brunswick high school feasibility study committee meeting ...€¦ · brunswick high school...
TRANSCRIPT
Brunswick High School Feasibility Study
Committee Meeting #03
February 7, 2019
Today’s Agenda
1. Schedule
2. Area Comparison
3. Review Building Blocks
4. Program Shortfalls
5. Capacity Discussion
Q+A
AprMarFebJan
Feasibility Phase
May
Data Collection
Report Preparation
Committee Meetings
Community Meetings
Final Report
Preliminary Report Draft Report
Project Schedule
Feb 7th Mar 7th Apr 24th
Feb 7th
Project Schedule
Stakeholder + Community Meetings
FS Committee Meetings
Deliverables / Milestones
MEETING DATE TIME LOCATION AGENDA
FS Committee Meeting #1 1/10/2019 2:00pm FCPS Building Project Kick-off
FS Committee Meeting #2 1/24/2019 2:00pm FCPS Building Assessment Findings
Faculty Workshop - Small 2/4/2019 2:30pm Brunswick HS - TBD All staff meeting; project introduction
Faculty Workshop - Large 2/7/2019 11:00 - 12:30 Brunswick HS - TBDMeet with small faculty group during
lunch period
Student Workshop 2/7/2019 1:00pm Brunswick HS - TBDProject Introduction, Stakeholder
Input
FS Committee Meeting #3 2/7/2019 2:00pm Brunswick HS - TBD Ed Spec Review
Community Meeting #1 2/7/2019 6:00pm BHS AuditoriumProject Introduction, Stakeholder
Input
FS Committee Meeting #4 2/21/2019 2:00pm FCPS Building Concept Options - initial
Preliminary Report to FCPS 2/28/2019
FS Committee Meeting #5 3/7/2019 2:00pm FCPS Building Concept Options - refinement
Community Meeting #2 3/7/2019 6:00pm BHS Auditorium Concept Options – feedback
FS Committee Meeting #6 3/21/2019 2:00pm FCPS Building Concept Options - refinement
FS Committee Meeting #7 4/4/2019 2:00pm FCPS Building Review Draft Report
Draft Report to FCPS 4/10/2019
FS Committee Meeting #8 4/18/2019 2:00pm FCPS Building Review Final Report (if required)
Community Meeting #3 4/24/2019 6:00pm BHS AuditoriumPresent Final Options and
recommendations
Final Report to FCPS 4/24/2019
BOE Due Date 5/1/2019
BOE Meeting 5/22/2019
Area Comparison
Overall
Program area with 10% of Ed. Spec.
Program > 10% belowEd. Spec.
Program > 10% aboveEd. Spec.
Unprogrammed areas
Legend
Area Comparison
Overall
Program area with 10% of Ed. Spec.
Program > 10% belowEd. Spec.
Program > 10% aboveEd. Spec.
Unprogrammed areas
Legend
Academic Block
Area Comparison
Academic Block
KEY ISSUES
• Remedy stairs
• Internal rooms @ core
• Undersized Media Center
• ADA upgrades @ doors
• ADA upgrades @ Toilet
• Health suite remoteness
Classrooms 150sf < program
Media Center is 5400sf<Program
Classrooms close to program
CR950 SF
CR778 SF
CR776 SF
CR779 SF
CR764 SF
CR780 SF
CR779 SF
CR776 SF
CR780 SF
FIRST FLOOR SECOND FLOOR
Area Comparison
Academic Block -
Ed Spec Spaces Missing From Existing
Media Center Special Ed.
Administration
CR950 SF
CR778 SF
CR776 SF
CR779 SF
CR764 SF
CR780 SF
CR779 SF
CR776 SF
CR780 SF
Collaboration/Conf.Collaboration/Conf.
Student Services
FIRST FLOOR SECOND FLOOR
Classrooms
CR775 SF
CR775 SF
Area Comparison
Overall
Program area with 10% of Ed. Spec.
Program > 10% belowEd. Spec.
Program > 10% aboveEd. Spec.
Unprogrammed areas
Legend
Performing Arts Block
Area Comparison
Performing Arts Block
Stage is 50% > program area
KEY ISSUES
• Separate back of house
• Limitations to theater
• Music Rooms split
• ADA access to sound booth
• Many P.A. spaces missing
Instrumental Music is 570 sf < program
Insufficient toilet facilities –ADA accessibility
Area Comparison
Performing Arts Block -
Ed Spec Spaces Missing From Existing
Performing Arts
Area Comparison
Overall
Program area with 10% of Ed. Spec.
Program > 10% belowEd. Spec.
Program > 10% aboveEd. Spec.
