Page 1: Building an Observatory The building Of Rose Mountain Observatory By Daniel R. Blais

Building an ObservatoryBuilding an Observatory

The building The building Of Rose Mountain ObservatoryOf Rose Mountain Observatory

ByByDaniel R. BlaisDaniel R. Blais

Page 2: Building an Observatory The building Of Rose Mountain Observatory By Daniel R. Blais

Picking The SitePicking The Site

If you own plenty of high open space in an isolated area If you own plenty of high open space in an isolated area than skip on to the next slide.than skip on to the next slide.

The ideal location is a flat piece of land with little or no The ideal location is a flat piece of land with little or no obstruction at a decent elevation.obstruction at a decent elevation.

Calculate the costs, maintenance of property ease of Calculate the costs, maintenance of property ease of access, taxes…ect. Ensure it is within your budget or access, taxes…ect. Ensure it is within your budget or your clubs budget. Take all precautions as you would for your clubs budget. Take all precautions as you would for buying any real estate, research for liens and other legal buying any real estate, research for liens and other legal binds that may consume your time in areas you would binds that may consume your time in areas you would rather not get involved with. rather not get involved with.

Be flexible and have vision. A scrappy piece of land can Be flexible and have vision. A scrappy piece of land can turn into a swan of a location.turn into a swan of a location.

Page 3: Building an Observatory The building Of Rose Mountain Observatory By Daniel R. Blais

Breaking GroundBreaking Ground

Be sure to calculate the size of the structure and that it will meet the needs Be sure to calculate the size of the structure and that it will meet the needs for space, and comfort for yourself and other potential visitors.for space, and comfort for yourself and other potential visitors.

Once staked out, order a 16’ X 14’ X 20” slab of “REINFORCED” concrete Once staked out, order a 16’ X 14’ X 20” slab of “REINFORCED” concrete to be poured into a “sturdy” frame over a bed of gravel about 9” deep. We to be poured into a “sturdy” frame over a bed of gravel about 9” deep. We didn’t think the frame the foundation pouring folk put up was sturdy enough, didn’t think the frame the foundation pouring folk put up was sturdy enough, but they said it was fine, well, it did bow out at the sides and this made for a but they said it was fine, well, it did bow out at the sides and this made for a nasty turn of events as we had to chisel the foundation back to square nasty turn of events as we had to chisel the foundation back to square which is critical for the frame of the structure you will be building! Also ask which is critical for the frame of the structure you will be building! Also ask the cement company about their types and qualities of reinforced concrete. the cement company about their types and qualities of reinforced concrete. This concrete was made with special fibers to enhance the strength of This concrete was made with special fibers to enhance the strength of material.material.

Note: a 16” slab or less will do fine if you are in an area that is not rocky with Note: a 16” slab or less will do fine if you are in an area that is not rocky with no frost heaving's. Ensure slab has proper drainage.no frost heaving's. Ensure slab has proper drainage.

Page 4: Building an Observatory The building Of Rose Mountain Observatory By Daniel R. Blais

Beginning The Dream!Beginning The Dream!

Once the slab is squared, framing can begin.Once the slab is squared, framing can begin. If you are not a skilled carpenter (like me) it is best to have this done by If you are not a skilled carpenter (like me) it is best to have this done by

professionals who have a reputation of quality workmanship. professionals who have a reputation of quality workmanship. It may cost you more to build initially, but it will save you much money and It may cost you more to build initially, but it will save you much money and

embarrassment from mistakes or oversights in the long run.embarrassment from mistakes or oversights in the long run. I chose “L & L” construction who’s slogan was “The Finnishing Touch”. Leo I chose “L & L” construction who’s slogan was “The Finnishing Touch”. Leo

and Linda (Pictured in top right photo) a young couple recently married.and Linda (Pictured in top right photo) a young couple recently married. Leo chose ¾” plywood for the walls with standard 2X4 framing. He was Leo chose ¾” plywood for the walls with standard 2X4 framing. He was

infatuated with everything being perfectly square! I took this as a good sign.infatuated with everything being perfectly square! I took this as a good sign. Note: The concrete foundation is chiseled square along the upper edge. Note: The concrete foundation is chiseled square along the upper edge.

This was done so the plywood would not touch the concrete and wick the This was done so the plywood would not touch the concrete and wick the moisture from it thus preventing rot.moisture from it thus preventing rot.

