Briefing to the Portfolio Committee
on the Annual Report
for the 2001/02 financial year
Department of Land Affairs
VISIONVISION
An equitable and sustainableAn equitable and sustainable
land dispensation that promotes social and land dispensation that promotes social and economic developmenteconomic development
ALIGNMENT OF DEPARTMENTAL MISSION WITH POLICY OBJECTIVES
To provide access to land and to extend rights in land, with particular emphasis on the previously disadvantaged communities, within a well planned environment
THE DEPARTMENTAL MISSION IS UNDERPINNED BY THE FOLLOWING
STRATEGIC OBJECTIVES
• Provision of access to land• Provision of rights in land• Improvement & alignment of systems &
processes• Improvement of stakeholder relations• Effective co-ordination of integrated spatial
planning and information
PROGRAMMES THAT SUPPORT DEPARTMENTAL STRATEGIC
OBJECTIVES ARE:
• Programme 1: Administration• Programme 2: Surveys and Mapping• Programme 3: Cadastral Surveys• Programme 4: Restitution• Programme 5: Land Reform• Programme 6: Spatial Planning and Information
The Programmes achieved the following results:
SO 1: Provision of access to landSubprogramme: Land Reform Implementation
Management & Co-ordinationDepartmental Outcomes
Outputs Indicators / Targets
Actual Performance
Reaching Redistribution Targets
Acquisition of land in support of urban renewal programme LRAD audit
Identify State land for the acquisition of urban settlements i.t.o Urban Renewal Programme Compile an audit of all LRAD projects from day of launch of programme to January 2002
Alexandra project: Land identified by cross-functional team with Gauteng Provincial Government Completed. Audit compiled and sent to Minister as a Cabinet memo
SO 1: Provision of access to landSubprogramme: Land Reform Implementation
Management & Co-ordinationDepartmental Outcomes
Outputs Indicators / Targets
Actual Performance
Reaching Redistribution Targets
Revised Farm Equity Policy in line with LRAD
Align grant structure and obtain Ministerial approval
Completed. Minister approved revised policy in March 2001. However question of tenure security in equity schemes remains a pertinent issue that will be looked at in the new financial year
SO 1: Provision of access to landSubprogramme: Land Reform Implementation
Management & Co-ordinationDepartmental Outcomes
Outputs Indicators / Targets
Actual Performance
Reaching Redistribution Targets
Operational manual for LRAD for all land reform implementers The DLA/Land Bank Agency Agreement
Manual accepted by National LRAD task team and disseminated to implementers Agreement accepted by all stakeholders
Achieved Achieved. R50 million was transferred to the Land Bank for release of LRAD grants simultaneously with loan funding to disadvantaged land redistribution participants
Departmental Outcomes
Outputs Indicators / Targets
Actual Performance
Reaching Redistribution Targets
Land Redistributed
Hectares: 518 500 Hectares: 365 993 Projects: 418 Households: 83 530
SO 1: Provision of access to landSubprogramme: Land Reform Implementation
Management & Co-ordination
SO 1: Provision of access to landSubprogramme: Land Reform Implementation
Management & Co-ordinationDepartmental Outcomes
Outputs Indicators / Targets
Actual Performance
Decrease in state owned land
Dispose of 500 000 ha of land
Identify 500 000 ha of State land for disposal
341 705 ha of land identified for issuing of State title on SG Diagrams already available.
