blue gold prograivi...october, 2016 designed by: design circle-5, bwdb, dhaka. notes 1 all...

9
I/~ I I - - --- - -- -- --------- --- - - - --- - - ---- ---- Bangladesh Water Development Board BLUE GOLD PROGRAIvI APPROPRIATE RIVER BANK EROSION PROTECTION IN POLDER 29 ALONG THE RIGHT BANK OF LOWER BHADRA RIVER (FOUR SPURS AT KM 4.500, KM 4.700, KM 4.900 AND KM 5.100) AT - DUMURIA UPAZILLA OF DISTRICT KHULNA IN C/W "BLUE GOLD PROGRAM, BWDB" Khulna 0 & M Division-I, BWDB, Khulna. October, 2016 Designed By: Design Circle-5, BWDB, Dhaka.

Upload: others

Post on 11-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BLUE GOLD PROGRAIvI...October, 2016 Designed By: Design Circle-5, BWDB, Dhaka. NOTES 1 ALL DIMENSIONS SHOWN IN THE DRAWING ARE IN MILLIMETER AND ALL ELEVATIONS ARE IN METER (PWD) UNLESS

I/~II -

- --- - -- -- --------- ---- - - --- - - ---- ----

Bangladesh Water Development Board

BLUE GOLD PROGRAIvI

APPROPRIATE RIVER BANK EROSION PROTECTION IN POLDER 29 ALONG THE RIGHT BANKOF LOWER BHADRA RIVER (FOUR SPURS AT KM 4.500, KM 4.700, KM 4.900 AND KM 5.100) AT- DUMURIA UPAZILLA OF DISTRICT KHULNA IN C/W "BLUE GOLD PROGRAM, BWDB"

Khulna 0 & M Division-I, BWDB, Khulna.

October, 2016

Designed By: Design Circle-5, BWDB, Dhaka.

Page 2: BLUE GOLD PROGRAIvI...October, 2016 Designed By: Design Circle-5, BWDB, Dhaka. NOTES 1 ALL DIMENSIONS SHOWN IN THE DRAWING ARE IN MILLIMETER AND ALL ELEVATIONS ARE IN METER (PWD) UNLESS

NOTES1 ALL DIMENSIONS SHOWN IN THE DRAWING ARE IN MILLIMETER AND ALL ELEVATIONS ARE IN METER

(PWD) UNLESS OTHERWISE MENTIONED IN THE DRAWING

!'!.QIE~QR~!~_1 CONCRETE.

a. Compressive Strengthb Mixiting Ratioc. Coarse Aggregated. Fine Aggregatee Cementf. Water

·>25 Nlmm'1:1 5:3

: stone chips. Sylhet Sand (FM>2.2)OPC

: free of salinity

2. REINFORCING BARS SHALL BE TWISTED M.S. BARS HAVING MINIMUM YIELD STRESS OF 414 N/mm2.

3. CASTING OF PILE SHALL BE CARRIED ON AS A CONTINUOUS OPERATION UNTIL THE ENTIRE PILE CASTINGIS COMPLETED BEGINING FROM THE HEAD TO END.

4 MINIMUM WEIGHT OF THE HAMMER FOR DRIVING PILE SHALL BE 1500KG.

5. HEIGHlOF FALL OF DROP HAMMER SHALL NOT BE GREATER THAN 1.5 METRE.

6. DRIVING MAY BE STOPPED WHEN A PENETRATION OF MINIMUM 5mm PER BLOW IS ATTAINED THROUGH THEDRIVING APPLIANCES AS MENTIONED ABOVE. THE LIMIT OF PENETRATION AS NOTED SHALL BE AVERAGE OF 3Ocm.

7. FOLLOWING PILE DRIVING RECORD SHALL BE KEPT IN AN ORDERLY FORM AND SHALL BE SENT TO THE DESIGNOFFICE TO VERIFY THE ALLOWABLE AND SHALL BE SENT TO THE DESIGN OFFICE TO VERIFY THE ALLOWABLEPILE CAPACITY BEFORE NEXT PHASE OF WORK.

(a) TYPE AND WEIGHT OF HAMMER(b) HEIGHT OF FALL OF HAMMER(c) NUMBER OF BLOWS REQUIRED FOR EACH 30 cm OF PENETRATION.(d) SPECIAL MEASURE SHALL BE TAKEN TO RECORD THE PENETRATIONS PER BLOW FOR THE LAST 6Ocm.

