bond construction program long beach city college district march 2007
TRANSCRIPT
![Page 1: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/1.jpg)
Bond Construction Program
Long Beach City College DistrictMarch 2007
![Page 2: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/2.jpg)
Pacific Coast CampusFeatured Projects
![Page 3: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/3.jpg)
PCC Learning Resource Center
This new facility will provide students with updated technology, media services and an expanded modern learning resource facility. The Learning Resource Center includes open computer access and multimedia areas for reference, study, and self-paced education.
Start of construction April 2007; Complete Summer 2008
p a
c i f
i c
c
o a
s t
![Page 4: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/4.jpg)
PCC Learning Resource Center
p a
c i f
i c
c
o a
s t
![Page 5: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/5.jpg)
New Industrial Technology Phase 1
A new state-of-the-art facility will be constructed at the north end of PCC to replace antiquated Buildings UU and VV. The facility will provide integration of computer and media technology for the training and retraining of students in the industrial trades, including video-enhanced demonstration labs and lecture classrooms.
Currently out to bid; anticipated start July 2007; complete Spring 2009
p a
c i f
i c
c
o a
s t
![Page 6: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/6.jpg)
New Industrial Technology Phase 1
p a
c i f
i c
c
o a
s t
DSA Approval98% Complete
C onstruction
Bidding
DSA Approval
C onstruction Documents
Design Dev.
Schematic Design
C lose-out
Planning/Pre-Design
Pre-Aw ard
![Page 7: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/7.jpg)
PCC New Central Plant
The New Central Plant will replace obsolete existing individual building systems with a new centralized efficient and economical system. The PCC Central Plant will incorporate space for a maintenance facility, public safety office, and a new Verizon MDF building, and the new PCC Campus Restroom.
p a
c i f
i c
c
o a
s t
![Page 8: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/8.jpg)
PCC New Central Plant
p a
c i f
i c
c
o a
s t
![Page 9: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/9.jpg)
New Industrial Technology Phase 2
Construction has begun on the new PCC facility, which will replace antiquated buildings currently housing the Aviation and Automotive Departments. "Smart" classrooms and labs will be provided in the modern, state-of-the-art instructional center in support of the increased employment demand in the industry.
p a
c i f
i c
c
o a
s t
![Page 10: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/10.jpg)
New Industrial Technology Phase 2
p a
c i f
i c
c
o a
s t
![Page 11: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/11.jpg)
Liberal Arts CampusFeatured Projects
![Page 12: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/12.jpg)
South Quad Complex A new state-of-the-art building is under construction
on the "Golf Mall" area of the Liberal Arts Campus. The modern facility will house both academic and administrative offices. The instructional portion of the complex will provide needed "smart" classrooms for the Creative Arts and Applied Science, History and Political Science, and Public Service Departments. Additionally, the facility will house the Superintendent's offices as well as other administrative offices. Construction has begun on the relocation and improvement of site utilities including replacement of obsolete data and telecommunication lines.
Anticipated construction completion Spring 2008
l i b
e r
a l
a r
t s
![Page 13: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/13.jpg)
South Quad Complex
l i b
e r
a l
a r
t s
![Page 14: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/14.jpg)
LAC New Central Plant
The new Central Plant and utility improvements are underway which will replace obsolete existing individual building systems with a new centralized efficient and economical system.
The project is being completed in two bid packages. The first package consists of utility relocation, which began in January 2006. The second package, currently in Plan check consists of the structures for the Central Plant, Public Safety Office and the Concession Stand.
l i b
e r
a l
a r
t s
![Page 15: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/15.jpg)
LAC New Central Plant
l i b
e r
a l
a r
t s
![Page 16: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/16.jpg)
LAC Learning Resource Center In conformance with LBCCD's 5-Year
Construction and Education Plan, the existing Library/LRC will be modernized and space added to meet the current and projected needs of the campus. Design is underway on the LRC, which will include an expanded library, an automated and computerized processing area for media material, learning aids, and educational program delivery.
An Interim Facility (E-Portables) will house the center is currently under construction; anticipated completion Summer 2007
Currently out to bid; anticipated start June 2007; completion early 2009
l i b
e r
a l
a r
t s
![Page 17: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/17.jpg)
LAC Learning Resource Center
l i b
e r
a l
a r
t s
![Page 18: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/18.jpg)
FeaturedCompleted Projects
![Page 19: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/19.jpg)
Completed Construction Projects PCC CDC – 4/06 District Facilities & Warehouse Complex – Opened
1/17/06 Men’s Gym Boiler Replacement – 4/06 PCC MM/NN Lighting Upgrade – 4/05 LAC Athletic Field – 3/06 South Quad Complex - Bid Pkg. #1 – 12/05 LAC/LRC Utilities–6/06 LAC Men’s Gym Façade Replacement (FEMA &
Insurance Funded) – 8/06 LAC Central Plant Piping & Watermain Relocation
(SQC Bid Pkg 2) – March 2007 PCC Central Plant Utility Improvements & MDF Bid
Pkg 1 – March 2007 S.E. Interim Bungalow – Relocation of Career
Assessment Portables – March 2007
![Page 20: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/20.jpg)
Completed Construction Projects
![Page 21: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/21.jpg)
Child Development Center
Construction is completed on this new comprehensive academic/vocational child development teaching facility, which trains students for immediate employment and/or transfer to a four-year institution. The state-of-the-art facility provides a dynamic classroom experience covering physical, motor, cognitive, social, emotional, and linguistic growth and development.