Certificates for State title issued and/or land surveyed for 263 972 ha of State land
SO 1: Provision of access to landSubprogramme: Land Reform Implementation
Management & Co-ordinationDepartmental Outcomes
Outputs Indicators / Targets
Actual Performance
Decrease in state owned land
Intergovern-mental programme to confirm vesting of State land
Vest 10% of State land annually
Intergovernmental programme implemented. In addition, 418 237 ha of State land has been confirmed vested, bringing the total of State land confirmed vested to 3,45 million ha
SO 1: Provision of access to landSubprogramme: Land Reform Implementation
Management & Co-ordinationDepartmental Outcomes
Outputs Indicators / Targets
Actual Performance
Decrease in state owned land
Training programme to implement vesting
Programme initiated in July 2001
Ongoing
SO 1: Provision of access to landSubprogramme: Land Reform Systems & Support Services
Departmental Outcomes
Outputs Indicators / Targets
Actual Performance
Provision of land use information
Land use investigations and audits
Conduct 12 land use investigations and 16 land audits
16 land use investigations completed and 16 land audits completed
SO 1: Provision of access to landSubprogramme: Land Reform Systems & Support Services
Departmental Outcomes
Outputs Indicators / Targets Actual Performance
State land administration policy/proce-dures
State land administration, procedures, policy and systems
Assets register compiled (50%)
Item 28 (1) Certificate Register
Public land inventory to be maintained
Communal land administration policy
Asset Register in process of development-to be implemented in next financial year
Register developed and implemented on web-site
SO 1: Provision of access to landSubprogramme: Land Reform Systems
& Support Services(continue)Departmental Outcomes
Outputs Indicators / Targets
Actual Performance
Public Land Inventory maintained and refined. An additional 4 324 State Land parcels have been identified. Land in the ownership of the State is according to the info of the Dept 24,137 million ha.
The policy is part of the Communal Land Rights Bill
SO 1: Provision of access to landSubprogramme: Land Reform Systems & Support Services
Departmental Outcomes
Outputs Indicators / Targets Actual Performance
Communal land administration policy/legislation
Development of Communal Land Administration policy, procedures and systems
Policy on tribal commonage
Draft policy on communal tribal commonage available
SO 1: Provision of access to landProgramme: Restitution
DepartmentalOutcomes
Outputs Indicators / Targets ActualPerformance
Improvedsettlement ofclaims
Claims settled Number of claimsSettled -11 490
Number of householdsbenefited – 33 000
17 783 claims
44 247households
SO 1: Provision of access to landProgramme: Surveys and Mapping
Departmental Outcomes
Outputs Indicators / Targets
Actual Performance
Support to land reform programmes and restitution
To assist with the Land Reform Programme
Research, advise and carry out surveys in support of Land Restitution and Land Reform projects
Assisted with Restitution and Land Reform projects in: Eastern Cape, Simonstown, Waterfall Road, and Cardiff Road, amongst others
SO 1: Provision of access to landProgramme: Cadastral Surveys
Departmental Outcomes
Outputs Indicators / Targets
Actual Performance
Support to land reform programmes and restitution
Provide land reform information and assistance
Use of Directorate by Land and Tenure Reform Branch and Land Claims Commissions
Both formal and informal cadastral spatial data are used by components dealing with land reform and restitution
SO 1: Provision of access to landProgramme: Cadastral Surveys
Departmental Outcomes
Outputs Indicators / Targets
Actual Performance
Better access to land administration systems
Provide land reform information and assistance
Use of Directorate by Land and Tenure Reform Branch and Land Claims Commission
Fully utilised by Land and Tenure Reform Branch and Land Claims Commission
SO 1: Provision of access to landProgramme: Spatial Planning and Information
Departmental Outcomes
Outputs Indicators / Targets
Actual Performance
Better access to land administration
Environmental guidelines and policy to guide sustainable land use
Approval by the Director-General by June 2001
The Director-General approved guidelines in April 2001. A package has been published containing the policy, guidelines and a pamphlet
SO 2: Provision of rights in landSubprogramme: Land Reform Implementation
Management and Co-ordinationDepartmental Outcomes
Outputs Indicators / Targets
Actual Performance
Increase security of tenure
Quality draft Bill produced on time and few amendments
Implementable
plan to be produced on time
March 2002 was planned for the enactment of the Communal Land Rights Act but due to the complexity of the issues and consultation involved, the target could not be achieved
