blast all inc. · 7.2 daily painting and blasting report . ... production daily blasting and...

65
Equal Opportunity Employer BLAST ALL Inc. Industrial Coating Structural Maintenance Abrasive Blasting 148 Mill Rock Road East P.O. Box 775 Old Saybrook, CT 06475 Tel (860) 388-5464 / Fax (860) 388-4644 ITEM #0603729A - LOCALIZED PAINT REMOVAL AND FIELD PAINTING OF EXISTING STEEL CT DOT #0063-0699, 0700, 0701 Hartford Rehab I-84 East Bound West Bound Bridges Hartford

Upload: dohanh

Post on 06-Aug-2018

292 views

Category:

Documents


11 download

TRANSCRIPT

Page 1: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

Equal Opportunity Employer

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

148

Mill

Roc

k Ro

ad E

ast

P.O

. Box

775

Old

Say

broo

k, C

T 06

475

Tel (

860)

388

-546

4 /

Fax

(860

) 388

-464

4

ITEM #0603729A - LOCALIZED PAINT REMOVAL AND FIELD PAINTING OF EXISTING STEEL

CT DOT #0063-0699, 0700, 0701

Hartford Rehab I-84 East Bound West Bound Bridges

Hartford

Page 2: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

14

8 M

ill R

ock

Ro

ad E

ast

P.O

. Bo

x 7

75

O

ld S

ayb

roo

k, C

T 0

64

75

Te

l (8

60

) 3

88

-54

64

/ F

ax (

86

0)

38

8-4

64

4

Equal Opportunity Employer

Quality Control Program

1.0 PURPOSE

2.0 MISSION STATEMENT

3.0 PROGRAM SUMMERY

4.0 ORGANIZATION

4.1 Superintendant / Quality Control Manager

4.2 Project Management

4.3 Contractors Other Personnel

4.4 Commercial Testing Firms

5.0 PROCEDURES

5.1 Three Phases of Control

5.2 Control of Onsite Construction

5.3 Receiving and Warehousing

5.4 Off Site Inspection

5.5 Inspection Documentation

5.6 Drawing and Documentation Control

5.7 Material Certification

5.8 Workmanship Inspection

5.9 Calibration of Equipment

5.10 Punch Out Inspection

5.11 Pre-Final Inspection

5.12 Final Acceptance and Inspection

6.0 TESTING METHODS

6.1 ASTM Standards

6.2 SSPC Standards

7.0 RECORDING FORMS

7.1 Contractor Daily Quality Control, Safety, Production

7.2 Daily Painting and Blasting Report

8.0 QUALITY CONTROL PROCEDURES

8.1 Quality Control Inspection Plan

8.2 Inspection and Acceptance Procedures

8.3 Coating Work Testing Procedures

Page 3: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

14

8 M

ill R

ock

Ro

ad E

ast

P.O

. Bo

x 7

75

O

ld S

ayb

roo

k, C

T 0

64

75

Te

l (8

60

) 3

88

-54

64

/ F

ax (

86

0)

38

8-4

64

4

Equal Opportunity Employer

9.0 DEFINABLE FEATURES OF WORK

9.1 General Requirements

9.2 Site Work Mobilization, Initial Setup, Equipment

10.0 ATTACHMENTS

10.1 Contractor Daily Quality Control, Safety, Production Daily Blasting and Painting

Inspection Reports

1.0 PURPOSE This document establishes the Quality Control System of Blast All, Inc. to provide the necessary supervision, control phases and inspections for all items of work, including that of suppliers and subcontractors, that will ensure the compliance of all work with the applicable specifications and drawings in respect with the contractor furnished equipment, materials, workmanship, construction, finish, functional performance, and identification.

2.0 MISSION STATEMENT Blast All, Inc., through the utilization of the Quality Control System will strive to obtain a uniform level of high quality workmanship throughout all phases of procurement, fabrication, construction, and installation of equipment and facilities. To assure this result, the following principles will be observed: Assure the uniform high quality work by maintaining supervised controls and written instructions governing the three phases of quality control procedures and practices, to establish clear, well-defined responsibility and lines of authority for compliance. Conform to all contractual requirements, specifications, applicable standards (ASTM, NACE, SSPC etc.) and the Blast All, Inc. Painting Quality Work Plan which compiles accurate records of test certifications, inspections, and other required documentation. It is our goal to improve performance of our field applicators, and to continuously increase the quality of workmanship in order to attempt to achieve “Zero Defects.” Notify Project Management, and the Engineer of quality discrepancies for corrective action to assure that corrective action is implemented properly. The designated job site Superintendent is vested with the responsibility and the authority to stop or discontinue work on this project if work is found not in compliance with the specifications.

Page 4: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

14

8 M

ill R

ock

Ro

ad E

ast

P.O

. Bo

x 7

75

O

ld S

ayb

roo

k, C

T 0

64

75

Te

l (8

60

) 3

88

-54

64

/ F

ax (

86

0)

38

8-4

64

4

Equal Opportunity Employer

3.0 PROGRAM SUMMARY

The Painting Quality Work Plan has been established to utilize methods of control as a continual system of planning future activities and inspection of the completed work. Control of construction and inspection of the work are two distinct processes in which control (“preventative”) will ensure the contractor is adequately prepared for the work. Inspections (“after the fact”) will be ongoing with a standard set of inspection hold points and documentation of the results. The objective of the Painting Quality Work Plan is to ensure that project work is accomplished in accordance with contract provisions. Prior to the start of the project, BAI will attend a Pre-Construction Conference with the Engineer. At this conference, BAI will discuss methods of operations to accomplish all phases of the surface preparation and coating work. The Contract Documents as well as the Plans and Specifications will be reviewed by supervisory personnel to ensure that all responsible parties have a complete and thorough understanding of the scope of work. Quality Control Reports and Project Documentation from the work processes will be packaged in a timely manner and retained on file at our office. Copies will be submitted to the Engineer if requested.

4.0 ORGANIZATION

4.1 On Site Quality Control: The On Site Quality Control will report directly to the Quality Assurance. The On Site Quality Control shall implement as required the written procedures and instructions contained in this plan to ensure conformance with the Specification. Actual practices are not limited to this plan and if a discrepancy exists between this plan and the contract requirements, the contract requirements shall prevail. The On Site Quality Control will coordinate the quality control efforts and will determine hold points for inspections during the work process to ensure that each phase is completed and acceptable prior to the start of the next phase.

Page 5: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

14

8 M

ill R

ock

Ro

ad E

ast

P.O

. Bo

x 7

75

O

ld S

ayb

roo

k, C

T 0

64

75

Te

l (8

60

) 3

88

-54

64

/ F

ax (

86

0)

38

8-4

64

4

Equal Opportunity Employer

The On Site Quality Control shall provide direct feedback and advise the Engineer or his representative regarding the quality control work, including but not limited to coordination, field inspections, reporting, and overall accounting of the contractors quality program. The On Site Quality Control will review submittals and approvals for materials and equipment furnished by Blast All Inc., and will conduct tests and follow up project work as required ensuring compliance with contract plans and specifications. The On Site Quality Control has the responsibility and authority to stop or discontinue progress on this project if any work is found not in compliance with the specifications. 4.2 Project Manager/ Quality Control: Blast All Inc.’s Quality Control personnel, is responsible for assuring that the On-site Foreman/Quality Control personnel has a clear understanding of the project requirements and that all Quality Control documents are properly reviewed and filed. The project manager has the responsibility and authority to stop or discontinue work on this project if any work is found not in compliance with the specifications. 4.3 Site Foreman / On-Site Quality Control: Blast All Inc.’s Site Foreman / On-Site Quality Control is responsible for seeing that all work is carried out in compliance with the project specifications in accordance with the contract. The site foreman has the responsibility and authority to stop or discontinue work on this project if any work is found not in compliance with the specifications. 4.4 Contractor’s Other Personnel: Quality Control functions may be carried out by other contractor personnel. These individuals will assist the Superintendent and the On-Site Quality Control in other areas as required to fully implement the Quality Conrol Plan. The Superintendent or the On-Site Quality Control may delegate such duties to other contractor’s personnel who may be assigned to the project. All foreman or lead individuals are responsible for seeing that all work is carried out in compliance with the project specifications in accordance with the contract. The project competent person has the responsibility and authority to stop or discontinue work on this project if any work is found not in compliance with the specifications. 4.5 Commercial Testing Firms: BAI will utilize various testing firms to perform such specialized duties as environmental laboratory tests.

Page 6: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

14

8 M

ill R

ock

Ro

ad E

ast

P.O

. Bo

x 7

75

O

ld S

ayb

roo

k, C

T 0

64

75

Te

l (8

60

) 3

88

-54

64

/ F

ax (

86

0)

38

8-4

64

4

Equal Opportunity Employer

Employee monitoring testing and its documentation will consist of visual inspections and mechanical testing, as outlined in this plan. The results of those inspections and tests will be reporting in the Daily Quality Control Reports.

5.0 PROCEDURES 5.1 Three Phases of Control:

PREPARATORY PHASE This phase will be performed at the beginning of a definable feature of work. Results of the initial phase will be recorded in the Daily Quality Control Report. Prior to the beginning of each work activity there will be a pre-work inspection. The following procedures will be included in the initial phase:

Establish the quality of the workmanship required. Review the Contract Documents and Specifications Verify the required controls, inspections, and testing at the work area for

each specific activity to be sure that preliminary work has been completed. Resolve conflicts Review the safety plan and appropriate activity hazard analysis to verify

compliance to the contract requirements. Confirm that all applicable workers have been instructed as to the level of

workmanship required in order to meet the contract specifications. Repeat the initial phase for each new crew to work on-site, or any time

acceptable specified quality standards are not being met.

INITIAL PHASE

This phase will include the following procedures prior to performing work on each definable feature of work:

Review each paragraph of the applicable specification sections and contract drawings.

Verify shop drawings and submittals for materials and equipment that have been submitted for approval and, if required, that factory test results have been received.

Review testing plan Examine work area for completion of preliminary work Examine required materials, equipment, and sample work to verify

conformance to the approved shop drawings and submittal data.

Page 7: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

14

8 M

ill R

ock

Ro

ad E

ast

P.O

. Bo

x 7

75

O

ld S

ayb

roo

k, C

T 0

64

75

Te

l (8

60

) 3

88

-54

64

/ F

ax (

86

0)

38

8-4

64

4

Equal Opportunity Employer

Review required material safety data sheets and discuss construction method with Quality Control Personnel, superintendent and foreman.

FOLLOW-UP PHASE

This is the third phase of control and will include daily checks, inspections, and control activities to assure continuing compliance with the contract requirements. As the work progresses, we will perform daily follow-up inspections to verify the quality and workmanship of the completed work activity.

Verify quality of workmanship Ensure that all required testing is performed and the laboratory is approved. Ensure that rework items are corrected. Ensure that daily control tests or inspections are completed in a timely

manner Perform final inspections and proper documentation of completed work

5.2 Control of On-Site Construction:

1. Initial Setup of Access Systems and Work Areas

PREPARATORY PHASE

Review contract specifications and submittal requirements Verify submittal of environmental control system Review hazard analysis with regard to access systems

INITIAL PHASE

Verify containment materials compliance with intended use Verify placement of access systems Verify proper installation and operation of control systems Verify that all safety equipment is properly installed and working

FOLLOW-UP PHASE

Confirm that access/containment systems are functioning as designed Confirm that testing of the environmental control system is being done Confirm that all safety procedures are being followed Confirm that all work procedures are in compliance

2. Localized Cleaning

Page 8: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

14

8 M

ill R

ock

Ro

ad E

ast

P.O

. Bo

x 7

75

O

ld S

ayb

roo

k, C

T 0

64

75

Te

l (8

60

) 3

88

-54

64

/ F

ax (

86

0)

38

8-4

64

4

Equal Opportunity Employer

PREPARATORY PHASE

Review contract specifications and submittal requirements Verify that environmental controls are in place Verify adequacy of access system Verify that equipment is in working order Review safety plan and hazard analysis with regard to power tool cleaning

INITIAL PHASE

Verify access and environmental systems are working properly Record ambient air conditions and test equipment before and after use Verify proper waste collection and storage is in compliance Verify that all safety equipment is properly installed and working

FOLLOW-UP PHASE

Confirm that environmental systems are functioning as designated Confirm that testing and inspection of surfaces is being done Confirm that testing of air source are being done Confirm that ambient air conditions and equipment used are being recorded Confirm that all waste manifests are submitted Confirm that all safety procedures are being followed

3. Abrasive Blasting

PREPARATORY PHASE

Review contract specifications and submittal requirements Verify that environmental controls are in place Verify adequacy of access system Verify that equipment is in working order Verify that the abrasives are properly sized to obtain required profile Review safety plan and hazard analysis with regard to abrasive blasting INITIAL PHASE

Verify access and environmental systems are working properly Inspect surfaces for cleanliness and surface profile Test compressor air for oil and water contamination

Page 9: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

14

8 M

ill R

ock

Ro

ad E

ast

P.O

. Bo

x 7

75

O

ld S

ayb

roo

k, C

T 0

64

75

Te

l (8

60

) 3

88

-54

64

/ F

ax (

86

0)

38

8-4

64

4

Equal Opportunity Employer

Verify that breathing-air monitoring equipment is working properly Record ambient air conditions and test equipment before and after use Verify proper waste collection and storage is in compliance Verify that all safety equipment is properly installed and working

FOLLOW-UP PHASE

Confirm that environmental systems are functioning as designed Confirm that testing and inspection of surfaces are being done Confirm that testing of abrasive and air source are being done Confirm that ambient air conditions and equipment used are being recorded Confirm that all waste manifests are submitted Confirm that all safety procedures are being followed

4. Coating Application(s)

PREPARATORY PHASE

Review contract specifications and submittal requirements Verify that any environmental controls (if required) are in place Verify that equipment is available and in working order Verify that coatings have been tested and approved Verify that qualified applicators are available Verify by review, the health safety plan and hazard analysis with regard to coating

application

INITIAL PHASE

Verify all equipment is working Verify that surface preparation was performed in accordance with specifications Verify compliance of the ambient air conditions and equipment used Verify that appropriate materials are being applied to appropriate areas Verify that materials were applied to the proper thickness Verify that all safety equipment is properly installed and working

