Drayton Beaumont Services Ltd. Newstead Trading Estate, Trentham, Stoke-on-Trent, Staffordshire. ST4 8HX Office Line: +44 (0) 1782 645170 Fax Line: +44 (0) 1782 645171 Website: www.draytonbeaumontservices.com email: [email protected] Page 1 of 4 TECHNICAL SUBMISSION Technical Submission Ref. : DBS-507-TSM-002 Revision : A Technical Submission Title : Boiler Plant Project Number : DBS 507 Project Name : New Training Centre & Restaurant, Slimming World Completed By : J.Burns Issued To (Name / Company) : Scott Churchill / Morgan Sindall Construction Manufacturer Model No. Of Hoval Ultragas 300 3 General Description of Equipment: The proposed boilers are the Hoval Ultragas 300 range. Please see technical details below: Fully condensing boilers, operating with natural gas and floor mounted. Boilers design to operate at 80/60 o C flow and return respectively. 3no. boilers installed, each boiler capable of producing 50% of the total building heat demand. 2no. duty boilers with 1no. operating in standby mode. Each boiler has a vertically arranged combustion chamber with stainless steel heat exchanger and combustion chamber. aluFer heat exchanger system. TopTronic E controls system for high efficiency operation. Boiler weight 724kg dry, with a 318ltr water capacity. Modulating pre-mix burner system. Boiler operates with no minimum water flow rates due to system water content. Motorised air intake shut off damper (supplied as an optional extra) NOx emissions 32mg/kWh The boiler will be installed with the following equipment and components: Hydraulic shut off valves – isolation valves across the flow and return connections. Integral controls panel on the boiler facia but will be connected

Upload: others

Post on 01-Feb-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: tomrobbo.comtomrobbo.com/dbsinfo/designstuff/DBS-507-TSM-002 Boiler Plant...  · Web viewBoiler Plant. Project Number: DBS 507. Project Name: New Training Centre & Restaurant, Slimming

Drayton Beaumont Services Ltd.Newstead Trading Estate, Trentham, Stoke-on-Trent, Staffordshire. ST4 8HXOffice Line: +44 (0) 1782 645170 Fax Line: +44 (0) 1782 645171Website: www.draytonbeaumontservices.com email: [email protected]

Page 1 of 3 TECHNICAL SUBMISSION

Technical Submission Ref. : DBS-507-TSM-002 Revision : A

Technical Submission Title : Boiler Plant

Project Number : DBS 507

Project Name : New Training Centre & Restaurant, Slimming World

Completed By : J.Burns

Issued To (Name / Company) : Scott Churchill / Morgan Sindall Construction

Manufacturer Model No. Of

Hoval Ultragas 300 3

General Description of Equipment:

The proposed boilers are the Hoval Ultragas 300 range. Please see technical details below:

Fully condensing boilers, operating with natural gas and floor mounted. Boilers design to operate at 80/60oC flow and return respectively. 3no. boilers installed, each boiler capable of producing 50% of the total building heat

demand. 2no. duty boilers with 1no. operating in standby mode. Each boiler has a vertically arranged combustion chamber with stainless steel heat

exchanger and combustion chamber. aluFer heat exchanger system. TopTronic E controls system for high efficiency operation. Boiler weight 724kg dry, with a 318ltr water capacity. Modulating pre-mix burner system. Boiler operates with no minimum water flow rates due to system water content. Motorised air intake shut off damper (supplied as an optional extra) NOx emissions 32mg/kWh

The boiler will be installed with the following equipment and components:

Hydraulic shut off valves – isolation valves across the flow and return connections. Integral controls panel on the boiler facia but will be connected to the site BMS also. BMS will provide remote enable/disable and common fault indication capability. Binder test points installed on flow and return pipework connections. Nabic pressure safety relieve valve set at 0.5bar above working boiler pressure. Gas connection complete with isolation valve and test nipple. Drain valves provided to each boiler. 150mm dial thermometer graded from 20-125oC on boiler combined flow and combined

return. 150mm altitude gauge graded from 0-4bar gauge on boiler combined flow.