Page 5: Building an Observatory The building Of Rose Mountain Observatory By Daniel R. Blais

Take The TimeTake The Time Take your time when building Take your time when building

the frame or having a frame the frame or having a frame built. If you rush things built. If you rush things mistakes are made, or mistakes are made, or builders will overlook quality builders will overlook quality of work for time constraints of work for time constraints you place on them! This you place on them! This phase took months patience. phase took months patience. A good idea would be to A good idea would be to document it by taking photos. document it by taking photos.

Also, in determining wall Also, in determining wall height think about your height think about your observable horizon. My walls observable horizon. My walls are less than 6’. This gives a are less than 6’. This gives a view just above the tree tops. view just above the tree tops. I used a 2X4 with one end I used a 2X4 with one end held up at varying heights held up at varying heights against the treetops to against the treetops to determine this height.determine this height.

Page 6: Building an Observatory The building Of Rose Mountain Observatory By Daniel R. Blais

L & L construction wisely chose to build the roof frame onto the casters so L & L construction wisely chose to build the roof frame onto the casters so no crane or A frame was needed to hoist a heavy roof onto the walls. no crane or A frame was needed to hoist a heavy roof onto the walls.

Note: that the roof tracks rest on the casters in upper left of photo. Note: that the roof tracks rest on the casters in upper left of photo.

Page 7: Building an Observatory The building Of Rose Mountain Observatory By Daniel R. Blais

Casters And RailsCasters And Rails Note: upper picture shows casters on Note: upper picture shows casters on

“roll off” posts. The choice of casters is “roll off” posts. The choice of casters is critical and I highly recommend one inch critical and I highly recommend one inch wide casters that use Bearings! Stay wide casters that use Bearings! Stay away from sleeved casters which where away from sleeved casters which where originally installed (shown upper left originally installed (shown upper left photo). These cheap sleeved casters photo). These cheap sleeved casters made the roof a real work out to roll back made the roof a real work out to roll back and almost impossible for one man to do. and almost impossible for one man to do. Bottom left photo and next slide show the Bottom left photo and next slide show the “better” wheel. “better” wheel.

The steel rails are of 1/8” steel angle the The steel rails are of 1/8” steel angle the length of the buildings roof and placed on length of the buildings roof and placed on the roof portion of the structure allowing the roof portion of the structure allowing gravity to lend a hand. The roof was built gravity to lend a hand. The roof was built upon this frame making it less of a upon this frame making it less of a project to complete. I would also project to complete. I would also recommend deeper tracks, than shown, recommend deeper tracks, than shown, but these are suffice and lessen the but these are suffice and lessen the potential friction against the sides of the potential friction against the sides of the wheels when rolling the roof back onto wheels when rolling the roof back onto the posted portion of the observatory. the posted portion of the observatory. Changing out the casters was a simple Changing out the casters was a simple feat, just roll the roof back replace feat, just roll the roof back replace casters, roll it the other way and replace casters, roll it the other way and replace casters.casters.

Page 8: Building an Observatory The building Of Rose Mountain Observatory By Daniel R. Blais

Rails Attached Under RoofRails Attached Under Roof Top right photo shows the steel angle iron Top right photo shows the steel angle iron

“track” that is attached to roof assembly. “track” that is attached to roof assembly. These are 1” Heavy duty polyurethane These are 1” Heavy duty polyurethane wheels with bearings and it is the way to go wheels with bearings and it is the way to go here, if you want to be able to roll the roof here, if you want to be able to roll the roof back by yourself. (Less friction the better). back by yourself. (Less friction the better). The black bar at the bottom right of this The black bar at the bottom right of this photo is a heavy duty plastic teflon material photo is a heavy duty plastic teflon material that acts as a flap to seal and also give way that acts as a flap to seal and also give way when rolling the roof.when rolling the roof.

See The Red Christmas Rope Lights? They See The Red Christmas Rope Lights? They wrap around the whole inside of the structure wrap around the whole inside of the structure and used for lighting the observatory at night and used for lighting the observatory at night when the need to move around at night in the when the need to move around at night in the observatory to recheck charts, or change out observatory to recheck charts, or change out eyepieces. This will save your night vision.eyepieces. This will save your night vision.

Bottom right photo shows solid soffits with a Bottom right photo shows solid soffits with a white teflon trim against the wall, creating a white teflon trim against the wall, creating a decent seal. This will help keep birds and decent seal. This will help keep birds and insects out. Note The cut away area or insects out. Note The cut away area or caster groove. A black flap extends along caster groove. A black flap extends along the front and rear of the building to enhance the front and rear of the building to enhance the sealing effect to keep creepy critters out. the sealing effect to keep creepy critters out.

