4
PROJECT : NET BUILDING COST Q.R. - LOCATION : GROSS BUILDING COST Q.R. - OWNER : NET PROJECT COST Q.R. - SUBJECT : GROSS PROJECT COST Q.R. - OVER HEAD & PROFIT 70% Labor Materials Equipment O & P Item Definition Qty Unit Rate Amount PART-1 GENERAL MATTERS - 1.01.00 Preliminaries Sq.mts - - - PART-2 SUBSTRUCTURE - 2.01.00 Foundations Sq.mts - - - - 2.01.01 Structural Elements - Sq.mts - - - - 2.01.02 Basements - Cu.mts - - - - 2.01.03 Ground Floor Slabs - Sq.mts - - - - 2.01.04 Foundation Sundries - Item - - - - - PART-3 SUPER STRUCTURE - - 3.01.00 Structure (Reinforced Concrete) - Sq.mts - - - - 3.01.01 Frame (RC) - Sq.mts - - - - 3.01.02 Roofs (RC) - Sq.mts - - - - 3.01.03 Upper Floors (RC) - Sq.mts - - - - 3.01.04 Structural Walls (RC) - Sq.mts - - - - 3.01.05 Stairs & Landings (RC) - Sq.mts - - - - 3.01.06 Balustrades & Handrails (RC) - l.mts - - - - 3.01.07 Structure Sundries (RC) - Item - - - - 3.02.00 Structure (Other) - Sq.mts - - - - 3.02.01 Frame (Other) - Sq.mts - - - - 3.02.02 Roofs (Other) - Sq.mts - - - - 3.02.03 Upper Floors (Other) - Sq.mts - - - - 3.02.04 Structural Walls (Other) - Sq.mts - - - - 3.02.05 Stairs & Landings (Other) - Sq.mts - - - - 3.02.06 Balustrades & Handrails (Other) - l.mts - - - - 3.02.07 Structure Sundries (Other) - Item - - - - 3.03.00 External Walls (Non-structural) - Sq.mts - - - - 3.04.00 Windows and External Doors - Nos - - - - 3.05.00 Curtain Walling - Sq.mts - - - - 3.06.00 Internal Partitions - Sq.mts - - - - 3.07.00 Internal Doors - Nos - - - - 3.08.00 Internal Finishes - Sq.mts - - - - 3.08.01 Wall Finishes - Sq.mts - - - - 3.08.02 Floor Finishes - Sq.mts - - - - 3.08.03 Ceiling Finishes - Sq.mts - - - - 3.08.04 Stair Finishes - Sq.mts - - - - 3.08.05 Balustrade & Handrail Finishes - Sq.mts - - - - 3.08.06 Internal Finishes Sundries - Item - - - - 3.09.00 External Finishes - Sq.mts - - - - 3.09.01 Roof Finishes - Sq.mts - - - - 3.09.02 Wall Finishes (External) - Sq.mts - - - - 3.09.03 Floor Finishes (External) - Sq.mts - - - - 3.09.04 Ceiling Finishes (External) - Sq.mts - - - - 3.09.05 Stair Finishes (External) - Sq.mts - - - - 3.09.06 Balustrade & Handrail Finishes (External) - Sq.mts - - - - 3.09.07 External Finishes Sundries - Item - - - - 3.10.00 Fittings and Fixtures - Sq.mts - - - - 3.11.00 Plumbing Services - Sq.mts - - - - 3.11.01 Rainwater Installations - Eaves gutters and down pipes. l.mts - - - - 3.11.02 Sanitary Fittings - Nos - - - - 3.11.03 Soil & Waste Installations - Nos - - - - 3.11.04 Cold Water Installations - Nos - - - - 3.11.05 Hot Water Installations - Nos - - - - 3.11.06 Flushing Water Installations - Nos - - - - 3.11.07 Fire Fighting Installations - The main riser to the roof tanks. Item - - - - 3.11.08 Refuse Disposal - Refuse chutes, fittings and fixtures. Nos - - - - 3.11.09 Plumbing Services Sundries - Item - - - - 3.12.00 Builder’s Work in Connection with Services - All contractor’s preliminary costs not otherwise included in the unit rates. Work below and including ground floor slab. Pile caps, ground beams, tie beams, structural walls, columns etc. including excavation, blinding, concrete, reinforcement and formwork. Basements, lift and escalator pits including bulk excavation, external walls, tanking and filling around external walls. Including diaphragm walls and barrettes. Ground floor and lowest basement slabs, including reduce level excavation, hardcore filling, membranes, concrete, reinforcement and formwork. Includes thickening out for non-structural walls. Service ducts including excavation, concrete, reinforcement and formwork. Underpinning and all temporary support. All structural elements of the building above ground floor slab, constructed in reinforced concrete. Columns and beams, fins and projections where part of columns and beams including reinforcement, formwork, fair faced formwork finishes. Portal frames. Includes pre-cast concrete units. Roof slabs, rainwater gutters, verge or eaves upstand kerbs including reinforcement, formwork, fair faced formwork finishes. Includes pre-cast concrete units. Suspended floors, upper basement suspended floors, mezzanine floors, balcony floors including reinforcements, formwork, fair faced formwork finishes. Includes pre-cast concrete units. Structural walls, lift shaft walls, balcony and parapet walls, fins and projections including reinforcement, formwork, fair faced formwork finishes. Includes precast concrete units. Stair slabs, treads, risers, intermediate landings, strings and aprons including reinforcement, formwork, fair faced formwork finishes. Includes pre- cast concrete units. Includes balustrades and handrails to stairs and other