This work formed part of the drafting of Communal Land Rights Bill. By end 2001/2002, this work was still in process
SO 2: Provision of rights in landSubprogramme: Land Reform Implementation
Management and Co-ordinationDepartmental Outcomes
Outputs Indicators / Targets
Actual Performance
Production of Quality Bill
Implementable
amendments produced within stipulated time frames and an amended Act by November 2001
The target was unrealistic and as a result the output was not achieved
This could not be achieved. The Minister did not approve of the amendments to the Upgrading of the Land Tenure Rights Act, 1991 because of the complexity of using this Act to transfer land to African traditional communities, other communities and groups
SO 2: Provision of rights in landSubprogramme: Land Reform Implementation
Management and Co-ordinationDepartmental Outcomes
Outputs Indicators / Targets
Actual Performance
A situational analysis report
Implementable
system for speedy processing of the Labour Tenant Applications
The report was completed in December 2001. As a result of the Report and other Departments’ engagement with the IRSDP processes, there are now 29 projects in the nodal areas (more than the 3 originally planned)
Achieved. The Land Tenure Act was amended and further procedures are being developed for district level delivery
SO 2: Provision of rights in landSubprogramme: Land Reform Implementation
Management and Co-ordinationDepartmental Outcomes
Outputs Indicators / Targets
Actual Performance
System in place within the stipulated time frame
Assessment framework of CPAs Developed and review task team set up to take review further
Implementable regulations, systems and procedures
Achieved. Problem lies in the implementation of the system. The PLRO does not have the capacity to put the system into operation
Achieved Not achieved. Effort redirected
into compilation of framework document for the assessment of all CPAs
SO 3: Improvement & alignment of systems and processes
Sub-programme: Corporate ServicesDepartmental Outcomes
Outputs Indicators / Targets
Actual Performance
Establishment of decentralised delivery systems
Pilot Shared Service Centre (SSC)
Alignment of support service systems and processes
Establishment of the SSC structure
Migration of staff to capacitate and operationalise SSC
All targets were achieved. The SSC has been operational since October 2001
SO 3: Improvement & alignment of systems and processesSub-programme: Land Reform implementation management & co-
ordinationDepartmental Outcomes
Outputs Indicators / Targets Actual Performance
Establishment of decentralised delivery systems
Pilot District Level Delivery (DLD) Framework
Establishment of a district level delivery structure
Compilation of authority and responsibility delegations
Alignment of land reform systems and functions
The DLD process was delayed in order to accommodate a shortened project cycle and revised land reform delegations. This was done to ensure compatibility between DLD structures with the shortented project cycle and land reform delegations
SO 4: Improvement of Stakeholder RelationsProgramme: Spatial Planning and Information
Departmental Outcomes
Outputs Indicators / Targets Actual Performance
Improved and clarified interaction with the Department of Provincial and Local Government (DPLG)
Engagements with Department of Provincial and Local Government
Establish cordial relations with the Department of Provincial and Local Government (DPLG) regarding the integration of spatial plans in the Integrated Development Plans (IDP) process and the funding of spatial plans formulation
Discussions with the Department of Provincial and Local Government have been productive and consensus has been reached w.r.t. the integration of spatial plans into the IDP process
SO 5: Promoting Intra- Departmental Excellence
Programme: Cadastral SurveysDepartmental Outcomes
Outputs Indicators / Targets
Actual Performance
Better access to land administration services
Improved accessibility of land information to all South Africans
Number and location of SG Offices
The establishment of a new SG Office in Nelspruit is under investigation
SO 5: Promoting Intra- Departmental Excellence
Subprogramme: Corporate Services Departmental Outcomes
Outputs Indicators / Targets
Actual Performance
More effective departmental transformation
Annual project plan for mainstreaming of disability rights
Finalisation of project plan with clear objectives, roles and responsibilities, costs and deadlines
Promoting internal awareness of disability activities and national/interna-tional events
A project plan was finalised in May 2001. The plan is being implemented. International day of the disabled was celebrated in December 2001 with all staff with disabilities.
