bs2 main report v2
TRANSCRIPT
-
8/14/2019 Bs2 Main Report v2
1/23
PROINTEC S.A.
Avda. de Burgos, no. 12,28036, Madrid - Spain
MINISTRY OF TRANSPORTS,CONSTRUCTIONS AND TOURISM
Dinicu Golescu Blvd., no. 38,Bucharest - Romania
LOUIS BERGER SAS
Tour Mercure III - 55 BIS, Quaide Grenelle, 75015, Paris -
France.
Road Safety ReportDraft
ALBESTI-PALEOLOGU LOCATION
BS N O . 2DN 1B Km 17+000 18+000
Version 1.0
16/07/2007
Produced by PROINTEC& LOUIS BERGER Consortium
-
8/14/2019 Bs2 Main Report v2
2/23
TECHNICAL ASSISTANCE FOR THE PREPARATION OF AROAD SAFETY PIPELINE OF PROJECTS
Draft
Document presentation
Table of Contents
1 BLACK SPOT n 02 ............................................................................................................... 3
2 ACCIDENTS DATA AND INFORMATION ...................................................................... 4
3 DATA ANALYSIS .................................................................................................................. 9
4 DESCRIPTION OF THE SITUATION ............................................................................ 12
5 SAFETY DIAGNOSIS ....................................................................................................... 20
6 MAIN PROPOSED SOLUTIONS ..................................................................................... 21
16.07.2007 Page 2 of 23 Version 1.0
-
8/14/2019 Bs2 Main Report v2
3/23
-
8/14/2019 Bs2 Main Report v2
4/23
TECHNICAL ASSISTANCE FOR THE PREPARATION OF AROAD SAFETY PIPELINE OF PROJECTS
Draft
2 ACCIDENTS DATA AND INFORMATION
The main analysis for this location and the typology of accidents are presented in this chapter.
Following are shown the accidents and the traffic data from NAR.
Data From List of BS (NAR)
Nr. crt. RegionalDirectorate JudetNational
RoadStart
KilometreEnd
KilometreAccidentnumber Fatalities
Seriouslyinjured AADT
02 BUCHAREST Prahova 1B 17+000 18+000 9 5 4 21524
The safety analysis of the BS is carried out on the base of the Accident Data Base and takesinto consideration the ranges of years between 2001 2006 and the distances between km17+000 18+000.
Data From Accidents Database
Location Data BUCHAREST
Judet Prahova
Location
National Road DN1B Ploiesti Buzau
Cumul. dist. (m)
from Km 17+000
to Km 18+000
distance Km 1+000
Accidents Data per Year
Year Accidents Seriously injured Dead
2001 3 1 2
2002
2003 4 3 1
2004 2 2
2005
2006
Total 9 4 5
16.07.2007 Page 4 of 23 Version 1.0
-
8/14/2019 Bs2 Main Report v2
5/23
TECHNICAL ASSISTANCE FOR THE PREPARATION OF AROAD SAFETY PIPELINE OF PROJECTS
Draft
Accident Data per Km
Cumul. dist. (m) Accidents Seriously injured Dead
17000 1 0 1
17000 1 0 1
17130 1 1 017300 1 0
17450 1 1 0
17615 1 1 0
17700 1 0 1
17750 1 0 1
18000 1 0 1
The following diagrams highlight the annual trends of accidents and the location of the moredangerous places along the considered section.
The causes of the accidents are shown into the following table.
The columns extracted from the database give for each accident information about:
the location and the periods:
the general causes and typologies of the accident:
the actual characteristics of the section lanes, shoulders, type of pavement:the elements of road safety situation of lighting, paved, road marking and signaling.