locations. Sundry items, including planter boxes and window boxes. Expansion joints. Includes pre-cast concrete sundries. All structural elements of the building above ground floor slab, constructed in materials other than reinforced concrete. For structural steel: columns, beams and trusses including concrete or other fire protection, reinforcement, formwork, fair faced formwork finishes. For timber: posts, beams and trusses. For brick/masonry: columns, piers and arches. Portal frames. Roofs of steel, timber or other material (excluding reinforced concrete). Suspended floors, mezzanine floors, balcony floors, of steel, timber or other materials (excluding reinforced concrete). Proprietary floors including concrete topping. Structural walls of steel, timber, brick, masonry or other materials (excluding reinforced concrete). Includes treads, risers, intermediate landings, strings and aprons. Includes balustrades and handrails to stairs and other locations. Roof lights and lantern lights including framing and glass. Includes other structure sundries (excluding reinforced concrete). Includes all non-structural external walls, cladding, infill panel walls, balcony and parapet walls (other than in reinforced concrete). Windows and external doors including all glass, ironmongery, louvres, fixings, trimmings, decoration and other associated works. Roller shutter doors and folding doors. Curtain walling including all glass, panelling, louvres, trimmings, fixings, doors, ironmongery, decoration and other associated works. Non-structural internal walls and partitions including glazed screens, demountable partitions, proprietary toilet and shower cubicles including doors to same. Liftshaft walls other than reinforced concrete. All internal doors including frames, architraves, finishes, glazing, fanlights, sidelights, panels over doors (door sets) and ironmongery. Folding and sliding doors, fire doors, strongroom doors, roller shutter doors, wall hatches and duct doors. Includes all necessary preparatory work (e.g. spatterdash), expansion joints, plasterbeads, stops and the like, and decoration. Includes plaster, tiles, linings, insulation and grounds behind linings and other decorations; skirtings, dado rails and the like. Finishes to stairwell walls. Includes screeds, surface finishes, integral skirtings (i.e. same material as floor finish), matwells, threshold and junction strips. False floors laid over structural floors (e.g. computer flooring). Includes suspended ceilings, framings and supports, ceiling and beam linings, insulation and grounds behind linings, cornices, ceilings access panels, fire stops and sound barriers in ceiling spaces together with framing. Finishes to treads and risers including nosings, landings, strings and aprons, and soffits of stairs and landings. Finishes to balustrading and handrails including both sides and top of balustrading. Includes finishes to art works and the like. Includes all necessary preparatory work (e.g. spatterdash), expansion joints, plasterbeads, stops and the like, and decoration. Complete weather-proof covering to all types of roofs, balconies and decks including coverings, sheetings, flashings, skirtings, gutters, screeds and insulation. Includes finishes to all fins and other features including both sides and top of balcony and parapet walls. Skirtings, dado rails and the like. Finishes to roofs, balconies and decks where exposed to foot traffic and the like. Finishes to external soffits, balcony soffits and the like. Finishes to treads and risers including nosings, landings, strings, aprons and soffits of stairs and landings. Finishes to balustrading and handrails including both sides and top of balustrading. Includes finishes to art works and the like. Includes wardrobes, cupboards, shelving, shelving units, sinks, vanitory and bench units, lockers, fixed desks, cloakroom fittings, benches and seating, counters, bars, chalkboards, projection screens, notice boards, curtain track and pelmets, mirrors, towel rails, hose reel cabinets, storage racks and the like. Cat ladders, cat walks and the like. All finishes. Water supply services, sanitary fittings and waste plumbing, including rainwater and refuse disposal. Sanitary fittings including sinks, basins, WCs, urinals, complete with taps, traps, cisterns etc. Includes all types of pipes, fittings and fixings; support systems. Includes all types of pipes, fittings and fixings; support systems. Includes all types of pipes, fittings and fixings; support systems. Includes all types of pipes, fittings and fixings; support systems. Includes connecting client provided appliances and the like.