p a
c i f
i c
c
o a
s t
![Page 22: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/22.jpg)
Child Development Center
p a
c i f
i c
c
o a
s t
![Page 23: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/23.jpg)
Interim Facility - Vet's Stadium/District Facilities & Warehouse Complex
During the construction of the Technology Phase 2 project the existing building required demolition. Interim housing was provided for the existing occupants in the temporary facility in the southeast corner of the Veteran's Stadium parking lot. After the occupants vacate and move into the new Tech 2 Facility at PCC the space will be retrofitted and become the new Facilities and Maintenance home.
l i b
e r
a l
a r
t s
![Page 24: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/24.jpg)
Interim Facility - Vet's Stadium/District Facilities & Warehouse Complex
l i b
e r
a l
a r
t s
![Page 25: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/25.jpg)
Building R Façade Replacement The LAC Gymnasium (Building R) Façade
Replacement was undertaken with great care to restore it to its original beauty. Water and earthquake damage caused the façade to fail requiring a much needed face lift. The completion of this project contributes to the progress of campus upgrade and development.
l i b
e r
a l
a r
t s
![Page 26: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/26.jpg)
Building R Façade Replacement
l i b
e r
a l
a r
t s
![Page 27: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/27.jpg)
Cordoba Corporation
![Page 28: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/28.jpg)
Cordoba Corporation CORDOBA CORPORATION is a civil
engineering and construction management firm specializing in educational facilities, transportation systems, and water infrastructure. Cordoba is headquartered in Los Angeles and has an office in Oakland, California. Cordoba has successfully completed hundreds of projects throughout its 23 year history, and has evolved into one of the leading firms in the nation.
Cordoba Corporation was founded in 1983 by George L. Pla as a specialized urban planning firm, and has been heavily involved in the development of California’s infrastructure.
Cordoba’s business model has been regaled for its efficiency, speed, and for its multifaceted approach toward projects, and has been featured as a case study at the Harvard Business School.
m a
n a
g e
m e
n t
![Page 29: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/29.jpg)
Cordoba Corporation Cordoba Corporation combines the
technical expertise of our engineers and construction managers with an understanding of public policy and infrastructure development to shape the world around us.
Cordoba has consistently been recognized by Hispanic Business Magazine to be among the 200 largest firms in the United States, the 50 largest "high tech" businesses in the nation, and among the 10 largest service providers in California. The Los Angeles Business Journal has ranked Cordoba one of the top ten most established minority-owned firms and one of the fastest growing companies in Los Angeles.
m a
n a
g e
m e
n t
![Page 30: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/30.jpg)
The BMT Team
![Page 31: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/31.jpg)
Bond Management Team, Cordoba
Bill Adams
Program Director
Angel Alvarez
Deputy Program Director
Ann Kovara
Sr. Construction Manager
m a
n a
g e
m e
n t
![Page 32: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/32.jpg)
Bond Management Team, Cordoba
Mike Soto
Sr. Construction Manager
Jim Espinosa
Sr. Construction Manager
Lisa Hernandez
Asst. Construction Manager
m a
n a
g e
m e
n t
![Page 33: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/33.jpg)
Bond Management Team, Cordoba
Paul Picchi
Asst. Construction Manager
Michael Johnson
Asst. Construction Manager
Gerardo Jimenez
Field Engineer
m a
n a
g e
m e
n t
![Page 34: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/34.jpg)
Bond Management Team, Cordoba
Tracie Powell
Field Engineer
Joe Johnson, Jr.
Scheduler
Dave Hall
CADD/IT/Move Mgmt.
m a
n a
g e
m e
n t
![Page 35: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/35.jpg)
Bond Management Team, Cordoba
Laura Tocco
Cost Engineer
Lisa Jones
Contracts Administrator
David Cates
Financial Analyst
m a
n a
g e
m e
n t
![Page 36: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/36.jpg)
Bond Management Team, Cordoba
Gilbert Esquibel
Document Control
Jill Hayes
Administrative Asst.Graphic Designer
Sharon Stureman
Administrative Asst.Document Control
m a
n a
g e
m e
n t
![Page 37: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/37.jpg)
Bond Management Team, Cordoba
Sonia Babian
Field Engineer
Ashi Martin
LCBBD Student Intern
Jose Jimenez
LCBBD Student Intern
m a
n a
g e
m e
n t
![Page 38: Bond Construction Program Long Beach City College District March 2007](https://reader038.vdocuments.net/reader038/viewer/2022110400/56649dbe5503460f94ab1ed6/html5/thumbnails/38.jpg)