borehole location (a) and... · office male wc svp dis.wc deliveries / unloading female wc lobby ss...

1
Scale Bar 1:200 @ A1 (Metres) 0 1 2 4 3 5 10 15 20 25 30 L'Avenue de la Commune Clos Saut Falluet PFS SHOP CAR WASH INTERCEPTOR Workshop Tank 2 Unleaded 45,000 litres Tank 1 Diesel 45,000 litres Tank 4 Super Unleaded 15,000 litres Tank 3 Diesel 15,000 litres V2 V4 V1 V3 O1 O2 O3 O4 4m Hazardous Zone 4m Hazardous Zone 4m Hazardous Zone P2 P1 P4 P3 P6 P5 P8 P7 F5 C2a C2b C1 S7 S4 F4 C5 su su su S8 S1 S2 S3 C6 W3 W2 D1 G1 SE1 E6 E8 E7 C8 su E13 E9 E11 E6 BT2 W3 E2 E1 E5 E4 E3 F6 MW1 MW2 2m Hazardous Zone 1m Hazardous Zone 1m Hazardous Zone Carwash Codax SAFE RETAIL AREA CUSTOMER ENTRANCE KIOSK 800x270 500x270 800x270 800x270 KITCHEN & STAFF AREA RWP RWP RWP DELIVERIES ENTRANCE RWP 1200 1000 ATM ELEC BT COMMS CUP'D MANAGERS OFFICE MALE WC svp DIS.WC DELIVERIES / UNLOADING FEMALE WC LOBBY ss ss NIGHT PAY ss ss W1 above ground offset fills & tank vents tanker stand drainage channel drainage channel drainage channel ug tank farm (total capacity 120,000 litres) customer parking customer parking customer parking staff parking company sign ev charging bays ev charging unit electric h/h electric h/h electric h/h electric h/h electric h/h electric h/h electric h/h electric h/h electric h/h electric h/h water h/h water h/h water h/h water h/h water meter bt h/h bt h/h f/w m/h f/w m/h f/w m/h f/w pumping chamber f/w m/h for future connection to pumping chamber f/w m/h f/w m/h f/w m/h c/w m/h c/w m/h c/w m/h c/w m/h s/w m/h s/w m/h s/w m/h s/w m/h s/w m/h s/w m/h s/w m/h data h/h compressor workshop compound pfs compound s/w m/h 4 island starter gate petrol forecourt canopy over at a minimum of 4.6m to u/s 4no. jetwash bays services bay with air/screenwash & vac units sub station LV and meter cup'd card reader air con units gully gully gully gully gully gully gully gully gully gully gully gully tactile paving tactile paving tactile paving tactile paving drainage channel tactile paving tactile paving borehole tte earthing tte earthing tte earthing 1.8m close boarded timber fence kerbline kerbline kerbline kerbline post and rail fence post and rail fence Jetwashes Carwash low level lighting low level lighting low level lighting bollard gravel board footpath new tree existing tree existing tree existing trees new tree new tree existing trees existing tree existing hedge existing hedge existing hedge carwash plant room drainage channel new tree low level planting drop kerbs kerbs kerbs kerbs kerbs kerbs kerbs kerbs gully blister paving drop kerbs drop kerbs drop kerbs drop kerbs drop kerbs drop kerbs tactile paving tactile paving tactile paving drop kerbs drop kerbs drop kerbs drop kerbs drop kerbs 2no. bollards 2no. bollards 4 hoop apollo cycle shelter from Broxap (code BXM/AP) 1.8m close boarded fence 1.8m close boarded fence 1.8m close boarded timber fence 1.8m close boarded timber fence 1.8m close boarded timber fence S13 fw pumping control unit knifegate chamber THIS AREA TO USE 'ULTIMA STAKKBOX' CUBIS SYSTEMS FOR DUCTING rodding eye rodding eye E5 C2c c/w interceptor j/w interceptor f/w m/h s/w m/h s/w m/h gully gully gully gully E12 E10 electric h/h ev charging unit electric h/h existing gully retained existing sw manhole retained