  

2

  2

U   2

U

2

 

2

U

Page 145: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 145/149

Zinc D

mg L

 

5   65  

3

  3

  89

Cyanide

T mg L

 

3  

3

U   3

 

3 U

  3 U   3 U

Hardness as CaCO3 mg L

 

833

 

642

829

2

8 8

Nitrate

Nitrite as N

mg

L

  2

 

6 B

  2   9 B

 

5 B

 

2

  8 B

Nitrogen ammonia mg L

  5   55   5 58 U

  8   5

  28

TDS

mg L

 

9

89 H

 27

Sulfate

mg

L

 

75 54

75 72

Total

Alkalinity

mg L

2

8 2

  4

 

Field

Parameters

Units   6

2 3

5  4 2 3

7  7

2 3

 

23

2 3

pH

st d

units

 

7 66 7 5

7  9

7

49

Temperature

C

  8 9  5

4

8 7

Conductivity

umhos

cm  

35

75

543

 54

Depth to Wa te r Feet   5

 

4 5 4  

4 7

D Disso lved

T Total

Laboratory

Qualifiers

B Analyte detected at value between

MDL and

PQL

U Ana ly te concentration less than MDL

H Analysis

exceeded

holding

time

Resurrection Mining

Company

E 27

Advanced Environmental

Sciences

November

26

2 4

2 3

Black

Cloud

Surface and

Ground

Water Monitoring Results

Cont

SAMPLE LOCATION

Method

Detection

Limi t

MW 4

MW

4 MW 4 MW 4

DATE

  6 2 3

5

 4 2 3 7 7 2 3   23 2 3

PARAMETER UNITS Conc

Lab Qual Conc La b

Qual

Conc La b

Qual

Conc Lab Qua l

Cadmium D

mg

L

 

3

  2

 

2

Copper

D

mg

L

  5

  B

  9 B

  6 B

  5 U

Lead D

mg L

 

B  

U  

U

 

U

Manganese D

mg L

 

5

  5 U   5

U

  5

U

  5

U

Mercury D

mg

L

 

2

 

2

U  

2

U   2

U

  2 U

Zinc

D

mg

L

  2

  93

265

  254

 

227

Page 146: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 146/149

Cyanide

T

mg

L

  3

  3 U   3

U

  3

U

  3

U

Hardness

as

CaCO3

mg

L

 

238 222

 93

257

Nitrate Nitri te as N

mg

L

 

2

  54

 

73

 

35

 

45

Nitrogen

ammonia

mg

L

 

5

 

5

U

  5

U

 

5

U

 

5

U

TDS

mg L

 

3

27

H

28

3

Sulfate

mg L

 

5 3

5

Total

Alkaline

mg

L

2

  84

97

98

Field

Parameters Units   6 2 3

5  4 2 3 7

 7 2 3

  23

2 3

H

st d

units

  7

76 7 77 7

6

7 8

Tem

erature

C

  9 4 8 3

 2

3

9

 

Conductive umhos cm

 

473 423

443

5 2

Depth

to Water

Feet

 

6 6

  3  2 7  5 8

D D is so lv ed

T Total

Laboratory Qualifiers

B

Analyte

detected at

value

between

MDL

and

PQL

U

Analyte

concentration less than

MDL

H

Analysis

exceeded

holding t ime

Resurrect ion

Mining

Company

E

28

Advanced Environmental Sciences

November26 2 4

2 3

Black Cloud Surface and Ground

Water Monitoring

Results Cont

SAMPLE LOCATION

Method

Detection

Limit

MW 5

Numeric

Protection

Limits

MW 5 MW 5

MW

5

MW 5

DATE

 

6 2 3 5 4 2 3 7

 7

2 3

 

23

2 3

PARAMETER UNITS

Conc Lab

Qual

Conc Lab

Qual

Conc La b

Qual

Conc

Lab

Qual

Cadmium D

mg L

  5   2

B

 

3

B

 

3

B   2

B

Copper D

mg L

 

5

  5

  6 B   B  

5

U   5 U

Lead D

mg

L

  6 2

B

  2

B

 

B  

U

Manganese

D

mg

L

  5 4 4 5

U

  5

U

  2  

B

  6

B

Mercury

D

mg

L

 

2

 

2

U

 

2

U

 

2

U

 

2

U

Zinc D

m

 

2

  5   44   54   4

  4

Cyanide T

 

3

 

2 3

U   3

U

  3

U   3

U

Page 147: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 147/149

mg L

Hardness

as

CaCO3

mg

L

 

Report

 95

2 3

 92

2 4

Nitrate Nitri te as

N

mg

L

 

2

Re

or t   26

  83

 

89

Nitrogen

ammonia

mg L

 

5

Report

  5

U

 

5

U   5

U

 

5

U

TDS m   4

25 24 2

24

Sulfate m   3

9 7 8

9

Total Alkalinity

m 2 Report  

4

23   8

Field

Parameters Units

  6 2 3 5 4 2 3

7

 7 2 3   23

2 3

H std

units

 