8. CLEAR COVER FOR PILE AND BEAM= 75mm.

DUMPING OPERATION:

1. GEO BAGS IN LAYERS MUST BE DUMPED UNIFORMLY FROM ANCHORED AND PROPERLY POSITIONED DUMPING BOAT.

2. DUMPING OF GEO-BAGS SHALL BEGIN FROM THE TOE (END) OF THE APRON AND PROCEED TOWARDS BANK.

3. INSPECTION BY DIVING MUST BE DONE TO CONFIRM THAT NO RIVER BED AREA REMAINS EXPOSED AND GEO-BAGSARE PLACED UNIFORMLY

4. CROSS SECTIONS SHALL BE TAKEN WITHIN 12 HOURS AFTER DUMPING AT 1 5.00 METERS APART.

5. GEO BAGS MUST BE HANDLED WITH CARE, NO DAMAGED BAGS SHALL BE USED FOR ANY PART OF THE WORK.

SPECIAL NOTES:

I. TillS ORA WING liAS BEEN PREPARED AS PER THE STUDY OF RIVER BANK EROSION MANAGEMENTIN POI.DER 29. KHULNA UNDER "BLUE GOLD PROGRAM" AND AS PER THE MEETING MI UTES OFGI3SP VIDE MEMO NO. GBSP/M-1I091175 DATED. 08.09.2016

') IIiE WORK SIIALL IiL EXI el'·1 U) AFTER ADMINIS mAllVI AND 1'lNANelAI APPROVAl IIWM n IECOMI)I,'II-.N'I AUT/lORn Y

.I, lOR A" Y I.f{ROf{. OMISSIU'< UR CU"'ll SIO~. Pl.J:.i\SL RULR I () 1'111. CO", '1.I{~[\) \)I.SIC,~ (JI I IC'\'FOf{ I "KIN(; Nf'Cl SSARY AC1IOf\:.

~11I1! "1'\ (1,·V. 11!\' •..•1I'·. I

BANGLADESH WATER DEVELOPMENT BOARDOFFICE OF THE SUPERINTENDING ENGINEER

DESIGN CIRCLE-5APPROI'RIA TE RIVER I)ANK EROSION PROTEcnON IN POI.DLR 29 AI.ONG1111.RI(;lf'I I)ANK OF I,()WI:R I3IIAf)RA RIVFR (FOUR Sl'llR\ A I KM 4.500,KM 4,700. K~14,~OO A~1l KM 5,1001 AT Dl'MliRIA UPAI.II LA 01 DI~ I RICI I

KlIlIU,A II' ("W "RI ur, GOI.D PROGRAM. HWDIl" JLOCATION MAP ,

Di::SICNED OY:RECO~

------,

~II MD, SIIOIJIOUUAMAN1, H

' ,9,10,16·1 MO, ABDUSSATTARI, SE-

CHECKED BV: APPROVEO RY t==>:

I ~ ~~\"Ic, .('(~·\ttU,\ "\I)''' .•~I \rr\ \

: (,~~~UOtllDtJZZAMANI. sr, -r CillO ~:~(;I\I.[)( •..:•..•:

r,\;,-, 'r: ,'-..;;',l",,"'V,',!r- _ .. ,',',VY}.' :)1),' .' I!...' -'-'L(\ (,,' :!'"

Page 3: BLUE GOLD PROGRAIvI...October, 2016 Designed By: Design Circle-5, BWDB, Dhaka. NOTES 1 ALL DIMENSIONS SHOWN IN THE DRAWING ARE IN MILLIMETER AND ALL ELEVATIONS ARE IN METER (PWD) UNLESS

Ur)'OUI (J/Bunk Protection work /11I" [)()lder·29along Lower Bhadra Rive« (chnagnr)

Poldtr·19

.. =:: -------_._----;--_.,

~WW'

S

Legend- Groyne_ChadQar

- Oro~_Bar'IJna

C3 Polder

g,. Riv.r_Bilng~esh

o 0.075016 0.3_-===-__ Km

~lhym.uy

.11.,1 '03

", .1(1) 91)