Page 9: Building an Observatory The building Of Rose Mountain Observatory By Daniel R. Blais

Exterior Finishing TouchesExterior Finishing Touches

I chose cedar slats for looks and durability. I also I chose cedar slats for looks and durability. I also chose to paint the observatory with a light color and chose to paint the observatory with a light color and placed a white corrugated roof, to keep the placed a white corrugated roof, to keep the observatory from collecting to much heat in the observatory from collecting to much heat in the summer months. Too much collected heat, equates to summer months. Too much collected heat, equates to waiting a longer period of time for stabilized air waiting a longer period of time for stabilized air currents at night. This is critical for large reflectors.currents at night. This is critical for large reflectors.

Page 10: Building an Observatory The building Of Rose Mountain Observatory By Daniel R. Blais

Other Ideas To NoteOther Ideas To Note

(upper left photo): I think it’s a good idea to keep the external (upper left photo): I think it’s a good idea to keep the external casters protected when I am not using the observatory. A length of casters protected when I am not using the observatory. A length of plastic gutter material was purchased and cut away on one side to plastic gutter material was purchased and cut away on one side to allow sliding the whole length over the exposed wheels.allow sliding the whole length over the exposed wheels.

(upper left photo): You may create roof dead bolt locks such as (upper left photo): You may create roof dead bolt locks such as shown above (in several spots preferably). Also cable harnesses shown above (in several spots preferably). Also cable harnesses connecting the roof to walls through eyebolts is a good idea! If you connecting the roof to walls through eyebolts is a good idea! If you live in a hurricane zone or storm ridden area, this is a must! All can live in a hurricane zone or storm ridden area, this is a must! All can be undone when you prepare for the nights viewing session, which be undone when you prepare for the nights viewing session, which will be done on clear calm nights of course.will be done on clear calm nights of course.

Page 11: Building an Observatory The building Of Rose Mountain Observatory By Daniel R. Blais

Little odd and ends…..Little odd and ends….. Upper Left Photo: Note the bulb holder (15 watt Upper Left Photo: Note the bulb holder (15 watt

bulb) hooked onto the rear of the reflector mirror… bulb) hooked onto the rear of the reflector mirror… this prevents condensation or (acid) dew from this prevents condensation or (acid) dew from deteriorating the mirror during temperature change deteriorating the mirror during temperature change condensation. Remember the building is not air condensation. Remember the building is not air tight. Note the platform ladder on wheels to the tight. Note the platform ladder on wheels to the right. I bought and assembled this so I could sit in right. I bought and assembled this so I could sit in comfort while observing the zenith where the skies comfort while observing the zenith where the skies are the clearest. A desk and chair along with are the clearest. A desk and chair along with wastepaper basket and small file cabinet is always wastepaper basket and small file cabinet is always good to have near at hand.good to have near at hand.

When all is ready you have an awesome place to When all is ready you have an awesome place to enjoy hours at your hobby in observing the most enjoy hours at your hobby in observing the most magnificent manifestations in nature known to magnificent manifestations in nature known to man. You can always add and enhance your man. You can always add and enhance your structure as time and money allow. My wife did not structure as time and money allow. My wife did not like the look of this “shed” without windows, so I like the look of this “shed” without windows, so I have commissioned four stained glass windows have commissioned four stained glass windows over the winter, and plan to have them installed over the winter, and plan to have them installed latter this spring. I think these windows will add to latter this spring. I think these windows will add to the beauty of my 2the beauty of my 2ndnd home! Three that are home! Three that are completed are shown on next slide.completed are shown on next slide.

Page 12: Building an Observatory The building Of Rose Mountain Observatory By Daniel R. Blais

Keep Enhancing Your Work AreaKeep Enhancing Your Work Area

These are three of the four and a half windows that I have These are three of the four and a half windows that I have completed. Mars and a narrow moon window are presently being completed. Mars and a narrow moon window are presently being worked on. When the snow thaws I will install them.worked on. When the snow thaws I will install them.

Speaking of Snow THAW! ONE MORE POINT!........Speaking of Snow THAW! ONE MORE POINT!........

Page 13: Building an Observatory The building Of Rose Mountain Observatory By Daniel R. Blais

A final note!A final note!

Always ensure you or your club members are prepared to keep up Always ensure you or your club members are prepared to keep up with maintenance and accessibility of the observatory. I must really with maintenance and accessibility of the observatory. I must really love this hobby or maybe I am just crazy as my wife believes! Either love this hobby or maybe I am just crazy as my wife believes! Either way… I am having fun at it… good luck in your endeavors!way… I am having fun at it… good luck in your endeavors!