Report

8

7

88

7

78

7

93

Temperature C  

Report

 2 3 8

9

 2 2

4

7

Conductivity

umhos cm   Report

4 3

4 7

435

39

Depth to Water Feet

Report

 3

7

  5  2 3

 3

3

D Disso lved

T Total

Laboratory

Qualifiers

B

Analyte

detected at

value

between

MDL

and

PQL

U Ana lyte concentration less than MDL

H

Analysis exceeded holding time

Resurrection

Mining

Company

E 29 Advanced Environmental

Sciences

Novembe r 2 6 2 4

2 3

Black

Cloud

Surface and

Ground Water Monitoring

Results

Cont

SAMPLE LOCATION Method

Detection

Limi t

MW 6

MW 6 MW 6 MW 6

DATE

  6

2 3 5

 4

2 3 7

 7

2 3

  23

2 3

PARAMETER

UNITS Conc Lab Qual

Conc

Lab Qual

Conc

La b Qual

Conc

Lab Qual

Cadmium

D

mg

L

 

U

  U  

U

 

U

Copper

D

mg

L

  5

  5

U  

24

B  

5

U  

5

U

Lead D

mg L

 

5 B   3 B

  3

B

 

2

B

Manganese

D

mg L

 

5

  B

  9

B

 

5

U

 

5 U

Mercury D

mg L

 

2

  2

U  

2

U  

2

U

 

2

U

Zinc

D

mg L

 

2

 

22

 

37

 

24

  8

Page 148: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 148/149

Cyanide T

mg L

  3

  3

U  

3

U  

3

U

  3

U

Hardness as

CaCO3

mg L

 

62

 77

 77

 82

Nitrate

Nitrite

as N

mg

L

 

2

 

87 75

  84

 

76

Nitrogen

ammonia

mg

L

  5

 

5

U   5

U

  5

U

  5

U

TDS

mg L

 

9

22

25

22

Sulfate

mg

L

 

6

7

7

7

Total

Alkalinity

mg

L

2

  4

  2

  2

  3

Field

Parameters Units   6 2 3

5

 4 2 3

7

 7 2 3   23 2 3

H std

units

  8

4

8  5 8  4 8 2

Tem erature

C   8  

9 8

9

7

5 9

Conductivity

umhos cm  

333 363 394 355

Depth to Water Feet

 

8 3

 9 5

 5 4

 7 3

D Dissolved

T Total

Laboratory Qualifiers

B Analyte detected at value between

MDL and

PQL

U Ana ly te concentration

less

than

MDL

H Analysis

exceeded

holding

time

Resurrection Mining Company

E

3

Advanced Environmental

Sciences

November

26

2 4

2 3

Black Cloud Surface

and

Ground Water Monitoring

Results

Cont

SAMPLE LOCAT ION Method

Detection

Limi t

SW

5

SW

5

SW 5 SW

5

DATE   6 2 3 5  4 2 3 7 7 2 3  

23

2 3

PARAMETER

UNITS

Cone La b Qual Cone Lab Qual Cone La b Qual Cone Lab Qua l

Cadmium D

mg

L

 

3

  25  

8

 

9

Copper

D

mg

L

 

5

 

47

 

69

 

9 B

 

9 B

Lead D

mg

L

 

U

  2

 

4

B

Manganese

D

mg

L

  5

 

574

  246

  4

96

Mercury

D

mg L

 

2

 

2 U

 

2

U

  2

U

 

2

U

Zinc

D

mg L

  2

  349

 

543

  2 5

  94

Page 149: Black Cloud Mine Final Reclamation Report

7/18/2019 Black Cloud Mine Final Reclamation Report

http://slidepdf.com/reader/full/black-cloud-mine-final-reclamation-report 149/149

Cyanide T

mg

L

  3

 

3

U

 

3

U

  3

U

  3

U

Hardness

as

CaCO3

mg

L

 

355

 39 99

 48

Nitrate Nitrite as N

mg L

 

2

 

5

35 22

 

34

Nitrogen

ammonia

mg L

 

5

  5

U

  5

U

  5

U

  5

U

TDS

mg L

 

45

7 2

7

Sulfate

mg L

 

24

8 3 B

5 B

Total Alkalinity

mg L

2

  4

74 82

97

Field

Parameters Units   6 2 3

5

 4 2 3 7

 7

2 3   23 2 3

H

std units   8  7

8  6 8 26

8 29

Temperature

C  

6 8

7 7  

4 4

7

Conducti ity

umhos cm

 

642

236

227

279

Depth to

Water

Feet   NA NA NA

NA

D D is so lv ed

T Total

Laboratory Qualifiers

B

Analyte

detected at value between MDL and PQL

U

Analyte

concentration

less

than

MDL

H

Analysis

exceeded holding time

Resurrection Mining Company

E 3

Advanced

Environmental Sciences

November

26 2 4