16.07.2007 Page 5 of 23 Version 1.0
-
8/14/2019 Bs2 Main Report v2
6/23
TECHNICAL ASSISTANCE FOR THE PREPARATION OF AROAD SAFETY PIPELINE OF PROJECTS
Draft
16.07.2007 Page 6 of 23 Version 1.0
Data Acc. Drum Artera Judet In Localitate Localitate Deplasament
17.10.2004 20:00 DN1BPloiesti-Mizil-D.N.2(Buzau) PRAHOVA DA
VALEACALUGAREASCA 17000
23.10.2001 23:00 DN1BPloiesti-Mizil-D.N.2(Buzau) PRAHOVA DA ALBESTI-PALEOLOGU 17000
23.02.2001 09:00 DN1BPloiesti-Mizil-D.N.2(Buzau) PRAHOVA DA ALBESTI-PALEOLOGU 17130
27.11.2003 14:15 DN1BPloiesti-Mizil-D.N.2(Buzau) PRAHOVA DA CHITORANI 17300
13.11.2003 19:15 DN1BPloiesti-Mizil-D.N.2(Buzau) PRAHOVA DA
VALEACALUGAREASCA 17450
25.02.2003 23:00 DN1BPloiesti-Mizil-D.N.2(Buzau) PRAHOVA DA
VALEACALUGAREASCA 17615
25.03.2001 21:15 DN1BPloiesti-Mizil-D.N.2(Buzau) PRAHOVA DA ALBESTI-PALEOLOGU 17700
15.12.2004 06:00 DN1BPloiesti-Mizil-D.N.2(Buzau) PRAHOVA DA
VALEACALUGAREASCA 17750
24.08.2003 22:45 DN1BPloiesti-Mizil-D.N.2(Buzau) PRAHOVA DA
VALEACALUGAREASCA 18000
-
8/14/2019 Bs2 Main Report v2
7/23
TECHNICAL ASSISTANCE FOR THE PREPARATION OF AROAD SAFETY PIPELINE OF PROJECTS
Draft
16.07.2007 Page 7 of 23 Version 1.0
-
8/14/2019 Bs2 Main Report v2
8/23
TECHNICAL ASSISTANCE FOR THE PREPARATION OF AROAD SAFETY PIPELINE OF PROJECTS
Draft
16.07.2007 Page 8 of 23 Version 1.0
-
8/14/2019 Bs2 Main Report v2
9/23
TECHNICAL ASSISTANCE FOR THE PREPARATION OF AROAD SAFETY PIPELINE OF PROJECTS
Draft
3 DATA ANALYSIS
For each BS site two parameters are used for the data analysis:
Annual Accident Rate (AR): Number of Deaths per hectometer.
The calculus of this rates have been carried out considering the number of the accident andthe number of Deaths indicated on the NAR list but taking the length from the database (seethe graph of dangerous section).
The table shows the Rates and the values used for the calculus.
Indicator reference to 2001 2006BS N. 02
Accident Rate Annual accident rate values ( AR )
AR = (106
* A) /365 * ADT * L * t 0,229
Accident A 9
Daily Traffic ADT 21524
lengtht of branch L (Km) 1.0
T (years) t 5
Fatalities per hectometer =(Dead / L )/ t 0,01
Dead D 5
L (length) L (hm.) 1000t (years) t 5
In the next figures, the accidents rate, injuries rate and the death rate from Romania are presented.
16.07.2007 Page 9 of 23 Version 1.0
-
8/14/2019 Bs2 Main Report v2
10/23
TECHNICAL ASSISTANCE FOR THE PREPARATION OF AROAD SAFETY PIPELINE OF PROJECTS
Draft
Figure Accidents rate, injuries rate and the death rate in Romania (source: Romanian NationalPolice Department)
Figure Vehicle rate in Romania (source: Romanian National Police Department)
Table 2 Mortality rate in Europe (data source: HFA db 2003)
16.07.2007 Page 10 of 23 Version 1.0
-
8/14/2019 Bs2 Main Report v2
11/23
TECHNICAL ASSISTANCE FOR THE PREPARATION OF AROAD SAFETY PIPELINE OF PROJECTS
Draft
Figure Mortality caused by road accidents in Europe (data source: HFA db 2003)
Although some actions were taken by the Romanian authorities, the death rate in the lastyears is quit high (please see above Figure) and is on the first place in Europe with 12,81 rate(Table 2 and Figure). But the sever injuries as consequence of the transportation of thedangerous good increased the last 3 years with almost 40%. Moreover, the accidents rate onthe national roads or highways located outside of the cities areas is double that in the citiesneighbourhood areas. Most of them from these are with heavy vehicles that transportdangerous goods.
Based on national economical development and the political integration in EU in 2007, theroad transport will continue to grow with 8-10% per year till 2015. If the accidents rate
caused by the transportation of the dangerous goods will follow the same rate, in some yearsthe number of injuries will increase tremendous.
The social costs of the traffic accidents in 2003 were estimated at over 350 million euro(about 2 % from PIB), representing the losing of human lives, the expenses for re-covering of the people with physical handicaps, as well as those for financial prejudice.
16.07.2007 Page 11 of 23 Version 1.0
-
8/14/2019 Bs2 Main Report v2
12/23
TECHNICAL ASSISTANCE FOR THE PREPARATION OF AROAD SAFETY PIPELINE OF PROJECTS
Draft
4 DESCRIPTION OF THE SITUATION
The on-site visit allowed to understand the main safety issue related with this BS 02 locatedin Albesti-Paleologu on the DN1B from Ploiesti to Buzau.
16.07.2007 Page 12 of 23 Version 1.0
-
8/14/2019 Bs2 Main Report v2
13/23
TECHNICAL ASSISTANCE FOR THE PREPARATION OF AROAD SAFETY PIPELINE OF PROJECTS
Draft
a. LAYOUT OF THE ROAD SECTION ALIGNMENT
The layout and the alignment of the road section show complex junction between DN1B andDJ68 to Valea Mieilor and Albesti/Muru directions.