SO 5: Promoting Intra- Departmental Excellence
Subprogramme: Corporate ServicesDepartmental Outcomes
Outputs Indicators / Targets Actual Performance
More effective departmental transformation
A national employment equity committee
Appointment by the DG of a national employment equity manager and senior managers to serve on the national committee
Terms of reference to guide the work of committees
In August 2001 the DG appointed the Chief Director:Corporate Services as the National Employment Equity Manager for the Department. A national committee comprising of all other Chief Directors and Senior Managers from Transformation and HR was established. This committee held its first meeting in September 2001.This committee discussed and approved terms of reference in line with its mandate
SO 5: Promoting Intra- Departmental Excellence
Subprogramme: Corporate Services Departmental Outcomes
Outputs Indicators / Targets Actual Performance
More effective departmental transformation
Employment equity committees in every province
Meetings with managers and staff to establish the type of committee that would best support the institutionalisation of transformation
Two provincial committees were established, in the Western Cape and Gauteng respectively. Arrangements to establish committees in three other provinces are at an advanced stage. The Gauteng and Western Cape provincial committees have also adopted terms of reference
SO 5: Promoting Intra- Departmental Excellence
Subprogramme: Corporate ServicesDepartmental Outcomes
Outputs Indicators / Targets
Actual Performance
More effective departmental transformation
Gender sensitive policies Policy formulation guidelines – (Restitution programme)
Submission of inputs towards the development of the Land Rights Bill Guidelines document for the implementation of the Restitution programme
Inputs on policy were adopted as resolu- tions during the National Tenure Conference in November 2001 Proposed guidelines were presented and adopted by the Restitution Policy Directorate
SO 5: Promoting Intra- Departmental Excellence
Subprogramme: Corporate Services Departmental Outcomes
Outputs Indicators / Targets
Actual Performance
More effective departmental transformation
Capacity building and provision of gender skills
Training and awareness programmes in 4 regional offices of the Restitution commission and 2 Provincial Land Reform Offices
The process involved all staff members within the respective offices. The Provincial Land Reform Offices have also received training
SO 5: Promoting Intra- Departmental Excellence
Subprogramme: Corporate Services Departmental Outcomes
Outputs Indicators / Targets
Actual Performance
More effective departmental transformation
Advocacy Awareness-raising programmes held and topics covered on women and gender issues
Several events were celebrated at which the level of awareness on the three gender instruments (national,regional,in-ternational) was raised. Awareness campaigns also covered crucial topics on womens rights, gender-based violence and land rights
SO 5: Promoting Intra- Departmental Excellence
Subprogramme: Corporate Services Departmental Outcomes
Outputs Indicators / Targets
Actual Performance
More effective departmental transformation
Nine provincial structures; A workplace gender committee in each DLA office i.e. all 60 offices of the Department
Official launch of the structure
One national gender promotion structure has been formed in which most (70%) DLA offices are represented
SO 5: Promoting Intra- Departmental Excellence
Subprogramme: Corporate Services
Departmental Outcomes
Outputs Indicators / Targets
Actual Performance
More effective departmental transformation
A gender implementa-tion strategy for each provincial structure
Nine provincial gender implementation strategies
All provinces have Developed Implementation strategies in line with the national plan
SO 5: Promoting Intra- Departmental Excellence
Subprogramme: Corporate ServicesDepartmental Outcomes
Outputs Indicators Actual Performance
Effective Performance Management
A Public service commitment charter
An approved Charter, signed by the Minister and published in all national languages
Development of the Charter has been widely consulted internally. The 7th draft awaits approval and endorsement by the Minister
SO 5: Promoting Intra- Departmental Excellence
Subprogramme: Corporate ServicesDepartmental Outcomes
Outputs Indicators / Targets
Actual Performance
Effective Performance Management
A service standards guidelines document
One document detailing the services, sub-services and standards of each Chief Directorate
Service standards have been determined and finalised for all key services offered by the Department to internal and external clients. The first edition of this document will be published once the Minister endorses the Public Service Charter
SO 5: Promoting Intra- Departmental Excellence
Subprogramme: Corporate Services
Departmental Outcomes
Outputs Indicators / Targets
Actual Performance
Effective Performance Management
Participation in Batho pele campaigns
Planned activities in every component during Public Service week
The Department co-ordinated over 150 activities
SO 6: Effective co-ordination of integrated Spatial Planning and Information
Programme: Spatial Planning and Information
Departmental Outcomes
Outputs Indicators / Targets
Actual Performance
More effective spatial integration
Legislative documents on more effective spatial integration: White Paper on
Spatial Planning and Land Use Management
Approval by Cabinet
Approval by Cabinet was given on 27 June 2001
SO 6: Effective co-ordination of integrated Spatial Planning and Information
Programme: Spatial Planning and Information
Departmental Outcomes
Outputs Indicators / Targets Actual Performance
More effective spatial integration
Tabling of the Planning Profession Bill in Parliament
Discussions at Portfolio Committee level Tabling of Bill in August 2001
