boq - al quoz 4

44
8/1 Project: Private Residence Al Quoz 4, Dubai Client: Consultant: Bill No. 2 – FINISHES Description Qty Unit Rate FINISHES All the finishing items shall be as per the schedule of finishes. The floor and wall tiles Shall be fixed using approved epoxy adhesive and epoxy grout Colour matching to the tiles, and to approval. All the pattern and finishing level shall be maid as per drawing and specification. All rates includes supply and fix of tile and necessary cement sand screed, grouting, cutting as per shape and post protection method after fixing. (The material and workmanship shall be to the approval of The engineer.) INTERNAL Floor Finishes A Polished marble tile 20.25 m2 20.00 B Semi-solid Parquet 14.04 m2 20.00 C #N/A m2 20.00 D1 300x300mm 'Graniti tiles' #N/A m2 20.00 PC Supply Rate Dhs.75/m2 D2 Main Contractors rate for fixing with all items necessary for fixing, etc including Cement Sand #N/A m2 20.00 E1 300x300mm non-slip ceramic tile finish with cemnt sand screed (O/A 50mm thick) #N/A m2 20.00 PC Supply Rate Dhs.45/m2 E2 Main Contractors rate for fixing with all items necessary for fixing, etc including Cement Sand #N/A m2 20.00 Item No. Supply and fixing of 300x300/400x400x8mm unglazed ceramic tile (heavy Duty) with matching colour epoxy grout. (Allow a PC rate of - Dhs. 40/m2 for supply of Ceramic) - CT-3 Screed (O/A 50mm thick) - and wastage factor Screed (O/A 50mm thick) - and wastage factor

Upload: amy-fitzpatrick

Post on 23-Oct-2015

56 views

Category:

Documents


4 download

DESCRIPTION

boq

TRANSCRIPT

Page 1: BOQ - Al Quoz 4

8/1

Project: Private Residence Al Quoz 4, DubaiClient: Consultant:

Bill No. 2 – FINISHES

Description Qty Unit Rate

FINISHES All the finishing items shall be as per the schedule of finishes. The floor and wall tilesShall be fixed using approved epoxy adhesiveand epoxy grout Colour matching to the tiles, and to approval. All the pattern and finishing level shall be maid as per drawing and specification. All rates includes supply and fix of tile and necessary cement sand screed, grouting, cuttingas per shape and post protection method after fixing. (The material and workmanship shall be to the approval of The engineer.)

INTERNAL

Floor Finishes

A Polished marble tile 20.25 m2 20.00 405.00 PMT

B Semi-solid Parquet 14.04 m2 20.00 280.80 SSP

C #N/A m2 20.00 #N/A

D1 300x300mm 'Graniti tiles' #N/A m2 20.00 #N/A

PC Supply Rate Dhs.75/m2

D2 Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement Sand

#N/A m2 20.00 #N/A

E1 300x300mm non-slip ceramic tile finish with cemnt

sand screed (O/A 50mm thick) #N/A m2 20.00 #N/APC Supply Rate Dhs.45/m2

E2 Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement Sand

#N/A m2 20.00 #N/A

Item No.

Amount (Dhs.)

Supply and fixing of 300x300/400x400x8mm unglazed ceramic tile (heavy Duty) with matching colour epoxy grout. (Allow a PC rate of - Dhs. 40/m2 for supply of Ceramic) - CT-3

Screed (O/A 50mm thick) - and wastage factor

Screed (O/A 50mm thick) - and wastage factor

Page 2: BOQ - Al Quoz 4

8/2

Project: Private Residence Al Quoz 4, DubaiClient: Consultant:

Bill No. 2 – FINISHES

Description Qty Unit Rate Item No.

Amount (Dhs.)

Total Carried To Collection #N/A

Page 3: BOQ - Al Quoz 4

8/3

Project: Private Residence Al Quoz 4, DubaiClient: Consultant:

Bill No. 2 – FINISHES

Description Qty Unit Rate Item No.

Amount (Dhs.)