16.07.2007 Page 13 of 23 Version 1.0
-
8/14/2019 Bs2 Main Report v2
14/23
TECHNICAL ASSISTANCE FOR THE PREPARATION OF AROAD SAFETY PIPELINE OF PROJECTS
Draft
16.07.2007 Page 14 of 23 Version 1.0
-
8/14/2019 Bs2 Main Report v2
15/23
TECHNICAL ASSISTANCE FOR THE PREPARATION OF AROAD SAFETY PIPELINE OF PROJECTS
Draft
b.TRAFFIC AND MOBILITY SITUATION
There are problems due to the high presence of heavy traffic and to the high speed of traffic.
c. SITUATION CONDITIONS OF THE CARRIAGGEWAY AND SHOULDERS
The pavement of the road is in a fair condition but with shoulders only partially paved. Onthe other hand, there is some small presence of rutting and deformations due to the presence
of heavy traffic.
16.07.2007 Page 15 of 23 Version 1.0
-
8/14/2019 Bs2 Main Report v2
16/23
TECHNICAL ASSISTANCE FOR THE PREPARATION OF AROAD SAFETY PIPELINE OF PROJECTS
Draft
d. CONDITIONS OF THE S & M AND SAFETY BARRIER
Safety barrier are unsatisfactory. Signaling and Marking are unsatisfactory, in particular during night and bad weather conditions.
16.07.2007 Page 16 of 23 Version 1.0
-
8/14/2019 Bs2 Main Report v2
17/23
TECHNICAL ASSISTANCE FOR THE PREPARATION OF AROAD SAFETY PIPELINE OF PROJECTS
Draft
e. CONDITIONS OF THE LIGHTING
The lighting is existing only on the corner with the DJ 69 to Valea Mieilor. The lighting for the junction at whole is very poor. Moreover, many accidents were in the last years during thenight.
16.07.2007 Page 17 of 23 Version 1.0
-
8/14/2019 Bs2 Main Report v2
18/23
-
8/14/2019 Bs2 Main Report v2
19/23
TECHNICAL ASSISTANCE FOR THE PREPARATION OF AROAD SAFETY PIPELINE OF PROJECTS
Draft
g. LATERAL DITCHES AND RESTRICTION OF THE VISIBILITY OF THECARRIAGEWAY
A lateral unprotected ditch is present on one side of the road (dangerous for both vehicles and pedestrians).
H.PEDESTRIAN CROSSING
Before and after this junction doesnt exist any pedestrian crossing.
16.07.2007 Page 19 of 23 Version 1.0
-
8/14/2019 Bs2 Main Report v2
20/23
TECHNICAL ASSISTANCE FOR THE PREPARATION OF AROAD SAFETY PIPELINE OF PROJECTS
Draft
5 SAFETY DIAGNOSIS
5.1 DESCRIPTION OF THE SITUATION
The on-site visit allowed to understand the main safety issue related with this place.
There are three main subjects to be treated and resolved:1. the junctions between DN1B with DJ68
2. the pedestrian crossings
3. the bus station
The existing situation is illustrated in the next paragraph.
5.2 Junction
The DN1B intersects DJ 68 and in this junction.
The scenario is also affected by the following elements:
a. high presence of heavy traffic on DN1B
b. inappropriate geometric characteristics for operating speeds: insufficient sightdistances
c. there are only painted markings and not plastic markings; this cause lowvisibility especially during the darker seasons of the year and makes regular road woks necessary for repainting.
5.3 Pedestrian crossingsThere are not pedestrian crossings in this area.
16.07.2007 Page 20 of 23 Version 1.0
-
8/14/2019 Bs2 Main Report v2
21/23
-
8/14/2019 Bs2 Main Report v2
22/23
TECHNICAL ASSISTANCE FOR THE PREPARATION OF AROAD SAFETY PIPELINE OF PROJECTS
Draft
A.DIFFUSED OPERATIONS
Code Type of Action
A.1.1 Pavement rehabilitation
A.1.4 Improvement of Signaling and Marking
B.2.2 Improvement of the lighting system
B. PUNCTUAL OPERATIONS
Code Type of Action
B.2.1 Improvement of the junction
B.2.1 Improvement of the pedestrian crossing
A.1.2 Bus Stop rehabilitation / New Bus Stop
16.07.2007 Page 22 of 23 Version 1.0
-
8/14/2019 Bs2 Main Report v2
23/23
TECHNICAL ASSISTANCE FOR THE PREPARATION OF AROAD SAFETY PIPELINE OF PROJECTS
Draft
Annex
1. PHOTO INTER-GIS (A3)2. PRESENT SITUATION
3. DESIGN SOLUTION
16.07.2007 Page 23 of 23 Version 1.0