bpr final gr 5

23
8/14/2019 Bpr Final Gr 5 http://slidepdf.com/reader/full/bpr-final-gr-5 1/23 GROUP NO - 5 GROUP NO - 5  PRESENTED BY GYANADEV BOXI(18) MANOROMA BARA(26)  Business Process Re- Business Process Re-

Upload: trideepsahu

Post on 30-May-2018

227 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Bpr Final Gr 5

8/14/2019 Bpr Final Gr 5

http://slidepdf.com/reader/full/bpr-final-gr-5 1/23

GROUP NO - 5GROUP NO - 5

 PRESENTED BY

GYANADEV BOXI(18)

MANOROMA BARA(26) 

Business Process Re-Business Process Re-

Page 2: Bpr Final Gr 5

8/14/2019 Bpr Final Gr 5

http://slidepdf.com/reader/full/bpr-final-gr-5 2/23

CONTENTSIntroduction

FOUR KEY WORDS

Objectives of BP

Pre & Post BPR impactsBenefits of BPRBPR Vs. TQM

BPMSuccesses

Critiques

Conclusion

Page 3: Bpr Final Gr 5

8/14/2019 Bpr Final Gr 5

http://slidepdf.com/reader/full/bpr-final-gr-5 3/23

Re-engineering(BPR)vRe-engineering is the fundamental ,rethinking and radical

redesign of business processes to achieve dramaticimprovements in critical contemporary measures of performance such as

cost

quality

service

Speed

vAlso called as Business Process Redesign

Business Transformation

Business Process Change Management

Page 4: Bpr Final Gr 5

8/14/2019 Bpr Final Gr 5

http://slidepdf.com/reader/full/bpr-final-gr-5 4/23

Four Key Words Fundamental

Why we do what we do ? Why we do it the way we do it ?

Radical getting to the root of the thing instead of making only superficial changes.

Page 5: Bpr Final Gr 5

8/14/2019 Bpr Final Gr 5

http://slidepdf.com/reader/full/bpr-final-gr-5 5/23

Four Key Words (contd..)Dramatic -Dramatic means Achieving Not for marginal or incremental improvements

Only when need exists for “heavy blasting”

Process It is a collection of tasks that takes one or

more kind of Input & creates an output that is of value to customer.

Page 6: Bpr Final Gr 5

8/14/2019 Bpr Final Gr 5

http://slidepdf.com/reader/full/bpr-final-gr-5 6/23

Contd..

Ex-

-Development of new Product.

-Creating a Market planning. 