gully s/w m/h s/w m/h s/w m/h this section of fence to be knee high 9282 gully area of land to be excavated and levels reduced to form slope down to new gravel board A A B B C C D D area of land to be excavated and levels reduced to form slope down to new gravel board manholes S1,S2 & S3 to be constructed to States of Jersey specification as shown on Dwg No.SD/4E manholes S1,S2 & S3 to be constructed to States of Jersey specifications as shown on Dwg No.SD/4E SITE NOTES CONTRACTORS ARE TO SURVEY & IDENTIFY THE LOCATIONS & STATUS OF ALL INCOMING SERVICES TO THE SATISFACTION OF THE PROJECT MANAGER/CLIENT/AGENT. CONTRACTORS ARE TO SURVEY & PROVIDE COVER & INVERT LEVELS OF ALL EXISTING SURFACE & FOUL WATER DRAINAGE TO THE SATISFACTION OF THE PROJECT MANAGER/CLIENT/AGENT. GRADE CHANGE / REPUMP REQUIREMENTS TYPICAL BUILDERS WORK ă 5HPRYH H[LVWLQJ 3RUWDNDELQ DQG FRQVWUXFW QHZ 3)6 VDOHV %XLOGLQJ DQG QHZ :RUNVKRS WR GHWDLO x Install new Wayne Helix 6000 pumps on new brushed concrete kerbed islands - to detail. (See WPS-ROB-246-T-25 for more details) x Allow for the installation of all litter bins, towel dispensers, pump island signage and column fixed signage. x Install a new 120,000 litre tank farm split 2No. 60,000 litres underground tanks split 45,000/15,000 litres. x Create a new 4 island starter gate petrol forecourt with a new canopy above at a minimum of 4.6m to u/s. x Install new above ground fills and tank vents on Northern boundary. x New min.7600 litre forecourt interceptor installed. x Install new Jetwash interceptor to standard specifications. x Install 4No. new Jetwash bays with screen surrounds. x Erect a new timber trash enclosure by the side of the new PFS. x Excavate trenches for the installation of new pipework. x Install where shown new pole lights. x Install 2No. new EV charging units in designated charging bays. x Install new inspection chambers, drainage channels, gullies, drains and ducts where indicated. x New drainage channels and inspection chambers to have 150mm min concrete margin when situated in a concrete finished area. When situated in a tarmac finished area, deeper frames are to be used so enabling tarmac surrounds. x New Air/Screenwash & Vac Units installed in new services bay. x Re-surface forecourt in concrete, and SMA where indicated. x ALL SERVICES AND DRAINS MUST BE LOCATED PRIOR TO EXCAVATION. The Cart Shed, Amberley Court, Amberley Lane, Milford, Surrey, GU8 5EB, United Kingdom Tel: +44 (0)1483 424704 Email: [email protected] DRAWING Dwg No: Draw By: Date: Scale: Rev: Ξ dŚŝƐ ĚƌĂǁŝŶŐ ŝƐ ƚŚĞ ĐŽƉLJƌŝŐŚƚ ŽĨ tzd, WZK:d^ ^Zs/^ >ƚĚ CAD file ref: A1 original plot size rev date by description CLIENT PROJECT LOCATION Roberts Garages Ltd Springfield Rd Jersey JE2 4LE 2086P Ave de la Commune_Sitemaster_Rev 07.dwg LAND AT L'AVENUE DE LA COMMUNE JERSEY GENERAL WORKS LAYOUT PLAN WPS-ROB-246-T-20 B 1:200 June 2019 DB B 26/07/19 DB Vac unit added to services bay, notes amended to suit. Footpath between crossovers indicated. A 18/07/19 DB Electric sub station and LV cabinet relocated to Car Sales area. Revised site layout. Revised EV charging area and units. Pumps changed. Revised road markings in front of PFS shop. ~ 28/06/19 DB Drawing created General Works Layout Plan Scale 1:200 Borehole location (A)

