bus body building
TRANSCRIPT
![Page 1: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/1.jpg)
![Page 2: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/2.jpg)
PRESENTED BY
K.S.SYED AFSALD.THIRUNAVUKKARASUB.SWARNA A TULASIA.KEERTHANA NAGADEVIR.JAYA LAKSHMI II B.comKongu Arts & Science College Erode
![Page 3: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/3.jpg)
ORIGIN OF BUS BODY BUILDING In the year 1952 LG.Balakrishnan started LGB Coach .
Gained the knowledge of this process from G.D.NAIDU who dismantled a bus,bought from foreign.
In TamilNadu Karur was considered as its origin place.
In 1972 the employees & workers scattered from LGB & started their own coaches.
Karur is considered as suitable place because required raw materials availability is more.
![Page 4: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/4.jpg)
CHASSISTATA,LEYLAND,EICHER are chassis manufacturers
![Page 5: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/5.jpg)
CHASSISMID POINT OVER HANG
![Page 6: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/6.jpg)
CHASSIS CHASIS VARIETY:
a)210 inchesb)222 inchesc)205 inchesd)218 inchese)232 inches/4200mm
The chassis are handed over to the company with the engine number and registration number on their side.
![Page 7: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/7.jpg)
KITSKits are readymade pre-welded angles.Kits are meant for uniform model buses.
ADVANTAGES:The main advantage in the kit model is that
the company need not wait for the chassis from the customer.
Working days are less in doing kit model buses.
![Page 8: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/8.jpg)
KITSFLOOR KIT ROOF KIT
![Page 9: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/9.jpg)
KITSLEFT & RIGHT KITS ALL KITS ASSEMBLED
STAGE
![Page 10: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/10.jpg)
ASSEMBLING STAGEWELDED ANGLES furnished with SAL WOOD ASSEMBLED KIT
![Page 11: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/11.jpg)
FIBRE REINFORCED PLASTICSTo avoid water leakage fibre reinforced plastics are used.
This fibre materials reduces weight and helps in mileage
These fibres are made out of readymade moulds of different shapes.
![Page 12: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/12.jpg)
FIBRE RE-INFORCED PLASTICSA chemical cote called PVA is applied. This
cote will be converted as thin polythene sheets within few minutes.
Then a mixture of Gel Cote,Catalyst,Resin and COBOLT are applied.
This fibre is a non heat conductor.Can repair the damages easily,need not be
replaced entirely
![Page 13: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/13.jpg)
FIBRE REINFORCED PLASTICSFIBRE MADE FRONT COWL
FIBRE used for FRONT COWL & DASH BOARD
![Page 14: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/14.jpg)
SHEET METAL
This is an alternative for FIBRE.These are fixed over the KITS.Each metals are joined through
BEEADING.These are more strong than FIBRE.It can only be replaced cannot be
repaired.
![Page 15: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/15.jpg)
SHEET METAL FRONT PANELLING REAR PANELLING
![Page 16: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/16.jpg)
SHEET METALsheet metals are placed for outer PANELLING
Between metal & angles, THERMOCOAL are placed as heat resistant.
![Page 17: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/17.jpg)
FLOORING
DENSIFIED PLYWOOD are fixed for flooring .Each PLYWOOD are attached through BEEADING.Diamond shaped, plain,round designs plywoods are available.
![Page 18: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/18.jpg)
ROOFINGPLYWOOD FIXED BEFORE ELECTRICAL WORKS
COMPLETION OF ROOFING WORK after ELETRICAL WORKS
![Page 19: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/19.jpg)
ELECTRICAL WORKS
This works would be done after space allocated for
TV sets,cabinet for players & speakers
Tube Lights & Lamps in roof Decorative lights placed in roof Lamp placed in Steps
![Page 20: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/20.jpg)
ELECTRICAL WORKS
This work involves major human risk.Time consuming too long.