Upload: ashok-kumar-singh

Post on 03-Jan-2016

92 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BOQ Standard Method of Measurement for Building Elements

PROJECT : NET BUILDING COST Q.R. - LOCATION : GROSS BUILDING COST Q.R. - OWNER : NET PROJECT COST Q.R. - SUBJECT : GROSS PROJECT COST Q.R. -

OVER HEAD & PROFIT 70%

Labor Materials Equipment O & P Item Definition Qty Unit Rate Amount

PART-1 GENERAL MATTERS - 1.01.00 Preliminaries

Sq.mts - - -

PART-2 SUBSTRUCTURE - 2.01.00 Foundations

Work below and including ground floor slab. Sq.mts - - -

- 2.01.01 Structural Elements -

Sq.mts - - -

- 2.01.02 Basements -

Cu.mts - - -

- 2.01.03 Ground Floor Slabs -

Sq.mts - - -

- 2.01.04 Foundation Sundries -

Item - - -

- -

PART-3 SUPER STRUCTURE - - 3.01.00 Structure (Reinforced Concrete) -

Sq.mts - - -

- 3.01.01 Frame (RC) -

Sq.mts - - -

- 3.01.02 Roofs (RC) -

Sq.mts - - -

- 3.01.03 Upper Floors (RC) -

Sq.mts - - -

- 3.01.04 Structural Walls (RC) -

Sq.mts - - -

- 3.01.05 Stairs & Landings (RC) -

Sq.mts - - -

- 3.01.06 Balustrades & Handrails (RC) -

l.mts - - -

- 3.01.07 Structure Sundries (RC) -

Item - - -

- 3.02.00 Structure (Other) -

Sq.mts - - -

- 3.02.01 Frame (Other) -

Sq.mts - - -

- 3.02.02 Roofs (Other) -

Sq.mts - - -

- 3.02.03 Upper Floors (Other) -

Sq.mts - - -

- 3.02.04 Structural Walls (Other) -

Sq.mts - - -

- 3.02.05 Stairs & Landings (Other) -

Sq.mts - - -

- 3.02.06 Balustrades & Handrails (Other) -

l.mts - - -

- 3.02.07 Structure Sundries (Other) -

Item - - -

- 3.03.00 External Walls (Non-structural) -

Sq.mts - - -

- 3.04.00 Windows and External Doors -

Nos - - -

- 3.05.00 Curtain Walling -

Sq.mts - - -

- 3.06.00 Internal Partitions -

Sq.mts - - -

- 3.07.00 Internal Doors -

Nos - - -

- 3.08.00 Internal Finishes -

Sq.mts - - -

- 3.08.01 Wall Finishes -

Sq.mts - - -

- 3.08.02 Floor Finishes -

Sq.mts - - -

- 3.08.03 Ceiling Finishes -

Sq.mts - - -

- 3.08.04 Stair Finishes -

Sq.mts - - -

- 3.08.05 Balustrade & Handrail Finishes -

Sq.mts - - -

- 3.08.06 Internal Finishes Sundries -

Includes finishes to art works and the like. Item - - - -

3.09.00 External Finishes -

Sq.mts - - -

- 3.09.01 Roof Finishes -

Sq.mts - - -

- 3.09.02 Wall Finishes (External) -

Sq.mts - - -

- 3.09.03 Floor Finishes (External) -

Sq.mts - - -

- 3.09.04 Ceiling Finishes (External) -

Sq.mts - - -

- 3.09.05 Stair Finishes (External) -

Sq.mts - - -

- 3.09.06 Balustrade & Handrail Finishes (External) -

Sq.mts - - -

- 3.09.07 External Finishes Sundries -

Includes finishes to art works and the like. Item - - - -

3.10.00 Fittings and Fixtures -

Sq.mts - - -

- 3.11.00 Plumbing Services -

Sq.mts - - -

- 3.11.01 Rainwater Installations -

Eaves gutters and down pipes. l.mts - - -

- 3.11.02 Sanitary Fittings -

Nos - - -

- 3.11.03 Soil & Waste Installations -

Nos - - -

- 3.11.04 Cold Water Installations -

Nos - - -

- 3.11.05 Hot Water Installations -

Nos - - -

- 3.11.06 Flushing Water Installations -

Nos - - -

- 3.11.07 Fire Fighting Installations -

The main riser to the roof tanks. Item - - - -

3.11.08 Refuse Disposal -

Refuse chutes, fittings and fixtures. Nos - - -

- 3.11.09 Plumbing Services Sundries -

Item - - -

- 3.12.00 Builder’s Work in Connection with Services -

All contractor’s preliminary costs not otherwise included in the unit rates.

Pile caps, ground beams, tie beams, structural walls, columns etc. including excavation, blinding, concrete, reinforcement and formwork.

Basements, lift and escalator pits including bulk excavation, external walls, tanking and filling around external walls. Including diaphragm walls and barrettes.