INTERNAL FINISHES (Cont'd)

Floor Finishes (Cont'd).

A Supply and fix 60mm thick interlock paving tiles oncement bed (Basement); colour to approval #N/A m2 20.00 #N/A

B1 Cut to size polished granite to approved pattern #N/A m2 20.00 #N/APC Supply Rate Dhs.500/m2

B2 Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement Sand

#N/A m2 20.00 #N/A

B3 Main Contractors OHP percentage on B1 & B2 #REF! % 20.00 #REF!

EXCLUDEDC1 300x300 Granite tile #N/A m2 20.00 #N/A

PC Supply Rate Dhs.200/m2

C2 Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement Sand

#N/A m2 20.00 #N/A

C3 Main Contractors OHP percentage on C1 & C2 #REF! % 20.00 #REF!

Total Carried To Collection #REF!

Screed (O/A 50mm thick) - and wastage factor

Screed (O/A 50mm thick) - and wastage factor

Page 4: BOQ - Al Quoz 4

8/4

Project: Private Residence Al Quoz 4, DubaiClient: Consultant:

Bill No. 2 – FINISHES

Description Qty Unit Rate Item No.

Amount (Dhs.)

INTERNAL FINISHES (Cont'd)

Floor Finishes (Cont'd).

A1 Fully Vitrified porcelain tiles with to approved #N/A m2 20.00 #N/ApatternPC Supply Rate Dhs.75/m2

A2 Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement Sand

#N/A m2 20.00 #N/A

A3 Main Contractors OHP percentage on A1 & A2 #REF! % 20.00 #REF!

B1 Non - slip ceramic tiles #N/A m2 20.00 #N/APC Supply Rate Dhs.45/m2

B2 Main Contractors rate for fixing with all items EXCLUDED necessary for fixing, etc including Cement Sand

#N/A m2 20.00 #N/A

C1 Non-slip fully Vitrified porcelain tiles #N/A m2 20.00 #N/APC Supply Rate Dhs.75/m2

C2 Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement Sand

#N/A m2 20.00 #N/A

Total Carried To Collection #N/A

Screed (O/A 50mm thick) - and wastage factor

Screed (O/A 50mm thick) - and wastage factor

Screed (O/A 50mm thick) - and wastage factor

Page 5: BOQ - Al Quoz 4

8/5

Project: Private Residence Al Quoz 4, DubaiClient: Consultant:

Bill No. 2 – FINISHES

Description Qty Unit Rate Item No.

Amount (Dhs.)

INTERNAL FINISHES (Cont'd)

Floor Finishes (Cont'd).

A1 Non-slipCeramic floor tile #N/A m2 20.00 #N/APC Supply Rate Dhs.25/m2

A2 Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement Sand

#N/A m2 20.00 #N/A

A3 Main Contractors OHP percentage on A1 & A2 #REF! % 20.00 #REF!

Non-Slip Procelain tiles Tread & riser with, cement sand screed for staircase steps 300mm tread & EXCLUDED 180mm rise

B1 Main Stair Case #N/A m 20.00 #N/APC Supply Rate Dhs.75/m

B2 Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement Sand

#N/A m 20.00 #N/A

B3 Main Contractors OHP percentage on B1 & B2 #REF! % 20.00 #REF!

C1 Service Stair Case Not Applicable PC Supply Rate Dhs.65/m

C2 Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement SandScreed Not Applicable

C3 Main Contractors OHP percentage on C1 & C2 #REF! Not Applicable

Non-Slip Procelain tiles for stair case landing with,cement sand screed

D1 Main Staircase #N/A m2 20.00 #N/APC Supply Rate Dhs.50/m2

D2 Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement Sand EXCLUDED

#N/A m2 20.00 #N/A

D3 Main Contractors OHP percentage on D1 & D2 #REF! % 20.00 #REF!

Total Carried To Collection #REF!

Screed (O/A 50mm thick) - and wastage factor

Screed (O/A 50mm thick) - and wastage factor

Screed (O/A 50mm thick) - and wastage factor

Page 6: BOQ - Al Quoz 4

8/6

Project: Private Residence Al Quoz 4, DubaiClient: Consultant:

Bill No. 2 – FINISHES

Description Qty Unit Rate Item No.