Upload: others

Post on 05-Jul-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Borehole location (A) and... · OFFICE MALE WC svp DIS.WC DELIVERIES / UNLOADING FEMALE WC LOBBY ss NIGHT PAY ss W1 above ground offset fills & tank vents tanker stand drainage channel

Scale Bar 1:200 @ A1 (Metres)

0 1 2 43 510 15 20 25 30

L

'A

v

e

n

u

e

d

e

l

a

C

o

m

m

u

n

e

C

lo

s

S

a

u

t F

a

llu

e

t

PFS SHOP

CAR WASH

INTERCEPTOR

Workshop

Tank 2Unleaded45,000 litres

Tank 1Diesel45,000 litres

Tank 4Super Unleaded15,000 litres

Tank 3Diesel15,000 litres

V2V4V1V3

O1O2O3O4

4m Hazardous

Zone

4m Hazardous Zone

4m Hazardous

Zone

P2P1 P4P3 P6P5 P8P7

F5

C2a C2b

C1

S7

S4

F4

C5

su

su

su

S8

S1

S2

S3

C6

W3

W2

D1

G1

SE1

E6

E8

E7

C8

su

E13

E9

E11

E6

BT2

W3

E2

E1

E5

E4

E3

F6

MW1

MW2

2m Hazardous

Zone

1m

Hazardous

Zone

1m

Hazardous

Zone

Carwash

Codax

SAFE

RETAIL AREA

CUSTOMERENTRANCE

KIOSK

800x

270

500x

270

800x

270

800x

270

KITCHEN &STAFF AREA

RWPRWP

RWP

DEL

IVER

IES

ENTR

AN

CE

RWP

USB 2050

EXTERNAL ATM

with housing

Maximum 1800h

AREA TO BE KEPT CLEAR

1200

1000

ATM

ELEC

BT

COMMS CUP'D

MANAGERSOFFICE

MALE WC

svp

DIS.WC

DELIVERIES /UNLOADING

FEMALE WC

LOBBY

ss ss

NIGHT PAY

ss ss

W1

above groundoffset fills & tankvents

tankerstand

drainagechannel

drainagechannel

drainagechannel

ug tank farm(total capacity120,000 litres)

customerparking

customerparking

customerparking

staff parking

companysign

evchargingbays

evchargingunit

electrich/h

electrich/h

electrich/h

electrich/h electric

h/helectrich/h

electrich/h

electrich/h

electrich/h

electrich/h

waterh/h

waterh/hwater

h/h

waterh/h

watermeter

bt h/h

bt h/hf/wm/h

f/wm/h

f/wm/h

f/wpumpingchamber

f/w m/h for futureconnection topumping chamber

f/wm/h

f/wm/h

f/wm/h

c/wm/h

c/wm/h

c/wm/h

c/wm/h

s/wm/h

s/wm/h

s/wm/h s/w

m/h

s/wm/h

s/wm/h

s/wm/h

datah/h

compressor

workshopcompound

pfscompound

s/wm/h

4 island startergate petrolforecourt

canopy over ata minimum of4.6m to u/s

4no. jetwash bays

services bay withair/screenwash &vac units

substation

LV andmetercup'd

cardreader

air con units

gullygully

gully

gully gully

gully gully gully

gully

gully

gully

gully

tactilepaving

tactilepaving

tactilepaving

tactilepaving

drainagechannel

tactilepaving

tactilepaving

borehole

tteearthing

tteearthing

tteearthing

1.8m close boardedtimber fence

kerbline

kerbline

kerbline

kerbline

postand railfence

postand railfence

Jetwashes

Carwash

low levellighting

low levellighting

low levellighting

bollard

gravelboard

footpath

newtree

existingtree

existingtree

existingtrees

newtree

newtree

existingtrees

existingtree

existinghedge

existinghedge

existinghedge

carwashplantroom

drainagechannel

newtree

low levelplanting

dropkerbs

kerbs

kerbs

kerbs

kerbs

kerbs

kerbs

kerbsgully

blisterpaving

dropkerbs

dropkerbs

dropkerbs

dropkerbs

dropkerbs

dropkerbs

tactilepaving

tactilepaving

tactilepaving

dropkerbs

dropkerbs

dropkerbs

dropkerbs

dropkerbs

2no. bollards 2no. bollards

4 hoop apollocycle shelterfrom Broxap(code BXM/AP)