Ground floor and lowest basement slabs, including reduce level excavation,hardcore filling, membranes, concrete, reinforcement and formwork. Includesthickening out for non-structural walls.

Service ducts including excavation, concrete, reinforcement and formwork. Underpinning and all temporary support.

All structural elements of the building above ground floor slab, constructed inreinforced concrete.

Columns and beams, fins and projections where part of columns and beams including reinforcement, formwork, fair faced formwork finishes. Portal frames. Includes pre-cast concrete units.

Roof slabs, rainwater gutters, verge or eaves upstand kerbs including reinforcement, formwork, fair faced formwork finishes. Includes pre-cast concrete units.

Suspended floors, upper basement suspended floors, mezzanine floors, balcony floors including reinforcements, formwork, fair faced formwork finishes. Includes pre-cast concrete units.

Structural walls, lift shaft walls, balcony and parapet walls, fins and projections including reinforcement, formwork, fair faced formwork finishes. Includes precast concrete units.

Stair slabs, treads, risers, intermediate landings, strings and aprons including reinforcement, formwork, fair faced formwork finishes. Includes pre-cast concrete units.

Includes balustrades and handrails to stairs and other locations.

Sundry items, including planter boxes and window boxes. Expansion joints. Includes pre-cast concrete sundries.

All structural elements of the building above ground floor slab, constructed inmaterials other than reinforced concrete.

For structural steel: columns, beams and trusses including concrete or other fire protection, reinforcement, formwork, fair faced formwork finishes. For timber: posts, beams and trusses. For brick/masonry: columns, piers and arches. Portal frames.

Roofs of steel, timber or other material (excluding reinforced concrete).

Suspended floors, mezzanine floors, balcony floors, of steel, timber or other materials (excluding reinforced concrete). Proprietary floors including concrete topping.

Structural walls of steel, timber, brick, masonry or other materials (excluding reinforced concrete).

Includes treads, risers, intermediate landings, strings and aprons.

Includes balustrades and handrails to stairs and other locations.

Roof lights and lantern lights including framing and glass. Includes other structure sundries (excluding reinforced concrete).

Includes all non-structural external walls, cladding, infill panel walls, balcony and parapet walls (other than in reinforced concrete).

Windows and external doors including all glass, ironmongery, louvres, fixings, trimmings, decoration and other associated works. Roller shutter doors and folding doors.

Curtain walling including all glass, panelling, louvres, trimmings, fixings, doors, ironmongery, decoration and other associated works.

Non-structural internal walls and partitions including glazed screens, demountable partitions, proprietary toilet and shower cubicles including doors to same. Liftshaft walls other than reinforced concrete.

All internal doors including frames, architraves, finishes, glazing, fanlights, sidelights, panels over doors (door sets) and ironmongery. Folding and sliding doors, fire doors, strongroom doors, roller shutter doors, wall hatches and duct doors.

Includes all necessary preparatory work (e.g. spatterdash), expansion joints, plasterbeads, stops and the like, and decoration.

Includes plaster, tiles, linings, insulation and grounds behind linings and other decorations; skirtings, dado rails and the like. Finishes to stairwell walls.

Includes screeds, surface finishes, integral skirtings (i.e. same material as floor finish), matwells, threshold and junction strips. False floors laid over structural floors (e.g. computer flooring).

Includes suspended ceilings, framings and supports, ceiling and beam linings, insulation and grounds behind linings, cornices, ceilings access panels, fire stops and sound barriers in ceiling spaces together with framing.

Finishes to treads and risers including nosings, landings, strings and aprons, and soffits of stairs and landings.

Finishes to balustrading and handrails including both sides and top of balustrading.

Includes all necessary preparatory work (e.g. spatterdash), expansion joints, plasterbeads, stops and the like, and decoration.

Complete weather-proof covering to all types of roofs, balconies and decks including coverings, sheetings, flashings, skirtings, gutters, screeds and insulation.

Includes finishes to all fins and other features including both sides and top of balcony and parapet walls. Skirtings, dado rails and the like.

Finishes to roofs, balconies and decks where exposed to foot traffic and the like.

Finishes to external soffits, balcony soffits and the like.

Finishes to treads and risers including nosings, landings, strings, aprons and soffits of stairs and landings.

Finishes to balustrading and handrails including both sides and top of balustrading.

Includes wardrobes, cupboards, shelving, shelving units, sinks, vanitory and bench units, lockers, fixed desks, cloakroom fittings, benches and seating, counters, bars, chalkboards, projection screens, notice boards, curtain track and pelmets, mirrors, towel rails, hose reel cabinets, storage racks and the like. Cat ladders, cat walks and the like. All finishes.

Water supply services, sanitary fittings and waste plumbing, including rainwater and refuse disposal.

Sanitary fittings including sinks, basins, WCs, urinals, complete with taps, traps, cisterns etc.