, .~Oe~•. tS ·f 7

•.• 1. 1 '.1~.t. tf

:: .£6 ../11

_fO .~;.- .~4.HI:l(

e •.., 4

1 .4 3.'.& .~:,•••a: _2~

19t .,\- 11~~ .') c ~- _"",.0.'.0' nq

.09 I._>I~The locat'ionof proposed erosion mitigation measures as pilot basis

e •

I Sheet, '0 (l:2'nr~,~

BANGLADESH WATER DEVELOPMENT BOARDOFFICE OF THE SUPERINTENDING ENGINEER

DESIGN CIRCLE-5APPROPRIATE RIVER BANK EROSION PROTECTION IN POLDER 2Y

ALONG THE RIGHT BANK OF LOWER BHADRA RIVER (FOUR SPURSAlKM 4 500. KM 4 700. KM 4 91Kl AND KM 51(0) AT DUMURIA (l"AlILLA

OF DISTRICl KHUL A IN CIW "BLUE GOLD PROGRAM. BWJ)B "

LOCA TION MAPO':SIGNEo BY,

~MD. SHOHIo ZZAMAN. EE

OI£CK£O BV:

~:y

\ N !~j1 .•., ~

(SAEEOA NAZNEENI 'lIt.~?--' Go\\CHIE'" ENClN[ER A if \MD. SIIOIIIDUZZAMAN . EE

Page 4: BLUE GOLD PROGRAIvI...October, 2016 Designed By: Design Circle-5, BWDB, Dhaka. NOTES 1 ALL DIMENSIONS SHOWN IN THE DRAWING ARE IN MILLIMETER AND ALL ELEVATIONS ARE IN METER (PWD) UNLESS

LAYOUT OF BANK PROTECTION WORK FOR POLDER-29ALONG LOWER BHADRA RIVER (CHADGAR)

POLDER-29

CHADGER <f of. ~O

_._. . .__---1- _

D/S

§ITE PLANNOT TO SCALE

ctIAJ~-ct

OfctQ

Of~~

ctIAJ

oko

-..J

U/S

POLD£R-31

N

}

___u . \ .-- __ ...J

Sheet No: 03 or08

BANGLADESH WATER DEVELOPMENT BOARDOFFICE OF THE SUPERINTENDING ENGINEER

DESIGN CIRCLE-5APPROPRIA TE KIVEK BANK EROSION PROTECTION IN POLL>ER 29

ALONG THl RIGII'J flANK OF LOWlR BIJADRA RIVER (FOUR SPURS A 1KM 4.500. KM 4.700. KM 4.900 AND KM 5.100) AT DUMURIA lIPAlII.LA Of

DISTRICT KHIJJ.NA IN C/W "BLUE GOl.D PRO(iRAM. IlWIlB"

SlTE PLANDESIGNED BY,

~MO. SHOHIDUZZAMAN ,EE

(flEC:KEDB~

(MD. SUOUIOUZZAMANl, f.1,:

I \J.~·"L~ 1~1lJ-LOII>--" I

Page 5: BLUE GOLD PROGRAIvI...October, 2016 Designed By: Design Circle-5, BWDB, Dhaka. NOTES 1 ALL DIMENSIONS SHOWN IN THE DRAWING ARE IN MILLIMETER AND ALL ELEVATIONS ARE IN METER (PWD) UNLESS

