BRC-A Queensland Launch
Monday 25th Nov 2019
Jackie McKeon, Program Director, BRC-A
Jonathan Prendergast, Technical Director, BRC-A
BRC-A & Renewable PPAs
![Page 2: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/2.jpg)
237 companies with SBTs
![Page 3: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/3.jpg)
RE100 – 211 Companies
![Page 4: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/4.jpg)
Renewable PPAs in Australia
https://www.energetics.com.au/insights/knowledge-centres/corporate-renewable-ppa-deal-tracker/
![Page 5: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/5.jpg)
Why PPAs?
![Page 6: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/6.jpg)
Why PPAs?
• Fastest way to reach
ambitious targets
• Volatility of electricity
market
• Renewable energy cost
reduction:
Cheap enough for
benefits to be worth the
costs
An energy buyer may seek a PPA to secure lower energy pricing as a PPA can
reduce the cost of electricity below standard retail offer.
‘A well negotiated PPA can potentially provide savings between 15-47% on the
energy component of a typical electricity bill expected in 2020’ (Energetics, 2018)
![Page 7: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/7.jpg)
PPA pricing?
Technology costs and competition mean renewable PPAs offer savings to market
price
20
10
20
11
20
12
20
13
20
14
20
15
20
16
20
17
20
18
20
19
0
50
100
150
200
250
300
350
$/M
Wh
(re
al 2
01
9)
PPA Price NSW Price
Technology costs
Competition
20-30
RE targets
![Page 8: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/8.jpg)
How does a PPA work?
![Page 9: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/9.jpg)
Case Study I: Retail & Aggregation
Australian Hotels Association Australia
and ENGIE AU/NZ
Type Buyer Developer Retailer Project Volume Term
Retail, Aggregation
AHA ENGIE Simply Energy
Silverleaf Solar Farm, 120MW AC
N/A 10 years from Jan 2020
![Page 10: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/10.jpg)
Case Study II: Wholesale
Coles and Metka EGN
Type Buyer Developer Retailer Project Volume Term
Wholesale Coles Terrain, acq. MetkaEGN
N/A June + Wagga + Corowa Solar = 90MW
>154GWh p.a.; 10% of total load
10 years from Jul 2020
![Page 11: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/11.jpg)
Case Study III: Wholesale & Aggregation
Intelligent Water Network/
Zero Emissions Water and Total Eren
Type Buyer Developer Retailer Project Volume Term
Wholesale, Aggregation
13 Water Utilities
Origin N/A Kiamal Solar Farm, 200MW AC
N/A N/A
![Page 12: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/12.jpg)
Case Study IV: Small Retail
Ascham School and Flow Power
Type Buyer Developer Retailer Project Volume Term
Retail (small) Ascham School
N/A Flow Power Wind, Solar 90% N/A
![Page 13: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/13.jpg)
Case Study V: Aggregation
Victorian Greenhouse Alliances
Type Buyer Developer Retailer Project Volume Term
Aggregation 48 Local Councils
RFP soon RFP soon RFP soon 246GWh p.a.; 44%
RFP soon
![Page 14: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/14.jpg)
National PPA market
▪ Large deals are mostly
Wholesale PPAs
▪ Australian Market is rapidly
diversifying into Retail
PPAs & mid-sized buyers
▪ Market is consolidating
![Page 15: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/15.jpg)
58 Projects
2260 MW Contracted
5200 MW Projects
Supported
Corporate PPAs so far
![Page 16: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/16.jpg)
▪ Coles, NSW Solar Farms (x3) – 90 MW
▪ Bluescope, Finley Solar Farm (NSW) - 133 MW
▪ Westpac, Bomen Solar Farm – 63 GWh
▪ Mars, Kiamal Solar Farm – 220 MW (project)
▪ Kelloggs, Beryl Solar Farm (NSW) - ~25 MW
Recent large PPA deals
![Page 17: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/17.jpg)
Corporate PPAs an important segment in
