    Purpose

    To provide work and process controls to achieve

    high level of leak tightness integrity to properly

    designed Bolted Flange Joint Assemblies

    Uniform use of this procedure by and other

    Contractor personnel is expected to result in aero incidence rate of flange leaks

  • 8/13/2019 Bolted Flanges Generic

    3/46

    SCOPEThis process is applicable to flanged !oint assemblies for"

    #iping

    $alves

    %eactors

    $essels

    &rums

    'xchangers

    Boilers

    Coalescers

    and other e(uipment using flanged !oints administered at

    all !obsites

  • 8/13/2019 Bolted Flanges Generic

    4/46

    SCOPE

    This process is to be implemented in con!unction

    with the approved design standards)

    This process is applicable to the field offices thatpurchase* receive* field fabricate* inventory*

    install* erect* and inspect piping and piping

    related components)

  • 8/13/2019 Bolted Flanges Generic

    5/46

    SCOPE

    &eficiencies identified during in+process monitoring andfinal inspections* shall be documented and tracked in

    accordance with the individual site practices for Control

    of Deficient Items.

    Any aboveground piping within the !urisdiction of A,-'

    ,ection . #ower Boilers* and A,-' ,ection B/0)0

    #ower #iping* and any work related to A,-' ,ection

    $... $essels* shall be executed in accordance with the

    A,-' -anual for A,-' Code Construction andadditional re(uirements stated in the Bolt Flange Joint

    Assembly procedure)

  • 8/13/2019 Bolted Flanges Generic

    6/46

    Definitions

    Fasteners 1 all bolting* studs* nuts* and washersused in the assembly of flanged !oints)

    Flange Maps are isometrics drawings* sketches*

    e(uipment drawings* and2or #3.&4s that 5map6

    flange locations and identifies each flange

    connection with uni(ue numbers)

  • 8/13/2019 Bolted Flanges Generic

    7/46

  • 8/13/2019 Bolted Flanges Generic

    8/46

    DefinitionsInspection and Test Plan (ITP) is a document that

    outlines examination* inspection* and2or hold points* and

    witness points activities)

    Flange Tightening Method is used to tighten flanged

    connections as pre+determined and specified on the

    flange maps) The method used can be indicated on

    flange tags so that the relevant information is

    communicated to persons directly responsible for the

    assembly of flanged connections)

  • 8/13/2019 Bolted Flanges Generic

    9/46

    Training

    .n general* all personnel with duties associatedwith the bolted flanged !oint assembly program

    are to receive training) All training is to be

    documented)

    The BFJ Progra! "ualit# Training Matri$ lists

    all affected personnel and their corresponding

    level of needed training)

  • 8/13/2019 Bolted Flanges Generic

    10/46

    %esponsibilitiesSite Manager 8,-9 ensures that the re(uirements of this :ork

    #rocess are properly implemented)

    Superintendents are responsible for the overall (uality of work

    performed by maintenance and construction personnel for

    their assigned area8s9)

    Site "ualit# Control Manager 87C-9 manages the 7uality

    Control functions for the pro!ect* provide oversight* and direct

    the work of the site 7C.4s)

    The 7C- addresses any deficiencies in the BFJA program

    with appropriate personnel to assure continued compliance

    with the program)

  • 8/13/2019 Bolted Flanges Generic

    11/46

  • 8/13/2019 Bolted Flanges Generic

    12/46

    %esponsibilities

    Piping Fore!an ( PF ) is responsible for"

    Understanding the work scope and re(uirements of this

    process

    Adhering to pro!ect drawings and specifications

    -aintaining good workmanship and fulfilling all (uality

    re(uirements of the work and targeting punch+list itemsassociated with completed work activities

    Assigning trained personnel to assemble flanged !oint

    connections

    Arranging all re(uired work permits* tools* e(uipment*scaffolding* and consumable material for the work activities

    Coordinating and scheduling work activities based on pro!ect

    schedule re(uirements

    'xamining and verifying BFJA4s in accordance with the .T#4s

  • 8/13/2019 Bolted Flanges Generic

    13/46

    %e(uirements'or Process

    All materials and workmanship shall fully comply with the designdrawings* Client specifications* and applicable Codes and

    ,tandards)

    Field changes to design documents shall not be performed without

    prior written approval from the Client)

    All measuring and test e(uipment used during the installation*

    testing* and verification of piping systems shall meet the

    re(uirements of T.; procedure -T'+0* Control of -easuring and

    Test '(uipment)

    All material specifications and applied tightening method information

    must be disseminated to personnel assigned to flange mapping)