1.8m closeboardedfence

1.8m closeboardedfence

1.8m close boardedtimber fence

1.8m close boardedtimber fence

1.8m close boarded

timber fence

S13

fw pumpingcontrol unit

knifegatechamber

THIS AREA TO USE 'ULTIMA STAKKBOX' CUBIS SYSTEMS FOR DUCTING

rodding eye

rodding eye

E5

C2c

c/w interceptor

j/w interceptor

f/wm/h

s/wm/h

s/wm/h

gullygully

gullygully

E12

E10

electric h/h

evchargingunit

electrich/h

existinggullyretained

existing swmanholeretained

gully

s/wm/h

s/wm/h

s/wm/h

this section offence to beknee high

92

82

gully

area of land to beexcavated and levelsreduced to form slopedown to new gravelboard

A A

B B

C C

D D

area of land to beexcavated and levelsreduced to form slopedown to new gravelboard

manholes S1,S2 & S3to be constructed toStates of Jerseyspecification as shownon Dwg No.SD/4E

manholes S1,S2 & S3to be constructed toStates of Jerseyspecifications asshown on DwgNo.SD/4E

SITE NOTES

CONTRACTORS ARE TO SURVEY & IDENTIFY THE LOCATIONS & STATUS OF ALL INCOMING SERVICES TOTHE SATISFACTION OF THE PROJECT MANAGER/CLIENT/AGENT.

CONTRACTORS ARE TO SURVEY & PROVIDE COVER & INVERT LEVELS OF ALL EXISTING SURFACE & FOULWATER DRAINAGE TO THE SATISFACTION OF THE PROJECT MANAGER/CLIENT/AGENT.

GRADE CHANGE / REPUMP REQUIREMENTS

TYPICAL BUILDERS WORK· Remove existing Portakabin and construct new PFS sales Building and new Workshop - to detail. Install new Wayne Helix 6000 pumps on new brushed concrete kerbed islands - to detail. (See

WPS-ROB-246-T-25 for more details) Allow for the installation of all litter bins, towel dispensers, pump island signage and column fixed

signage. Install a new 120,000 litre tank farm split 2No. 60,000 litres underground tanks split 45,000/15,000 litres. Create a new 4 island starter gate petrol forecourt with a new canopy above at a minimum of

4.6m to u/s. Install new above ground fills and tank vents on Northern boundary. New min.7600 litre forecourt interceptor installed. Install new Jetwash interceptor to standard specifications. Install 4No. new Jetwash bays with screen surrounds. Erect a new timber trash enclosure by the side of the new PFS. Excavate trenches for the installation of new pipework. Install where shown new pole lights. Install 2No. new EV charging units in designated charging bays. Install new inspection chambers, drainage channels, gullies, drains and ducts where indicated. New drainage channels and inspection chambers to have 150mm min concrete margin when

situated in a concrete finished area. When situated in a tarmac finished area, deeper frames are tobe used so enabling tarmac surrounds.

New Air/Screenwash & Vac Units installed in new services bay. Re-surface forecourt in concrete, and SMA where indicated. ALL SERVICES AND DRAINS MUST BE LOCATED PRIOR TO EXCAVATION.

The Cart Shed, Amberley Court,Amberley Lane, Milford, Surrey,GU8 5EB, United Kingdom

Tel: +44 (0)1483 424704Email: [email protected]

DRAWING

Dwg No:

Draw By:Date:

Scale: Rev:

© This drawing is the copyright of WYETH PROJECTS SERVICES Ltd.

CAD file ref:

A1

original plot size

rev date by description

CLIENT

PROJECT LOCATION

Roberts Garages Ltd

Springfield Rd

Jersey JE2 4LE

2086P Ave de la Commune_Sitemaster_Rev 07.dwg

LAND ATL'AVENUE DE LA COMMUNEJERSEY

GENERAL WORKS LAYOUT PLAN

WPS-ROB-246-T-20 B1:200

June 2019 DB

B 26/07/19 DB Vac unit added to services bay, notes amended to suit. Footpathbetween crossovers indicated.

A 18/07/19 DB Electric sub station and LV cabinet relocated to Car Sales area. Revisedsite layout. Revised EV charging area and units. Pumps changed. Revisedroad markings in front of PFS shop.

~ 28/06/19 DB Drawing created

General Works Layout PlanScale 1:200

Borehole location (A)

DeGruchyCh
Highlight
DeGruchyCh
Line