diversified market
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2017 Q3 2017 Q4 2018 Q1 2018 Q2 2018 Q3 2018 Q4 2019 Q1 2019 Q2 2019 Q3
Utility PPAs Corporate PPAs Government PPAs Merchant projects
![Page 18: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/18.jpg)
Corporate PPAs & Energy Transition
-100
100
300
500
700
900
1,100
1,300
1,500
2016Q2
2016Q3
2016Q4
2017Q1
2017Q2
2017Q3
2017Q4
2018Q1
2018Q2
2018Q3
2018Q4
2019Q1
2019Q2
2019Q3
Electricity market (Utility PPAs & Merchant Projects)
Non-electricity market (Corporate PPAs & government auctions)
![Page 19: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/19.jpg)
Mostly supporting new deals
71
22
7
New Project Confirmed Project Operating
Capacity contracted through PPAs (%, MW)
5919
22
New Project Confirmed Project Operating
Number of PPAs (%)
![Page 20: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/20.jpg)
Growing diversity in deal size
<20MW 20-50MW 50-100MW 100MW+
0
5
10
15
20
25
30
35
40
Average size (44 MW) and Median (30 MW) falling as smaller Retail PPAs become more common
![Page 21: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/21.jpg)
Where are the deals?
0.0
5.0
10.0
15.0
20.0
25.0
![Page 22: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/22.jpg)
Victoria is currently leading
0
200
400
600
800
1000
1200
Victoria QLD SA NSW Tas
![Page 23: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/23.jpg)
Queensland generation
![Page 24: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/24.jpg)
▪ $59 / MWh last 12 months for solar farms (plus
LGCs)
▪ Low Solar Farm costs
▪ Solar Farms excellent winter production
▪ Wind farms excellent uncorrelated production
▪ Transmission constraints & Abundant Generation
Queensland market
![Page 25: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/25.jpg)
Queensland solar PPAs
$0
$20
$40
$60
$80
$100
$120
2019 2020 2021 2022 2023
$/M
Wh
Solar Farm PPA - Annual Costs and Revenues - Scenario 2
NEM Pool Revenue RECs Revenue Solar Farm PPA Cost
![Page 26: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/26.jpg)
▪ Highly dependent on market changes
▪ Aggregation for large scale wind
▪ Retail PPAs to maximise use of low cost solar
Queensland PPA outlook
![Page 27: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/27.jpg)
PPA scale
Very Large200 GWh +
p.a.Over
100 MW
Project finance over
$100m
Very cost competitive
PPA
Large50-200 GWh
p.a.Over
30 MW
Project finance over
$30m
Competitive PPA
Medium20-50 GWh
p.a.Over
10 MWFinance mix Partial PPA
SmallUnder
20 GWh p.a.Under 10 MW
Project finance
challenge
Other options
![Page 28: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/28.jpg)
Options for smaller buyers?
• Retail PPAs
• Group PPAs / aggregation
• PPA with existing wind or solar
farm
• Intermediated
• Other (LGC only, self-investment,
others)
![Page 29: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/29.jpg)
BUYERS, DEVELOPERS SERVICE PROVIDERS
PROJECTS MARKETPLACEBUYER PPA RESOURCES COLLABORATION TRAINING & EVENTS
https://businessrenewables.org.au
![Page 30: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/30.jpg)
https://members.businessrenewables.org.au/
Members’ portal
![Page 31: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/31.jpg)
https://members.businessrenewables.org.au/
Buyers’ Roadmap
![Page 32: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/32.jpg)
Resource Library
https://members.businessrenewables.org.au/
![Page 34: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/34.jpg)
• Brisbane: early 2020.
• One-and-a-half days, scenario-
based workshop.
• Experienced Buyers’ Faculty.
• Energy Procurement Managers,
Sustainability Managers, Finance
Managers and CFOs, Contracts
Managers / Legal.
• Shared experiences.
• 25 participants, 25 Buyers Faculty
– Chatham House Rules.