Amount (Dhs.)

INTERNAL FINISHES (Cont'd)

A1 Service Staircase Not Applicable PC Supply Rate Dhs.45/m2

A2 Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement SandScreed Not Applicable

A3 Main Contractors OHP percentage on A1 & A2 #REF! Not Applicable

B1 Supply and fixing of high pressurised Laminateflooring with necessary under lay as per drawingand specfication 523 m2 20.00 10,460.00

B2 Main Contractors OHP percentage on B1 #REF! % 20.00 #REF!

Skirting

D 100mm high epoxy paint 70 m 20.00 EXCLUDED

D1 Procelain tile skirting match to the floor 314 m 20.00 6,280.00 (PC Supply Rate Dhs. 15/Rm)

D2 Main Contractors rate for fixing with all itemsnecessary for fixing, etc Including Cement

314 m 20.00 6,280.00

D3 Main Contractors OHP percentage on D1 & D2 #REF! % 20.00 #REF!

Total Carried To Collection #REF!

(PC Supply and Fix rate Dhs.100/m2) - Including wastage

mortar/glue and wastage factor

Page 7: BOQ - Al Quoz 4

8/7

Project: Private Residence Al Quoz 4, DubaiClient: Consultant:

Bill No. 2 – FINISHES

Description Qty Unit Rate Item No.

Amount (Dhs.)

INTERNAL FINISHES (Cont'd)

Skirting (Cont'd)

A1 100mm high Granite Skirting 399 m #REF! #REF!(PC Supply Rate Dhs. 20/Rm)

A2 Main Contractors rate for fixing with all itemsnecessary for fixing, etc Including Cement

399 m #REF! #REF!

A3 Main Contractors OHP percentage on A1 & A2 #REF! % #REF! #REF!

B1 100mm high Ceramic tile Skirting 144 m #REF! #REF!(PC Supply Rate Dhs. 10/Rm)

B2 Main Contractors rate for fixing with all itemsnecessary for fixing, etc Including Cement

144 m #REF! #REF!

B3 Main Contractors OHP percentage on B1 & B2 #REF! % #REF! #REF!

C1 100mm high ceramic tile skirting for Stair case 145 m #REF! #REF!(Main Staircase - PC Supply Rate Dhs. 15/Rm)

C2 Main Contractors rate for fixing with all items EXCLUDED necessary for fixing, etc Including Cement

145 m #REF! #REF!

C3 Main Contractors OHP percentage on C1 & C2 #REF! % #REF! #REF!

D1 Ceramic tile skirting to Toilet 326 m #REF! #REF!(PC Supply Rate Dhs. 15/Rm)

D2 Main Contractors rate for fixing with all itemsnecessary for fixing, etc Including Cement

326 m #REF! #REF!

D3 Main Contractors OHP percentage on D1 & D2 #REF! % #REF! #REF!

E1 100mm high pressurised laminate skirting to 400 m #REF! #REF!

E2 Main Contractors rate for fixing with all items400 m #REF! #REF!

E3 Main Contractors OHP percentage on E1 & E2 #REF! % #REF! #REF!

Total Carried To Collection #REF!

mortar/glue and wastage factor

mortar/glue and wastage factor

mortar/glue and wastage factor

mortar/glue and wastage factor

match floor (PC Supply Rate Dhs. 50/Rm)

necessary for fixing, etc. including wastage factor

Page 8: BOQ - Al Quoz 4

8/8

Project: Private Residence Al Quoz 4, DubaiClient: Consultant:

Bill No. 2 – FINISHES

Description Qty Unit Rate Item No.

Amount (Dhs.)

INTERNAL FINISHES (Cont'd)

Threshold

A1 350mm wide threshold for doors as per site 30 m #REF! #REF!

A2 Main Contractors rate for fixing with all itemsnecessary for fixing, etc Including Cementmortar/glue 30 m #REF! #REF!