  • 8/13/2019 Bolted Flanges Generic

    14/46

    Preplanning ctiities

    #re+activity construction meetings should be held to

    finalie the scope of activities prior to the

    commencement of work or unit blinding)

    A review of the .nspection and Test #lan for BFJA4s

    and referenced documents shall be performed by the

    7C-) The re(uired 7C and Client

  • 8/13/2019 Bolted Flanges Generic

    15/46

    #replanning Activities

    #iping ,upervision8#,9 shall maintain a full

    understanding of the work scope and installation criteria)

    The #,* working with the 7uality Control personnel* shall

    develop the leak test program as per the procedure to

    ensure that all piping is tested is in accordance with the

    pro!ect specifications)

  • 8/13/2019 Bolted Flanges Generic

    16/46

    'or Preparation*Initiation

    Assigned personnel will have the responsibility of providing a blind

    list and of hanging of blind tags at all blind locations) This will bedone prior to the hanging of flange tightening tags by craft

    personnel)

    Applicable personnel will have the responsibility for generating

    flange tightening tag lists for all flanges to be disturbed during

    each2any activity 8i)e)* Turn+Around* %outine -aintenance* Capital#ro!ect* etc)9) This list will be maintained and appended should the

    scope of the activity be advanced)

    All disturbed flanges will be identified using a uni(ue numbering

    system) This system numbering will be e(uipment* unit outage*

    and2or pro!ect specific) The determination of the tightening methods to be employed shall

    be indicated on the Flange Tags)

  • 8/13/2019 Bolted Flanges Generic

    17/46

    Flange Tag Preparation and +anging At initial execution of work* the company will issue and hang initial

    Flange Tightening Tags on all flanges2line breaks to be loosenedand then tightened)

    Flange Tightening Tags are to be filled out and installed on all

    flange2line breaks and when blinds are installed)

    'ach flange will have an individual tag 5Uni(uely numbered6)

    Flange tags shall be initiated and attached to affected BFJA4s in

    accordance with the flange maps)

    Flange Tightening Tags are to be filled out and hung as each flange

    connection is made up and completed) These tags will be attached

    to the flange connection using electrical tie wraps or bailing wire)

  • 8/13/2019 Bolted Flanges Generic

    18/46

    The same process is to be followed throughout the final removal

    and final assembly of the connection)

    The Flange Tightening Tags will be removed only by 7C after the

    final removal of the blinds and2or final flange make up)

    All revisions or additional of work are to be treated as Field Changes

    and will be added only as additional work once approved by

    appropriate management personnel) =nce approved and planned*

    7A27C &epartment shall be notified of the work* prior to execution*and prepare Flange Tightening Tags and update the flange logs for

    the flanges2line break affected)

    Flange Tag #reparation and

  • 8/13/2019 Bolted Flanges Generic

    19/46

    Material +andling and Storage

  • 8/13/2019 Bolted Flanges Generic

    20/46

    -echanical Joints

    Flanged valves shall be checked for thefollowing" Check* globe* and control valves are installed with

    indicated flow in the correct direction as indicated on

    the #3.& -anufacturer4s name tag description agrees with

    stock code number 8if used9* description* and trim)

    &o not rely on warehouse tag)

  • 8/13/2019 Bolted Flanges Generic

    21/46

    'or Process Flo, and

    Docu!entation All BFJA4s shall be tightened using the method assigned)

    As flanges are tightened* the responsible craftsmen will completethe re(uired entries on the tag* sign and date* and inform his

    appropriate foreman or supervisor of the connection completion)

    The foreman or his designee will then check the flange for proper

    gasket* proper type of bolting 8i)e)* nuts and studs9* proper flange

    alignment* and bolt tightness) .f all is correct* the foreman ordesignee will sign the flange tag and notify the 7C representative

    that the flange is ready for inspection)

    7C will verify the flange installation is in accordance with the .T#)

    :hen .T#4s re(uire witness or holds by the Client* the 7C inspector

    shall make those notifications to Client) Upon final acceptance* the 7C .nspector will remove the Flange

    Tightening Tag8s9 and turn them into the ,ite 7C -anager)

  • 8/13/2019 Bolted Flanges Generic

    22/46

    Blinds All blinds installed on towers* drums* reactors* piping* etc) shallreceive Flange Tightening Tags) The installation of the Blinds shall

    be documented in the designated area for Blind installation located

    on the back side of the Flange Tightening Tag)

    Flange Tightening Tags are not to be removed until the blinds have

    been removed* the final flange is made up* and the actions

    documented on the front of the tag as per the procedure)