• Ask questions, safe environment.
https://businessrenewables.org.au/eve
nts-and-webinars/
Energy Buyers Bootcamp
![Page 35: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/35.jpg)
• Join BRC-A as a member to gain access to the free
resources.
• Attend BRC-A Training ‘Bootcamps’ and webinars. Scenario-
based training with organisations that have executed
• Buyers’ Bootcamp Brisbane (early 2020)
• Developer mini-Bootcamps - TBA
• Webinars
• Online tour of platform
• Industry networking events
• All Energy – 23rd-24th Oct (Melbourne)
• Industry reports and case studies
• One-on-one support
• News & blogs
Where can I learn more…
![Page 36: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/36.jpg)
More information…
www.businessrenewables.org.au
or contact:
Jackie McKeon, Program Director
Jonathan Prendergast, Technical Director
![Page 37: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/37.jpg)
BRC-A Queensland Launch
Monday 25th Nov 2019
Simon Crock, Co-ordinator Commercial Analysis,
Sunshine Coast Council
PPA Buyer Case Study I: Sunshine Coast Council
![Page 38: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/38.jpg)
Solar Farm Project
Brisbane BRC-A Launch & Briefing
25 November 2019
![Page 39: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/39.jpg)
39
![Page 40: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/40.jpg)
40
2010 - 2012 2013 - 2015 2015 - 2016 2017 - 2018
Note:
• Roadmap focuses on PPA - whereas Council went BOO+PPT
![Page 41: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/41.jpg)
41
![Page 42: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/42.jpg)
42
![Page 43: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/43.jpg)
Procurement Design Construct Operate & Maintain
43
EOI
ETI
Tender
2013/14 - 48 Submissions, 10 interviewed – market knowledge
Preferred Supplier
2014 – 4 Shortlisted Entities
2015 – 2 Final Submissions
SIGNED CONTRACT 2016 – $37.5m for ‘D&C’
2015 – Downer Utilities
![Page 44: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/44.jpg)
Procurement – Retail Electricity Services
44
EOI
Shortlist
Tender
2013/14 - 48 Submissions, 5 retailers – market knowledge
Preferred Supplier
Interviewed all
2014 – 2 Final Submissions
SIGNED CONTRACT2014 ESA2017 PPT
2014 – Diamond Energy
![Page 45: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/45.jpg)
45
![Page 46: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/46.jpg)
46
Solar Farm – typical day
![Page 47: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/47.jpg)
47
Solar Farm –typical day
BUY
SELL
BUY
EXPENSE
REVENUE
![Page 48: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/48.jpg)
48
2017- 18 2018 - 19
Monthly generator performance v forecast
![Page 49: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/49.jpg)
Electricity usage and spend
49
![Page 50: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/50.jpg)
Summary – lessons learnt• Alignment with vision and policy• Continuity of personnel• Early, frequent and transparent consultation with key
stakeholders • Consistently revisiting underlying assumptions• Detailed financial modelling with appropriate stress testing• Need for specific multi-disciplinary project teams• Complex contracts tailored to project’s needs and equitable
to both parties.• Managing project schedule to practical completion• Post project performance analysis
50
![Page 51: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/51.jpg)
Thank You
51
![Page 52: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/52.jpg)
BRC-A Queensland Launch
Monday 25th Nov 2019
Andrew Wilson, Manager of Energy & Sustainability,
University of Queensland
PPA Buyer Case Study II: University of Queensland
![Page 53: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/53.jpg)
UQ’s Journey to 100% Renewable:
Warwick Solar FarmAndrew Wilson
Manager – Energy & Sustainability
![Page 54: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/54.jpg)
About UQ
54
• Queensland’s oldest and largest
university – founded in 1910
• Over 52,000 students and around
6,600 FTE staff
• Ranked in Top 50 universities in
the world
• Revenue of A$2 billion+ (2018)
• Main campuses at St Lucia,
Gatton & Herston