BANK LINEr---

DIS

r----·- -----------200.0m----· --200.0m---.- - - -

-------------------------

1Eoo

1

""-,-----------

SEMI-PERMEABLE SPUR TOP BLOCKED FACE OF SEMI-PERMEABLE SPUR --- 3 LAYERS OF 250KG SAND FILLED GEO BAG DUMPING

'0.--'<--- TOP OPEN FACE SEMI-PERMEABLE SPUR

PLAN OF SPUR

400 x400mm BEAM

,...400mmx400mm BEAM

,...1600mmx250mmx125 PRE-CAST CONCRETE SLABTO BE FIXED WITH PRE-CAST PILE BY BOLT

, EL 2.90 mPWD

~Ft~~~~~~~~~~~,EL 2.50 mPWD§l

l 1EI. 0.00 mPWD

I' mm I{

I

l4 4 4 4 U U

,Ell90mPWD, ELl50mPWD

-15.0m Long 400x400mm PRE-CAST PILE@1200mm CIC l

0: 04 of OX

U/S

I

I----II

4

- 15.0m Long 400mmx400mm PRE-CAST PILE@1200mm CICL4 4

ELEVATION OF TOP OPEN FACE.ELEVATION OF TOP BLOCKED FACE

BOLT TO FIX PRE-CAST SLAB

WITH PRE-CAST PILE

16mm OIA CONNECTING NON-CORROSIVE BOLT

",- 400.400mm PRE-CAST PiLE

1600.2SO.125mm PRE·CAST CONCRETE SLAB

AI'PROPRIA rE RIVER BA K EROSln I'RUTFl' liON IN 1'01 OI·.R29~I ONe; 1111KI('III IIA K or I O\\'I.R HIlAllRA RIVI:R (I ()I'll WlIK', A IK~14 5(XI. KM 4 70(1, KM 4 9<XIASIJ """ 5 11K))A I m H'RIA (IPA/II.I.'\

01 I)I~IRI('I KIII'1 A 1"('\\ "1111'1 (,OIJ)I'R('<,R""" 11\\1)11"I 012 @ 150mm CIC

~ ...•-- 3-012

1 -------~

JOINT DETAIL-------

REINFORCEMENT DETAILOF PRE-CAST SLAB

MD. SIIOIIIDU2ZAMAI\i ,r.f

n-v t r IQ-IO-2016KHULNAO&M UIVISION·l

4",\111)\ '\L" tr\1fllllt' 1.1'.1-1{1l\A..(, (I ')( c .••...,~I\ " .•~--

Page 6: BLUE GOLD PROGRAIvI...October, 2016 Designed By: Design Circle-5, BWDB, Dhaka. NOTES 1 ALL DIMENSIONS SHOWN IN THE DRAWING ARE IN MILLIMETER AND ALL ELEVATIONS ARE IN METER (PWD) UNLESS

6.()()