FOLLOW-UP PHASE

Confirm that all control systems are functioning as designed

Confirm that ambient air conditions, materials and equipment used are being

recorded

Page 10: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

14

8 M

ill R

ock

Ro

ad E

ast

P.O

. Bo

x 7

75

O

ld S

ayb

roo

k, C

T 0

64

75

Te

l (8

60

) 3

88

-54

64

/ F

ax (

86

0)

38

8-4

64

4

Equal Opportunity Employer

Check quality, adhesion, uniformity, dry film thickness and cure of the applied coating

Confirm that all safety procedures are being followed 5.3 Receiving and Warehousing: Inspection of construction materials received will be performed by the Quality Assurance or other contractor personnel. Visual inspection will be made for:

Identification of materials Damage to containers or labels Completeness of order and batch numbers Evidence of compliance with approved submittals Material storage is in compliance with the specified requirements All OSHA regulations for storage of paints and thinners are met Verify the type and number of fire extinguishers to be available

There will be no smoking in paint storage or paint application areas and no mixing of paint in the storage area nor will the accumulation of empty paint cans, combustibles, and other debris be allowed in the smoking area or in the pain application areas. Take all necessary precautionary measures to ensure that workmen and work areas are adequately protected from fire hazards and health hazards resulting from handling, mixing, and application of coating-related materials. 5.4 Offsite Controls and Inspections: Facilities of offsite suppliers will be surveyed as required to assure that all requirements of the contract drawings and specifications are met and maintained and to assure delivery of quality products. The results will be made available to the Engineer if required. The supplier will be notified of any deficiencies and will be required to submit a report of corrective actions taken. BAI will inform the Engineer of offsite surveys if required. 5.5 Inspection Documentation: The Quality Control Representative will maintain current records of all control activites, tests, and inspections for this project. These will include factual evidence that the required control phases and tests were performed, including the number and results; nature of defects; causes for rejection; proposed remedial action; and corrective actions taken. BAI records will include all conforming features, and will include statements of compliance with specifications and non contract work. 5.6 Material Certification: BAI will provide to the Engineer all pertinent material certifications as required by the contract documents and specifications. As a minimum, BAI will provide coating material certifications from the Manufacturer to ensure compliance of:

Page 11: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

14

8 M

ill R

ock

Ro

ad E

ast

P.O

. Bo

x 7

75

O

ld S

ayb

roo

k, C

T 0

64

75

Te

l (8

60

) 3

88

-54

64

/ F

ax (

86

0)

38

8-4

64

4

Equal Opportunity Employer

a) Verify that the primer of the coating system is located on and meets the requirements of the current qualified products listing.

b) Verify that coating materials meet the specifications on the manufacturer’s data sheets.

c) Verify compatibility of supplied coating materials. 5.7 Workmanship Inspection: The Quality Control Representative will inspect and review all phases of work to confirm that all work complies with requirements of the manufacturer’s product data sheets. All application techniques will conform to SSPC-PA. Unless otherwise specified, paint will be applied by airless spray, or brush/roller to the specified structural steel surfaces.

1. Surface Preparation a. Surfaces to be prepared will be inspected to ascertain that they are clean,

(i.e. free of oil, grease, soil, drawing and cutting compounds, and other soluble contaminates that may interfere with the proper adhesion with the subsequent applied coating system) in accordance with SSPC-PA 1.

b. Prepared surfaces shall be tested to verify that adequate surface profile is maintained in accordance to ASTM-D-4417 using Test-Tex replica tape or the Keane-Tator surface comparator.

c. Inspect the blast cleaned surface for any traces of corrosion, water, oil, grease, and other material deposited during the cleaning operations. If present, remove any other contaminates that may interfere with adhesion.

2. Application of Coatings a. When not in conflict the specifications and the Special Provisions, we will

perform coating applications conforming to: The best practices of the trade The recommendations of the coating manufacturer The applicable portions of the SSPC-PA 1

b. Ensure that coating applicators have complete knowledge of mixing and applications of the specified coatings.

c. Verify that surfaces are in a paint-ready condition. d. Verify that ambient conditions prior to mixing and application to ensure

the air temperature and surface temperatures are a minimum of 5F above the dew point and rising.

e. Verify the thickness of each coat of paint to ensure specification conformance and acceptance using a magnetic type 2 gauge according to SSPC-PA 2.

Page 12: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

14

8 M

ill R

ock

Ro

ad E

ast

P.O

. Bo

x 7

75

O

ld S

ayb

roo

k, C

T 0

64

75

Te

l (8

60

) 3

88

-54

64

/ F

ax (

86

0)

38

8-4

64

4

Equal Opportunity Employer

f. Perform a visual inspection of each layer of coating to ascertain it is free of defects such as holidays, pinholes, bubbles, sags, or runs. Assure that a continuous and uniform coating system is applied.

g. Verify the recoat windows of all coatings before the subsequent coat is applied.

5.8 Calibration of Equipment: BAI will maintain at the project a full inventory of inspection equipment to perform the inspections for surface preparations and all coatings applied to structural steel. The following inspection equipment will be utilized for this project.

Positector 6000, Dry Film Thickness Gauge Wet Film Thickness Gauges Bacharach Sling Psychrometers U.S. Weather Bureau Psychrometric Tables Surface Temperature Thermometers (Magnetic or non-contact laser) SSPC-VIS Pictorial Standards Test-Tex & Micrometer

The inspection equipment used on this project will be factory calibrated and traceable to NIST and ASTM Standards or Specifications as they apply. In the event inspection equipment is dropped, damaged, or believed to be inaccurate, such equipment will be removed from service or recalibrated. The QC Representative will maintain instruments and calibrations to assure that accuracy for each piece is maintained to the manufacturers recommendations. 5.9 Punch-Out Inspection Near the completion of the work items on this contract, the QC Representative will conduct an inspection of the work and develop a “Punch List” of items which do not conform to the approved drawings and specifications. Included on the punch list will be any remaining items which were not corrected prior to the Punch-Out Inspection. 5.10 Pre-Final Inspection: The QC Representative will make follow-up inspections to ascertain that all deficiencies have been corrected. 5.11 Final Inspection and Testing: The QC Representative and or other management personnel, along with at least one representative of the contracting office, will attend this inspection. By following the procedures outlined above, we can be certain that we will perform this project according to the specifications, and we can be certain that all materials, equipment, and workmanship conform to the contract specifications.

Page 13: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

14

8 M

ill R

ock

Ro

ad E

ast

P.O

. Bo

x 7

75

O

ld S

ayb

roo

k, C

T 0

64

75

Te

l (8

60

) 3

88

-54

64

/ F

ax (

86

0)

38

8-4

64

4

Equal Opportunity Employer

6.0 TESTING METHODS All testing methods on this project will be accordance with the applicable section of the written specifications. The following publications will be used as guidelines for inspections and testing during the course of this project. 6.1 ASTM Standards

Environmental conditions for coating, ASTM-E-337 Cleanliness of abrasive material, ASTM-D-4940 Cleanliness of compressed air, ASTM-D-4285 Surface Profile by Keane-Tator Comparator, ASTM-D-4417 (Method A) Surface Profile by replica tape, ASTM-D-4417 (Method C) Wet Film Thickness, ASTM-D-4414 Dry Film Thickness by Tooke Gauge, ASTM-D-4138, (if needed) Adhesion Testing by Elcometer Adhesion Tester, ASTM-D-4541 Determination of “Dry to Touch”, ASTM D1640 Portland Cement conform to requirements of ASTM C150, Type 1 Concrete Aggregates meet grading requirements of ASTM C-33 (unless concrete

producer can provide past data that shows a proposed non-conforming gradation will produce concrete with required strength and suitable workability.)

Welded wire fabric will conform to ASTM A185 Admixture shall conform to ASTM C494 or ASTM C260 Curing compounds shall conform to ASTM C309 Slump tests standard tests as described in ASTM C143 Compressive Strength shall be in accordance with ASTM C39 Cylinders will be in accordance with ASTM C31 Concrete mixing will be in accordance with ACI 614 Ready mix will conform to provisions of ASTM C94

6.2 SSPC Standards

SSPC-PA-1, Shop, Field & Maintenance Painting SSPC-PA-2, Dry Film Thickness by Magnetic Gauge SSPC-SP-1, Solvent Cleaning SSPC-SP-2, Hand Tool Cleaning SSPC-SP-3, Power Tool Cleaning SSPC-SP-6, Commercial Blast Cleaning SSPC-SP-7, Brush-Off Blast Cleaning SSPC-SP-10, Near White Blast Cleaning SSPC-SP-11, Power Tool Cleaning to Bare Metal

Page 14: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

14

8 M

ill R

ock

Ro

ad E

ast

P.O

. Bo

x 7

75

O

ld S

ayb

roo

k, C

T 0

64

75

Te

l (8

60

) 3

88

-54

64

/ F

ax (

86

0)

38

8-4

64

4

Equal Opportunity Employer

SSPC-QP- 1, Standard Procedure for Evaluating the Qualifications of Painting Contractors (Field Application to Structures Complex)

SSPC-QP-2, Standard Procedure for Evaluating the Qualifications of Painting Contractors to Remove Hazardous Paint

SSPC-VIS-1-01, Visual Standard for Abrasive Blast Cleaned Steel SSPC-VIS-3, Visual Standard for Hand and Power Tool Cleaned

7.0 RECORDING FORMS Submittals: All materials incorporated into this construction project will be certified by the manufacturer/supplier as meeting the requirements of the contract, and such certifications as well as a sample of the materials (if required) will be submitted to the Engineer for testing. Shop drawings (if required) will be supported by sufficient descriptive literature such as laboratory test reports, laboratory test labels, catalogs, diagrams, and other data published by the manufacturer which are needed to demonstrate conformance with the specifications. 7.1 Contractor Daily Quality Control, Safety, Production: This report will be completed daily by the Project Superintendent and will describe the work, manpower, QC items, events, and equipment for each work day. 7.2 Daily Painting and Blasting Report: This report will be completed daily by the Quality Control Representative and will describe the surface preparations and coating applications for each activity for each workday.

8.0 QUALITY CONTROL PROCEDURES 8.1 Quality Control Inspection Plan: The BAI Quality Control Plan utilizes the three phases of control described in this Quality Control Plan to assure that all materials and work incorporated into the scope of work are in full compliance with the contract documents and specifications. It is BAI’s intent to provide a Quality Control Plan that will insure that each phase of work is correctly identified and documented accordingly. 8.2 Inspection and Acceptance Procedures: Inspection hold points will be performed during each phase of work. Visual inspections, instrument inspections, and testing will be utilized to determine the quality and acceptance of the work.

Pre-Cleaning

Page 15: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

14

8 M

ill R

ock

Ro

ad E

ast

P.O

. Bo

x 7

75

O

ld S

ayb

roo

k, C

T 0

64

75

Te

l (8

60

) 3

88

-54

64

/ F

ax (

86

0)

38

8-4

64

4

Equal Opportunity Employer

Protection of areas not to be prepared Surface Preparation Zinc Primer Application Intermediate Coat Application Finish Coat Application Cure

8.3 Coating Work Testing Procedures: The coating manufacturer will provide certifications, batch numbers, and test results of all coating system related materials at the time of delivery to the project. The coating materials will be inspected and rejected if:

The coating materials have begun to polymerize, solidify, gel, or deteriorate in any other manner

The recommended shelf life, as stated in the manufacturer’s product data sheets, have expired.

Mixing and/or application equipment are not adequate for the work The mixing of coatings will be observed to insure that coating materials are thoroughly mixed by mechanical means in strict accordance with the manufacturer’s written instructions. After mixing, inspect the coated materials for uniformity and to ensure that no unmixed pigment or lumps are present. Verify the application of each coat by visual inspections and testing required by specifications. Ensure acceptance of cure, dry film thickness, and uniformity prior to subsequent applications.

9.0 DEFINABLE FEATURES OF WORK 9.1 General Requirements:

a) Special project procedures to include coordination of work, project meetings, submittals, and quality control.

b) Administrative Requirements c) Environmental Protection d) Job Conditions, Safety

9.2 Site Work:

a) Mobilization, scaffolding, and containment systems in area of work b) Inspections c) Surface Preparations d) Waste or Hazardous Waste Handling and Controls

Page 16: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

14

8 M

ill R

ock

Ro

ad E

ast

P.O

. Bo

x 7

75

O

ld S

ayb

roo

k, C

T 0

64

75

Te

l (8

60

) 3

88

-54

64

/ F

ax (

86

0)

38

8-4

64

4

Equal Opportunity Employer

e) Coating Applications f) Final Cleanup and Demobilization

10.0 ATTACHMENTS 10.1 Names and Qualifications: The following persons have been assigned responsibilities for this project. See the attached resume for qualifications. Project Manager/NACE Certified: Todd Davenport Project Superintendent/SSPC BCI Level 2, Q.C.S.: Joseph Fouquette

SSPC QP-1, QP-2 Certifications Contractor Daily Quality Control, Safety, Production Daily Painting & Blasting Inspection Report Form

Page 17: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

14

8 M

ill R

ock

Ro

ad E

ast

P.O

. Bo

x 7

75

O

ld S

ayb

roo

k, C

T 0

64

75

Te

l (8

60

) 3

88

-54

64

/ F

ax (

86

0)

38

8-4

64

4

Equal Opportunity Employer

QUALIFICATIONS OF THE PERSONNEL SUPERVISING AND PERFORMING QUALITY CONTROL FUNCTIONS

Attached are the individuals that are qualified and perform Q.C. functions on our projects. Each qualified person must attend at least one formal training class a year and have been involved in industrial painting for at least three years full time. Revised 1/7/2017 Todd Davenport: Program Administrator, NACE-3 (NACE) Joe Fouquette: Quality Control Supervisor, BCI II (SSPC) William Glover: BCI I (SSPC) Jeff Stoddard: BCI I (SSPC) Mark Emilyta: BCI I (SSPC)

Page 18: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify
Page 19: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify
Page 20: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify
Page 21: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify
Page 22: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify
Page 23: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify
Page 24: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify
Page 25: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify
Page 26: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

Date:

Specific Area Painted:

Specific Area Blasted:

Conditions

(circle one) (CLEAR) (CLOUDY) (RAIN) (SNOW)

Temp: Start: ˚F Finish: ˚F

Dry Bulb Temp: Start: ˚F Finish: ˚F

Wet Bulb Temp: Start: ˚F Finish: ˚FRelative Humid: Start: % Finish: %

Dew Point: Start: ˚F Finish: ˚F

Surface Temp: Start: ˚F Finish: ˚FTime: Start: Finish:

Surface Preparation

Time Start: Finish:

Type/Size of Abrasive:

Grit Cleanliness: Vile Test

Compressed Air Cleanliness: Blotter Test

Specified Surface Cleanliness:

Achieved Surface Cleanliness:

Unacceptable Areas Recleaned:

Remarks/Other:

Paint Storage Conditions Min Temp: Max Temp:

Materials Batch # Color

Primer

Intermediate

Top Coat

Thinner

Other

Paint Mixing Mixing Per Data Sheet

Induction Time Specified

Coating Application

Min Dry Film Thickness: Min

Max Max

Testing Performed:

Remarks:

Q.C.S. Signature: Date:

14

8 M

ill R

ock

Ro

ad E

ast

P.O

. Bo

x 7

75

Old

Say

bro

ok,

CT

06

47

5

T

el (

86

0)

38

8-5

46

4 /

Fax

(8

60

) 3

88

-46

44

(PARTLY CLOUDY)

DAILY PAINTING AND BLASTING REPORT FORM

Part A Part B Part C

Project No. and Title:

Wet Film Thickness:

File With: BAI Main Office, BAI Field Office

Page 27: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

Location and DFT's

1 2 3 Total % Min/ Max Ave 1 2 3 Total % Min/ Max Ave

A A

B B

C C

D D

E E

Total Ave. mils/um Total Ave. mils/um

1 2 3 Total % Min/ Max Ave 1 2 3 Total % Min/ Max Ave

A A

B B

C C

D D

E E

Total Ave. mils/um Total Ave. mils/um

1 2 3 Total % Min/ Max Ave 1 2 3 Total % Min/ Max Ave

A A

B B

C C

D D

E E

Total Ave. mils/um Total Ave. mils/um

Approx.