PPB due to be signed by the President
SO 6: Effective co-ordination of integrated Spatial Planning and Information
Programme: Spatial Planning and Information Departmental Outcomes
Outputs Indicators / Targets Actual Performance
More effective spatial integration
Land Use Management Bill
Finalisation of the draft Land Use Management Bill
The final draft is on schedule for submission to Cabinet in last quarter of 2002
SO 6: Effective co-ordination of integrated Spatial Planning and Information
Programme: Spatial Planning and Information
Departmental Outcomes
Outputs Indicators / Targets Actual Performance
More effective spatial integration
Spatial Data Discovery Facility (SDDF)
Populate SDDF with metadata records and nodes
21 nodes established (increased by 4 since 2001) 3180 records in metadata catalogue (increased by 1980 since 2001)
SO 6: Effective co-ordination of integrated Spatial Planning and Information
Programme: Spatial Planning and Information Departmental Outcomes
Outputs Indicators / Targets Actual Performance
More effective spatial integration
Systems to distribute Spatial Data Contacts database
Develop systems to capture, maintain and deploy metadata and spatial data Maintenance of electronic contact list of the Geographical Information Community
Framework Data Set Viewer enables visualisation of framework datasets 1200 records on the Contacts database
SO 6: Effective co-ordination of integrated Spatial Planning and Information
Programme: Spatial Planning and Information
Departmental Outcomes
Outputs Indicators / Targets Actual Performance
More effective spatial integration
Spatial information Standards
1 Standard submitted to SABS annually
Feature Catalogue Methodology added to the list of national standards
SO 6: Effective co-ordination of integrated Spatial Planning and Information
Programme: Spatial Planning and Information
Departmental Outcomes
Outputs Indicators / Targets Actual Performance
More effective spatial integration
Spatial Information Bill
Spatial Information Act passed
Presented to Governance and Admin Cluster of South African DG’s 18 consultation workshops held countrywide
SO 6: Effective co-ordination of integrated Spatial Planning and Information
Programme: Spatial Planning and Information
Departmental Outcomes
Outputs Indicators / Targets Actual Performance
More effective spatial integration
Participation, co-operation during development of NSIF
4 seminars annually 4 Seminars held with a total of 325 attendees
SO 6: Effective co-ordination of integrated Spatial Planning and Information
Programme: Spatial Planning and Information
Departmental Outcomes
Outputs Indicators / Targets
Actual Performance
More effective spatial integration
Web-based Geographical Information Viewer for Dept of Land Affairs
Maintain system Needs analysis visits to 3 Provincial Land Reform offices and Regional Land Claims Commissioner offices.
SO 6: Effective co-ordination of integrated Spatial Planning and Information
Programme: Spatial Planning and Information
Departmental Outcomes
Outputs Indicators / Targets
Actual Performance
More effective spatial integration
Hard copy maps
Produce maps from digital spatial information for the Department of Land Affairs in areas of interest to land reform
Compiled and produced maps to address approximately 200 requests
SO 6: Effective co-ordination of integrated Spatial Planning and Information
Programme: Surveys and Mapping Departmental Outcomes
Outputs Indicators / Targets Actual Performance
National mapping programme
Production of maps in the national map series
Production of topographic medium-scale(1:50 000) maps
Production of 700 orthophoto maps (1:10 000 scale)
Production of 15 small-scale maps (scales ranging from 1:250 000 and 1:500 000)
Production of 9 provincial maps (various scales)
90 820 20 9
SO 6: Effective co-ordination of integrated Spatial Planning and Information (Continue)
Programme: Surveys and Mapping
Departmental Outcomes
Outputs Indicators / Targets Actual Performance
Production of aeronautical charts (1:500 000 scale) on demand
Production of 10 international Civil Aviation Organisation (ICAO) maps (1:1000 000 scale)
16 12
SO 6: Effective co-ordination of integrated Spatial Planning and Information
Programme: Surveys and Mapping Departmental Outcomes
Outputs Indicators / Targets Actual Performance
National mapping programme
To acquire and update geospatial information
Collect, compile & update topographic info for the topographic info Database comprising an area of 65 625 km² (105 sheets) at 1:50 000 mapping standards
To capture/complete data for 1000 maps of the 1:10 000 orthophoto map series
To compile elevation data and compute Digital Elevation Model (DEM) data for 250 maps of the 1:10000 sheet areas
79 sheets completed
1239 sheets
completed 156 sheets
completed-further 119 sheets almost completed
SO 6: Effective co-ordination of integrated Spatial Planning and Information (Continue)
Programme: Surveys and MappingDepartmental Outcomes
Outputs Indicators / Targets Actual Performance
To re-compute the DEM of 800 maps of the 1:10 000 sheet ares to a 25m resolution where raw data does not exist
To continually improve the Topographic info System (TIS) in all aspects by
Adding 30 of the 1:50 000 sheet areas which have to be fully vectorised
Converting the contours of 250 of the 1:10 000 sheets to digital format
Adding 105 new 1:50 000 sheets to the TIS
451 sheet areas computed
65 sheets done 309 sheets done 76 sheets done
SO 6: Effective co-ordination of integrated Spatial Planning and Information
Programme: Surveys and Mapping Departmental Outcomes
Outputs Indicators / Targets Actual Performance
National control survey network
To provide, maintain and upgrade National Control Survey Networks
To extend, inspect and maintain permanent beacons and marks of the national control survey network; 1 400 beacons to be inspected.