4.01)2.00

0.00(·12.00(·}4.oo

1·}6.00(·)8.00

(·)10.00(·)12.00(·)14.00

EARTH FILLINGy, I ~ EL (+)2.90m "WI)'. .... ""!."<y

IIII III ~mmlI,

~

I II!Ii Iii i

~~~~WI----

J ~ ~~ , EL (-)12.50m PWD

00 V) ...• V) C"')-o V) ~ ...• ~EXIST! IG LEVEL ~ "<t N r- N

~ 2 8 2 2 2V) M -:INmPWD C"') N N N - ~, I , , , , , , ,

N '-0'-0 N 00 \0 N \0 = ~0 0 \0 ~ ~ C"') r- ~ ~N

C> 00 ~ V) ...• 00 N 0 NDISTANCE, IN M 0 N r- - N \0 \0 00, , , , , , ,TYPICAL X-SECTION AT CHADGAR

6.004.002.000.00

(·)2.00(·)4.00(·)6.00(-)8.00

(-)10.00(-)12.00(-)14.00

EXISTING LEV~L ::;:;INmPWD

, EL (+)2.90 mPWD

, EL (-)12.50 mPWDC"') 0 "<t C"') r-r- 0-, '-0 ~ 00 C"! ~ ~ ~N

2 2 2 V) V)V) ~ r-, ~

2 ~ ~I I

0 - - 0 ~ ~, , , , , , , , , ,00 0N "<t "<t 00 "<t

N "<t 00 ~ 0-~ V) ~ C"! V)V) ~ 00 ...• r-:'" V) 0 r- 0 \0 a- 0N C"') ...• "<t r- r- oo, , , I ,

TYPICAL X-SECTION AT CHAD GAR

-,

DISTANCE, IN Mooo,

I<HUL:oIA O&M DIVISION·!

0: 05 or os

EARTH FILLING

OFFICE OF THE SUPERINTENDING ENGINEERDESIGN CIRCLE-S

BANGLADESH WATER DEVELOPMENT BOARD

+ 2.90 mPWD

APPROI'RIATI' RIVER [lANK EROSION PROTECTION IN I'OLDER 29AI.ONG rur: RiCarr ilANK OF LOWER J)IIADRA RIVER (!'OIJR SI'I iRSA r

KM 4.500. KM 4.700. KM 4.900 AND KM 5.100) Al UliMURIA IIPA7.1L1.AOF DlS'1Rle I KIIIILt-;A IN cr« "J)LlIl GOLD I'R()(;RA~ nwon-"". .; .. ::-:'::-":';~-~~.

_.-~',;-~~:<:...:)/::,;:-:::;>'.:.~.:'..?:>-.

SECTION V·V

Page 7: BLUE GOLD PROGRAIvI...October, 2016 Designed By: Design Circle-5, BWDB, Dhaka. NOTES 1 ALL DIMENSIONS SHOWN IN THE DRAWING ARE IN MILLIMETER AND ALL ELEVATIONS ARE IN METER (PWD) UNLESS

--- - =--:=- -~

r 7/

KHULNA O&M DIVISION-J

J.

~/

1Sheet No: 06 01'08

r15.0m Long 400mmx400mm PRE-CAST-PILEBANK LINE @1200mm CIC

o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0l~

o 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 oj1 .l1200f 120011200112001120011200.l12(X)l1200112001120011200.l1200112001120011200112001120011200.l1200.l120011200.l12001120011200.l1200.l12001120011200.l1200.l1200.l1200112001120011200.l12001120011200112001120011200112001120011200112O<P-12001120011200

. 57~--------------------------------------------------------------------~PILE LAYOUT PLAN

(Total Ncs.of Pile Per Spur=49x2=9B, Pile Lenglh=15.50m. &. Pile Size 400mm x 400mm)

g+-i-ODIID:j j~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~200

. 57~----------------------------------------------------------------------------~

~ BEAM LAYOUT PLAN (AT PILE TOP)

If 400mmx400mm BEAML 1_ SEESEC P-P;r1600mmx250mmx125 PRE-CAST CONCRETE SLAB

/ ~ TO BE FIXED WITH PRE-CAST PILE BY BOL 1"f\-I EBANK LINE

I \p-ft=f1-r-- -ut1 n-+-++-+- mtEtD:OD:rro'p"I1I

r----400-------'-l

p,

BiANGLADESH WATER DEVELOPMENT BOARDOFFICE OF THE SUPERlNTENDING ENGINEER

DESIGN CIRCLE-5APPROPRIATE RIVER BANK ERQSION PROTECTION IN POLDER 29

ALONG THE RIGHT BANK OF LOWER BHADRA RIVER (FOUR SPURS ATKM 4.500, KM 4.700, KM 4.900 AND KM 5.100) AT DUMURIA UPAZILLA

OF DISTRICT KHULNA IN C/W "BLUE GOLD PROGRAM. BWDB"

PILE AND BEAM LA YOUT PLAN & DETAILS

DATE. 19-10-2016

I D-~----3-D161 l ~::1~150C/C

DESIGNEDB~

I (MD. SHOHIDUZZAMANI. EE

RECOMMENDED BY,

~bI(Mil. ABDUS SATIARI. SE

SECTION p-pSECTION OF BEAM