SqFt Specified DFT mils/um

14

8 M

ill R

ock

Ro

ad E

ast

P.O

. Bo

x 7

75

Old

Say

bro

ok,

CT

06

47

5

T

el (

86

0)

38

8-5

46

4 /

Fax

(8

60

) 3

88

-46

44

DFT Gauge Calibration Record:Ga. Type/Model:

Ga. Serial #: Adjustments:Date of Last Calibration:

Comments:

Approx.

SqFt Specified DFT mils/um

Item:

Location AreaSpot Reading

BAI Project #

Inspector:

Copy to: QC Super □ Owner □ Main Office □

Location Area

DFT MEASUREMENT WORKSHEET

Item:

Spot Reading

Specified Minimun DFT: Specified Maximun DFT:

Item:

Location AreaSpot Reading

Approx.

SqFt Specified DFT mils/um

Item:

Location AreaSpot Reading

Approx.

SqFt Specified DFT mils/um

Approx.

SqFt Specified DFT mils/um

Approx.

SqFt

Project:

Specified DFT mils/um

Location:

Description:

Date: / / M T W R F Sa Su

Q.C. Supervisor's Signature: Date:

Item:

Spot ReadingLocation Area

Item:

Location AreaSpot Reading

Equal Opportunity Employer

Page 28: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify
Page 29: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

14

8 M

ill R

ock

Ro

ad E

ast

P.O

. Bo

x 7

75

O

ld S

ayb

roo

k, C

T 0

64

75

Te

l (8

60

) 3

88

-54

64

/ F

ax (

86

0)

38

8-4

64

4

Equal Opportunity Employer 1b, 1c, 1d,2

AUTHORITY & RESPONSIBILITY OF COMPETENT PERSONS

The competent person is not routinely required to act as a member of the crew that performs paint removal work. They are company employees and represent the company. Their key responsibilities are monitoring the effectiveness and ensuring the continued integrity of environmental controls are according to contract specifications and supervising worker airborne and biological exposure monitoring and employee notifications.

Knowledge & Action

A competent person should not be chosen lightly, experts say, because he or she needs to be qualified to identify the hazards associated with a particular operation. For instance, if work is being performed on scaffolding, the competent person must be knowledgeable about scaffolding hazards.

Proper Person

Because many different types of activities can take place on a worksite, a competent person must either have the authority to make safety-related changes to those different operations or know who can enforce those changes

OSHA Inspection

When OSHA visits a site, one of the first questions an inspector may ask is who the competent person is. (If not with those exact words, then by asking who may be in charge.) The agency inspector may then question that individual about his or her knowledge to ensure the work being performed is done so under the oversight of a truly “competent” competent person. The requirement for competent person goes beyond simply designating an individual with that title.

Page 30: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

14

8 M

ill R

ock

Ro

ad E

ast

P.O

. Bo

x 7

75

O

ld S

ayb

roo

k, C

T 0

64

75

Te

l (8

60

) 3

88

-54

64

/ F

ax (

86

0)

38

8-4

64

4

Equal Opportunity Employer

Enforcement Procedure and Authority of Personnel

The following Blast All, Inc. personnel have the authority to stop all work that is non-conforming and/or violates implemented safety measures. It is the duty and responsibility of the undermentioned personnel to verify that all materials and work incorporated within the scope of work are in full compliance with specifications and the contract documents. All non-conforming work will be identified and documented so corrective measures can be taken.

Joe Fouquette: QA/QC Superintendent, BCI-Level 2 Bill Glover: Site Forman, BCI-Level 1 Robert Mancini: Site Forman, BCI-Level 1 Jeff Stoddard: Site Forman, BCI-Level 1

Page 31: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

14

8 M

ill R

ock

Ro

ad E

ast

P.O

. Bo

x 7

75

O

ld S

ayb

roo

k, C

T 0

64

75

Te

l (8

60

) 3

88

-54

64

/ F

ax (

86

0)

38

8-4

64

4

Equal Opportunity Employer

SURFACE PREPARATION AND APPLICATION PROCEDURES Work under this item shall consist of paint removal and field painting of the steel structure at designated areas. The work shall include containments, paint removal, collection of paint and associated debris, surface preparation and field painting. Designated areas include: areas specifically designated on the plans and those areas where construction activities required the removal of the existing coatings to accomplish other contract work (i.e., arc gouging, welding, etc.). The paint removal is required because of the possible presence of hazardous paint (e.g., containing lead or other hazardous metals). The paint removal is required to comply with OSHA and Department of Energy and Environmental Protection (DEEP) regulations. Materials: See attached Safety Data Sheets and Product Data Sheets Carboline Carbomastic 90

Carboline Carbothane 134 HS All materials for the complete coating system shall be furnished by the same coating material manufacturer with no subcontracted manufacturing allowed. Intermixing of materials within and between coating systems will not be permitted. Thinning of paint shall conform to the manufacturer's written recommendations. The coating thickness shall be in accordance with the Manufacturer's printed instructions. All components of the coating system and the mixed paint shall comply with the Emission Standards for Volatile Organic Compounds (VOC) stated in the Connecticut Department of Energy and Environmental Protection's Administration Regulation for the Abatement of Air Pollution, Section 22a-174-20(s). Paint Removal/Surface Preparation: Steel surfaces shall be cleaned by the specified methods described in the SSPC Steel Structures Painting Manual, Volume 2 – Systems and Specifications, latest edition. The structural steel shall be hand power tool cleaned according to SSPC-SP 15 “Commercial Grade Power Tool Cleaning”. Before and after cleaning, all dissolvable foreign matter, such as oil, grease, and dust shall be removed by wiping or scrubbing the surface with rags or brushes wetted with solvent in accordance with the provisions of SSPC-SP 1 “Solvent Cleaning.” Clean solvent and clean rags or brushes shall be used for the final wiping. All foreign materials such as dirt, dust, rust scale, sand, bird droppings shall be completely removed before any painting operations are begun. The cleaned surface shall be accepted by the Engineer before any painting. If the surface is determined to meet the requirements of SSPC-SP 15, painting operations can commence. The prime coat shall be applied to the steel before the end of the day that preparation was performed and before the formation of any flash rusting or rerusting of the steel. Flash rusting or rerusting

Page 32: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

14

8 M

ill R

ock

Ro

ad E

ast

P.O

. Bo

x 7

75

O

ld S

ayb

roo

k, C

T 0

64

75

Te

l (8

60

) 3

88

-54

64

/ F

ax (

86

0)

38

8-4

64

4

Equal Opportunity Employer

of the surface is unacceptable and requires recleaning prior to painting. See data sheets below for equipment and materials. Application of Field Paint: The method for coating application shall be by spray, brush and or roll equipment. The containment for paint application shall consist of drop clothes and a solid platform bottom. Storage, opening, mixing, thinning and application of the paint shall be accomplished in strict accordance with the specified contract requirements and procedures published by the paint manufacturer and supplier. The Contractor shall have at the project site, at all times, the current copies of all technical data, recommendations and procedures published by the paint manufacturer. All coatings shall be supplied in sealed containers bearing the manufacturers name, product designation, batch number and mixing/thinning instructions. Leaking containers shall not be used. Paint shall be furnished in the manufacturer's original sealed and undamaged containers. The paint shall be applied to produce a uniform smooth coat without runs, streaks sags, wrinkles, or other defects. A suitable facility for the storage of paint, which is in accordance with the latest Federal and State regulations. This facility must provide protection from the elements and insure that the paint is not subjected to temperatures outside the manufacturer's recommended extremes. Storage for paint must be located in reasonable proximity to the painting locations. The Engineer shall be provided access to the stored paint at any time, for inspection and to witness removal of the materials. The Contractor's facility for the storage of paint is subject to the approval of the Engineer. See data sheets below for equipment and materials.

• Ambient Conditions: No coating application work shall be performed when the conditions are as follows in containment:

o When the relative humidity is at or above 80 percent or when there is falling rain or dew present, or anticipated, before a prepared surface can be coated.

o When the substrate is damp or covered by frost or ice. o When the surface temperature or air temperature are less than 50 degrees

Fahrenheit or greater than 100 degrees Fahrenheit or per manufacturers recommendations.

o When the surface temperatures of the steel or air are less than five (5) degrees Fahrenheit above the dewpoint temperature as determined by a surface temperature thermometer and electric or sling psychomotor.

Page 33: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

BLAST ALL Inc. Industrial Coating • Structural Maintenance • Abrasive Blasting

14

8 M

ill R

ock

Ro

ad E

ast

P.O

. Bo

x 7

75

O

ld S

ayb

roo

k, C

T 0

64

75

Te

l (8

60

) 3

88

-54

64

/ F

ax (

86

0)

38

8-4

64

4

Equal Opportunity Employer

2 COAT PAINT REPAIR PROCEDURE

After all concrete is placed and the forms are removed, all rust, scale, dirt, grease, concrete splatter and other foreign material shall be removed from all surfaces to be painted. All surfaces to be repaired shall be cleaned by solvent cleaning in accordance with SSPC-SP 1, SSPC-SP 2, and or SSPCSP 3. All debris generated from cleaning operations must be contained and properly disposed of. Bolts, nuts, washers and surrounding areas shall receive brush applications of base and topcoat after final tensioning. Careful attention shall be given to bolted connections to insure that all bolts, nuts and washers are fully coated and that no gaps are left unfilled and uncoated. Field welds and surrounding areas shall be treated in the same manner as shop welded areas, including special treatment requirements. Damage to the coating system that extends to the sub straight (such as scratches, gouges or nicks), shall have the entire two-coat system locally reapplied after power tool cleaning. The coating system adjacent to the damage shall be feathered back to increase the surface area for touch up painting. Damage to the coating system that extends back only to the base or top coat, shall only have the topcoat applied. Application of the touch-up materials in these damaged areas shall be performed by brush only.

Page 34: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify
Page 35: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify
Page 36: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify
Page 37: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

* Made in the U.S.A.* World class value pricing.* Quality equal to or better

than competitively madescalers.

* Tools have been provenin thousands of applica-tions.

* Tens of thousands ofthese tools are in thefield.

* Completely convertiblefrom needle to chiselscaler and vice versa.

* Parts availability virtuallyguaranteed with sameday shipment.

TX1B Needle / Chisel Scalers

Tool Applications:• De-rusting and cleaning of metals• Peening of welded joints• Cleaning castings• Cleaning welding slag• Removing barnacles• Removing paint, rust and dirt• Chipping stone, concrete and brick• Needle scalers adjust to any surface contour au-

tomatically.

Texas Pneumatic scalers have been proven through-out the industrial job sites, as well as constructionand marine repair industry.

SPECIFICATIONS:TX1BLTNS TX1BLTCS

WEIGHT 6 lb. 4 oz. 4 lb. 10 oz.LENGTH 17" w/5" Ndls. 15" w/ChiselCFM CONSUMED 12 CFM 12 CFMBORE 1" 1'STROKE 1-1/8" 1-1/8"BPM 4600 4600INLET 1/4" NPT 1/4" NPTMIN. HOSE SIZE 5/16" 5/16"

STANDARD WELD FLUX SCALERS:Model TX1B

STANDARD EQUIPMENT:With Needle Scaler: One set 5" ScalerNeedles With Weld Flux Scaler: One 7" FlatChisel

DESCRIPTIVE SUFFIXES FOLLOWING “B”TO FURTHER DESCRIBE TOOL:LT=Lever Throttle PT=Push ThrottleNS=Needle Scaler CS=Chisel Scaler

*For listing of parts, see schematic and parts breakdown page.