A3 Main Contractors OHP percentage on A1 & A2 #REF! % #REF! #REF!

B1 87 m #REF! #REF!

B2 Main Contractors rate for fixing with all itemsnecessary for fixing, etc Including Cement EXCLUDED mortar/glue 87 m #REF! #REF!

B3 Main Contractors OHP percentage on B1 & B2 #REF! % #REF! #REF!

C1 3 m #REF! #REF!

C2 Main Contractors rate for all items necessary For fixing, etc as described in preambles 3 m #REF! #REF!

C3 Main Contractors OHP percentage on C1 & C2#REF! % #REF! #REF!

Total Carried To Collection #REF!

measurement (PC Supply rate = Dhs. 150/M)

200mm wide threshold for doors as per sitemeasurement (PC Supply rate = AED 50/M)

100mm wide threshold for doors as per sitemeasurement (PC Supply rate = AED 50/M)

Page 9: BOQ - Al Quoz 4

8/9

Project: Private Residence Al Quoz 4, DubaiClient: Consultant:

Bill No. 2 – FINISHES

Description Qty Unit Rate Item No.

Amount (Dhs.)

INTERNAL FINISHES (Cont'd)

Wall Finishes

Plastering for the walls shall be including allaccessories as per drawings / specifications The spills shall be cleaned and touch up shall be done wherever required.

A 12mm thick Internal wall plastering 6440 m2 #REF! #REF!

B 4729 m2 #REF! #REF!

C Epoxy Coating System 275 m2 #REF! #REF!

D Oil Paint System 500 m2 #REF! #REF!

E 20mm thick render with matt finish sandtec or 80 m2 #REF! #REF!approved similar

Porcelain tile / Ceramic tiles / Glossy-Ceramic Tiles/ Vitrified Ceramic tile / Marble stone wall finishes laying to pattern as per drawing

& specification, including back ground

Plaster & adhesives/glue, grouting to approval

of the Engineer;

F1 300x300-Glazed ceramic tiles 977 m2 #REF! #REF!PC Suply Rate Dhs 30/m2

F2 Main Contractors rate for fixing with all items EXCLUDED necessary For fixing, etc 977 m2 #REF! #REF!Including background plaster

F3 Main Contractors OHP percentage on F1 & F2 #REF! % #REF! #REF!

Total Carried To Collection #REF!

Emulsion Painting 1 coat Primer only for the plastered surface

Page 10: BOQ - Al Quoz 4

8/10

Project: Private Residence Al Quoz 4, DubaiClient: Consultant:

Bill No. 2 – FINISHES

Description Qty Unit Rate Item No.

Amount (Dhs.)

INTERNAL FINISHES (Cont'd)

Ceiling finishes

A 12mm thick Ceiling Plaster 556 m2 #REF! EXCLUDED

B Complete false ceiling with bulkhead, Covelight, Cornice and curtain box detail Sum

C Epoxy Paint on Plaster 280 m2 #REF! EXCLUDED

D Oil Paint on Plaster 179 m2 #REF! EXCLUDED

E Emulsion Paint on plaster 97 m2 #REF! EXCLUDED

Total Carried To Collection .00

Refer Provisional

Page 11: BOQ - Al Quoz 4

8/11

Project: Private Residence Al Quoz 4, DubaiClient: Consultant:

Bill No. 2 – FINISHES

Description Qty Unit Rate Item No.

Amount (Dhs.)

INTERNAL FINISHES (Cont'd)

ACCESSORIES

Sanitary Fittings

Supply & Install the following Sanitarywares &

accessories Complete with Fittings , Taps &

Mixers, Traps And accessories as per drawing &

specification

A1 Bathroom Set (Master bathroom & Secondary 13 Sets #REF! #REF!Bedroom Bathroom) including mirrorsPC Rate.Dhs.7000/Each set

A2 Main Contractors rate for all items necessary For fixing, etc as described in preambles 13 Set #REF! #REF!

A3 Main Contractors OHP percentage on A1 & A2 #REF! % #REF! #REF!