![Page 21: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/21.jpg)
FITTINGS57+2 seats only as per GOVT.rulesSeats LightsIGR & PostLaftCrathyCurtains
![Page 22: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/22.jpg)
INNER FITTINGSDriver partitionSeatsPost,IGR,CrathyHandleLightingsSound systemVideo provisionBattery box Lafts on either sidesVentilator
![Page 23: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/23.jpg)
DRIVER PARTITION
Route board & connection boardAlmira Engine bannet Mirror, first aid box, bottle holderPlayer cabinetUPS,Swith boardSeat facing driver
![Page 24: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/24.jpg)
FITTINGSJack knife entrance door Expertise IGR works &
ventilator
![Page 25: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/25.jpg)
OUTER FITTINGS Front & rear glassDoom LightIndicator sWiper, Name boardRear view mirrorWindows Entrance shutterLaddersluggage scrollersRear light
![Page 26: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/26.jpg)
WATER LEAK TEST BOOTHThis is used to test water leakage after sheet metal is fixedWater will be sprayed out from EVERY NOOK & CORNERThis work will be held before painting
![Page 27: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/27.jpg)
PAINTINGThis process is done after fitting stageFinancial risk is included in this workModerate climate is friendly to painting
process RISK FACTORS :-Air pollutionRainfall Workers in-alertnessUnusual sunlight
![Page 28: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/28.jpg)
PAINTINGPATTY WORK BEFORE PAINTING
![Page 29: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/29.jpg)
BOOTHHOT DRIER PAINT BOOTH
INSIDE THE BOOTH
![Page 30: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/30.jpg)
COMPLETED PAINTING WORK
![Page 31: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/31.jpg)
EXTRA SPACES SPACE FOR TOOLS SPACE FOR LUGGAGE
![Page 32: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/32.jpg)
INVESTMENTS FIXED CAPITALPLANT & MACHINERY = Rs 25,00,000LAND & BUILDING = Rs 30,00,000(2
acres)
WORKING CAPITALRs 20,00,000Based on financial strength of the owner.Most of the existing companies are running
as a medium scale business.
![Page 33: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/33.jpg)
CONSTRUCTION COST DETAILS City buses -Rs.4,40,000 Moffisil buses -Rs.4,75,000
Generator buses -Rs.5,50,000 Institutional buses-Rs.5,00,000 Caravons -Rs.8,00,000 to Rs.15,00,000 Mini buses& omni buses -Rs.3,00,000 Travel buses -Rs.6,00,000
![Page 34: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/34.jpg)
FOR COMPLETION OF WORKTime schedule for various kinds of
buses:- City buses : 10 days.Mofissil buses : 10-12 days.Caravon buses : 40-45 days.Other types(Institutional & travels):Around 20
days.
![Page 35: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/35.jpg)
PROBLEMS OF EMPLOYEESProtection to human life risk is provided only as a voluntary measure.
No regularity of transaction(as contract basis).
No job security.Working without training is impossible
![Page 36: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/36.jpg)
PROBLEMS OF MANAGEMENTNo labour flow though demand is
tremendous. Mechanisation is not possible due to
non-standardisation.Training of employees should be done
mostly by companies.Associations are strengthening only at
recent times.
![Page 37: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/37.jpg)
ASSOCIATIONAssociation of Bus body builders exist to
bring unity among companies.They even arrange foreign trips for industrial
visit to members at their own expenses.As associations are not functioning effective
CLUSTERS are formed by interested groups.CLUSTERS are planned to be helpful through
subsidies.
![Page 38: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/38.jpg)
EMPLOYERS SURVEY1.EMPLOYMENT OPPORTUNITY
![Page 39: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/39.jpg)
2.RISK IN WORK
![Page 40: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/40.jpg)
3.PREFERRED RISK POLICY PROVIDED BY THE COMPANY
![Page 41: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/41.jpg)
4.MECHANIZATION LEADS TO DECREASE IN EMPLOYMENT OPPORTUNITY
![Page 42: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/42.jpg)
5.Preference for training
![Page 43: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/43.jpg)
COMPLETED BUS ORDINARY BUS DOUBLE TUCKER BUS
![Page 44: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/44.jpg)
CERTAIN EXISTING COMPANIES
MAARUTHI COACH BUILDERS,KARURATAL COACH BUILDERS,KARUR SAKTHI COACH BUILDERS,KARUR INDIAN COACH BUILDERS,KARURPEETEE COACH BUILDERS,KARURSTAR COACH BUILDERS,KARURSUN COACH BUILDERS,ERODE
![Page 45: Bus Body Building](https://reader038.vdocuments.net/reader038/viewer/2022102402/544bb918b1af9f7b538b460a/html5/thumbnails/45.jpg)
CONCLUSIONThe main aim of this project is to invite
youngsters to do this business.A business having sufficient PROFIT &
stand as a SERVICE SECTOR.Hope you all had a good time & a clear
picture about this business.Thus we have a new pathway for our
FUTURE.