![Page 55: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/55.jpg)
Energy impact – St Lucia
55
• 540+ buildings across 25 sites with GFA of almost 800,000 m2
• Electricity usage in 2018 was ~140 GWh
• Gross electricity spend = ~$20 million per annum
• Peak demand = ~25 MW
• Many energy intensive spaces (labs, 24x7 libraries, art galleries)
![Page 56: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/56.jpg)
UQ’s load profile
56
Q4
Q2
Q3
![Page 57: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/57.jpg)
Energy Management at UQ
57
• Significant gains in energy efficiency first – now approaching a ‘ceiling’
• Always had strong focus on solar (e.g. 1.2 MW in 2011, 3.3MW Gatton SF in 2015)
12% reduction
from peak
![Page 58: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/58.jpg)
Warwick Solar Farm – Rationale
58
▪ PPA vs. Build, Own, Operate (BOO)
▪ UQ has a ‘hand’s on’ attitude, building on experience from Gatton SF
▪ More research and engagement opportunities
▪ Unique commercial advantages create LCOE competitive with PPA prices
▪ Desirable site criteria
▪ Greater than 70 MWdc
▪ Driving distance from St Lucia & Gatton campuses
▪ Amenities of a regional centre
▪ Partner with solar developer
▪ Solar development not core business, but have BOO experience
▪ BAU NPV vs. WSF NPV to calculate financial benefit
▪ No ‘new’ money needed for project – just reallocation of Utilities spend
▪ Self retirement of LGC obligation vs. purchase via retailer
▪ Likely cost savings from of managing risk in-house vs. retailer margin
![Page 59: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/59.jpg)
Warwick Solar Farm - History
59
• Building on success of Gatton SF, question asked: “How much land would we need….?”
• March 2017 – Commissioned pre-feasibility study
• May 2017 – Started internal business case development
• August 2017 – Senior Executive committees approved
• October 2017 – UQ Senate approved business case
• December 2017 – Development & sale agreement with Terrain Solar signed
• June 2018 – Public announcement
• November 2018 – Design & construction commenced
• February – work starts on site
• November 2019 – Mechanical Completion
• Early 2020 – Grid commissioning
• Mid-2020 – UQ will be 100% renewable
3 years
from idea
to
completion
![Page 60: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/60.jpg)
The Solar Farm comes to life…
60
![Page 61: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/61.jpg)
The Solar Farm comes to life…
61
![Page 62: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/62.jpg)
The Future of Energy Management at UQ
62
• UQ transitioning to spot price exposure
from 1 Jan 2020
• Future is no longer be about quantity of
kWh used – it is about timing of when
energy is used
• Projects that reduce ‘shoulder’ period
energy usage will of most value to us
• Strong storage and demand response
focus – already underway
• UQ at cutting edge of this now, but
likely to become the ‘new normal’ for
many in ~5 years time
![Page 63: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/63.jpg)
Thank you
facebook.com/uqsustainability
Instagram.com/uqsustaianbility
![Page 64: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/64.jpg)
BRC-A Queensland Launch
Monday 25th Nov 2019
Angela Heck, Senior Manager Sustainability
CitySmart Brisbane
Practical solutions for QLD-based corporates
![Page 65: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/65.jpg)
Educate & Qualify Procure
Repeat
Hosted by
Brisbane RE Buyers Group
The first step in developing a permanent procurement
facility
Identify Interested Buyers
![Page 66: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/66.jpg)
Troy McGrath, Market Development – 07 3007 7004
Angela Heck, Sustainability Marketing & Communications
https://www.citysmart.com.au/news/how-to-reduce-costs-by-buying-renewable-energy-direct/
Thank you
![Page 67: BRC-A Queensland Launch Monday 25th Nov 2019 … · Monday 25th Nov 2019 Jackie McKeon, Program Director, BRC-A Jonathan Prendergast, Technical Director, BRC-A BRC-A & Renewable PPAs](https://reader030.vdocuments.net/reader030/viewer/2022041014/5ec4c92b1be751625a6d9b6c/html5/thumbnails/67.jpg)
BRC-A Queensland Launch
Monday 25th Nov 2019
Thank you!