Page 7: Bpr Final Gr 5

8/14/2019 Bpr Final Gr 5

http://slidepdf.com/reader/full/bpr-final-gr-5 7/23

OBJECTIVEüIMPROVE EFFICENCY

üINCREASE EFFECTIVENESS

üCOST SAVING IN LONGER RUN

üINCREASE FLEXIBILITY & ADAPTIBILITYTOCHANGE

üENABLE NEW BUSINESS GROWTH

Page 8: Bpr Final Gr 5

8/14/2019 Bpr Final Gr 5

http://slidepdf.com/reader/full/bpr-final-gr-5 8/23

BPR CYCLE

Page 9: Bpr Final Gr 5

8/14/2019 Bpr Final Gr 5

http://slidepdf.com/reader/full/bpr-final-gr-5 9/23

STEPS OF BPRVISSION

IDENTIFY&UNDERSTANDPROCESS

REDESIGN

IMPLEMENT

Page 10: Bpr Final Gr 5

8/14/2019 Bpr Final Gr 5

http://slidepdf.com/reader/full/bpr-final-gr-5 10/23

BEFORE BPR

-NO. OF DEPARTMENTS NO OF TASKS

CHANGES OF OWNERSHIP

QUERRYMARKETI

NG DESIGN

PRODUCTION/ENGINEERINGCOSTING

Page 11: Bpr Final Gr 5

8/14/2019 Bpr Final Gr 5

http://slidepdf.com/reader/full/bpr-final-gr-5 11/23

AFTER BPR

NO COMPLICATION

NO. OF TASKS/PROCESS

REDUCED

QUERRY MARKETING

QUERRY-RESPONSEAPPLICATION SUPPORT

SYSTEM

Page 12: Bpr Final Gr 5

8/14/2019 Bpr Final Gr 5

http://slidepdf.com/reader/full/bpr-final-gr-5 12/23

Benefits30-35%-decrease in cost of sales

65-70%-decrease in cost of quality

60-80% - decrease in inventory35-40%- decrease in manpower

Increase in market share

Page 13: Bpr Final Gr 5

8/14/2019 Bpr Final Gr 5

http://slidepdf.com/reader/full/bpr-final-gr-5 13/23

WHAT IS NOT BPR?(A MIS-

 TQM

IS0-9000

DOWNSIZING

RESTRUCTURING

AUTOMATION

CHANGE MANAGEMENT

Page 14: Bpr Final Gr 5

8/14/2019 Bpr Final Gr 5

http://slidepdf.com/reader/full/bpr-final-gr-5 14/23

09/10/09

BPR and TQM rPutting the customer first

rAdopting a process viewpoint

rFavouring partnerships with customersand suppliers

rPromoting teamwork

Page 15: Bpr Final Gr 5

8/14/2019 Bpr Final Gr 5

http://slidepdf.com/reader/full/bpr-final-gr-5 15/23

09/10/09

BPR and TQM 

  TQM BPR

r Theme improving reinventing

r Approach incremental radical

r Assumption sound process brokenprocess

r Cognitive style analytical creative

r Management style empowered directive

r Change limited to process holisticr Goal enhancement stretch

r Role of IT secondary fundamental

Page 16: Bpr Final Gr 5

8/14/2019 Bpr Final Gr 5

http://slidepdf.com/reader/full/bpr-final-gr-5 16/23

Implementation of BPR

Business Process Management

Business Process Management (BPM) is afield of management focused on aligningorganizations with the wants and needs of clients.

Holistic management approach that promotes business effectiveness and efficiency

while striving for innovation, flexibility, andintegration with technology.

process optimization process

Page 17: Bpr Final Gr 5

8/14/2019 Bpr Final Gr 5

http://slidepdf.com/reader/full/bpr-final-gr-5 17/23

BPM

Page 18: Bpr Final Gr 5

8/14/2019 Bpr Final Gr 5

http://slidepdf.com/reader/full/bpr-final-gr-5 18/23

Impact of BPM

Page 19: Bpr Final Gr 5

8/14/2019 Bpr Final Gr 5

http://slidepdf.com/reader/full/bpr-final-gr-5 19/23

SUCCESS STORIESGM Corporation

DELL

Ford Motor Company

P&G Corporation

Page 20: Bpr Final Gr 5

8/14/2019 Bpr Final Gr 5

http://slidepdf.com/reader/full/bpr-final-gr-5 20/23

Page 21: Bpr Final Gr 5

8/14/2019 Bpr Final Gr 5

http://slidepdf.com/reader/full/bpr-final-gr-5 21/23

Conclusion/SummaryRe-engineering- A radical design

(Cost, Quality, Service, Speed)

Why we do what we do ?

Why we do it the way we do it ?

Objectives-Efficiency and effectiveness of BPR

Pre and Post-BPR effects and stepsDifference and advantage of BPR over TQM

BPR-BPM

Page 22: Bpr Final Gr 5

8/14/2019 Bpr Final Gr 5

http://slidepdf.com/reader/full/bpr-final-gr-5 22/23

Literature Cited

Abu-ghararah, Z. H., and C. W. Randall. 1991. The effect of organic compounds on biologicalphosphorus removal. Water Science and 

Technology 23:585-94.Bates, D. M., and D. G. Watts. 1988. Nonlinear 

regression analysis and its application. JohnWiley & Sons, Inc., New York.

Benefield, L. D., and C. W. Randall. 1980.Biological process design for wastewater treatment . Prentice-Hall, Inc., Englewood Cliffs,NJ.

Chen, S. T. 1996. Fortran ro ram for nonlinear

Page 23: Bpr Final Gr 5

8/14/2019 Bpr Final Gr 5

http://slidepdf.com/reader/full/bpr-final-gr-5 23/23