B1 Toilets including mirrors 16 No #REF! #REF!PC Rate.Dhs.5000/Each Toilet

B2 Main Contractors rate for all items necessary For fixing, etc as described in preambles 16 No #REF! #REF!

B3 Main Contractors OHP percentage on B1 & B2 #REF! % #REF! #REF!EXCLUDED

C1 Toilet Maid Room including mirrors 5 No #REF! #REF!PC Rate.Dhs.1500/Each Toilet

C2 Main Contractors rate for all items necessary For fixing, etc as described in preambles 5 No #REF! #REF!

C3 Main Contractors OHP percentage on C1 & C2 #REF! % #REF! #REF!

D1 Jacuzzi with necessary mixer (Master Bathroom 3 Set #REF! #REF!Villa 1,2&3) PC Rate Dhs.10,000/set

D2 Main Contractors rate for all items necessary 3 Set #REF! #REF!For fixing, etc as described in preambles

D3 Main Contractors OHP percentage on D1 & D2 #REF! % #REF! #REF!

Page 12: BOQ - Al Quoz 4

8/12

Project: Private Residence Al Quoz 4, DubaiClient: Consultant:

Bill No. 2 – FINISHES

Description Qty Unit Rate Item No.

Amount (Dhs.)

Total Carried To Collection #REF!

INTERNAL FINISHES (Cont'd)

Accessories (Cont'd)

Sundries

A Supply and fix corner gaurds, wall guard as per DMrequirement to basement parking 12 No #REF! #REF!

B Floor marking to basement parking 1 LS #REF! #REF!

C Concave mirrors as per requirement for basement 2 Nos #REF! #REF!parking

D Internal signage on staircase doors, landing, 1 LS #REF! EXCLUDED corridor, service room etc., as per civilDefence/DEWA requirement

E Garbage Container as per DM requirement 1 LS #REF! #REF!

F MR Gypsum board ducts for vertical down take pipe 1 LS #REF! #REF!

Total Carried To Collection #REF!

Page 13: BOQ - Al Quoz 4

8/13

Project: Private Residence Al Quoz 4, DubaiClient: Consultant:

Bill No. 2 – FINISHES

Description Qty Unit Rate Item No.

Amount (Dhs.)

FINISHES (Cont'd)

EXTERNAL

External Entrance Finishes

A1 Supply and fix of granite bushed hammer finish forexternal entrance Ramps 8 m2 #REF! #REF!PC Supply Rate Dhs.200/m2

A2 Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement SandScreed 8 m2 #REF! #REF!

A3 Main Contractors OHP percentage on A1 & A2 #REF! % #REF! #REF!

B1 Supply and fix of Polished granite finish for EXCLUDED external steps tread & riser 67 m #REF! #REF!PC Supply Rate Dhs.300/m

B2 Main Contractors rate for fixing with all itemsnecessary for fixing, etc including Cement SandScreed 67 m #REF! #REF!

B3 Main Contractors OHP percentage on B1 & B2 #REF! % #REF! #REF!

External wall Finishes

C 20mm thick cement & sand render with paint finish. 3075 m2 #REF! #REF!

D1 Natural Stone Cladding to the wall 178 m2 #REF! #REF!PC Supply Rate.Dhs.200/m2

D2 Main Contractors rate for fixing with all itemsnecessary For fixing, etc 178 m2 #REF! #REF!

D3 Main Contractors OHP percentage on D1 & D2 #REF! % #REF! #REF!

E 50mm Depth Punch Hole Groove in Plaster wall as Included per Drawing & Specification

F Heavy Texture 4 coats solvent based epoxy paint 3075 m2 #REF! #REF!system for all exposed surface

G Extra over for Grooves in Plaster with 12mm wide x10mm deep aluminium channel 1 LS #REF! #REF!

Total Carried To Collection #REF!

Page 14: BOQ - Al Quoz 4

8/14

Project: Private Residence Al Quoz 4, DubaiClient: Consultant:

Bill No. 2 – FINISHES

Description Qty Unit Rate Item No.