Includes all types of pipes, fittings and fixings; support systems.

Includes all types of pipes, fittings and fixings; support systems.

Includes all types of pipes, fittings and fixings; support systems.

Includes all types of pipes, fittings and fixings; support systems.

Includes connecting client provided appliances and the like.

Page 2: BOQ Standard Method of Measurement for Building Elements

Item - - -

- 3.13.00 -

Item - - -

- PART-4 MECHANICAL & ELECTRICAL SERVICES - - 4.01.00 Electrics -

Item - - -

- 4.01.01 Incoming Mains -

KVA - - -

- 4.01.02 Main & Submain -

Nos - - -

- 4.01.03 Lighting & Power -

Item - - -

- 4.01.04 Call Bell System -

Nos - - -

- 4.01.05 Electrical Works Associated with Other Services -

Nos - - -

- 4.01.06 Trunking & Tray -

Item - - -

- 4.01.07 Lightning Protection -

Sq.mts - - -

- 4.01.08 Earthing & Bonding -

Item - - -

- 4.01.09 Items Supplied by Government -

Item - - -

- 4.01.10 Electrical Sundries -

Item - - -

- 4.02.00 Low Voltage (LV) Cubicle Switchboards Installation.. -

Item - - -

- 4.02.01 LV Cubicle Switchboards Installation -

Ampere - - -

- 4.02.02 LV Cubicle Switchboards Installation Sundries -

Item - - -

- 4.03.00 Diesel Generating Sets Installation -

Item - - -

- 4.03.01 Diesel Generating Sets Installation -

KVA - - -

- 4.03.02 Diesel Generating Sets Installation -

Item - - -

- 4.04.00 Uniterruptible Power Supply -

Item - - -

- 4.04.01 Uninterruptible Power Supply System -

KVA - - -

- 4.04.02 Uninterruptible Power Supply System Sundries -

Item - - -

- 4.05.00 Broadcast Reception - 4.05.01 Broadcast Reception Installation -

Item - - -

- 4.05.02 Broadcast Reception Installation Sundries -

Item - - -

- 4.06.00 Air-conditioning -

Item - - -

- 4.06.01 Chilled Water System -

KW - - -

- 4.06.02 Condenser Water System -

KW - - -

- 4.06.03 Heating Water System -

KW - - -

- 4.06.04 Steam & Condensate System -

KW - - -

- 4.06.05 Fuel Oil System -

Item - - -

- 4.06.06 Water Treatment -

Item - - -

- 4.06.07 Air Handling & Distribution System -

KW - - -

- 4.06.08 Condensate Drain System -

Item - - -

- 4.06.09 Unitary Air Conditioning System -

KW - - -

- 4.06.10 Cold Rooms -

Cu.mts - - -

- 4.06.11 Mechanical Ventillation System -

Item - - -

- 4.06.12 Staircase Ventilation System -

Sq.mts - - -

- 4.06.13 Kitchen Exhaust System -

Sq.mts - - -

- 4.06.14 Special Exhaust System -

Item - - -

- 4.06.15 Electrical & Control System -

All items required to be carried out by the builder as a direct result of a services or specialist services installation. All holes, pipe sleeves, etc. and the like. Painting on pipes.

Builder’s Profit and Attendance on Mechanical &Electrical Services

Sum required by builder for profit and attendance on nominated subcontractorsand separate contracts.

Includes for all works associated with the supply of electrical power. Additionally those works involved with the provision of call bell system and lightning protection system.

Total maximum designed capacity of the incoming mains.

Includes for all works for the distribution of electricity from the main low voltageswitchboard to submain and final circuit distribution boards or equipment including busbar trunkings, cables, cabling facilities, switchgears and distribution boards.

Includes for all works for the installation of lighting points, power points, luminaires, accessories and electrical appliances including trunkings, cables and cabling facilities

Includes for all works associated with the installation of call bell system

Includes for all works associated with the installation of cabling facilities for other trades such as telephone and PABX system, public address system, CCTV system including the installation of trunkings, ducts, trays, cable ladders, conduits and outlet boxes.

Includes for all works associated with the installation of cabling facilities associated with more than one system including the installation of trunkings, ducts, trays, cable ladders, conduits and outlet boxes.

Includes for all works associated with the installation of lightning protection system including air termination, down conductors and earth electrodes.

Includes for all works associated with the installation of earthing and bonding system including equipotential bonding and earth electrodes.

Includes for all works associated with the fixing only of the items supplied by government.

Includes for all miscellaneous work associated with the electrical installation including marking the position of holes, mortices, chases and the like in the structure, testing and commissioning, preparation of working drawings, builder’s work drawings, "as fitted” drawings and design drawings, provision of mock-ups and/or prototypes, maintenance service other than that require under the defects liability as stipulated in the General Conditions of Contract, tuition of Employer's staff, provision of manuals, fabricated composite support structure, supply conduit and cable sleeves for fixing by other trades, and fire stopping.

