BOTTLENECK STUDY UPDATE
Pedro Orso-DelgadoPedro Orso-DelgadoDistrict DirectorDistrict Director
District 11District 11
![Page 2: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11](https://reader035.vdocuments.net/reader035/viewer/2022070308/551c5a14550346b1458b51bc/html5/thumbnails/2.jpg)
Presentation Outline
Review Completed Bottleneck Study and Findings
Provide Update of Improvements Completed and Underway at: Otay Mesa/Mesa de Otay Port of Entry San Ysidro/Puerta Mexico Port of Entry
Future Activities
![Page 3: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11](https://reader035.vdocuments.net/reader035/viewer/2022070308/551c5a14550346b1458b51bc/html5/thumbnails/3.jpg)
Background
12/02 Caltrans Tasked by JWC to Address Transportation Infrastructure Supporting POE’s
Develop Border-wide & Multimodal Bottleneck Methodology for U.S.-Mexico
11/04 JWC approved the Final Report of Bottleneck Study - Phase I Case Study: San Diego-Tijuana Gateway
![Page 4: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11](https://reader035.vdocuments.net/reader035/viewer/2022070308/551c5a14550346b1458b51bc/html5/thumbnails/4.jpg)
Study Objectives & Accomplishments
The San Diego-Tijuana gateway was used as a test-bed
Documented results of methodology including challenges and recommendations
The study can be used as a common U.S.-Mexico border-wide framework
Successfully developed a methodology to identify low-cost/high result recommendations
![Page 5: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11](https://reader035.vdocuments.net/reader035/viewer/2022070308/551c5a14550346b1458b51bc/html5/thumbnails/5.jpg)
N3 N4
N1 N2 N5 N6
Methodology
![Page 6: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11](https://reader035.vdocuments.net/reader035/viewer/2022070308/551c5a14550346b1458b51bc/html5/thumbnails/6.jpg)
MEXICO
U.S.A.
Otay MesaCase Example
MEXICOEXPORT
U.S.IMPORT
![Page 7: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11](https://reader035.vdocuments.net/reader035/viewer/2022070308/551c5a14550346b1458b51bc/html5/thumbnails/7.jpg)
Otay Mesa/Mesa de Otay Operational, Minor Infrastructure and
Safety Improvements at Northbound & Southbound Truck Routes
Improve turning radii at various locations Pave emergency lane
Re-route empty lane Add traffic signal
Increase capacity via additional lanes Install concrete barriers
Identify Bottlenecks and Proposed Improvements
![Page 8: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11](https://reader035.vdocuments.net/reader035/viewer/2022070308/551c5a14550346b1458b51bc/html5/thumbnails/8.jpg)
Otay Mesa/Mesa de Otay Northbound Key Improvements
UltimateExpansion
8 lanes
$600,000 to expand from 3 to 4 lanes
4 Lanes completed
![Page 9: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11](https://reader035.vdocuments.net/reader035/viewer/2022070308/551c5a14550346b1458b51bc/html5/thumbnails/9.jpg)
OTAY MESA POENORTHBOUND INFRASTRUCTURE IMPROVEMENTS
![Page 10: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11](https://reader035.vdocuments.net/reader035/viewer/2022070308/551c5a14550346b1458b51bc/html5/thumbnails/10.jpg)
San Ysidro/Puerta Mexico Operational, Minor Infrastructure and
Safety Improvements for cars and pedestrians
Increase number of SENTRI lanes Expand access to SENTRI lanes Extend Pedestrian Bridge
Better utilization of all through lanes Create secondary turn pocket
Enforce “No Parking” zones
Identify Bottlenecks and Proposed Improvements
![Page 11: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11](https://reader035.vdocuments.net/reader035/viewer/2022070308/551c5a14550346b1458b51bc/html5/thumbnails/11.jpg)
13
18
1716
6
11
5
8
23
4
10
12
14
9
1
7
19
15
21
2022Southbound
Northbound
San Ysidro/Puerta Mexico
![Page 12: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11](https://reader035.vdocuments.net/reader035/viewer/2022070308/551c5a14550346b1458b51bc/html5/thumbnails/12.jpg)
San Ysidro/Puerta MexicoNorthbound Key Improvements SENTRI Lanes
Mex
ico
USA
![Page 13: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11](https://reader035.vdocuments.net/reader035/viewer/2022070308/551c5a14550346b1458b51bc/html5/thumbnails/13.jpg)
Existing Exit Lanes
Lane #1 Lane #2 Lane #3 Bus Lane
Proposed Exit Lanes
Caltrans Share: $300 kCBP Share: $200 k
Total Cost: $500 k
U.S. SENTRI Exit Lanes Pre Expansion
![Page 14: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11](https://reader035.vdocuments.net/reader035/viewer/2022070308/551c5a14550346b1458b51bc/html5/thumbnails/14.jpg)
Improvements to relieve bottleneck at inspection area have been implemented in Mexico
Mayor of Tijuana is interested in improving border crossing time into Tijuana
San Ysidro/Puerta MexicoSouthbound Key Improvements
![Page 15: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11](https://reader035.vdocuments.net/reader035/viewer/2022070308/551c5a14550346b1458b51bc/html5/thumbnails/15.jpg)
Next Steps
Continue to work with local and federal agencies to complete improvements identified in Bottleneck Study
Phase II Other Border Gateways (Unfunded)
Phase III U.S./Mexico Border-wide Bottleneck Report (Unfunded)
![Page 16: BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11](https://reader035.vdocuments.net/reader035/viewer/2022070308/551c5a14550346b1458b51bc/html5/thumbnails/16.jpg)
Questions ?