CHECKED B~(J.::,

~I (MD. SHo;.;;UZZAMANl. EE

APPROVED BY: j ~

i 'I)f-' "(~."EF:I)A f\AZl'ii:EN) ,./af \ \~)I

(1lIEF ENGINEEK / {tt' \~I OWG NO.: DC-5-3769-06/08

Page 8: BLUE GOLD PROGRAIvI...October, 2016 Designed By: Design Circle-5, BWDB, Dhaka. NOTES 1 ALL DIMENSIONS SHOWN IN THE DRAWING ARE IN MILLIMETER AND ALL ELEVATIONS ARE IN METER (PWD) UNLESS

@--3-LAYER SANDFILLEDGEOBAG(250 KG)DUMPINGZONE_@

Iooo

l,<::,<S>

~'I..---~VARIABLE

EL (+)2.90m PWD IOn\IIOOnOnOnoon' :nnoonoooono• ," '" " I I I I 'I " I I 'I " I' I t " 'I I I I I I I 'I I I " I I t t I I I

@- 3-LAYERSANDFILLEDGEOBAG(250 KG)DUMPINGZONE-@

GEOBAGDUMPINGPLAN

looo

~ ooo

J

OFFICE OF THE SUPERINTENDING ENGI EERDESIG CIRCI.F.-S

BA GLADESH WATER DEVELOPMENT BOARD

APPIWI'RIA IT RIVI.R I\ANK EROSlliN I'RO [1'("110" I~ POI.[JI'R 29,II O,,{, 1111"Iwa II 11,\\lK O~ 1.0\l'l'R I3I1MlRA RIVFR CHH IR SI'I'RS A I

I-,.\1 1,51~1.K"'11 7UO,1-,.\14.90..,,, "I> K \15.100) .\ I I H \11 :IU!\ 1 I'A/.II 1./\01 1)1'; 11(1("1 Kill -I "A IN C'W -111.1'1',{;OI.Il I'I(()(;RAM, B\I'IlIl"

PILE AND BEAM LAYOUT Pl.AN & DETAILSIlE~IG'EO "~-, {~ "COMM~~Frv, .. .>

I ~. ~""l~.\o.\bI(~U. SIiOUIUU7h\MA,\). EE MO. ",HUllS SJHT ..Ut . SF.

:currxrn BV' CL .f ( _,~ APPROVED BV • ,

~~ ,,\tt-lJ\''''tt'l J

:p.1IJ'ioIlOIlIOUlL<\\IA\I,H if lint .'LI\I H< .__ ~ _

()\II I"-I()-:~Olll 1)\\(, '(), (X','·'''h''·{I"'tlXKIIULNA O&M DIVISION-!

Page 9: BLUE GOLD PROGRAIvI...October, 2016 Designed By: Design Circle-5, BWDB, Dhaka. NOTES 1 ALL DIMENSIONS SHOWN IN THE DRAWING ARE IN MILLIMETER AND ALL ELEVATIONS ARE IN METER (PWD) UNLESS

ooD,NDNC'"l

L--

L-

400r Ii

J< C=====L====.II i

DII)

o»o

ooII)II)~

><

L- 3200 i 9100 i 3200..Ji 15500-------------J

L_

'"s•~ .. -f-\-:;HII'= I

N

W...J-o~xo(!)E!E~o~~

POINT OF LIFTING

~II> NN

@ Jwo -'~ 0-x<

(!)c!E~~o.x-

r- 400----, r-- 400 ----,

L r8-e-

L. >-(

Sheet No. 08 of 08

(10-+-- 8-016- 010@75C/C

r~4_020o -- 020 SPACER FORKS @ 1200 C/C~ -4-016L -- 010 LINK @ 1200 C/C

010@90C/C

r-- 400 ----,

r m--- 6-fo2gPACER FORKS@1200C/C

~ - - 4-016L -- 010 LINK @ 1200 C/C

-- 010@ 125 C/CSECTION Z-Z

.? •",Ii\-l.--- 4-020

010 @ 150 C/C

---' SECTION X-X SECTION y-y

o....oj'

w-'-0<Xc(!)E~E14.0- .....J_

J

oUo0>

@oo

Embeded and brokon portion=500mmTotal length of pile=15000mm+500mm

=15500mm

ooM

020 WELDED TO SHOE

>-ooN

J 6 mm PLATE

JL 20X20

DETAIL "K"

>-wowwIJ)

I - ~-I ,

II) •

M

oN_

, I I I 112 'II", I'll I)

135

HEI~l l,ET·III" (II 1'1:1-.\-:1 I'll ff'I\\. TIII:()1 (,II ',\

~

1'"J<:tl g

EL (+)2.50m PWDlo-__ I

BEAM & PILE JOINT

BANGLADESH WATER DEVELOPMENT BOARDOFFICE OF THE SUPERINTENDING ENGINEER

DESIGN CIRCLE-5APPROPRIATE RIVER BANK EROSION PROTF.CTION IN P()LDI~R 2'1

ALONG TIlE RIGIIT BANK OF LOWER BHADRA RIVER (FOUR SPl'RS ATKM 4 500. KM 4.700, KM 4.900 AND KM 5.1(0) A r DlJMURIA l!P'\/'11 I.A OF

DI<;rRICr KIIUl.NA IN ClW"BI.lJI.CiOI.IlI'ROGRAM. BWDII"

PRE-CAST PI LE DETAILS--- Inr.,.. .•...••..•.....,.....•........•,.DESIGNED ny: ~

--I (MU. ~IWIlIl)ULZAM"NJ, £L'CIIECKLD IIY . - -- ---

~-'.'-""'1) ~JIOIIIIJliZZ,\MAN). r.r

1)\11 II, III '1116

1'\lIIl". ,\\/,\11"1

, 1111I I '(,1" I II

I)\~(, '.(1 1)( "nhll.()XIIX