    Flange Tightening Tag tracking is to be kept by 7C in the masterelectronic >ine Break Tracking ,ystem) -anways are to be

    included)

    'or Process Flo, and

    Docu!entation

  • 8/13/2019 Bolted Flanges Generic

    23/46

    ?@0

    System requires Bolt/Nut Replacement ___Yes___No

    #3.& Do)

    FLANGE TIGHTENING TAG

    F%=DT

    UD.T"

    '7U.#2.&"

    &AT'"

    C%AFT,-AD"

    PRINT NAME

    SIGNATURE/DATE

    Foreman

    PRINT NAME _____________________

    ,ignature

    SIGNATURE/DATE

    7uality Control

    PRINT NAME

    SIGNATURE/DATE

    Final Flane !a"e up #ata

    continue# $rom $ront si#e

    B=>T ,#'C.F.CAT.=D"

    B=>T, %'#>AC'&" E', D=

    ;A,'T ,#'C.F.CAT.=D"

    .D,#'CT F>AD;' FAC'

    E', D=

    STENCIL/COMPANY

    SIGNATURE/DATE

    D': ;A,'T .D,TA>>'&

    E', D= =$A> %.D; .D,#'CT'&

    E', D=

    STENCIL/COMPANY

    SIGNATURE/DATEBelow is to be used only for blind installation

    CRAFTSMAN ________________________

    PRINT NAME

    _______________________________ STENCIL/COMPANY

    _______________________________

    SIGNATURE/DATE

    C=-#'T'DT #'%,=D

    PRINT NAME ________________________________

    STENCIL/COMPANY

    ________________________________

    -A.DT'DADC' SIGNATURE/DATE

    F=%-AD2,U#$)

    PRINT NAME ________________________________ SIGNATURE/DATE

  • 8/13/2019 Bolted Flanges Generic

    24/46

    At times Flange Tightening Tags become misplaced* the foreman or

    ,upervisor over this work will obtain a new tag from the 7C

    &epartment) The new tag number will replace the missing tag

    number and the new number added to the Flange -ap) This new

    tag is to be attached to flanged connection) All (uality checks* suchas proper gasket* bolts* nuts* tor(ue tightness* etc) will following the

    same work process as a new connection)

    'or Process Flo, and

    Docu!entation

  • 8/13/2019 Bolted Flanges Generic

    25/46

    Flange Assembly #ractices

    Preparation Bolts shall be checked for proper sie* length* and grade as per the

    information provided on the flange tag) Bolts shall be clean and free

    of damage)

    'xisting bolts to be reused shall be clean* in good condition* and

    undamaged 8nuts should run free on the bolt9) They shall beprepared for short+term storage using a rust preventing lubricant

    and can only be re+used as per the Bolt .nspection and %e+Use

    procedure)

    Just prior to installation* bolt threads and bearing surface of nuts for

    all bolting shall be coated with an anti+seie compound) ;askets shall be checked for sie* conformance to specifications*

    damage* and cleanliness) All gaskets shall be compared with the

    flange face to insure that the gasket seal area properly mates to the

    flange face)

  • 8/13/2019 Bolted Flanges Generic

    26/46

    Flange faces shall be thoroughly cleaned and the gasket surface

    inspected for any defects) Burrs and rust shall be removed)

    #articular attention shall be paid to the sealing surfaces for metal

    gaskets such as the grooves in ring !oint flanges and to the 0GH

    AA%< finished flanges) Any (uestionable flange faces shall bebrought to the attention of 7C in accordance with the BFJA .T#)

    Alignment measurements shall be taken prior to flange assembly

    8e)g) installing stud bolts9) Alignment tolerances of mating flanges

    for #ipe to $essels or ,tationary '(uipment Doles* #ipe to #ipe*

    and #ipe to .nline &evices shall be in accordance with thetolerances outlined in the Table --0)

    Flange Assembly #ractices

  • 8/13/2019 Bolted Flanges Generic

    27/46

    -aximum -isalignment Table --0

    -I./ME/T DETI- M0IM1M PE%MISSIB-EMIS-I./ME/T OF F-/.ED JOI/TS2

    I/3

    D#, I 0G 0GI D#, I

    GG

    D#, G

    $ertical bolt hole offset 02K 020L 020L

  • 8/13/2019 Bolted Flanges Generic

    28/46

    sse!&l#

    Bolt holes of mating flanges may be brought into initial alignment

    using a spud wrench or other tool) The alignment tolerances

    provided in Table --0 shall be recognied)