Includes for all work and sundry items in connection with the low voltage cubicle switchboards.

Includes for all work in connection with the low voltage cubicle switchboards.

Includes for all miscellaneous work associated with the low voltage cubicle switchboardsinstallation including marking the position of holes, mortices, chases and the like in the structure, testing and commissioning, earthing and bonding, preparation of working drawings, builders’ work drawings, “as fitted” drawings and design drawings, provision of mock-ups and/orprototypes, maintenance service other than require under the defects lia bility as stipulated in the General Conditions of Contract, tuition of Employer’s staff , provision of manuals, supplyconduit and cable sleeves for fixing by other trades, and fire stopping.

Includes for all work associated with the diesel generator sets installation and sundry items

Includes for all work associated with the diesel generator sets installation.

Includes for all miscellaneous work associated with diesel generator sets installation includingmarking the position of holes, mortices, chases and the like in the structure, testing and commissioning, earthing and bonding, preparation of working drawings, builders’ work drawings, “as fitted” drawings and design drawings, provision of mock-ups and/or prototypes, maintenance service other than require under the defects liability as stipulated in the General Conditions of Contract, tuition of Employer’s staff , provision of manuals, supply conduit and cable sleeves for fixing by other trades, and fire stopping.

Includes for all work and sundry items associated with the installation of uninterruptible power supply system.

Includes for all work associated with the installation of uninterruptible power supply system.

Includes for all miscellaneous work associated with uninterruptible power supply system installation including marking the position of holes, mortices, chases and the like in the structure, testing and commissioning, earthing and bonding, preparation of working drawings, builders’ work drawings, “as fitted” drawings and design drawings, provision of mock-ups and/or prototypes, maintenance service other than require under the defects liability as stipulated in the General Conditions of Contract, tuition of Employer’s staff , provision of manuals, supply conduit and cable sleeves for fixing by other trades, and fire stopping.

Includes for all work associated with the installation of broadcast reception system.

Includes for all miscellaneous work associated with broadcast reception installation includingmarking the position of holes, mortices, chases and the like in the structure, testing and commissioning, earthing and bonding, preparation of working drawings, builders’ work drawings, “as fitted” drawings and design drawings, provision of mock-ups and/or prototypes, maintenance service other than require under the defects liability as stipulated in the General Conditions of Contract, tuition of Employer’s staff, provision of manuals, supply conduit and cable sleeves for fixing by other trades, and fire stopping.

Includes for all works associated with the provision of mechanical ventilation and airconditioning including all pipework, insulation, ducting, fan motors, chillers and other plant and equipment, including boilers and unitary air conditioners.

Includes for all works associated with the chilled water system including chillers, water pumps, all pipework, fittings, insulation and valves.

Includes for all works associated with the condenser water system including condensers, water pumps, all pipework, fittings and valves.

Includes for all works associated with the heating water system including hot water boilers, flue, calorifiers, water pumps, all pipework, fittings, valves and insulation.

Includes for all works associated with the steam and condensate system including steam boilers, flue, calorifiers, water pumps, all pipework, fittings, insulation, valves and steam traps

Includes for all works associated with the provision of fuel oil supply to heating water system and steam supply system including fuel storage tank, fuel pumps, all pipework, fittings and valves.

Includes for all works and services associated with water treatment of air conditioning system including metering pumps, chemical storage, electrochemical chlorinator, pipework, fittings and valves.

Includes for all works associated with air handling and distribution installation including air handling units, fan coil units, variable air volume boxes, ventilation fans, air grilles and registers, air ducts, insulation, filters and dampers.

Includes for all works associated with condensate drain system including pipeworks, fittings, valves and insulation.

Includes for all works associated with unitary air conditioning system including condensing units, direct expansion units, pipework, fittings, valves and insulation.

Includes for all works associated with cold room installation including cold room, refrigeration plant, pipework, fittings, valves and insulation.

Includes for all works associated with mechanical ventilation installation including ventilation fans, ductwork, air grilles and registers, filters, dampers and insulation.

Includes for all works associated with staircase pressurisation installation including ventilation fans, ductwork, air grilles and registers, filters and dampers.

Includes for all works associated with kitchen ventilation and kitchen exhaust purificationinstallation including water scrubbers, exhaust hoods, hydro-vent units, roof extractors, ventilation fans, ductwork, air grilles and registers, filters and dampers.

Includes for all works associated with ventilating installation specifically designed for removalof toxic fumes or irritating gases including vehicular exhausts, bio-incinerator exhausts, ventilation fans, ductwork, air grilles and registers, filters and dampers.