Unprogrammed areas
Legend
CTE/Mechanical Block
KEY ISSUES
• Separate building, 2’ lower
• Supervision/Access challenge
• Mech rm below grade
• Woodworking + digital arts
Area Comparison
CTE/Mechanical Block
Woodworking program eliminated
Horticulture classroom notin current Ed Spec
Boiler & chiller plant remote from Academic Block
Separate building requires students to leave main bldg.
KEY ISSUES
• Separate building, 2’ lower
• Supervision/Access challenge
• Mech rm below grade
• Woodworking + digital arts
Area Comparison
CTE/Mechanical Block
Ed Spec Spaces Missing From Existing
Animal Science
Horticulture
Transition Ed.
Business Ed.
Area Comparison
Overall
Program area with 10% of Ed. Spec.
Program > 10% belowEd. Spec.
Program > 10% aboveEd. Spec.
Unprogrammed areas
Legend
Dining/Service Block
Area Comparison
Dining & Service Block
Serving line exits through corridor & are 1,308 sf < program
KEY ISSUES
• Undersized dining room
• Inadequate serving lines
• Aged kitchen equipment
• Trash + deliveries @ loading dock
• Courtyard is a plus
• Landlocked in plan
Kitchen delivery crosses corridor
Service/loading area is difficult for trucks to maneuver
Dining is 3,880 sf < program
Area Comparison
Dining & Service Block -
Ed Spec Spaces Missing From Existing
Food Service
Area Comparison
Overall
Program area with 10% of Ed. Spec.
Program > 10% belowEd. Spec.
Program > 10% aboveEd. Spec.
Unprogrammed areas
Legend
Phys Ed Block
Area Comparison
Phys Ed Block
Health suite is remote from Admin. Area
KEY ISSUES
• Gym < 30 years old
• Access to fields
• Underutilized lobby space
• Health Room location
• No wrestling room
• Room to grow on site
• Locker/shower updates
• No Varsity Team Rooms
No Team Locker RoomsInsufficient athletic storage
Conditioning Room is 730 sf< program
Area Comparison
Phys Ed Block
Ed Spec Spaces Missing from Existing
PE & Athletics
First Floor Plan
Plan Review
Second Floor Plan
Space
No. of
Spaces Net Sq. Ft.
Total Net
Sq. Ft.
Total Dept.
Sq. Ft.
No.
Teaching
Stations
General 23025
General Purpose Classroom 25 775 19375 25
Storage 3 350 1050
Conference/Planning Room 3 200 600
Collaborative Learning Spaces (Study) 10 200 2000
Restroom (Boys) (Existing) 0 0 0
Restroom (Girls) (Existing) 0 0 0
Resource Center Office / Seminar (Existing) 0 0 0
Science 14040
Lab, Biology 3 1360 4080 3
Lab, Chemistry 2 1360 2720 2
Lab, Physics 2 1360 2720 2
Lab, Physical Science 2 1360 2720 2
Preparation Area 2 200 400
Storage Room 4 300 1200
Chemical Storage Room 1 200 200
Technical Education
Foundations 14140
Foundations Lab 2 1900 3800 2
Storage 2 200 400
Classroom (Existing) 0 0 0
Foundations Support Rooms (Existing) 0 0 0
Restroom (Boys) (Existing) 0 0 0
Restroom (Girls) (Existing) 0 0 0
Restroom (Unisex) (Existing) 0 0 0
Computer Business Education
Computer Lab 1 1060 1060 1
Storage 1 100 100
Animal Science
Labs 1 1280 1280 1
Storage 1 200 200
Horticulture
Lab 1 1400 1400 1
Storage 1 200 200
Head House 1 300 300
Green House 1 1200 1200
Seminar Room (Existing) 0 0 0
Horticulture Support (Existing) 0 0 0
Auto Shop
Shop 1 3400 3400 1
Parts and Tools Storage 1 350 350
Classroom 1 450 450
Business Education 2050
Transition Education
Classroom 1 775 775 1
Storage 1 200 200
Business Program
Classroom/Lab 1 975 975 1
Storage 1 100 100
Family and Consumer Science/Life Skills 2575
Food Lab 1 975 975 1
Child Development Lab 1 1200 1200 1
Storage 1 300 300
Office 1 100 100
Living Room (Existing) 0 0 0
Grooming (Existing) 0 0 0
General Purpose (Existing) 0 0 0
General Purpose Toilet (Existing) 0 0 0
Draft BHS - 1300 SRC
Educational
Specifications
Design Capacity 1300
Design Capacity 900
Delta of 400 students = 16 teaching spaces
Core spaces to remain for 1300 SRC
Your Site
LITTLE LEAGUE
Q+AAny questions?