    Flange 5makeup6 shall be done without the use of gasket sealing

    compounds) The gasket shall be inserted* and centered between the flanges and

    nuts hand tightened to hold the gasket in place) Assure the color

    coding of spiral would gaskets) 8attachment J9 :hen flanged !oints

    are in horiontal lines* gaskets without centering devices such as

    ring !oint gaskets shall be lowered to the bolts for retention and thenraised into position)

  • 8/13/2019 Bolted Flanges Generic

    29/46

    The remaining bolts and nuts shall be installed and hand tightenedwith the flange faces parallel) Care shall be taken to assure proper

    seating and centering of the gasket within the allowable tolerances)

    ,nug tightening with a combination wrench prior to tensioning is

    permitted on large flanges)

    Bolts should be installed so that only one to three threads show pastthe nut on either side)

    sse!&l#

  • 8/13/2019 Bolted Flanges Generic

    30/46

  • 8/13/2019 Bolted Flanges Generic

    31/46

    F.;U%' 0 1 B=>T T.;

  • 8/13/2019 Bolted Flanges Generic

    32/46

    sse!&l#

    Two diametrically opposite bolts shall betightened either simultaneously or in direct

    se(uence)

    Care shall be taken to prevent over+tightening

    one side of the flange to prevent gasket crushing

    or flange distortion* especially when tightening

    flanges containing ring !oint* spiral wound* orsimilar type gaskets)

  • 8/13/2019 Bolted Flanges Generic

    33/46

    .n the case of flanged !oints that re(uire controlled tor(uing* it isrecommended that initially two diametrically opposite bolts shall be

    initially loaded utiliing tor(ue wrench tightened to GHN of the tor(ue

    load value listed in the procedure* either simultaneously or in direct

    se(uence)

  • 8/13/2019 Bolted Flanges Generic

    34/46

    sse!&l#

    :hen flanged !oints are assembled with hand wrenchesO the

    se(uence in in the procedure shall be used with an effort to

    approximate the tor(ue values)

    .f flange !oints re(uire hydraulic tensioning* this work will be

    performed by a subcontractor that specialies in controlled bolting

    and with experience in hydraulic tensioning methods) ,pecific

    re(uirements regarding the basic (ualifications of this contractor

    and their work practices are detailed in the procedure)

    After the flanged connection has been fully tightened with hand

    wrenches* the !oint shall be inspected for uniform bolt loading by

    wrench testing each bolt in the same se(uence listed until all bolts

    are !udged to have the same level of tightness)

  • 8/13/2019 Bolted Flanges Generic

    35/46

    =nce the flange !oint is assembled* the craftsman shall initial the

    applicable examination entries on the flange tag and alert his

    foreman or designee for verification of the BF>A) The foreman or

    designee will verify the BFJA* initial the flange tag for acceptance*

    and notify 7C for inspection All flange connections that re(uire controlled tor(uing or hydraulic

    tensioning must be documented by the craftsperson) At a minimum

    this documentation shall include the Control >oaded Flange

    Connection &ata ,heet as seen in the procedure)

    sse!&l#

  • 8/13/2019 Bolted Flanges Generic

    36/46

    Final Co!pletion and Turnoer

    Final Co!pletion and Turnoer

    The ,ite 7C -anager or his designee will accumulate flange tagsand update the flange tags logs) Flange tags* flange tag maps* and

    flange tag logs will become an integral component of document

    turnover)

  • 8/13/2019 Bolted Flanges Generic

    37/46

    Good Poor

    Rotational

    Skewed

    Excessive Gap

    Non Parallel

    Flane Fit !p " Alin#ent

    Flane Face

    $nspected %or Cleanliness

    Pipe &ore

    St!ds and N!ts

    Gasket

    'es No

    Proper FlaneMaterials and Ratin

    Con%ir#ation o% Material and

    $nspect General Condition

    St!ds and N!t Material

    St!d and N!t Condition

    'es No

    Condition o% Flane Face(A)rasions* rooves* r!st+

    Gasket Material

    Gasket Condition

    (Cr!s,ed or )ent-+

    A!dit o% Flane Asse#)l. Process

    /ork Practice

    Proper Se0!encin

    /orker Trained

    Proper Tools

    Sa%e /ork Practices

    'es No

    Proper Tor0!in E0!ip#ent

    Proper Ti,tness o% St!d

    Co#pleted Asse#)l.Marked and $nitialed

    Proper 1andlin and

    Place#ent o% Gasket

    E0!ip#ent 2 Spool $3 Contractor 2 Cra% ts#en4 A!ditor(s+4

    Bolt Inspection and %euse

  • 8/13/2019 Bolted Flanges Generic

    38/46

    Bolt Inspection and %euse

    Procedure

    The #urpose of this procedure is to assure proper inspection of boltstargeted for reuse in systems re(uiring bolt replacement) This

    program is to assist in providing a 5leak free6 startup after

    turnaround)