29 29

1

2

3

4

5

6

7

Page 38: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

TX-00173

TX-00126

TX-00373

TX-00196TX-00508

TX-00700

TX-00963

TX-00801

TX-00313

TX-00554

TX-00527

TX-00956 Lever ThrottleBackhead Assembly

TX-00848

TX-00780

TX-00781

TX-00882TX-00947 TX-00302

TX-00782

TX-00078

TX-00636TX-00207

TX-00043TX-00024

TX-00045TX-00046

TX-00044

TX-00779

PART # DESCRIPTIONTX-00024 7" STEEL SCALER NEEDLE TX-00373 PLUNGERTX-00043 5" STEEL SCALER NEEDLE TX-00508 VALVE BLOCKTX-00044 NEEDLE SPRING TX-00519 NEEDLE SET (19 - 5" X .125)TX-00045 NEEDLE DRIVER TX-00527 RETAINER BUFFERTX-00046 NEEDLE HOLDER TX-00554 RETAINER CLIPTX-00047 7" FLAT CHISEL (3/4"W) TX-00583 SOCKET SCREW-VALVE RETAINERTX-00048 6" SPOON CHISEL (1-3/8"W) TX-00600 THROTTLE VALVE SNAP RINGTX-00049 6" FLAT CHISEL (1-3/8"W) TX-00610 CONTROL VALVE HANDLETX-00050 7" HARDENED BLANK CHISEL TX-00636 THROTTLE VALVE CAP GASKETTX-00051N 12" FLAT CHISEL (3/4"W) TX-00645 THROTTLE VALVE CASING LOCK NUTTX-00051W 12" FLAT CHISEL (1-3/8"W) TX-00700 CYLINDER SLEEVETX-00052 12" SPOON CHISEL (1-3/8"W) TX-00719 NEEDLE SET (19 - 7" X .125)TX-00054N 18" FLAT CHISEL (3/4"W) TX-00735 BARREL ASSEMBLYTX-00054W 18" FLAT CHISEL (1-3/8"W) TX-00779 ROUND NEEDLE TUBETX-00055 18" SPOON CHISEL (1-3/8"W) TX-00780 THROTTLE LEVER (5/16" SLOT)TX-00078 THROTTLE VALVE SPRING TX-00781 BARE LEVER TYPE BACKHEAD 5/16"TX-00092 THROTTLE VALVE (PUSH TYPE) TX-00782 THROTTLE VALVE (INCLUDES “O” RING)TX-00095 THROTTLE VALVE CASING TX-00801 TOOL NOSE KEYTX-00109 VALVE BLOCK ASSEMBLY TX-00807 BARE PUSH TYPE BACKHEADTX-00126 VALVE BLOCK DOWEL PIN TX-00848 THROTTLE LEVER PINTX-00173 VALVE BLOCK BUTTON TX-00851 LEVER TYPE BACKHEAD ASSEMBLYTX-00196 FLUTTER VALVE TX-00882 BACKHEAD LOCK RINGTX-00207 THROTTLE VALVE CAP TX-00947 BACKHEAD POSITIONING SPACERTX-00219 PUSH THROTTLE BACKHEAD ASSEMBLY TX-00956 RETAINERTX-00302 THROTTLE VALVE “O” RING TX-00963 TOOL NOSETX-00313 TX1B BARREL TX-00989 P/T INLET BUSHING 1/4" X 1/4"TX-00322 ROUND NEEDLE ATTACHMENT TX-00991 L/T INLET BUSHING 3/8" X 1/4"

TX-00095

TX-00600

TX-00807

TX-00882

TX-00583

TX-00645

TX-00610

TX-00092

TX-00302

TX1BPTPush ThrottleBackhead Assembly

Needle Attachment

TX1BLTNS / TX1BLTCS Needle/Chisel Scalers

This throttle valve casingutilizes a socket screw asthe valve retainer.

TX-00991**Inlet bushing not shown

TX1B Needle / Chisel Scalers

Part List

3030

1

2

3

4

5

6

7

Page 39: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

* Exceeds OSHA 29 CFR

and SOEH for vacuum

pick-up tools.

* Flex-Vac (patent pend-

ing) nose piece gets

you into those impos-

sible corners.

* Requires only 87 CFM

vacuum flow and 90 psi

operating pressure.

* Currently testing for

breathing zone PEL

under the action level

of 30 ug/m3.

* Kits include vacuum

attachments necessary

for site clean up.

* Can be used with all

HEPA vacuum systems

(1-1/4" hose).

* Tool exhausts into

vacuum stream; lubri-

cation will not affect

surface preparation.

* Attachments for other

needle scaler models

also available.

3 Models AvailableTX1BLTNS-VK, TX182-VK,

& TX456-VK

VT=Attachment Only V=Attachment w/Case VK=Total Kit (Attachment w/Case& Accessories)

SCALER VACUUM ATTACHMENTS

MODEL # USE WITH DESCRIPTIONMODEL #

TX1BLTNS-VT TX1BLTNS Includes vacuum attachment with necessary hoses &TX-182-VT TXIR-182 clamps - needle scaler and hose whip assembly notTX-456-VT TXCP-456 included.

TX1BLTNS-V TX1BLTNS Includes vacuum attachment with necessary hoses &TX-182-V TXIR-182 clamps with carrying case - needle scaler and hoseTX-456-V TXCP-456 whip assembly not included.

TX1BLTNS-VK TX1BLTNS Includes vacuum attachment with necessary hoses &TX-182-VK TXIR-182 clamps, carrying case, vacuum accessories (see tableTX-456-VK TXCP-456 below), choice of needle scaler (TX1BLTNS, TX182

or TX456) and TX-1HW hose whip assembly.

All needle scalers require 7" needles when using vacuum attachments.

SCALER VACUUM ATTACHMENT PARTSDESCRIPTION PART# TX1BLTNS-VT TX1BLTNS-V TX1BLTNS-VK

TX-182-VT TX-182-V TX-182-VKTX-456-VT TX-456-V TX-456-VK

Vacuum Nosepiece-Specify Make TXV-001 1 1 1Nosepiece Clamp w/Hardware TXV-003 1 1 1TX1BLTNS w/7" Needles TX1BLTNS - - 13/4" White/Clear Suction Hose TXV-004 1 1 1Suction Hose Support Clamp TXV-006 1 1 11" x 1-1/4" Vacuum Hose Clamp TXV-007 1 1 11-1/4" x 7" Black Vacuum Hose TXV-008 1 1 21-1/4" x 1-1/4" Vacuum Hose Cuff TXV-009 1 1 3TX-1HW Whip/Oiler Assembly TX-1HW - - 1Vac/Air Hose Support Clamps TXV-010 5 5 5Case 27-1/2 x 16 x 7" w/insert TXV-011 - 1 -TX-00719 Needle Set 7" TX-00719 - - 2Needle Set 7" Tube w/Caps TXV-013 - - 2Case 27-1/2 x 16 x 8-1/2" w/insert TXV-014 - - 11-1/4" x 1-1/4" Hose Splice TXV-015 - - 11-1/4" Crevice Tool- Grey TXV-016 - - 11-1/4" x 3" Rd Dust Brush - Grey TXV-017 - - 11-1/4" x 5" Floor Tool - Grey TXV-018 - - 1Slide-on Brush for 5" Floor Tool TXV-019 - - 11-1/4" x 9" Floor Brush - Grey/Metal TXV-020 - - 11-1/4" x 1-1/4" Black Connector TXV-021 - - 3Telescopic Chrome Wand 20" TXV-022 - - 11-1/4" Hose x 1-1/2" Tool Cuff TXV-023 - - 11-1/2" Hose x 1-1/4" Tool Cuff TXV-024 - - 1

Needle Scaler Vacuum Attachments

31 31

1

2

3

4

5

6

7

Page 40: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

Other TX1B Models Available:

MODEL # DESCRIPTIONTX1BPTCS PUSH THROTTLE CHISEL SCALERTX1BPTNS PUSH THROTTLE NEEDLE SCALERTX1BCOCS-NR COKE OVEN SCALER WITH NON-REVOLVING

BACKHEAD

Needle / Chisel Scalers

Copies of Major Manufacturers' Scalers:

MODEL # DESCRIPTIONTX456CS CHISEL SCALERTX456NS NEEDLE SCALERTX182CS CHISEL SCALERTX182NS NEEDLE SCALER

Tomato Stake Driver:

MODEL # DESCRIPTIONTX456TS TOMATO STAKE TOOL

Chisels Available for TX1B:

MODEL # ARROW # DESCRIPTIONTX-00047 632 7" FLAT CHISEL (5/8"W)TX-00048 634 6-1/2" SPOON CHISEL (1-3/8"W)TX-00049 633 6-1/2" FLAT CHISEL (1-3/8"W)TX-00050 631 7" HARDENED BLANK CHISELTX-00051N 632-12 12" FLAT CHISEL (5/8"W)TX-00051W 633-12 12" FLAT CHISEL (1-3/8"W)TX-00052 634-12 12" SPOON CHISEL (1-3/8"W)TX-00054N 632-18 18" FLAT CHISEL (5/8"W)TX-00054W 633-18 18" FLAT CHISEL (1-3/8"W)TX-00055 634-18 18" SPOON CHISEL (1-3/8"W)

635 7" SCRAPER (2" W)

Needles Available For All Models:

MODEL # DESCRIPTIONTX-00018 STAINLESS 5”TX-00019 STAINLESS 7”TX-00024 7" X .125 STEEL SCALER NEEDLETX-00043 5" X .125 STEEL SCALER NEEDLETX-00057 7" X .078(2MM) STEEL SCALER NEEDLETX-00058 7" X .117(3MM) STEEL SCALER NEEDLETX-00059 7" X .157(4MM) STEEL SCALER NEEDLETX-00119 5" X .125 BERYLLIUM COPPER NEEDLETX-00120 7" X .125 BERYLLIUM COPPER NEEDLE

Scaler Replacement Parts

CP456 CHISEL/NEEDLE SCALERP-009876 VALVE PLUG (1/8")P-041556 THROTTLE LEVER (B)P-041557 CYLINDER SLEEVEP-043309 LID VALVEP-043310 METALLIC CYCLING VALVEP-050933` CHISEL SLEEVEP-050934 RETAINING RINGP-070416 STEEL BALL (5/16")P-073225 7 1/2" FLAT CHISEL (5/8" W)P-083076 "O" RING (-007)P-084033 PISTONP-084034 CASE VALVE CYCLINGP-084037 METALLIC SHIM/.005P-084038 METALLIC SHIM/.010P-084043 THROTTLE LEVER PINP-084175 6 1/2" FLAT CHISEL (1-3/8" W)P-084376 6 1/2" SPOON CHISEL (1-3/8" W)P-088813 CHISEL LOCK RINGP-088815 RUBBER LOCKP-091582 THROTTLE VALVEP-091585 VALVE SPRINGP-100144 ANVILP-100145 NEEDLE HOLDERP-100146 19 - 7" X .125 NEEDLE SETP-100150 NEEDLE SPRINGP-100964 BUFFER HOLDERP-109271 CYLINDER LOCK NUTP-109273 BACKHEAD (MODEL B)P-113695 CYLINDER & RETAINERP-117630 NEEDLE HOUSINGP-117632 HOUSING CLAMPP-117633 ALLEN CAP SCREWP-125736 SPACER (MODEL B)P-103105 NEEDLE ATTACHMENT

IR 182 CHISEL/NEEDLE SCALERNS11-A HOUSING ATTACHMENT/5"NS11-A7 HOUSING ATTACHMENT / 7"NS11-20 ANVILNS11-21 NEEDLE HOLDERNS11-22 5" X .125 SCALER NEEDLENS11-22-19 19 - 5" X .125 NEEDLE SCALERNS11-A24 ROUND NEEDLE HOUSINGNS11-A25 INSERT FOR HOUSINGNS11-27 ANVIL SPRINGNS11-122 7" X .125 SCALER NEEDLENS11-122-19 19 - 7" X .125 NEEDLE SCALERPX2-626 THROTTLE VALVE SPRINGROB1J1-565 1/4" X 1/4" INLET BUSHINGR1-271 PLUNGER LOCK SPRINGR2F-167 "O" RINGW14F-7 7-1/2" FLAT CHISEL (5/8" W)WF109-A THROTTLE VALVE CAPWF14A/6-1/8 6-1/2" SPOON CHISEL (1-3/8" W)WF14B/6-1/8 6-1/2" FLAT CHISEL (1-3/8" W)WF163-A THROTTLE LEVERWF171-2 VALVEWF171-3 VALVE SEATWF171-4 VALVE CAPWF171-8 VALVE SPACERWF171-15 THROTTLE LEVER PINWF171-28 RETAINER BALLWF171-32 DOWEL PINWF171-49 THROTTLE VALVEWF181-5 PISTONWF181-A10A CASING ASSEMBLYWF182-AL160 BACKHEAD ASSEMBLYWF182-104 RETAINER SLEEVE LOCK RINGWF182-160 BACKHEAD W/O BLOW GUNWF182-716 RETAINER SLEEVE LOCK PLUNGER

3232

1

2

3

4

5

6

7

Page 41: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

Needle / Chisel Scalers

REPLACEMENT NEEDLE SETSTEXAS TX1BLTNS TX-00519 19 - 5" X .125PNEUMATIC TX1BLTNS TX-00719 19 - 7" X .125

TX1BLTNS TX-00119/19 19 - 5" X .125 BERYLLIUM COPPERTX1BLTNS TX-00120/19 19 - 7" X .125 BERYLLIUM COPPER

ARO 8500 42435 19 - 5" X .125BLACK & DECKER 5177, 5182 51700 19 - 7" X .125CHICAGO 3B NEEDLE GUN G002 65 - 7" X 2MMMONARCH 3B NEEDLE GUN G003 28 - 7" X 3MMCHICAGO CP-456 P-100146 19 - 7" X .125PNEUMATIC CP-951 NP123901 12 - 7" X 3MM

CP-951 NP123905 29 - 7" X 2MMCP-952 NP123902 23 - 7" X 3MMCP-952 NP123906 53 - 7" X 2MMCP-953 NP123903 28 - 7" X 3MMCP-953 NP123934 14 - 7" X 4MMCP-949 NP125082 29 - 7" X 2MMCP-9356 P137151 19 - 7” X .125

P106454 19 - 7” X .125 STAINLESS STEELP106455 19 - 7” X .125 BERYLLIUM COPPER

DRESSER B1-A-B-C 834024 19 - 7" X .125CLECO B1-A-B-C 834043 19 - 5" X .125INGERSOLL 171,181,172,182 NS11-22 19 - 5" X .125RAND 171,181,172,182 NS11-122 19 - 7" X .125MICH PNEUMATIC B25-M 00111 19 - 5" X .125NITTO KOHKI JC16 00A29-16 29 - 7" X 2MM

JC20 00A341-20 12 - 7" X 3MMJC20 00A342-20 29 - 7" X 2MMJEX24 00A341-24 23 - 7" X 3MMJEX24 00A342-24 53 - 7" X 2MMJEX28 00A341-28 28 - 7" X 3MMJEX28 00A342-28 66 - 7" X 2MM

SIOUX 65,266 2260 19 - 5" X .125STANLEY P-30 P-3055 19 - 5" X .125U.S. INDUST. 117,118 1518 19 - 7" X .125VON ARX - 1B NEEDLE GUN 501.02 29 - 7" X 2MMMARINDUS CO. 1B NEEDLE GUN 501.03 12 - 7" X 3MM

2B NEEDLE GUN 502.02 51 - 7" X 2MM2B NEEDLE GUN 502.03 19 - 7" X 3MM3B NEEDLE GUN 503.02 65 - 7" X 2MM3B NEEDLE GUN 503.03 28 - 7" X 3MM4B NEEDLE GUN 504.02 111 - 7" X 2MM4B NEEDLE GUN 504.03 49 - 7" X 3MM

* Needles areavailable invarioussizes.