The boiler controls shall consist of the following:

Page 2: tomrobbo.comtomrobbo.com/dbsinfo/designstuff/DBS-507-TSM-002 Boiler Plant...  · Web viewBoiler Plant. Project Number: DBS 507. Project Name: New Training Centre & Restaurant, Slimming

Drayton Beaumont Services Ltd.Newstead Trading Estate, Trentham, Stoke-on-Trent, Staffordshire. ST4 8HXOffice Line: +44 (0) 1782 645170 Fax Line: +44 (0) 1782 645171Website: www.draytonbeaumontservices.com email: [email protected]

Drayton Beaumont Services Ltd.Newstead Trading Estate, Trentham, Stoke-on-Trent, Staffordshire. ST4 8HXOffice Line: +44 (0) 1782 645170 Fax Line: +44 (0) 1782 645171Website: www.draytonbeaumontservices.com email: [email protected]

Page 2 of 3 TECHNICAL SUBMISSION

Full control of the boiler operation via the BMS. Automatic lead/lag sequencing for duty rotation of boilers. Rotation shall occur on a weekly

basis. BMS to be BACnet open protocol. Boiler output modulated with a 0-10V signal. First boiler to operate from 0-65% capacity, second boiler to be energised from 0-65%

capacity, for greater outputs each boiler shall be modulated simultaneously above this point.

BMS shall also modulate the primary pump equipment where required.

Note: the required output per boiler is 287kW. The selected boiler output at 80/60oC is 278kW which gives a 9kW deficit per boiler. Overall this equates to a 18kW deficit however this is equivalent to only 3%. Various design safety margins have been added during the boiler sizing and there is also the option to run the 3rd back-up boiler if required. We trust this is acceptable.

Please see attached calculations which shows the rationale for Boiler cylinder sizing.

Please refer to system schematic (when available) which shows pipework configuration and general system layout.

Equipment Literature Attached ☒ Not Applicable ☐Equipment Schedule Attached ☒ Not Applicable ☐

Specification By : CPW Consulting

Specification Title :Slimming World Cotes Park New Build, 16113, Mechanical Services Performance Specification & Tender Analysis, Rev T1 (22.06.16)

Page 3: tomrobbo.comtomrobbo.com/dbsinfo/designstuff/DBS-507-TSM-002 Boiler Plant...  · Web viewBoiler Plant. Project Number: DBS 507. Project Name: New Training Centre & Restaurant, Slimming

Drayton Beaumont Services Ltd.Newstead Trading Estate, Trentham, Stoke-on-Trent, Staffordshire. ST4 8HXOffice Line: +44 (0) 1782 645170 Fax Line: +44 (0) 1782 645171Website: www.draytonbeaumontservices.com email: [email protected]

Drayton Beaumont Services Ltd.Newstead Trading Estate, Trentham, Stoke-on-Trent, Staffordshire. ST4 8HXOffice Line: +44 (0) 1782 645170 Fax Line: +44 (0) 1782 645171Website: www.draytonbeaumontservices.com email: [email protected]

Page 3 of 3 TECHNICAL SUBMISSION

Equipment Compliant with Specification? Yes ☒ No ☐

Reason For Non Compliance (if required):

Note the following discrepancies against the specification which have been noted below but which do not represent a non-compliance against the performance specification:

Motorised air intake shut off damper will not be supplied as the combustion air inlet will be via wall mounted louvers/ louvered plantroom doors. Generally the automatic shut off damper is installed where the combustion air intake is ducted from outside to the boilers. We do not need to install a ducted air intake with the proposed boiler room location.

Issued Date : 08/05/2017

Approval / Comments Required Date : 22/05/2017

Approval / Comments Received Date :

Status A - Approved ☐Status B – Approved With Comments ☐Status C – Re-Submission Required ☐

Comments: