March 8, 2019 BL022-19 BOGAN ROAD BOOSTER STATION ENGINE PUMP ADDITION ADDENDUM #01 Clarifications / additions to the bidding documents: 1. Add sheet C-102 (see attached). 2. Sheet C-504 has been amended to remove the word "wood" from the Sd1-S detail to indicate wood post for silt fence is not acceptable (replace Sheet C-504 with the attached C-504). 3. Sheet C-504 has been amended to add the text "Type C" to the Sd2-F detail to further describe the type of silt fence required for inlet protection. 4. References are not needed as a part of the bid package. 5. On Sheet E-501, change the 1-inch conduit and CAT 5E cable in between the new and existing RTUs to 3/4-inch conduit and CAT 6 cable. Questions received and response (in Italics): 1. Can concrete be used Instead of asphalt for paving? Provide asphalt for paving in accordance with detail G5b on sheet C-501. Note that the site currently features asphalt paving. 2. Is It acceptable If the exhaust silencer/muffler Is mounted vertically in a separate compartment from the engine? (2.09.C.1) If it’s a manufacturer's standard package offering, then it's likely acceptable. However, any deviations to the package configuration as designed will need to be evaluated during the submittal review process for final approval. 3. What size fuses and breakers should be supplied? (2.10.A.3) Based on the current (RTU) design, the fuses and breakers should be sized for 5A to provide adequate power for the PLC and cellular communications unit. 4. Will a dry contact for the valve position be supplied to the engine controller to communicate the valve position? If not, how will this be done? (2.14.C.2) No. Valve control is by the County's system; not by the pump controller. A permissive signal will be provided by the County's RTU; allowing the engine pump to run.

Upload: others

Post on 23-Nov-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BOGAN ROAD BOOSTER STATION ENGINE PUMP ADDITION …

March 8, 2019

BL022-19

BOGAN ROAD BOOSTER STATION ENGINE PUMP ADDITION

ADDENDUM #01

Clarifications / additions to the bidding documents:

1. Add sheet C-102 (see attached).

2. Sheet C-504 has been amended to remove the word "wood" from the Sd1-S detail to indicate wood post

for silt fence is not acceptable (replace Sheet C-504 with the attached C-504).

3. Sheet C-504 has been amended to add the text "Type C" to the Sd2-F detail to further describe the type

of silt fence required for inlet protection.

4. References are not needed as a part of the bid package.

5. On Sheet E-501, change the 1-inch conduit and CAT 5E cable in between the new and existing RTUs to

3/4-inch conduit and CAT 6 cable.

Questions received and response (in Italics):

1. Can concrete be used Instead of asphalt for paving?

Provide asphalt for paving in accordance with detail G5b on sheet C-501. Note that the site currently

features asphalt paving.

2. Is It acceptable If the exhaust silencer/muffler Is mounted vertically in a separate compartment from the

engine? (2.09.C.1)

If it’s a manufacturer's standard package offering, then it's likely acceptable. However, any deviations to

the package configuration as designed will need to be evaluated during the submittal review process for

final approval.

3. What size fuses and breakers should be supplied? (2.10.A.3)

Based on the current (RTU) design, the fuses and breakers should be sized for 5A to provide adequate

power for the PLC and cellular communications unit.

4. Will a dry contact for the valve position be supplied to the engine controller to communicate the valve

position? If not, how will this be done? (2.14.C.2)

No. Valve control is by the County's system; not by the pump controller. A permissive signal will be

provided by the County's RTU; allowing the engine pump to run.

Page 2: BOGAN ROAD BOOSTER STATION ENGINE PUMP ADDITION …

5. Can the attached (Esterline Series 27) transmitter be used for control on the diesel drive pump instead of

the Rosemount 3051CG? I am concerned with how the Rosemount pressure transmitter will handle

natural voltage fluctuations of the diesel engine during startup and while running?

The Rosemount 3051CG is the County's standard instrument. It should be noted that the 4-20mA signal

to the pump controller is not directly sent from the PIT to the controller. This signal is transmitted to the

County's RTU. Signal is split and re-transmitted to the pump controller.

The sign in sheet for the Pre-Bid Conference held on February 21, 2019 at the Bogan Road Booster Pump

Station is attached.