* Qualitymanufactur-ing.

* Available insets or bulk.

* Heat treatedfor longerlife.

* TexasPneumatichas low/non-sparkneedlesavailable.

3333 33

VON ARX REPLACEMENT NEEDLES (CHISEL POINT)

PART# DESCRIPTION700190 3mm, Rivet Head, Chisel Point700191 4mm, Rivet Head, Chisel Point

CHISEL POINT NEEDLES FOR AMERICAN TOOLS(CLECO, CHICAGO PNEUMATIC, INGERSOLL RAND, TEXAS PNEUMATIC)

PART# DESCRIPTIONTX-00058CP Chisel Point

1

2

3

4

5

6

7

Page 42: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

TX1B Needle / Chisel Scalers

TX1B CHISEL SCALER REPAIR KITTX1BCSRK INCLUDES:

1 TX-00078 THROTTLE VALVE SPRING

2 TX-00126 VALVE BLOCK DOWEL PIN

2 TX-00196 FLUTTER VALVE

1 TX-00207 THROTTLE VALVE CAP

1 TX-00373 PLUNGER

3 TX-00527 RETAINER BUFFER

3 TX-00554 RETAINER CLIP

1 TX-00636 THROTTLE VALVE CAP GASKET

1 TX-00782 THROTTLE VALVE

1 TX-00848 THROTTLE LEVER PIN

1 TX-00956 RETAINER

3434

1

2

3

4

5

6

7

* These kits are a conve-nient way to stock wearparts for the TX1B.

* Especially important ifyou are in an area wherereordering parts is noteasily done.

TX1B NEEDLE SCALER REPAIR KITTX1BNSRK INCLUDES:

3 TX-00044 NEEDLE SPRING1 TX-00045 NEEDLE DRIVER1 TX-00046 NEEDLE HOLDER1 TX-00078 THROTTLE VALVE SPRING2 TX-00126 VALVE BLOCK DOWEL PIN2 TX-00196 FLUTTER VALVE1 TX-00207 THROTTLE VALVE CAP1 TX-00373 PLUNGER2 TX-00519 5" X .125 NEEDLE SET (19)3 TX-00527 RETAINER BUFFER3 TX-00554 RETAINER CLIP1 TX-00636 THROTTLE VALVE CAP GASKET1 TX-00782 THROTTLE VALVE1 TX-00848 THROTTLE LEVER PIN1 TX-00956 RETAINER

NEEDLE / CHISEL SCALER Repair Kits

Page 43: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify
Page 44: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify
Page 45: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify
Page 46: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify
Page 47: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify
Page 48: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

Smooth Drum for Easy Debris Removal Dry Pick-up - Workshop, Garage etc. Hose and Accessory Storage Large Drain for Emptying Water

RIDGID® is a registered trademark of RIDGID, INC., and used under license.

Dual-Flex™ Locking Hose

Vac with Accessories & Filter

WD1270

FEATURES BENEFITS

• 5.0 Peak Hp Motor• Sound Reduction Technology

• 12 Gallon drum• 4 Swivel Casters• On-board Accessory Storage • Lower Center of Gravity• 1-Layer Standard Filter• Blowing Capability

• Dual-Flex™ Locking Hose• Large Built-In Drain• Included Accessories

Delivers the powerful suction needed for efficient clean up of large messes.Scroll Noise Reduction® is a patented feature that provides quiet operation by precisely controlling the flow of airthrough the vac.Provides capacity for clean-up of large spills & messes at job-sites and busy shops.Provide easy 360° mobilityFive unique built-in accessory storage pockets – 1 on each caster foot, plus hose storage on top.No more searching or fumbling to find accessoriesDesign lowers the center of gravity to help prevent tipping. Compact design stores more easily.Pleated paper filter captures common everyday dirt.Insert hose in exhaust port and use air-stream to blow saw dust from tools and debris from garages, decks & sidewalks. Resists collapsing and adds 180˚ flexibility at both hose ends. Hose locks onto vac.Drain located to lowest point of drum for complete emptying of water.2-1/2” x 7’ Dual-Flex™ Locking Hose, 2 Extension Wands, Utility Nozzle, Car Nozzle, Wet Nozzle, & 1-Layer Paper Pleated Filter

SPECIFICATIONS

Drum Size

Motor

- Peak Horsepower

- Air Watts

- Voltage

- Amps

Cord Length

Construction

U.L. Listed

Filter Surface Area

Replacement Filters

Optional Wet Filter

Optional Filter Bag

Accessory Size

Shipping Weight

Net Weight

12 gal.

5.0

227

120

10.0

15’

High Impact Polypropylene

Yes

1,600 sq. in.

VF4000,

VF5000,

VF6000

VF7000

VF3502

2-1/2”

22.5 lbs.

16.5 lbs.

This newly designed RIDGID® 12 Gallon High Performance Wet/Dry Vac is designed for Pro’s and DIY’ers who want a traditionally styled, medium sized vac that delivers the powerful performance and rugged durability required for job site clean-up. Its 5.0 peak HP motor delivers the suction power necessary to handle tough clean-up chores. This vacuum’s 12 gallon drum size results in a more compact design that requires less storage space on a service truck, in the shop, or in the garage. However, it still offers the capacity to handle large messes.

- WD1270

12 Gallon High Performance Wet/Dry Vac

Page 49: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify
Page 50: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

Carbomastic® 90

October 2006 replaces July 2006 0191 To the best of our knowledge the technical data contained herein is true and accurate on the date of publication and is subject to change without prior notice. User must contact Carboline Company to verify correctness before specifying or ordering. No guarantee of accuracy is given or implied. We guarantee our products to conform to Carboline quality control. We assume no responsibility for coverage, performance or injuries resulting from use. Liability, if any, is limited to replacement of products. NO OTHER WARRANTY OR GUARANTEE OF ANY KIND IS MADE BY CARBOLINE, EXPRESS OR IMPLIED, STATUTORY, BY OPERATION OF LAW, OR OTHERWISE, INCLUDING MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. Carboline® and Carbomastic® are registered trademarks of Carboline Company.

Selection & Specification Data Generic Type Cycloaliphatic Amine Epoxy Description Economical, aluminum-pigmented mastic with

excellent performance properties. Designed for a broad range of applications, this material provides good corrosion resistance, film build and surface tolerance. Can be applied at low temperatures and cures faster than many other epoxy mastics.

Features Very good performance over minimal surface

preparation of steel substrates Suitable as a tie-coat/topcoat for most tightly

adhered existing coatings Excellent film build on edges

Can be applied at temperatures as low as 40°F VOC compliant to current AIM regulations Color Aluminum (C901); Red (M500)*

(aluminum pigment yields a dull gray (or red) appearance) *Red (M500) is available for use as a contrasting primer in multiple coat applications, but should always be topcoated. Color variations within a batch and from batch-to-batch may occur due to the metallic pigments and variations in application techniques and conditions.

Finish Flat Primers Self-priming. May be applied over most tightly

adhering coatings and aged alkyds. Topcoats Acrylics, Alkyds, Epoxies, Polyurethanes Dry Film Thickness

3.0 mils (75 microns) over existing coatings and 5.0 mils (125 micron) on rusted steel substrates. 8.0-10 mils (200-250 microns) in one or two coats for severe exposures and immersion conditions. Do not exceed 10.0 mils (250 microns) in a single coat.

Solids Content By Volume: 90% ± 2% Theoretical Coverage Rate

1444 mil ft2 (36.0 m2/l at 25 microns) Allow for loss in mixing and application

VOC Values As supplied: 0.7 lbs./gal (84 g/l)

Thinned:* 32 oz/gal w/ #2: 2.0 lbs./gal (237 g/l) 32 oz/gal w/ #10: 2.0 lbs./gal (240 g/l) 32 oz/gal w/ #33: 2.0 lbs./gal (245 g/l) 45 oz/gal w/ #2: 2.3 lbs./gal (282 g/l) These are nominal values. *Maximum thinning for 250 g/l restricted areas is 35 oz/gal for Thinner #2 and 33 oz/gal for Thinner #33. Use Thinner #76 up to 38 oz/gal where non-photochemically reactive solvents are required

Dry Temp. Resistance

Continuous: 180°F (82°C) Non-Continuous: 250°F (121°C) Discoloration is observed above 180°F (82°C).

Selection & Specification Data (Cont.) Limitations Epoxies lose gloss, discolor and eventually chalk

in sunlight exposure.

Substrates & Surface Preparation General Surfaces must be clean and dry. Employ

adequate methods to remove dirt, dust, oil and all other contaminants that could interfere with adhesion of the coating.

Steel Non-Immersion: SSPC-SP6 with a 2.0-3.0 mil

(50-75 micron) surface profile for maximum protection. SSPC-SP2, SP3, or SP7 are also acceptable methods.

Galvanized Steel

For optimum performance sweep blast cleaning is recommended. Consult your Carboline Sales Representative for specific recommendations.

Previously Painted Surfaces

Lightly sand or abrade to roughen and degloss the surface. Existing paint must attain a minimum 3B rating in accordance with ASTM D3359 “X-Scribe” adhesion test.

Performance Data

Test Method System Results Report #

ASTM D 522 Flexibility 1 ct CM 90

No cracking 8” cylindrical

mandrel

ITL91-11-04783

ASTM D 1014

Outdoor Weathering

A.1 ct CM 90 over rusted steel (SP-2)

B.1 ct. CM 90 Over abrasive blasted steel

(SP-10)

No blistering and less than 1% rusting on either A & B

systems.

08933

ASTM B 117 Salt Fog

2 coats CM 90 over rusted steel (SP-2)

No blistering, rusting,

cracking or delamination, rust in scribe, no creepage from scribe.

02566

ASTM D 4060

Abrasion 2 coats CM 90

110 mg. loss CS-17 wheel,

1,000 gm. load 1,000 cycles

08093

Test data available upon written request.

Page 51: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

Carbomastic® 90

October 2006 replaces July 2006 To the best of our knowledge the technical data contained herein is true and accurate on the date of publication and is subject to change without prior notice. User must contact Carboline Company to verify correctness before specifying or ordering. No guarantee of accuracy is given or implied. We guarantee our products to conform to Carboline quality control. We assume no responsibility for coverage, performance or injuries resulting from use. Liability, if any, is limited to replacement of products. NO OTHER WARRANTY OR GUARANTEE OF ANY KIND IS MADE BY CARBOLINE, EXPRESS OR IMPLIED, STATUTORY, BY OPERATION OF LAW, OR OTHERWISE, INCLUDING MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. Carboline® and Carbomastic® are registered trademarks of Carboline Company.

Application Equipment Listed below are general equipment guidelines for the application of this product. Job site conditions may require modifications to these guidelines to achieve the desired results. General Guidelines: Spray Application (General)

The following spray equipment has been found suitable and is available from manufacturers such as Binks, DeVilbiss and Graco.

Conventional Spray

Pressure pot equipped with dual regulators, 3/8” I.D. minimum material hose, .070” I.D. fluid tip and appropriate air cap.

Airless Spray Pump Ratio: 30:1 (min.)* GPM Output: 3.0 (min.) Material Hose: 3/8” I.D. (min.) Tip Size: .017-.021” Output PSI: 1800-2200 Filter Size: 60 mesh

*Teflon packings are recommended and available from the pump manufacturer.

Brush & Roller (General)

Multiple coats may be required to obtain desired appearance, recommended dry film thickness and adequate hiding. Avoid excessive re-brushing or re-rolling.

Brush Use a medium bristle brush. Roller Use a medium-nap synthetic roller cover with phenolic

core.

Mixing & Thinning Mixing Power mix separately, then combine and power mix.

DO NOT MIX PARTIAL KITS. Ratio 1:1 Ratio (A to B) Thinning* Spray: Up to 32 oz/gal (25%) with Thinner #2, and or

Thinner #10. Brush/Roll: Up to 32 oz/gal (25%) with #33 or 45 oz/gal (35%) with Thinner #2. Thinner #2 is used typically for cooler temperatures and Thinner #33 for hot/windy conditions. Use of thinners other than those supplied or recommended by Carboline may adversely affect product performance and void product warranty, whether expressed or implied. *See VOC values for thinning limits. Carboline Thinner #236E may also be used to thin this product to minimize HAP and VOC emissions. Consult Carboline Technical Service for guidance.

Pot Life 4 Hours at 75°F (24°C) and less at higher temperatures.

Pot life ends when coating loses body and begins to sag.

Cleanup & Safety Cleanup Use Thinner #2 or Acetone. In case of spillage, absorb

and dispose of in accordance with local applicable regulations.

Safety Read and follow all caution statements on this product

data sheet and on the MSDS for this product. Employ normal workmanlike safety precautions. Hypersensitive persons should wear protective clothing, gloves and use protective cream on face, hands and all exposed areas.

Ventilation When used as a tank lining or in enclosed areas,

thorough air circulation must be used during and after application until the coating is cured. The ventilation system should be capable of preventing the solvent vapor concentration from reaching the lower explosion limit for the solvents used. In addition to ensuring proper ventilation, appropriate respirators must be used by all application personnel.

Cleanup & Safety Cont. Caution This product contains flammable solvents. Keep away

from sparks and open flames. All electrical equipment and installations should be made and grounded in accordance with the National Electric Code. In areas where explosion hazards exist, workmen should be required to use non-ferrous tools and wear conductive and non-sparking shoes.

Application Conditions

Condition Material Surface Ambient Humidity

Normal 60°-80°F (16°-27°C)

60°-80°F (16°-27°C)

60°-80°F (16°-27°C) 0-90%

Minimum 50°F (10°C)

40°F (4°C)

40°F (4°C) 0%

Maximum 90°F (32°C)

130°F (54°C)

100°F (38°C) 95%

This product simply requires the substrate temperature to be above the dew point. Condensation due to substrate temperatures below the dew point can cause flash rusting on prepared steel. Special application techniques may be required above or below normal application conditions.