Page 3: BOQ Standard Method of Measurement for Building Elements

Percentage - - -

- 4.06.16 Air-conditioning Sundries -

Item - - -

- 4.07.00 Gas Installation -

Nos - - -

- 4.08.00 Fire Services -

Item - - -

- 4.08.01 Fire Hydrant & Hosereel System -

Item - - -

- 4.08.02 Sprinkler System -

Nos - - -

- 4.08.03 Gaseous Extinguishing System -

Nos - - -

- 4.08.04 Audio/Visual Advisory System -

Item - - -

- 4.08.05 Automatic Fire Alarm & Detection System -

Item - - -

- 4.08.06 Portable Hand-operated Appliances -

Includes for all hand held fire fighting equipment. Item - - -

- 4.08.07 Electricity Supply -

Item - - -

- 4.08.08 Control System -

Nos - - -

- 4.08.09 Fire Service Sundries -

Item - - -

- 4.09.00 Horizontal and Vertical Movement Systems -

Item - - -

- 4.09.01 Lifts -

Nos - - -

- Conveyors -

Nos - - -

- Escalators -

Nos - - -

- 4.10.00 Building Automation -

Item - - -

- 4.11.00 Other Specialist Services -

Item - - -

- Kitchen Equipment -

Item - - -

- Other Specialist Installations -

Item - - -

- Mechanical Plant & Equipment -

Item - - -

- PART-5 EXTERNAL WORKS AND DRAINAGE - - 5.01.00 External Works -

Sq.mts - - -

- 5.01.01 Site Preparation -

Includes site clearance and demolition. Sq.mts - - -

- 5.01.02 Retaining Structures -

Retaining walls, crib walls and the like. Sq.mts - - -

- 5.01.03 Site Enclosures & Divisions -

Sq.mts - - -

- 5.01.04 Roads & Pavings -

Sq.mts - - -

- 5.01.05 Hard Landscaping -

Sq.mts - - -

- 5.01.06 Soft Landscaping -

Sq.mts - - -

- 5.01.07 Fittings & Equipment -

Nos - - -

- 5.01.08 External Services -

l.mts - - -

- 5.01.09 Unility Connections -

Item - - -

- 5.01.10 Ancillary Structures -

Nos - - -

- 5.02.00 Drainage -

Item - - -

- 5.02.01 Soil & Surface Water -

l.mts - - -

- 5.02.02 Manholes -

Nos - - -

- 5.02.03 Sewage Treatment -

Item - - -

- 5.02.04 Channels -

l.mts - - -

- 5.02.05 Catchpits -

Nos - - -

- 5.02.06 Drainage Connections -

Item - - -

- PART-6 SITE DEVELOPMENT - - 6.01.00 Site Investigation -

Item - - -

- 6.02.00 Site Formation -

Cu.mts - - -

- 6.03.00 Piling -

Item - - -

- 6.03.01 Sheet Piling -

Sq.mts - - -

- 6.03.02 Driven or Bored Piling -

Includes all types of driven or bored piles. l.mts - - -

- 6.04.00 Caissons -

Item - - -

- 6.04.01 Caisson Piling -

l.mts - - -

- 6.04.02 Caisson Contiguous Walls -

Sq.mts - - -

- PART-7 STORES,FURNITURE & EQUIPMENT - - 7.01.00 Government Stores -

Item - - -

- 7.01.01 Building Stores -

Item - - -

- 7.01.02 M & E Services Stores -

Item - - -

- 7.02.00 Furniture and Equipment -

Item - - -

- 7.02.01 Client Department -

Item - - -

- 7.02.02 Domestic Appliances -

Includes for all works associated with the provision of electrical supply and control of the total air conditioning installation including control cubicle and panels, power and control cables,cabling facilities, sensing devices, central control and monitoring equipment.

Includes for all miscellaneous work associated with the air conditioning installation includingmarking the position of holes, mortices, chases and the like in the structure, testing and commissioning, preparation of working drawings, builder’s work drawings, “as fitted” drawingsand design drawings, provision of mock-ups and/or prototypes, maintenance service other than that require under the defects liability as stipulated in the General Conditions of Contract, tuition of Employer's staff, provision of manuals, fabricated composite support structure, supply conduit, cable and pipe sleeves for fixing by other trades and fire stopping.

Includes for all works associated with the provision of piped or bottle gas including distribution pipework, meters and equipment.

Includes for all works associated with fire fighting, detection, alarming and advisory installation

Includes for all works associated with fire hydrant and hosereel installation including pipework,b fittings, valves, water pumps, hydrant outlets, fire services inlets and hosereels.

Includes for all works associated with water sprinkler installation including pipework, fittings, valves, sprinkler heads, water pumps, sprinkler water inlets.

Includes for all works associated with gas extinguishing installation including gas cylinders,cylinder racks and fixings, pipework, fittings, valves and nozzles.