Amount (Dhs.)

EXTERNAL FINISHES (Cont'd)

EXTERNAL (Cont'd)

A Refer Provisional all necessary base and kerb stone as per the Sumdrawings

Pitched Roof

B1 Clay roof tiles red colour including Eaves, Ridges 135 m2 #REF! #REF!(PC Supply Rate Dhs.55/m2)

B2 Main Contractors rate for all items necessary 135 m2 #REF! #REF!For fixing, etc

B3 Main Contractors OHP percentage on B1 & B2 #REF! % #REF! #REF!

GRC WORKS

C Supply & Fixing GRC Elements as per drawing and Refer Provisional specification. Sum

Total Carried To Collection #REF!

Supply and install 60mm thick inter lock paver with

Page 15: BOQ - Al Quoz 4

8/15

Project: Private Residence Al Quoz 4, DubaiClient: Consultant:

Bill No. 2 – FINISHES

Description Qty Unit Rate Item No.

Amount (Dhs.)

EXTERNAL FINISHES (Cont'd)

ADDITIONAL ITEMS

The tenderer is to detail below any

additional items with quantities and rates not

previously included to complete the build

up of lumpsum tender price for this section

of the works. Should the tenderer fail to

insert any items here, it will be deemed that

his lumpsum price for the tender includes all

items and no subsequent claim for any

additional item will be entertained.

Finishes to Ponds / FountainA Mosaic tile for ponds/Fountains By Client

B Mosaic skirting for ponds & fountain By Client

C WC back wall top as per drawings 1 LS #REF! #REF!

Total Carried To Collection #REF!

Page 16: BOQ - Al Quoz 4

8/16

Project: Private Residence Al Quoz 4, DubaiClient: Consultant:

Bill No. 2 – FINISHES

Description Qty Unit Rate Item No.

Amount (Dhs.)

EXTERNAL FINISHES (Cont'd)

Collection

From Page 8/1 #N/A

From Page 8/2 #REF!

From Page 8/3 #N/A

From Page 8/4 #REF!

From Page 8/5 #REF!

From Page 8/6 #REF!

From Page 8/7 #REF!

From Page 8/8 #REF!

From Page 8/9 .00

Total Carried To Page 8/15 #REF!

Page 17: BOQ - Al Quoz 4

8/17

Project: Private Residence Al Quoz 4, DubaiClient: Consultant:

Bill No. 2 – FINISHES

Description Qty Unit Rate Item No.

Amount (Dhs.)

EXTERNAL FINISHES (Cont'd)

Collection

From Page 8/15 (B/F) #REF!

From Page 8/10 #REF!

From Page 8/11 #REF!

From Page 8/12 #REF!

From Page 8/13 #REF!

From Page 8/14 #REF!

Total Bill No. 8- Carried To Summary #REF!

Page 18: BOQ - Al Quoz 4

Room Code Room dr1 dr21 Drying room 11.4 0.9 d36 -2.5 d 02 cool room 8.7 0.9 d36 -2.5 d 03 Laundry 12.87 1.8 d36 -2.5 d36 -2.54 Storage 15.8 1.8 d36 -2.5 d36 -2.55 20.45 4.5 d36 -2.5 d36 -2.56 Storage room (D 14.8 0.9 d34 -2.25 d 07 Maids room 12.75 1.8 d33 -2.25 d32 -2.258 4 0.9 d33 -2.25 d 09 3.17 0 d 0 d 0

10 4.1 2.7 d30 -2.25 d31 -2.6111 0.9 #N/A #N/A12 7.15 0.9 d30 -2.25 d 013 6.3 0.9 d29 -2.367 d 014 Foyer 1 10.95 2.8 d22 -5.51 d36 -2.515 5.4 1.8 d28 -2.5 d29 -2.36716 Lounge area 15.1 0.9 d28 -2.5 d 017 Bedroom 8 14.9 0.9 d36 -2.5 w7 -1.2818 18.75 0.9 d27 -5.1585 w7 -1.2819 10.8 1.8 d27 -5.1585 d36 -2.520 11 0.9 d24 -2.45 d 021 14.5 0.9 d25 -4.6155 w7 -1.2822 Foyer 2 14.75 5.6 d28 -2.5 d26 -2.923 13.65 0 d 0 d 024 Bedroom 7 29.15 1.8 d24 -2.45 d25 -4.615525 Lounge area 24 0 bw2 -12.1992 d 026 Recreation area 39.5 0.9 d23 -5.51 ed3 -6.004