To establish a network of 38 permanent GPS base stations (TrigNet)
2 050 beacons inspected
4 town survey mark schemes established
25 established and in operation
SO 6: Effective co-ordination of integrated Spatial Planning and Information
Programme: Surveys and Mapping Departmental Outcomes
Outputs Indicators / Targets Actual Performance
National aerial photography programme
To provide, maintain and update the National Aerial Photography database
To acquire aerial photography covering a total area of 280 000 km² for mapping and library purposes
Total area of 240 000 km² was acquired
SO 6: Effective co-ordination of integrated Spatial Planning and Information
Programme: Surveys and Mapping Departmental Outcomes
Outputs Indicators / Targets Actual Performance
Improved access to spatial information
To supply products on demand within specified turn-around times To provide technical training to personnel
Products supplied within 7 days, on average
Clients are satisfied with the services received
Provide theoretical and practical training to Departmental and other Pupil Survey Officers and Student Industrial Technicians
Products were generally supplied within 5 days, on average Training provided to 26 Departmental trainees and 6 private students
SO 6: Effective co-ordination of integrated Spatial Planning and Information
Programme: Surveys and Mapping Departmental Outcomes
Outputs Indicators Actual Performance
Improved access to spatial information
Establish more outlets to promote accessibility to spatial information
Establish 20% (6) more outlets in under-serviced areas
15 more outlets were established
SO 6: Effective co-ordination of integrated Spatial Planning and Information
Programme: Surveys and Mapping
Departmental Outcomes
Outputs Indicators / Targets Actual Performance
Improved access to spatial information
To provide map awareness and map literacy workshops and material
Provide 15 map literacy workshops
Distribute 2 000 Maptrix kits to schools and other institutions
20 workshops held
2 000 kits were given to education departments for distribution to schools
SO 6: Effective co-ordination of integrated Spatial Planning and Information Programme: Cadastral Surveys
Departmental Outcomes
Outputs Indicators / Targets Actual Performance
Effective information systems
Supply land information in any valid format
Number of users; client satisfaction
Approx. 140 clients per office requesting electronic data; 90% client satisfaction based on client response
SO 6: Effective co-ordination of integrated Spatial Planning and Information Programme: Cadastral Surveys
Departmental Outcomes
Outputs Indicators / Targets Actual Performance
Effective information systems
Capture of land information for supplying in any valid format
Number of users; Client satisfaction
The cadastral spatial data are used for a multitude of applications and were inter alia used by Statistics South Africa for the 2002 Census
SO 6: Effective co-ordination of integrated Spatial Planning and Information Programme: Cadastral Surveys
Departmental Outcomes
Outputs Indicators / Targets Actual Performance
More effective management information system
Digital lodgement
Implementation of digital lodgement system
e-CSS to be developed in conjunction with e-DRS
SO 6: Effective co-ordination of integrated Spatial Planning and Information Programme: Cadastral Surveys
Departmental Outcomes
Outputs Indicators Actual Performance
More effective management information system
Development of components of the cadastral information system
Component software developed and installed; accuracy of data; Client satisfaction
Major developments undertaken on key components; Tools provided to SG offices to improve accuracy and management of data; CIS Users “buy-in” satisfactorily
DEPARTMENT OF LAND DEPARTMENT OF LAND AFFAIRSAFFAIRS
THANK YOU
DEPARTMENT OF LAND DEPARTMENT OF LAND AFFAIRSAFFAIRS
Q&A