This addendum should be acknowledged on the Bid Form, page 16 of the Bid Document. Failure to do so may

result in your bid being deemed non-responsive.

Thank you.

Dana Garland, CPPB

Purchasing Associate III

Page 3: BOGAN ROAD BOOSTER STATION ENGINE PUMP ADDITION …

W

P

R

O

P

E

R

T

Y

L

IN

E

P

R

O

P

E

R

T

Y

L

IN

E

P

R

O

P

E

R

T

Y

L

IN

E

P

R

O

P

E

R

T

Y

L

IN

E

P

R

O

P

E

R

T

Y

L

IN

E

P

R

O

P

E

R

T

Y

L

IN

E

P

R

O

P

E

R

T

Y

L

IN

E

P

R

O

P

E

R

T

Y

L

IN

E

P

R

O

P

E

R

T

Y

L

I

N

E

P

R

O

P

E

R

T

Y

L

I

N

E

P

R

O

P

E

R

T

Y

L

I

N

E

L

O

D

LODLOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LO

D

LO

DLOD

L

O

D

L

O

D

L

O

D

1

D

W

ater%

20R

esources_D

ept_Logo_V

ER

T_B

lack.jpg

DATE

REVISIONS

DESCRIPTION

BC PROJECT NUMBER

FILENAME

SHEET NUMBER

DRAWING NUMBER

AT FULL SIZE

CHECKED:

APPROVED:

DRAWN:

CLIENT PROJECT NUMBER

DESIGNED:

REV

CHECKED:

2 3 4 5 6

C

B

1 2 3 4 5 6

OF

D

C

B

A

Pa

th

: Z

:\G

WIN

NE

TT

\2

01

8 D

EM

AN

D S

ER

VIC

ES

\C

AT

EG

OR

Y A

F

AC

IL

IT

IE

S\1

52

21

2 - B

OG

AN

R

OA

D E

NG

IN

E P

UM

P D

ES

IG

N\0

00

-B

IM

\0

3-A

UT

OC

AD

\0

4-C

IV

IL

3D

\0

2-S

HE

ET

S F

IL

EN

AM

E: C

-1

02

.D

WG

P

LO

T D

AT

E: 3

/6

/2

01

9 1

1:1

8 A

M C

AD

U

SE

R: JO

HN

AT

HA

N JA

CK

SO

N

A

LINE IS 2 INCHES

BID DOCUMENTS

CERT. NO. 0000070007

SCALE IN FEET

0 20 40

ARROW

NORTH

Utilities ProtectionCenter.Inc.

THREE WORKING DAYSBEFORE

YOU DIG GEORGIACALL

It's The Law.811

COLOR CODESFOR

UTILITY LOCATING

Utilities Protection Center.Inc.

IF YOU DIG GEORGIA

CALL US FIRST.811

It's The Law.

RED

YELLOW

ORANGE

BLUE

GREEN

ELECTRIC

GAS-OIL

WATER

SEWER

TELEPHONE/CATV

®

EXISTING VALVE VAULT

NEW ENGINE PUMP

EROSION CONTROL NOTES:

1. THE CONTRACTOR SHALL PROVIDE APPROPRIATE EROSION AND SEDIMENT CONTROL

MEASURES IN ACCORDANCE WITH THE MANUAL FOR EROSION AND SEDIMENT

CONTROL IN GEORGIA, 2016 EDITION (GEORGIA SOIL AND WATER CONSERVATION

COMMISSION).

2. SILT FENCE TO BE INSTALLED IN ALL LOCATIONS DOWN GRADE FROM LAND

DISTURBING / TRENCHING ACTIVITIES.

3. SLOPE PROTECTION AND RESTORATION MEASURES SHALL BE IMPLEMENTED IN

AREAS DISTURBED BY THE CONTRACTOR.

4. CONTRACTOR SHALL PREVENT TRACKING OR FLOW OF MUD ONTO ROADWAYS. ALL

MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLES OR SITE

ONTO ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY BY THE

CONTRACTOR.

5. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE

INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES

PRIOR TO, OR CONCURRENT WITH, LAND DISTURBING ACTIVITIES.

6. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL

IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE

EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES

SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.

7. AT THE END OF EACH WORK DAY, THE SITE SHALL BE STABILIZED WITH MULCH AND

TEMPORARY SEEDING.

X X

SILT FENCE - TYPE SENSITIVE

LEGEND:

INITIAL PHASE:

· INSTALLATION OF TYPE C SILT FENCE (Sd1-S)

INTERMEDIATE PHASE:

· DISTURBED AREA STABILIZATION (Ds1)

· SETUP OF TEMPORARY CONCRETE TRUCK AND VEHICLE WASH DOWN

AREA

FINAL PHASE:

· DISTURBED AREA STABILIZATION (Ds3)

· REMOVAL OF TEMPORARY EROSION AND SEDIMENTATION CONTROL

MATERIALS

EROSION AND SEDIMENTATION CONTROL PHASES:

Sd1-S

X

X

X

X

X

X

X

X

X

Ds3Ds1

Ds3Ds1

CONCRETE

WASHOUT AREA

DISTURBED AREA STABILIZATION

Ds3Ds1

FILTER SOCK - TYPE "B"

PLAN VIEW

Sd1-Fs

Sd1-Fs

INSTALL SD1-Fs

AROUND ANY PILE

OF DEBRIS AND/OR DIRT,

AS NECESSARY

BOGAN ROAD

BOOSTER STATION

ENGINE PUMP

ADDITION

ATLANTA, GA  

   

   

   

   

   

   

   

M-0741-69

######

C-102.DWG

J. BOLANO

J. BOLANO

J. CHENG

J. JACKSON

J. BOLANO

225

C-102

EROSION CONTROL

PLAN

CIVIL

Sd1-S

Sd2-F

Sd2-F

Page 4: BOGAN ROAD BOOSTER STATION ENGINE PUMP ADDITION …

1

D

W

ater%

20R

esources_D

ept_Logo_V

ER

T_B

lack.jpg

DATE

REVISIONS

DESCRIPTION

BC PROJECT NUMBER

FILENAME

SHEET NUMBER

DRAWING NUMBER

AT FULL SIZE

CHECKED:

APPROVED:

DRAWN:

CLIENT PROJECT NUMBER

DESIGNED:

REV

CHECKED:

2 3 4 5 6

C

B

1 2 3 4 5 6

OF

D

C

B

A

Pa

th

: \\B

CS

UN

FP

01

\P

RO

JE

CT

S\G

WIN

NE

TT

\2

01

8 D

EM

AN

D S

ER

VIC

ES

\C

AT

EG

OR

Y A

F

AC

IL

IT

IE

S\1

52

21

2 - B

OG

AN

R

OA

D E

NG

IN

E P

UM

P D

ES

IG

N\0

00

-B

IM

\0

3-A

UT

OC

AD

\0

4-C

IV

IL

3D

\0

2-S

HE

ET

S F

IL

EN

AM

E: C

-5

04

.D

WG

P

LO

T D

AT

E: 2

/4

/2

01

9 9

:2

8 A

M C

AD

U

SE

R: JO

HN

AT

HA

N JA

CK

SO

N

A

LINE IS 2 INCHES

BID DOCUMENTS

CERT. NO. 0000070007

FASTENERS FOR SILT FENCES

OVERLAP AT FABRIC ENDS

EROSION AND SEDIMENT CONTROL

COMPOST FILTER SOCK

Sd1-Fs

Sd1-S

BOGAN ROAD

BOOSTER STATION

ENGINE PUMP

ADDITION

ATLANTA, GA  

   

   

   

   

   

   

   

M-0741-69

######

C-504.DWG

J. BOLANO

J. CHENG

J. BOLANO

J. CHENG

J. BOLANO

2210

C-504

EROSION CONTROL

DETAILS

CIVIL

SILT FENCE - TYPE SENSITIVE

SIDE VIEW

FRONT VIEW

FABRIC AND SUPPORTING FRAME FOR

STEEL FRAME AND TYPE C SILT FENCE INSTALLATION

INLET PROTECTION

Sd2-F

Page 5: BOGAN ROAD BOOSTER STATION ENGINE PUMP ADDITION …