1 24.5 1.95 d2 -5.51 w1 -4.562 22.45 3.85 d3 -5.51 d4 -3.193 12.7 6.3 d1 -6.6 d2 -5.514 34.1 1.8 d10 -3 d11 -2.5745 5.2 0.9 d11 -2.574 w4 -1.8856 0.9 #N/A #N/A7 15.35 6.2 d1 -6.6 d1 -6.68 29.5 5.9 d9 -5.434 w1 -4.569 7 0.9 d6 -2.016 w4 -1.885

10 12.4 1.8 d5 -3.19 d6 -2.01611 37.8 0.9 d5 -3.19 bw1 -9.9208212 0 0 d 0 d 013 4.9 0 d 0 d 0

1 20.6 0.9 d19 -2.574 w1 -4.562 11.2 1.9 d18 -5.434 w6 -5.283 18.4 1.8 d12 -2.86 d36 -2.54 7.1 0.9 d36 -2.5 d36 -2.55 10 0.9 d13 -2.304 w1 -4.56

Page 19: BOQ - Al Quoz 4

6 9.6 1.8 d13 -2.304 d36 -2.57 0.9 #N/A #N/A8 23.8 6.4 d12 -2.86 d18 -5.4349 6.3 2.7 d14 -2.86 d36 -2.5

10 6.3 1.8 d15 -2.574 d36 -2.511 17.3 0.9 #N/A #N/A12 11.7 0.9 #N/A #N/A13 19.4 0.9 #N/A #N/A14 11.35 0.9 #N/A #N/A15 8 0.9 #N/A #N/A16 18 0.9 #N/A #N/A17 18.4 0.9 #N/A #N/A18 26.7 0.9 #N/A #N/A19 4.9 0.9 d36 -2.5 d36 -2.520 4.9 0.9 #N/A #N/A21 5.7 0.9 #N/A #N/A22 7.3 0.9 #N/A #N/A

Page 20: BOQ - Al Quoz 4

dr3 dr4 dr5 PL Qty WF Qty WF coded 0 d 0 d 0 43.01 35.63d 0 d 0 d 0 33.02 27.26d 0 d 0 d 0 49.28 40.48d 0 d 0 d 0 60.12 49.56d31 -2.61 d32 -2.25 d34 -2.25 80.21 65.24d 0 d 0 d 0 55.84 46.42w8 -1.12 d 0 d 0 48.22 39.49d 0 d 0 d 0 15.88 12.94d 0 d 0 d 0 11.73 9.83d36 -2.5 d 0 d 0 17.80 13.72

#N/A #N/A #N/A #N/A #N/Ad 0 d 0 d 0 27.54 22.71d 0 d 0 d 0 24.27 19.95d 0 d 0 d 0 42.87 34.62d 0 d 0 d 0 21.77 17.45d 0 d 0 d 0 56.70 47.10w7 -1.28 w8 -1.12 d 0 52.28 42.80d 0 d 0 d 0 66.27 54.48d 0 d 0 d 0 38.96 31.40d 0 d 0 d 0 41.58 34.44d 0 d 0 d 0 51.08 41.84d22 -5.51 d23 -5.51 d 0 58.88 46.67d 0 d 0 d 0 50.51 42.32w7 -1.28 d 0 d 0 106.17 87.60d 0 d 0 d 0 76.60 62.20ed4 -16.0844 d 0 d 0 121.88 97.64

w1 -4.56 w1 -4.56 w1 -4.56 76.76 60.89d36 -2.5 w1 -4.56 w1 -4.56 79.62 63.84d1 -6.6 d 0 d 0 53.49 42.09w1 -4.56 w1 -4.56 d 0 121.73 100.19d 0 d 0 d 0 18.72 15.06