Curing Schedule

Surface Temp. & 50% Relative Humidity Dry to Handle Dry to Topcoat*

40°F (4°C) 28 Hours 20 Hours 50°F (10°C) 24 Hours 18 Hours 60°F (16°C) 16 Hours 12 Hours 70°F (21°C) 10 Hours 8 Hours 80°F (27°C) 6 Hours 5 Hours 90°F (32°C) 4 Hours 3 Hours 100°F (38°C) 3 Hours 2 Hours

These times are based on a 5.0-8.0 mil (125-200 micron) dry film thickness. Higher film thickness, insufficient ventilation or cooler temperatures will require longer cure times and could result in solvent entrapment and premature failure. Maximum recoat/topcoat times are 30 days for epoxies and 90 days for polyurethanes at 75°F (24°C). Excessive humidity or condensation on the surface during curing can interfere with the cure, can cause discoloration and may result in a surface haze. Any haze or blush must be removed by water washing before recoating. If the maximum recoat time has been exceeded, the surface must be abraded by sweep blasting prior to the application of additional coats. Note: This product contains conductive pigments and cannot be holiday tested. * Product may be topcoated with itself (wet-on-wet) with the same or contrasting color in as short as 60 min (flash-off) in accordance with all the above application conditions.

Packaging, Handling & Storage Shipping Weight (Approximate)

2 Gallon Kit 29 lbs (13 kg)

10 Gallon Kit 143 lbs (65 kg)

Flash Point (Setaflash) Part A: 72°F (22°C)

Part B: 100°F (38°C) Storage (General) Store Indoors. Storage Temperature & Humidity

40° - 110°F (4°- 43°C) 0-95% Relative Humidity

Shelf Life Part A & B: Min. 36 months at 75°F (24°C)

*Shelf Life: (actual stated shelf life) when kept at recommended storage conditions and in original unopened containers.

Page 52: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

Emergency Overview: Warning! Flammable. Harmful if inhaled. Causes eye and skin irritation. Aspiration may cause lung damage. May cause dizziness and drowsiness. Keep away from heat, sparks, flame. Avoid breathing vapor. Avoid contact with eyes, skin and clothing. Do not swallow. Keep container closed. Use with adequate ventilation. Wash thoroughly after handling. Warning! May cause allergic skin reactions. May cause irritation. Contains SILICA which can cause cancer. Risk of Cancer depends on duration and level of exposure.

Effects Of Overexposure - Eye Contact: May cause eye irritation.

Effects Of Overexposure - Skin Contact: May cause skin sensitization. Direct skin contact may cause irritation. May cause allergic skin reaction.

Effects Of Overexposure - Inhalation: Harmful if inhaled, may affect the brain or nervous system, causing dizziness, headache, or nausea. May cause nose and throat irritation.

Material Safety Data Sheet

CHEMTREC Transportation Emergency Phone: 800-424-9300

Pittsburgh Poison Control Center Health Emergency No.: 412-681-6669

NOTE: The CHEMTREC Transportation Emergency Phone is to be used only in the event of chemical emergencies involving a spill, leak, fire, exposure or accident involving chemicals

Section 1 - Chemical Product / Company Information

Product Name: CARBOMASTIC 90 PART A Revision Date:

03/08/2012

Identification Number:

PLMSDS 0191A1NL Supercedes : 03/13/2009

Product Use/Class:

Cycloaliphatic Amine Epoxy - FOR INDUSTRIAL USE ONLY

Preparer: Regulatory, Department

Manufacturer: Carboline Company 2150 Schuetz Road St. Louis, MO 63146 (800) 848-4645

Section 2 - Composition / Information On Ingredients

Chemical Name CAS Number Weight % Less ThanACGIH TLV-TWAACGIH TLV-STELOSHA PEL-TWAOSHA-CEIL

MICROCRYSTALLINE SILICA

14808-60-7 35.0 0.025 MG/M3 (respirable)

N/E 0.1 MG/M3 (respirable)

N/E

EPOXY RESIN 25068-38-6 35.0 NE NE NE NE

1,2-BENZENEDICARBOXIOLIC ACID, DI-C9-11-BRANCHED AND LINEAR ALKYL ESTERS

68515-43-5 10.0 N/E N/E N/E N/E

ALUMINUM (DUST OR FUME)

7429-90-5 10.0 10 MG/M3 (metal dust)

N/E 15 MG/M3 (total dust)

N/E

TOLUENE 108-88-3 5.0 20 PPM N/E 375 MGM3 NE

CARBON BLACK 1333-86-4 0.3 3.0 MG/M3 N/E 3.5 MG/M3 N/E

Section 3 - Hazards Identification

Page 53: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

Effects Of Overexposure - Ingestion: Harmful if swallowed.

Effects Of Overexposure - Chronic Hazards: Crystalline silica is known to cause silicosis. Crystalline silica (Quartz) is classified as a known human carcinogen (Group 1) by IARC. Exposure is by route of inhalation. If material is in a liquid matrix it is unlikely to be inhaled. However, when sanding or grinding the finished product, there may be potential for crystalline silica to become airborne. Reports have associated repeated and prolonged occupational overexposure to solvents with permanent brain and nervous system damage.

Primary Route(s) Of Entry: Skin Contact, Inhalation, Ingestion

Medical Conditions Prone to Aggravation by Exposure: If sensitized to amines, epoxies, or other chemicals do not use. See a physician if a medical condition exists. If you have a condition that could be aggravated by exposure to dust or organic vapors, see a physician prior to use.

First Aid - Eye Contact: If material gets into eyes, flush with water immediately for 15 minutes. Consult a physician.

First Aid - Skin Contact: In case of contact, immediately flush skin with plenty of water while removing contaminated clothing and shoes. Launder clothing before reuse. If rash or irritation develops, consult a physician.

First Aid - Inhalation: If inhaled, remove to fresh air. Administer oxygen if necessary. Consult a physician if symptoms persist or exposure was severe.

First Aid - Ingestion: If swallowed do not induce vomiting. Seek immediate medical attention.

Extinguishing Media: Carbon Dioxide, Dry Chemical, Foam, Water Fog

Unusual Fire And Explosion Hazards: Flammable Liquid. Vapors are heavier than air and will accumulate. Vapors will form explosive concentrations with air. Vapors travel long distances and will flashback. Use mechanical ventilation when necessary to keep percent vapor below the "Lower Explosion Level" (LEL). Eliminate all ignition sources. Keep away from sparks, open flames and heat sources. All electric equipment and installations should be made and grounded in accordance with the National Electrical Code. In areas where explosion hazards exist, workers should be required to use non-ferrous tools and to wear conductive and non-sparking shoes.

Special Firefighting Procedures: Flammable. Cool fire-exposed containers using water spray.

Steps To Be Taken If Material Is Released Or Spilled: Eliminate all ignition sources. Handling equipment must be grounded to prevent sparking. Evacuate the area of unprotected personnel. Wear appropriate personal protection clothing and equipment. Follow exposure controls/personal protection guidelines in Section 8. Contain and soak up residual with an aborbent (clay or sand). Take up absorbant material and seal tightly for proper disposal. Dispose of in accordance with local, state and federal regulations. Refer to Section 15 for SARA Title III and CERCLA information.

Section 4 - First Aid Measures

Section 5 - Fire Fighting Measures

Flash Point, F: 72F (22C)

Lower Explosive Limit, %: 0.2

(Setaflash) Upper Explosive Limit, %: 7.1

Section 6 - Accidental Release Measures

Section 7 - Handling And Storage

Page 54: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

Handling: Do not get in eyes, on skin, or on clothing. Keep container tightly closed when not in use. Wear personal protection equipment. Do not breathe vapors. Wash thoroughly after handling. If pouring or transferring materials, ground all containers and tools. Do not weld, heat, cut or drill on full or empty containers. Use only in accordance with Carboline application instructions, container label and Product Data Sheet. Avoid breathing vapors or spray mist.

Storage: Keep away from heat, sparks, open flames and oxidizing agents. Keep containers closed. Store in a cool, dry place with adequate ventilation.

Engineering Controls: Use explosion-proof ventilation when required to keep below health exposure guidelines and Lower Explosion Limit (LEL).

Respiratory Protection: Use only with ventilation to keep levels below exposure guidelines listed in Section 2. User should test and monitor exposure levels to ensure all personnel are below guidelines. If not sure, or not able to monitor, use MSHA/NIOSH approved supplied air respirator. Follow all current OSHA requirements for respirator use. For silica containing coatings in a liquid state, and/or if no exposure limits are established in Section 2 above, supplied air respirators are generally not required.

Skin Protection: Recommend impervious gloves and clothing to avoid skin contact. If material penetrates to skin, change gloves and clothing. The use of protective creams may be beneficial to certain individuals. Protective creams should be applied before exposure.

Eye Protection: Recommend safety glasses with side shields or chemical goggles to avoid eye contact.

Other protective equipment: Eye wash and safety showers should be readily available.

Hygienic Practices: Wash with soap and water before eating, drinking, smoking, applying cosmetics, or using toilet facilities. Use of a hand cleaner is recommended. Launder contaminated clothing before reuse. Leather shoes can absorb and allow hazardous materials to pass through. Check shoes carefully after soaking before reuse.

(See section 16 for abbreviation legend)

Conditions To Avoid: Heat, sparks and open flames.

Incompatibility: Keep away from strong oxidizing agents, heat and open flames.

Hazardous Decomposition Products: Carbon monoxide, nitrogen oxides, and unidentified organic compounds. Consider all smoke and fumes from burning material as very hazardous. Welding, cutting or abrasive grinding can create smoke and fumes. Do not breathe any fumes or smoke from these operations.

Section 8 - Exposure Controls / Personal Protection

Section 9 - Physical And Chemical Properties

Boiling Range:

175 F (79 C) - 513 F (267 C)

Vapor Density:

Heavier than Air

Odor: Epoxy Odor Threshold: N/D Appearance: Viscous Liquid, Aluminum,

Red or Green Evaporation Rate: Slower than Ether

Solubility in H2O: N/D Freeze Point: N/A Specific Gravity: 1.5 Vapor Pressure: N/D PH: N/D Physical State: Liquid

Section 10 - Stability And Reactivity

Page 55: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

Hazardous Polymerization: Will not occur under normal conditions.

Stability: This product is stable under normal storage conditions.

Ecological Information: No data

Disposal Information: Dispose of in accordance with State, Local, and Federal Environmental regulations. Responsibility for proper waste disposal is with the owner of the waste.

Additional Notes: None.

CERCLA - SARA HAZARD CATEGORY

This product has been reviewed according to the EPA Hazard Categories promulgated under Sections 311and 312 of the Superfund Amendment and Reauthorization Act of 1986 (SARA Title III) and is considered, under applicable definitions, to meet the following categories:

IMMEDIATE HEALTH HAZARD, CHRONIC HEALTH HAZARD, FIRE HAZARD

SARA SECTION 313

This product contains the following substances subject to the reporting requirements of Section 313 of Title III of the Superfund Amendment and Reauthorization Act of 1986 and 40 CFR part 372:

Section 11 - Toxicological Information

Product LD50: N/D

Product LC50: N/D

Chemical Name CAS NumberLD50 LC50MICROCRYSTALLINE SILICA14808-60-7 NOT AVAILABLE NOT AVAILABLE

EPOXY RESIN 25068-38-6 11.4G/KG RAT,ORAL >20ML/KG SKIN,SENSITIZER

1,2-BENZENEDICARBOXIOLIC ACID, DI-C9-11-BRANCHED AND LINEAR ALKYL ESTERS

68515-43-5 >5000 MG/KG, ORAL, RAT NOT AVAILABLE

ALUMINUM (DUST OR FUME)

7429-90-5 NOT AVAILABLE NOT AVAILABLE

TOLUENE 108-88-3 5.0 G/KG RAT ORAL, 14G/KG RABBIT DERMAL8000 PPM/4HRS, RAT, INHALATION

CARBON BLACK 1333-86-4 NOT AVAILABLE >8000 MG/KG, ORAL, RAT

Section 12 - Ecological Information

Section 13 - Disposal Information

Section 14 - Transportation Information

DOT Proper Shipping Name:

Paint Packing Group: II

DOT Technical Name: N/A Hazard Subclass:

N/A

DOT Hazard Class: 3 Resp. Guide Page:

128

DOT UN/NA Number: UN 1263

Section 15 - Regulatory Information

Chemical Name CAS Number

Page 56: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

TOXIC SUBSTANCES CONTROL ACT

All components of this product are listed on the TSCA inventory.

This product contains the following chemical substances subject to the reporting requirements of TSCA 12(B) if exported from the United States:

No TSCA 12(B) Substances exist in this product

U.S. STATE REGULATIONS AS FOLLOWS:

NEW JERSEY RIGHT-TO-KNOW

The following materials are non-hazardous, but are among the top five components in this product.

PENNSYLVANIA RIGHT-TO-KNOW

The following non-hazardous ingredients are present in the product at greater than 3%.

CALIFORNIA PROPOSITION 65

Warning: The following ingredients present in the product are known to the state of California to cause Cancer:

Warning: The following ingredients present in the product are known to the state of California to cause birth defects, or other reproductive hazards:

INTERNATIONAL REGULATIONS AS FOLLOWS:

CANADIAN WHMIS

This MSDS has been prepared in compliance with Controlled Product Regulations except for the use of the 16 headings.

CANADIAN WHMIS CLASS: B2 D2A D2B

VOLATILE ORGANIC COMPOUNDS, GR/LTR MIXED (UNTHINNED): 84

REASON FOR REVISION: Changes made in Section(s): 2, 3, 5, 9, and 11

ALUMINUM (DUST OR FUME) 7429-90-5TOLUENE 108-88-3

Chemical Name CAS NumberCERAMIC MICROSPHERES 66402-68-4

Chemical Name CAS NumberCERAMIC MICROSPHERES 66402-68-4

Chemical Name CAS NumberMICROCRYSTALLINE SILICA 14808-60-7CARBON BLACK 1333-86-4

Chemical Name CAS NumberTOLUENE 108-88-3

Section 16 - Other Information

HMIS Ratings Health: 2 Flammability: 3 Reactivity: 1 Personal Protection: X

Page 57: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

Legend: N.A. - Not Applicable, N.E. - Not Established, N.D. - Not Determined

The information contained herein is, to the best of our knowledge and belief accurate. However, since the conditions of handling and use are beyond our control, we make no guarantee of results, and assume no liability for damages incurred by use of this material. It is the responsibility of the user to comply with all applicable federal, state, and local laws and regulations

Page 58: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

Carbothane® 134 HS

May 2015 0848

To the best of our knowledge the technical data contained herein is true and accurate on the date of publication and is subject to change without prior notice. User must contact Carboline Companyto verify correctness before specifying or ordering. No guarantee of accuracy is given or implied. We guarantee our products to conform to Carboline quality control. We assume no responsibility forcoverage, performance or injuries resulting from use. Liability, if any, is limited to replacement of products. NO OTHER WARRANTY OR GUARANTEE OF ANY KIND IS MADE BY CARBOLINE,EXPRESS OR IMPLIED, STATUTORY, BY OPERATION OF LAW, OR OTHERWISE, INCLUDING MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. Carboline® and Carboguard®are registered trademarks of Carboline Company.