Includes for all works associated with audio/visual advisory system including microphones, amplifiers, loudspeakers, cassette decks, CD decks, visual directional signs and audio/visual control equipment.

Includes for all works associated with automatic fire alarm and detection installation includingdetectors and alarm signalling devices.

Includes for all works associated with the provision of electricity supply to the fire services installation including power cables, cabling facilities and starters.

Includes for all works associated with control system of the fire service installation including control cables, cabling facilities and control panels.

Includes for all miscellaneous work associated with the fire service installation including marking the position of holes, mortices, chases and the like in the structure, testing and commissioning, preparation of working drawings, builder’s work drawings, "as fitted” drawings and design drawings, provision of mock-ups and/or prototypes, maintenance service other than that require under the defects liability as stipulated in the General Conditions of Contract, tuition of Employer's staff, provision of manuals, fabricated composite support structure, cable and pipe sleeves for fixing by other trades and fire stopping.

Includes lifts, escalators, conveyors and any other form of horizontal or vertical transportation system for people or goods.

Includes for all works associated with the installation of goods or passenger lifts and hoists.

Includes for all works associated with for the installation of a conveyor system.

Includes for all works associated with the provision of escalators.

Includes for all works necessary for the installation of a building automation system including wiring, conduit, trunking, outlets, equipment etc.

Includes for all other specialist services installations not already mentioned above for example, kitchen equipment, specialist medical gases, steam/hot water boilers and other mechanical plant and equipment and the like.

Includes for all works associated with the installation of kitchen equipment.

Includes for all works associated with specialist medical gases, steam/hot water boiler installations and the like.

Includes such items as gondolas, turnstiles, weighbridges, turntables and the like.

Site works beyond the line of the external face of the building structure.

All types of fencing and screen walls constructed in any material.

Any form of road, path, track, highway, parking area including excavation, filling, sub-base,paving material, surface finish, kerbs and road channels. Includes road markings and signs.Highways Office run-in charges.

Flower boxes, planters, integral seating, ornamental ponds etc. and the like.

Includes all grassed and planted areas, trees, shrubs, plants and the like.

Playground equipment, individual benches, seats and the like.

Includes trenches, pipes and cables for incoming water mains, gas, electricity, telephone etc., backfilling, protection, reinstatement as necessary.

Includes all connection charges for any incoming service.

Includes dangerous goods stores, guard houses, dog kennels, covering to carspaces, garages,elevated walkways and the like.

Generally covers all soil and surface water drainage, manholes, channels and catchpits;drainage connections.

Includes trenches, backfilling, pipes, haunching and surrounds.

Includes manholes, inspection chambers, soakaways and the like.

Includes all forms of sewage treatment, e.g. septic tanks, filtration beds and the like.

Includes all surface water channels and the like, gratings and covers.

Includes catchpits and the like in connection with surface water drainage, gratings and covers.

Includes catchpits and the like in connection with surface water drainage, gratings and covers.

Includes catchpits and the like in connection with surface water drainage, gratings and covers.

Site formation and geotechnical works e.g. slope stabilisation.

Includes all types of driven or bored piles and sheet piling.

Includes all necessary works in connection with temporary and permanent sheet piling.

Generally includes hand dug and large diameter driven caissons, contiguous walls, and associated rock anchors and the like.

Includes hand dug and large diameter driven caissons.

Includes hand dug and/or large diameter driven caisson contiguous walls and associated rock anchors and the like.

Includes all items supplied by Government Supplies Department including indent items.

Ironmongery, sanitary fittings, manhole covers and the like supplied by Government Supplies Department.

Items required by the Government Building Services Engineer supplied by Government Supplies Department.

Includes those items required by the client (Government) department and domestic appliances.

Items required by the client (Government) department to be charged to Furniture & Equipment within the project vote.

Page 4: BOQ Standard Method of Measurement for Building Elements

Item - - -

- PART-8 CONSULTANT'S FEES - - 8.01.00 Consultant’s Fees -

All fees chargeable for the specialist services. Item - - -

- 8.01.01 Geotechnical Consultants -

All fees chargeable for the specialist services. Item - - -

- 8.01.02 Architectural Consultants -

All fees chargeable for the specialist services. Item - - -

- 8.01.03 Structural Consultants -

All fees chargeable for the specialist services. Item - - -

- 8.01.04 Building Services Consultants -

All fees chargeable for the specialist services. Item - - -

- 8.01.05 Quantity Surveying Consultants -

All fees chargeable for the specialist services. Item - - -

- 8.01.06 Other Specialist Consultants -

All fees chargeable for the specialist services. Item - - -

- PART-9 CONTINGENCY - - 9.01.00 Contigency -

Item - - -

TOTAL COST- -

Domestic appliances required by the Government Building Services Engineer to be charged to Furniture & Equipment within the project vote.