#N/A #N/A #N/A #N/A #N/Ad3 -5.51 d9 -5.434 w1 -4.56 53.19 40.26w3 -2.4 d5 -3.19 #N/A #N/A #N/Ad 0 d 0 d 0 26.12 21.38d 0 d 0 d 0 48.75 40.23w2 -3.5815 w2 -3.5815 w2 -3.5815 123.20 99.98d 0 d 0 d 0 0.00 0.00d 0 d 0 d 0 18.62 15.68

w1 -4.56 d 0 d 0 72.16 60.33d 0 d 0 d 0 40.38 33.17w1 -4.56 d 0 d 0 68.86 57.75d 0 d 0 d 0 26.20 21.80d 0 d 0 d 0 35.65 29.65

Page 21: BOQ - Al Quoz 4

w4 -1.885 d 0 d 0 37.77 31.50#N/A #N/A #N/A #N/A #N/A

d14 -2.86 d16 -2.86 d36 -2.5 101.27 84.66d15 -2.574 d 0 d 0 27.17 22.22d 0 d 0 d 0 26.52 22.06

#N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A

d 0 d 0 d 0 17.62 14.43#N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A #N/A

Page 22: BOQ - Al Quoz 4

CF Qty CF code SF Qty SF code11.4

8.712.87

15.820.45

14.812.75

43.17

4.1

7.156.3

10.955.4

15.114.9

18.7510.8

1114.5

14.7513.6529.15

2439.5

24.522.45

12.734.1

5.2

15.3529.5

712.437.8

7.54.9

20.611.218.4

7.110

Page 23: BOQ - Al Quoz 4

9.6

23.86.36.3

17.311.719.4

11.358

1818.426.7

4.94.95.77.3

Page 24: BOQ - Al Quoz 4

W 0 0 0.00W1 1.9 2.4 -4.56W2 1.9 1.885 -3.58W3 1 2.4 -2.40W4 1 1.885 -1.89W5 0.8 2.4 -1.92W6 2.2 2.4 -5.28W7 1.6 0.8 -1.28W8 1.4 0.8 -1.12

ED1 1 2.9 -2.90ED2 5.09 2.9 -14.76ED3 1.9 3.16 -6.00ED4 5.09 3.16 -16.08

*BW1a 2.11 2.765*2BW1b 1.478 2.765BW1 3.588 2.765 -9.92

*BW2a 2.11 3.4*2BW2b 1.478 3.4BW2 3.588 3.4 -12.20

D 0 0 0.00D1 2.2 3 -6.60D2 1.9 2.9 -5.51D3 1.9 2.9 -5.51D4 1.1 2.9 -3.19D5 1.1 2.9 -3.19D6 0.9 2.24 -2.02D7 0.9 2.6 -2.34D8 0.9 2.6 -2.34D9 1.9 2.86 -5.43D10 1 3 -3.00D11 0.9 2.86 -2.57D12 1 2.86 -2.86D13 0.9 2.56 -2.30D14 1 2.86 -2.86D15 0.9 2.86 -2.57D16 1 2.86 -2.86D17 0.9 2.86 -2.57D18 1.9 2.86 -5.43D19 0.9 2.86 -2.57D20 1 2.86 -2.86D21 0.9 2.61 -2.35

Page 25: BOQ - Al Quoz 4

D22 1.9 2.9 -5.51D23 1.9 2.9 -5.51D24 1 2.45 -2.45D25 1.81 2.55 -4.62D26 1 2.9 -2.90D27 1.81 2.85 -5.16D28 1 2.5 -2.50D29 0.9 2.63 -2.37D30 0.9 2.5 -2.25D31 0.9 2.9 -2.61D32 0.9 2.5 -2.25D33 0.9 2.5 -2.25D34 0.9 2.5 -2.25D35 1 2.5 -2.50D36 1 2.5 -2.50