    ,ystems re(uiring bolt replacement will be identified on the FlangeTightening Tag) The bolts will be replaced with new and2or

    inspected bolts of the re(uired type and sie)

    B l I i d %

  • 8/13/2019 Bolted Flanges Generic

    39/46

    The implementation of a 5Bolt Cleaning and .nspection ,tation6 will be

    mandatory)

    This station will be e(uipped with"

    A bench grinder e(uipped with ade(uate safetyguards* utiliing a buffing wheel to expedite and provide

    thorough cleaning for inspection on bolts larger than P6 &ia)

    A

  • 8/13/2019 Bolted Flanges Generic

    40/46

    Bolt Inspection and %euse

    Procedure

    All bolts to be reused in systems that re(uire replacement will beremoved and sent to the 5Bolt Cleaning and .nspection ,tation6)

    The Bolt Cleaning station will inspect all received bolts for"

    Bolt 5Type6 markings* re!ecting those without markings

    =bvious defects* re!ecting those that are damaged)

    All bolts that are re!ected are to be laid on an .nspection

    bench for final inspection and accountability

    Bolt Inspection and %euse

  • 8/13/2019 Bolted Flanges Generic

    41/46

    .f no obvious defects are found"

    The bolts will be thoroughly cleaned

    >ubricated* with a light lubricant 8i)e)* :& @9)

    Dote" Dever+seie is not to be put on the bolts at the

    5Bolt Cleaning and .nspection ,tation6)

    A new nut will be run by hand from one end of the bolt off

    the other end

    5 .f the nut does not run freely* the bolt will beconsidered to have been yielded 8i)e)* over tor(ued*

    etc)9 therefore re!ected and segregated for further

    inspection)

    Bolt Inspection and %euse

    Procedure

    Bolt Inspection and %euse

  • 8/13/2019 Bolted Flanges Generic

    42/46

    Bolt Inspection and %euse

    Procedure

    All bolts that are deemed acceptable by the 5Bolt Cleaning and

    .nspection ,tation6 shall be placed on an .nspection bench"

    ,orted by sie and type

    Facing in the same direction) All ends with the bolt type

    stamped on them are to be faced on the same side) =nce the bolts are inspected and accepted they shall be

    color coded by applying a #urple paint on the opposite

    end from the stamped markings)

    Bolt Inspection and %euse

  • 8/13/2019 Bolted Flanges Generic

    43/46

    All accepted bolts will be stored in designated storage bins

    segregated by the sies and types of the boltso These bolts shall be issued when the newly ordered bolting

    materials are depleted)

    All bolts that are re!ected by the 7C &epartment shall be

    documented to show the (uantities of sies and types of the

    re!ected bolts to be replaced with new ones)

    o This report shall be submitted to the ,ite ,uperintendent

    assuring a prompt reordering of replacement bolts asneeded)

    Bolt Inspection and %euse

    Procedure

  • 8/13/2019 Bolted Flanges Generic

    44/46

    MI/IM1M %E"1I%EME/TS FO% BO-T

    TE/SIO/I/. CO/T%CTO%S

    7ualifications of a contractor specialiing in controlled bolt tensioningshall be addressed in the re(uest for in(uiry phase) The following

    deliverables shall be reviewed and subse(uently agreed upon by

    the Client* 7C -anager* and the Contractor 7uality -anager prior

    to award of a contract"

    7ualifications of personnel assigned to the pro!ect Dumber of craftsmen and supervision per field crew and

    roles

    7uality Control27uality Assurance plan

    Utilities and2or e(uipment re(uirements

    Tensioning Contractor approved !oint assembly anddisassembly procedures

    #roposal for bolt loading when there is not enough clearance

    for tensioning device

  • 8/13/2019 Bolted Flanges Generic

    45/46

  • 8/13/2019 Bolted Flanges Generic

    46/46

    Docu!entation %e4uire!ents 1

    The Tensioning ,ubcontractor 7uality #lan shall re(uire

    inspection reports2records on all tension or !oints for the

    pro!ect) The .T# shall outline responsibilities for monitoring

    all tensioning activities by the ,ubcontractor) .nspection reports2records should contain* as a minimum* the

    designated Control >oaded Flanged Connection &ata ,heet

    for each flange pair)

    MI/IM1M %E"1I%EME/TS FO% BO-T