Page 1 of 2

Selection & Specification Data Generic Type Acrylic aliphatic polyurethane

Description An attractive, high gloss, high solids topcoat which iseasily applied by airless or conventional spray to yielda smooth, easily cleanable surface. Recommendeduse as a finish coat for the exteriors of tanks,equipment, piping, structural steel, and concretesurfaces where chemical resistance, toughness, andweatherability are required. An excellent coating foruse in chemical processing, pulp and paper, petro-chemical, bridge, offshore, railcars, heavy marine,institutional and waste treatment facilities where ahighly resistant and attractive coating is desired. Notrecommended for immersion service.

Features • Excellent weatherability• Excellent flexibility• Excellent abrasion resistance• Available in Carboline’s Rapid Tint System• Meets most VOC requirements

Color Refer to Carboline Color Guide. Certain colors,particularly in non-leaded safety oranges, reds andyellows may require multiple coats for adequatehiding. Check color suitability before use.

Finish High Gloss

Primer Refer to Substrates & Surface Preparation.

Topcoat Carbothane Clear Coat when required

Dry FilmThickness

2.0 mils (51 microns) per coat

Additional thickness may be required over rough surfaces forappearance. Dry film thickness in excess of 4 mils per coat is notrecommended

Solids Content By Volume 66% +/- 2%

TheoreticalCoverage Rate

1059 ft2 at 1.0 mils (26.0 m2/l at 25 microns)

529 ft2 at 2.0 mils (13.0 m2/l at 50 microns) Allow for loss in mixing and application.

VOC Values Thinner 214 13 oz/gal 2.8 lbs./gal (336 g/l)Thinner 215 10 oz/gal 2.8 lbs./gal (336 g/l)Thinner 25 12 oz/gal 2.8 lbs./gal (336 g/l)As Supplied 2.4 lbs./gal (288 g/l)

These are nominal values and may vary slightly with color

Dry Temp.Resistance

Continuous: 200 °F (93 °C)Non-Continuous: 250 °F (121 °C)

Non-immersion

Substrates & Surface Preparation General Surfaces must be clean and dry. Employ adequate

methods to remove dirt, dust, oil and all othercontaminants that could interfere with adhesion of thecoating. For all surfaces prime with specific Carbolineprimers as recommended by your Carboline salesrepresentative. Refer to the specific primer’s ProductData Sheet for detailed requirements of the specifiedprimer.

Substrates & Surface Preparation Previously PaintedSurfaces

Lightly sand or abrade to roughen and degloss thesurface. Existing paint must attain a minimum 3Arating in accordance with ASTM D3359 “X-Scribe”adhesion test.

Performance Data Test Method System Results

ASTM E84 Flameand Smoke

1 ct. Zinc1 ct Epoxy1 ct 134 HS

5 FlameO SmokeClass A

Test reports and additional data available upon written request.

Mixing & Thinning Mixing Power mix Part A, then combine with Part B and

power mix in the following proportions. DO NOT MIXPARTIAL KITS.

Thinning May be thinned up to 13 oz/gal with Thinner 214or Thinner 25 for normal spray application. In hotor windy conditions, Thinner 214 is preferred. UseThinner 215 up to 10 oz/gal for brush and rollerapplications.Use of thinners other than those supplied orrecommended by Carboline may adversely affectproduct performance and void product warranty,whether expressed or implied.Carboline Thinner #236E may also be used to thin thisproduct to minimize HAP and VOC emissions. ConsultCarboline Technical Service for guidance.

Ratio 0.84 Gal. KitPart A (134 HS): 3 quarts (in 1 gal. can)Urethane Converter 900: 12 fl. oz.4.0 Gal. KitPart A (134 HS): 3.55 gallons (in 5 gal. can)Urethane Converter 900: 0.45 gallon

Pot Life 4 Hours at 75°F (24°C) and less at highertemperatures. Pot life ends when coating becomestoo viscous to use. THIS PRODUCT IS MOISTURESENSITIVE. AVOID MOISTURE CONTAMINATION.

Application Equipment Guidelines Listed below are general equipment guidelines for the application of this product. Job site conditionsmay require modifications to these guidelines to achieve the desired results.

Spray Application(General)

This is a high solids coating and may require slightadjustments in spray techniques. Wet film thicknessis easily and quickly achieved. The following sprayequipment has been found suitable and is availablefrom manufacturers such as Binks, DeVilbiss andGraco.

ConventionalSpray

Pressure pot equipped with dual regulators, 3/8”I.D. minimum material hose, .070” I.D. fluid tip andappropriate air cap.

Page 59: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

Carbothane® 134 HS

May 2015 0848

To the best of our knowledge the technical data contained herein is true and accurate on the date of publication and is subject to change without prior notice. User must contact Carboline Companyto verify correctness before specifying or ordering. No guarantee of accuracy is given or implied. We guarantee our products to conform to Carboline quality control. We assume no responsibility forcoverage, performance or injuries resulting from use. Liability, if any, is limited to replacement of products. NO OTHER WARRANTY OR GUARANTEE OF ANY KIND IS MADE BY CARBOLINE,EXPRESS OR IMPLIED, STATUTORY, BY OPERATION OF LAW, OR OTHERWISE, INCLUDING MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. Carboline® and Carboguard®are registered trademarks of Carboline Company.

Page 2 of 2

Application Equipment Guidelines Listed below are general equipment guidelines for the application of this product. Job site conditionsmay require modifications to these guidelines to achieve the desired results.

Airless Spray *Pump Ratio: 30:1 (min.)GPM Output: 3.0 (min.)Material Hose: 3/8” I.D. (min.)Tip Size: .013-.017”Output PSI: 2100-2400Filter Size: 60 mesh*Teflon packings are recommended and available fromthe pump manufacturer.

Brush & Roller(General)

Brushing recommended only for touch-up of smallareas. Use natural bristle brush applying with fullstrokes. For roller application, use a short nap mohairroller with phenolic core. Avoid re-brushing and/or re-rolling. Two coats may be required to obtaindesired appearance, hiding and recommended dry filmthickness.

Application Conditions Condition Material Surface Ambient HumidityMinimum 50 °F (10 °C) 35 °F (2 °C) 35 °F (2 °C) 10%Maximum 100 °F (38 °C) 120 °F (49 °C) 95 °F (35 °C) 80%

Industry standards are for substrate temperatures to be above the dew point.Caution: This product is moisture sensitive: application and/or curing in humidities above maximum,or exposure to moisture from rain or dew point may result in loss of gloss and/or microbubbling ofthe product. Special thinning and application techniques may be required above or below normalconditions.

Curing Schedule Surface Temp. & 50%

Relative HumidityDry to Handle Final Cure General

35 °F (2 °C) 24 Hours 14 Days50 °F (10 °C) 16 Hours 10 Days75 °F (24 °C) 8 Hours 7 Days90 °F (32 °C) 4 Hours 5 Days110 °F (43 °C) 1 Hours 2 Days

These times are based on a 2.0 mil (50 micron) dry film thickness. Higher film thickness, insufficientventilation or cooler temperatures will require longer cure times.

Cleanup & Safety Cleanup Use Thinner 2

Safety Read and follow all caution statements on this productdata sheet and on the MSDS for this product.

Ventilation When used in enclosed areas, thorough air circulationmust be used during and after application until thecoating is cured. The ventilation system should becapable of preventing the solvent vapor concentrationfrom reaching the lower explosion limit for the solventsused. User should test and monitor exposure levels toinsure all personnel are below guidelines. If not sureor if not able to monitor levels, use MSHA / NIOSHapproved respirator.

Caution This product contains flammable solvents. Keep awayfrom sparks and open flames. All electrical equipmentand installations should be made and grounded inaccordance with the National Electric Code. In areaswhere explosion hazards exist, workmen should berequired to use non-ferrous tools and wear conductiveand non-sparking shoes.

Packaging, Handling & Storage Shelf Life Part A: Min. 36 months at 75°F (24°C)

Part B: Min. 24 months at 75°F (24°C)

*Shelf Life: (actual stated shelf life) when kept at recommended storageconditions and in original unopened containers.

Shipping Weight(Approximate)

0.84 Gallon Kit - 13 lbs. (5.9 kg)4 Gallon Kit - 48 lbs. (21.8 kg)1sThinner 25: 8 lbs. (4 kg)Thinner 214: 8 lbs. (4 kg)Thinner 215: 8 lbs. (4 kg)5sThinner 25: 39 lbs. (18 kg)Thinner 214: 39 lbs. (18 kg)Thinner 215: 39 lbs. (18 kg)

StorageTemperature &Humidity

40° -110°F (4°-43°C)0-80% Relative Humidity

Flash Point(Setaflash)

Carbothane 134 HS Part A: 43°F (6°C)Urethane Converter 900: 106°F (41°C)Thinner 25: 87°F (30°C)Thinner 214: 110°F (43°C)Thinner 215: 128°F (54°C)

Storage Store Indoors.

This product is solvent based and not affected by excursions belowthese published storage temperatures, down to 10°F, for a duration of nomore than 14 days. Always inspect the product prior to use to make sureit is smooth and homogeneous when properly mixed.

Page 60: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

Date Printed: 3/20/2013

Material SafetyMaterial SafetyMaterial SafetyMaterial Safety

Data SheetData SheetData SheetData Sheet

CHEMTREC Transportation Emergency Phone:CHEMTREC Transportation Emergency Phone:CHEMTREC Transportation Emergency Phone:CHEMTREC Transportation Emergency Phone:

800-424-9300800-424-9300800-424-9300800-424-9300

Pittsburgh Poison Control Center HealthPittsburgh Poison Control Center HealthPittsburgh Poison Control Center HealthPittsburgh Poison Control Center Health

Emergency No.: 412-681-6669Emergency No.: 412-681-6669Emergency No.: 412-681-6669Emergency No.: 412-681-6669

NOTE: The CHEMTREC Transportation Emergency

Phone is to be used only in the event of chemical

emergencies involving a spill, leak, fire, exposure, or

accident involving chemicals

1. Identification1. Identification1. Identification1. Identification

Product Name:Product Name:Product Name:Product Name: CARBOTHANE 134 HG PART A Revision Date:Revision Date:Revision Date:Revision Date: 3/20/2013

Identification Number:Identification Number:Identification Number:Identification Number: 0859A1NL Supercedes Date:Supercedes Date:Supercedes Date:Supercedes Date: 9/7/2011

Aliphatic Acrylic Polyurethane - FOR INDUSTRIAL USE ONLYProduct Use/Class:Product Use/Class:Product Use/Class:Product Use/Class:

Manufacturer:Manufacturer:Manufacturer:Manufacturer: Preparer:Preparer:Preparer:Preparer: Regulatory DepartmentCarboline Company

2150 Schuetz Road

St. Louis, MO 63146

800-848-4645

2. Hazard Identification2. Hazard Identification2. Hazard Identification2. Hazard Identification

EMERGENCY OVERVIEW:EMERGENCY OVERVIEW:EMERGENCY OVERVIEW:EMERGENCY OVERVIEW: Contains SILICA which can cause cancer. Risk of Cancer depends on duration and level of

exposure. This product may contain Titanium Dioxide, which is listed by IARC as possibly carcinogenic to humans (Group 2B). This

listing is based on inadequate evidence of carcinogenicity in humans and sufficient evidence in experimental animals. This

classification is relevant when exposed to titanium dioxide in dust or powder form only, including cured product that is subject to

sanding, grinding, cutting, or other surface preparation activities. Irritating to eyes and skin. WARNING! - FLAMMABLE LIQUID

AND VAPOUR. Keep away from heat and sources of ignition. Harmful if inhaled. Use with adequate ventilation. Vapours may

cause drowsiness and dizziness. Keep container closed. Avoid contact with skin, eyes and clothing. Wash thoroughly after

handling. Harmful if swallowed. Risk of serious damage to the lungs (by aspiration).

EFFECTS OF OVEREXPOSURE EFFECTS OF OVEREXPOSURE EFFECTS OF OVEREXPOSURE EFFECTS OF OVEREXPOSURE ---- EYE CONTACT: EYE CONTACT: EYE CONTACT: EYE CONTACT: May cause eye irritation.

EFFECTS OF OVEREXPOSURE EFFECTS OF OVEREXPOSURE EFFECTS OF OVEREXPOSURE EFFECTS OF OVEREXPOSURE ---- SKIN CONTACT: SKIN CONTACT: SKIN CONTACT: SKIN CONTACT: May cause skin irritation.

EFFECTS OF OVEREXPOSURE EFFECTS OF OVEREXPOSURE EFFECTS OF OVEREXPOSURE EFFECTS OF OVEREXPOSURE ---- INHALATION: INHALATION: INHALATION: INHALATION: Harmful if inhaled. Symptoms of overexposure may be headache, dizziness,

tiredness, nausea and vomiting. Vapours may be irritating to eyes, nose, throat, and lungs.

EFFECTS OF OVEREXPOSURE EFFECTS OF OVEREXPOSURE EFFECTS OF OVEREXPOSURE EFFECTS OF OVEREXPOSURE ---- INGESTION: INGESTION: INGESTION: INGESTION: Harmful if swallowed.

EFFECTS OF OVEREXPOSURE EFFECTS OF OVEREXPOSURE EFFECTS OF OVEREXPOSURE EFFECTS OF OVEREXPOSURE ---- CHRONIC HAZARDS: CHRONIC HAZARDS: CHRONIC HAZARDS: CHRONIC HAZARDS: Crystalline silica is known to cause silicosis. Crystalline silica (Quartz)

is classified as a known human carcinogen (Group 1) by IARC. Exposure is by route of inhalation. If material is in a liquid matrix it

is unlikely to be inhaled. When sanding or grinding the finished product, there may be potential for crystalline silica to become

airborne. Repeated and prolonged exposure to solvents may cause brain and nervous system damage.

MEDICAL CONDITIONS PRONE TO AGGRAVATION:MEDICAL CONDITIONS PRONE TO AGGRAVATION:MEDICAL CONDITIONS PRONE TO AGGRAVATION:MEDICAL CONDITIONS PRONE TO AGGRAVATION: No information available.

PRIMARY ROUTE(S) OF ENTRY:PRIMARY ROUTE(S) OF ENTRY:PRIMARY ROUTE(S) OF ENTRY:PRIMARY ROUTE(S) OF ENTRY: Eye Contact, Ingestion, Inhalation, Skin Absorption, Skin Contact

3. Composition/Information On Ingredients3. Composition/Information On Ingredients3. Composition/Information On Ingredients3. Composition/Information On Ingredients

Hazardous Ingredients

Chemical NameChemical NameChemical NameChemical Name CAS-No.CAS-No.CAS-No.CAS-No.Weight %Weight %Weight %Weight %

Less ThanLess ThanLess ThanLess Than

ACGIH TLV-ACGIH TLV-ACGIH TLV-ACGIH TLV-

TWATWATWATWA

ACGIH TLV-ACGIH TLV-ACGIH TLV-ACGIH TLV-

STELSTELSTELSTELOSHA PEL-TWAOSHA PEL-TWAOSHA PEL-TWAOSHA PEL-TWA

OSHA PEL-OSHA PEL-OSHA PEL-OSHA PEL-

CEILINGCEILINGCEILINGCEILING

TITANIUM DIOXIDE 13463-67-7 40.0 10 MGM3 N/E 10 MGM3 N/E

MICROCRYSTALLINE SILICA 14808-60-7 35.00.025 MG/M3

(respirable)N/E

0.1 MG/M3

(respirable)N/E

N-BUTYL ACETATE 123-86-4 10.0 150 PPM 200 PPM 710 MG/M3 N/E

TOLUENE 108-88-3 10.0 20 PPM N/E 375 MGM3 N/E

CARBON BLACK 1333-86-4 10.0 3.0 MG/M3 N/E 3.5 MG/M3 N/E

Page 1 / 6

Page 61: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

Date Printed: 3/20/2013

META-XYLENE 108-38-3 5.0 100 PPM 150 PPM 435 MG/M3 N/E

ALIPHATIC DIOLTRADE

SECRET5.0 25 PPM N/E 25 PPM N/E

LIMESTONE 1317-65-3 5.0 10.00 MG/M3 N/E 5 MGM3 N/E

ETHOXYPROPIONATE 763-69-9 5.0 N/E N/E N/E N/E

ETHYL BENZENE 100-41-4 5.0 20 PPM N/E 435 MGM3 N/E

PARA-XYLENE 106-42-3 5.0 100 PPM 150 PPM 435 MGM3 N/E

STODDARD SOLVENT 8052-41-3 5.0 100 PPM N/E 500 PPM N/E

ORTHO-XYLENE 95-47-6 5.0 100 PPM 150 PPM 435 MG/M3 N/E

1-METHOXY-2-PROPANOL

ACETATE108-65-6 5.0 100 ppm N/E N/E N/E

4. First-aid Measures4. First-aid Measures4. First-aid Measures4. First-aid Measures

AFTER EYE CONTACT:AFTER EYE CONTACT:AFTER EYE CONTACT:AFTER EYE CONTACT: Rinse thoroughly with plenty of water for at least 15 minutes and consult a physician.

AFTER SKIN CONTACT:AFTER SKIN CONTACT:AFTER SKIN CONTACT:AFTER SKIN CONTACT: In case of contact, immediately flush skin with plenty of water for at least 15 minutes while removing

contaminated clothing and shoes. If skin irritation persists, call a physician.

AFTER INHALATION:AFTER INHALATION:AFTER INHALATION:AFTER INHALATION: Give oxygen or artificial respiration if needed. Remove person to fresh air. If signs/symptoms continue, get

medical attention.

AFTER INGESTION:AFTER INGESTION:AFTER INGESTION:AFTER INGESTION: Do NOT induce vomiting. Never give anything by mouth to an unconscious person. If swallowed, call a

poison control centre or doctor immediately.

5. Fire-fighting Measures5. Fire-fighting Measures5. Fire-fighting Measures5. Fire-fighting Measures

Flash Point, °F: 50F (10C) Lower Explosive Limit, %: 0.6

(Setaflash) Upper Explosive Limit, %: 10.4

Extinguishing Media: Carbon Dioxide, Dry Chemical, Foam, Water Fog

UNUSUAL FIRE AND EXPLOSION HAZARDS: Vapours are heavier than air and may spread along floors. Vapours may form

explosive mixtures with air. Vapors may travel to areas away from work site before igniting/flashing back to vapor source.* Provide

adequate ventilation. Prevent the creation of flammable or explosive concentrations of vapour in air and avoid vapour concentration

higher than the occupational exposure limits. Keep away from heat/sparks/open flames/hot surfaces. - No smoking. Electrical

installations / working materials must comply with the technological safety standards. Wear shoes with conductive soles. Flammable

liquid

SPECIAL FIREFIGHTING PROCEDURES: In the event of fire, wear self-contained breathing apparatus. Cool containers / tanks

with water spray. Flammable.

6. Accidental Release Measures

PERSONAL SAFETY MEASURES/ENVIRONMENTAL MEASURES/METHOD OF CLEANING/CONTAINMENT: Do not allow

material to contaminate ground water system. Prevent product from entering drains. Remove all sources of ignition. To avoid

ignition of vapours by static electricity discharge, all metal parts of the equipment must be grounded. Evacuate personnel to safe

areas. Wear personal protective equipment. For personal protection see section 8. Contain spillage, soak up with non-combustible

absorbent material, (e.g. sand, earth, diatomaceous earth, vermiculite) and transfer to a container for disposal according to local /

national regulations (see section 13).

7. Handling and Storage

INSTRUCTIONS FOR SAFE HANDLING : Do not breathe vapours or spray mist. Do not get in eyes, on skin, or on clothing. Keep

containers dry and tightly closed to avoid moisture absorption and contamination. Use only with adequate ventilation/personal

protection. Wash thoroughly after handling. Ensure all equipment is electrically grounded before beginning transfer operations. Do

not use sparking tools. Prepare the working solution as given on the label(s) and/or the user instructions.

STORAGE CONDITIONS: Keep containers tightly closed in a dry, cool and well-ventilated place. Keep container closed when not

in use. Store in a dry, well ventilated place away from sources of heat, ignition and direct sunlight.

Page 2 / 6

Page 62: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

Date Printed: 3/20/2013

8. Exposure Controls/Personal Protection

ENGINEERING CONTROLS: Avoid contact with skin, eyes and clothing. Ensure adequate ventilation, especially in confined

areas.

RESPIRATORY PROTECTION: Use only with ventilation to keep levels below exposure guidelines reported in this document. User

should test and monitor exposure levels to ensure all personnel are below guidelines. If not sure, or not able to monitor, use State or

federally approved supplied air respirator. For silica containing coatings in a liquid state, and/or if no exposure limits are established

above, air-supplied respirators are generally not required.

SKIN PROTECTION: Lightweight protective clothing Impervious gloves Gloves should be discarded and replaced if there is any

indication of degradation or chemical breakthrough. Request information on glove permeation properties from the glove supplier.

EYE PROTECTION: Safety glasses with side-shields

OTHER PROTECTIVE EQUIPMENT: Ensure that eyewash stations and safety showers are close to the workstation location.

PROTECTION AND HYGIENE MEASURES : When using, do not eat, drink or smoke. Handle in accordance with good industrial

hygiene and safety practice. Wash hands before breaks and at the end of workday.

9. Physical and Chemical Properties

Boiling Range: 232F (111C) - 284 F (140 C) Vapor Density: Heavier than Air

Odor: Solvent Odor Threshold: N/D

Appearance: Viscous Liquid, Various Colors Evaporation Rate: Slower Than Ether

Solubility in Water: N/D Specific Gravity: app. 1.28

Freeze Point: N/D pH: N/D

Physical State: Liquid Vapor Pressure: No Information

(See section 16 for abbreviation legend)

10. Stability and Reactivity

CONDITIONS TO AVOID: Heat, flames and sparks.

MATERIALS TO AVOID: Strong oxidizing agents

HAZARDOUS DECOMPOSITION PRODUCTS: Carbon dioxide (CO2), carbon monoxide (CO), oxides of nitrogen (NOx), dense

black smoke.

HAZARDOUS POLYMERIZATION: Hazardous polymerisation does not occur.

STABILITY: Stable under normal conditions.

11. Toxicological Information

Chemical Name CAS-No. LD50 LC50

TITANIUM DIOXIDE 13463-67-7 10000 mg/m3, oral (rat) 6.82 mg/L, Inh, rat 4H

MICROCRYSTALLINE SILICA 14808-60-7 Not Available Not Available

N-BUTYL ACETATE 123-86-4 10760 mg/kg, rat, oral 23.4 mg/l/4/h (rat)

TOLUENE 108-88-35000 mg/kg rat oral, 14000 mg/

kg rabbit dermal8000 ppm/4 hrs, rat, inhalation

CARBON BLACK 1333-86-4 8000 mg/kg oral, rat Not Available

META-XYLENE 108-38-3 Not Available Not Available

Page 3 / 6

Page 63: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

Date Printed: 3/20/2013

ALIPHATIC DIOLTRADE

SECRETNot Available Not Available

LIMESTONE 1317-65-3 6450 mg/kg, oral, rat Not Available

ETHOXYPROPIONATE 763-69-9 Not Available Not Available

ETHYL BENZENE 100-41-4 3500 mg/kg rat, oral 17.2 mg/L Inh, Rat, 4Hr

PARA-XYLENE 106-42-3 Not Available Not Available

STODDARD SOLVENT 8052-41-3 6001 mg/kg, oral, rat 5500 mg/m3, 4h, inhalation

ORTHO-XYLENE 95-47-6 Not Available Not Available

1-METHOXY-2-PROPANOL ACETATE 108-65-6 8532 mg/kg, oral (rat) 1105 mg/m3/4H

12. Ecological Information

ECOLOGICAL INFORMATION: No information available.

13. Disposal Information

DISPOSAL INFORMATION: Dispose of in accordance with local regulations.

14. Transport Information

PaintDOT Proper Shipping Name: Packing Group: II

DOT Technical Name: N/A Hazard Subclass: N/A

DOT Hazard Class: 3 Resp. Guide Page: 128

DOT UN/NA Number: UN 1263

Additional Notes: No Information

15. Regulatory Information

U.S. Federal Regulations:

CERCLA - SARA Hazard Category

This product has been reviewed according to the EPA ‘Hazard Categories’ promulgated under Sections 311 and 312 of the

Superfund Amendment and Reauthorization Act of 1986 (SARA Title III) and is considered, under applicable definitions, to

meet the following categories:

Fire Hazard, Acute Health Hazard, Chronic Health Hazard

Sara Section 313:

This product contains the following substances subject to the reporting requirements of Section 313 of Title III of the

Superfund Amendment and Reauthorization Act of 1986 and 40 CFR part 372:

Chemical Name CAS-No.

TOLUENE 108-88-3

META-XYLENE 108-38-3

ETHYL BENZENE 100-41-4

PARA-XYLENE 106-42-3

ORTHO-XYLENE 95-47-6

Toxic Substances Control Act:

This product contains the following chemical substances subject to the reporting requirements of TSCA 12(B) if exported

from the United States:

No TSCA 12(b) components exist in this product.

Page 4 / 6

Page 64: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

Date Printed: 3/20/2013

U.S. State Regulations:

New Jersey Right-to-Know:

The following materials are non-hazardous, but are among the top five components in this product.

Chemical Name CAS-No.

ACRYLIC COPOLYMER TRADE SECRET

YELLOW PIGMENT 14059-33-7

COLOR PIGMENT 5567-15-7

Pennsylvania Right-To-Know:

The following non-hazardous ingredients are present in the product at greater than 3%.

Chemical Name CAS-No.

ACRYLIC COPOLYMER TRADE SECRET

YELLOW PIGMENT 14059-33-7

COLOR PIGMENT 5567-15-7

YELLOW PIGMENT 31837-42-0

AZO PIGMENT 82199-12-0

YELLOW IRON OXIDE 51274-00-1

IRON OXIDE 1309-37-1

POLYMER NON HAZARDOUS TRADE SECRET

AZO PIGMENT 2786-76-7

RED PIGMENT 84632-65-5

COLOR PIGMENT 15793-73-4

QUINACRIDONE PIGMENT 1047-16-1

COLOR PIGMENT 1328-53-6

IRON OXIDE 1332-37-2

CALIFORNIA PROPOSITION 65:

Warning: The following ingredients present in the product are known to the state of California to cause Cancer:

Chemical Name CAS-No.

TITANIUM DIOXIDE 13463-67-7

MICROCRYSTALLINE SILICA 14808-60-7

CARBON BLACK 1333-86-4

ETHYL BENZENE 100-41-4

BENZENE 71-43-2

Warning: The following ingredients present in the product are known to the state of California to cause birth defects, or otherreproductive hazards.

Chemical Name CAS-No.

TOLUENE 108-88-3

METHYL ALCOHOL 67-56-1

BENZENE 71-43-2

International Regulations:

CANADIAN WHMIS:

This MSDS has been prepared in compliance with Controlled Product Regulations except for the use of the 16 headings.

Canadian WHMIS Class: B2 D2A D2B

Page 5 / 6

Page 65: BLAST ALL Inc. · 7.2 Daily Painting and Blasting Report . ... Production Daily Blasting and Painting ... equipment, and sample work to verify

Date Printed: 3/20/2013

16. Other Information

HMIS Ratings:

Health: 2 Flammability: 3 Reactivity: 1 Personal Protection: X

VOLATILE ORGANIC COMPOUNDS, GR/LTR MIXED (UNTHINNED): 264

Legend: N.A. - Not Applicable, N.E. - Not Established, N.D. - Not Determined

The information contained herein is, to the best of our knowledge and belief accurate. However, since the conditions of handlingand use are beyond our control, we make no guarantee of results, and assume no liability for damages incurred by use of thismaterial. It is the responsibility of the user to comply with all applicable federal, state, and local laws and regulations.

Page 6 / 6